2014/08/18 Equalizer Bar - Install (KENR5620)

SMCS - 7206 i05894326

Installation Procedure
Required Tools
Tool Part Number Part Description Qty
F 9S-5563 Driver Gp 1
8S-7650 Cylinder As 1
350-7768 Electric Hydraulic Pump Gp (115V) -
350-7769 Electric Hydraulic Pump Gp (230V) -
316-1489 Double Acting Cylinder 1
5P-4776 Puller Stud 1
G 5P-8714 Stud 1
6V-4871 Reaction Bar 1
1A-1935 Full Nut 1
3K-5234 Hard Washer 1
8S-7615 Pin 1
8S-7620 Base As 1
H - Loctite Graphite-50 Anti-Seize Lubricate -
J 129-1938 Grease Cartridge -

Table 1

When you are using hydraulic cylinders and puller studs, always
ensure that the rated capacity of the puller stud meets or
exceeds the rated capacity of the hydraulic cylinder. If the puller
stud does not meet or exceed the rated capacity of the hydraulic
cylinder, a sudden failure of the puller stud could occur. The
sudden failure of the puller stud could result in personal injury
or death.

Illustration 1 g03713785
Note: Install equalizer bar (1) with the side that is marked "FRONT" toward the front of the machine.

1. Position equalizer bar (1) under the machine.

2. Attach a suitable lifting device to one end of equalizer bar (1). The weight of equalizer bar (1) is approximately 771 kg (1700 lb). Align the end of equalizer bar (1) with the track roller frame. Apply
oil to the inside diameter of the equalizer bar seals.

3. Use Tooling (F) to install equalizer bar end pin (8). Install the spacer and the retaining ring on equalizer bar end pin (8).

Illustration 2 g03713789

4. Tighten bolt (9) to a torque of 1800 ± 250 N·m (1328 ± 184 lb ft).

5. Tighten bolt (10) to a torque of 1800 ± 250 N·m (1328 ± 184 lb ft).

6. Torque bolt (9) again to a torque of 1800 ± 250 N·m (1328 ± 184 lb ft).

7. Torque bolt (10) again to a torque of 1800 ± 250 N·m (1328 ± 184 lb ft).

8. Repeat Step 4 thru Step 7 for the other side.

Illustration 3 g03713797
Note: Make sure that equalizer bar seals (12) are in the NEUTRAL position before you operate the machine.

9. With a rubber mallet. tap on the center of equalizer bar end pin (8) in order to shake equalizer bar seals (12) to the NEUTRAL position. If equalizer bar seals (12) are not in the NEUTRAL
position, repeat Step 9 until equalizer bar seals (12) are in the NEUTRAL position.

10. Use a flat bar in order to ensure that equalizer bar seals (12) are in a neutral position. Equalizer bar seals (12) must not bulge.

Illustration 4 g03713800
Note: The spacer with the large diameter must be installed between equalizer bar (1) and the rear saddle. The spacer with the small diameter must be installed between equalizer bar (1) and the
front saddle.

11. Put the spacers in position on each side of equalizer bar (1).

12. Attach a suitable lifting device to the free end of equalizer bar (1). Use the suitable lifting device to raise equalizer bar (1).

13. Align equalizer bar (1) with the hole in equalizer bar saddle (10). Apply Tooling (H) on the rear diameter of center pin (7). Apply Tooling (H) to the bores of equalizer bar saddle (10).

14. Apply Tooling (J) onto the center bearings.

15. Position equalizer bar center pin (7) in equalizer bar saddle (10).
Note: Threaded Rods cannot be used with Hydraulic Cylinders as Tooling.

16. Use Tooling (G) to install equalizer bar center pin (7). Equalizer bar center pin (7) should be even with the surface of equalizer bar saddle (11).

Illustration 5 g01413482

17. Install plate (5). Install bolts (3). Install bolt (6). Connect hoses (2). Connect hose assemblies (4).

18. Refer to the Operation and Maintenance Manual for all fluid capacities and proper filling procedures.

End By:

a. Install the track roller frame (left or right).

b. Install the equalizer bar pads.

AMA1-UP, GEB1-UP, JEL1-UP, JNS1-UP, MDG1-UP, TPB1-UP

PIP-10891755
2021/08/03
21:00:10+02:00
i04322291
© 2021 Caterpillar Inc.