1.

General

1.1. Introduction
National Iranian Oil Engineering and Construction Company(NIOEC) intend to carry
out design, Procurement and construction of sour crude transfer pipeline from Sabzab
to Rey .The pipeline is approximate 630 Km in length which includes six pump
stations, one reduction station and one terminal.

1.2. Definition

Project: Abadan/ Rey


ey Pipelines Sabzab/Rey Pipeline Project
Client:: National Iranian Oil Engineering and Construction Company (NIOEC)
Client Consultant: Tarh Andishan Consultant Engineers Co.
EPC Contractor:: Ahvaz Nasr Misagh Co., Scetiran Consultant Engineers Co., Nardis
Co.

1.3. Project Scope


The purpose of the project is to transfer crude from Sabzab in Khuzestan Province to
Rey Terminal in Tehran.
Length of pipeline is approximately 630 Km and Crud
Crudee is transferred from Sabzab
pump station to Tange
Tange-Fanni
Fanni via 30” pipeline and after that by reduction in flow,crude
transferred to Asar pump Station by 26” pipeline. After Asar pump Station crude
transferred from Asar and passes Pale
Pale-Baba, Razan and Shazand
d pump stations. After
Shazand pump station crude oil transferred by 18” pipeline to Shahid Mahdavi
reduction station and after that enters to Rey terminal.