Key Personnel

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

KEY PERSONNEL

(FORMAT OF BIO-DATA)

Give the detailed information of the following personnel who are scheduled to be assigned as full-time
field staff for the project. Fill up a form for each person.

- Authorized Managing Officer / Representative

- Sustained Technical Employee

1. Name : DENISE T. LEGASPI____________________________

2. Date of Birth : NOVEMBER 8, 1979____________________________

3. Nationality : FILIPINO____________________________________

4. Education and Degrees : BS CIVIL ENGINEERING________________________

MASTER OF ENG’G -MAJOR IN CIVIL ENGINEERING___

5. Specialty : STRUCTURAL ENGINEERING_/ CONSTRUCTION______

CONSTRUCTION SAFETY

6. Registration : LICENSED CIVIL ENGINEER______________________

7. Length of Service with the Firm : _0__ Year from _2_ (months) _____ (year)
To ____ (months) _____ (year)

8. Years of Experience : 19 YEARS__________________________

9. If Item 7 is less than ten (10) years, give name and length of service with previous employers for
a ten (10)-year period (attached additional sheet/s), if necessary:

Name and Address of Employer Length of Service

LEGASPI DESIGNS & CONSULTANCY __7__year(s) from JULY 2014 to JUNE 2021__
PRIVATE PRACTITIONER (PROF. SERVICE) _5.75_year(s) from SEPT 2008 to JUNE 2014__
BICOL UNIVERSITY__________ _6.50_year(s) from FEB 2002 to AUGUST 2008

10. Experience:

This should cover the past ten (10) years of experience. (Attached as many pages as necessary
to show involvement of personnel in projects using the format below).
1. Name : DENISE T. LEGASPI____________________________

2. Name and Address of Owner : LEGASPI DESIGNS AND CONSULTANCY____________

3. Name and Address of the


Owner’s Engineer : MERCENARIO B. LEGASPI - Calzada, Guinobatan,
Albay
(Consultant)

4. Indicate the Features of Project


(particulars of the project
components and any other particular
interest connected with the project): STRUCTURAL EVALUATION/DESIGN/INSPECTION OF
VARIOUS INFRASTRUCTURE PROJECTS

5. Contract Amount Expressed in


Philippine Currency : N/A_______________________________________

6. Position : STRUCTURAL ENGINEER / INSPECTOR____________

7. Structures for which the employee


was responsible : N/A_________________________________________

8. Assignment Period : from _______ (months) _______ (years)


: to _______ (months) _______ (years)

_____DENISE T. LEGASPI______
Name and Signature of Employee

You might also like