Professional Documents
Culture Documents
Nitric Oxide Competency Document Feb 2010
Nitric Oxide Competency Document Feb 2010
Assessor’s
Performance Criteria Score Comments
Signature
PRE-USE PROCEDUES
Initial connections and leak test
- Connect regulator to cylinder
- Connect regulator to INOvent®
- Perform high pressure system leak test (regulators)
Cylinder Complete procedure for changing INOmax cylinder and purge regulator
Change assembly.
Explain what steps you would undertake to address the low nitric oxide ppm
Alarm.
Trouble
shoot
Scoring
Below expectation for Borderline for completion Meets expectations for Above expectations for
Unable to Comment
completion of post of post completion of post completion of post
1 2 3 4 5 6 U/C