The vendor's scope of work includes following local regulations, obtaining approvals, engineering and fabrication design, supplying materials, raw materials, consumables, calibration, quality control tests, providing facilities, packing and marking, transportation, erection, pre-commissioning, commissioning, supervision, training, performance guarantees, final documentation, and supplying spare parts for commissioning, start-up and 2 years of operation. The purchaser's failure to fully comment on vendor documents does not constitute acceptance of the contents unless expressly stated.
The vendor's scope of work includes following local regulations, obtaining approvals, engineering and fabrication design, supplying materials, raw materials, consumables, calibration, quality control tests, providing facilities, packing and marking, transportation, erection, pre-commissioning, commissioning, supervision, training, performance guarantees, final documentation, and supplying spare parts for commissioning, start-up and 2 years of operation. The purchaser's failure to fully comment on vendor documents does not constitute acceptance of the contents unless expressly stated.
The vendor's scope of work includes following local regulations, obtaining approvals, engineering and fabrication design, supplying materials, raw materials, consumables, calibration, quality control tests, providing facilities, packing and marking, transportation, erection, pre-commissioning, commissioning, supervision, training, performance guarantees, final documentation, and supplying spare parts for commissioning, start-up and 2 years of operation. The purchaser's failure to fully comment on vendor documents does not constitute acceptance of the contents unless expressly stated.
Should Purchaser fail to comment, or only partially comment, upon Vendor document, this shall
not be construed as an acceptance of the content of such document unless expressly provided.
The Vendor scope of work shall be as follow:
Local Regulations too follow during contract execution Obtaining governmental Approval (If any) Engineering Design (detail design & Fabrication Design) Supply of bulk Materials farming parts of the equipment/material Supply of bulk Materials to be used within the physical battery limit of the Equipment/Material.
Supply of Raw Materials
Supply of Consumables (like fasteners and accessories ) Calibration of equipment/material and tools Non-destructive destructive tests and other quality control (test and inspection) measures Facilities (accommodation, accommodation, office space, etc.) to be provided to buyer/client personnel during execution contract.
Packing & Marking
Transportation & Delivery (time, location, insurance, etc.) Erection at the construction Pre-commissioning commissioning and Commissioning
Supervisionn of Erection at the construction
Training of the client's personnel Performance guarantee Final documentation (vendor data pack) Spare parts required for commissioning & start up Spare parts required for 2 years operation