Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

b.

Two (2) Years Operation Spare Parts:


Vendor shall recommend the spare required for 2 years operation.

16.2. SPECIAL TOOLS


Vendor shall recommend the Latest price list of one complete set of special tools and devices
necessary, for the maintenance (All Levels) of the equipment.

16.3. PAINTING
Painting shall be done on the basis of Cli
Client’s specification and IPS standard.

17. DOCUMENTATION

17.1. DOCUMENTS TO BE PREPARED BY VENDOR


All documents and drawings shall be in English with System of Units specified in the project
specifications.
All documents shall be editable by MS
MS-Office software or other
ther regular assessable software.
Vendor shall provide the purchaser with the documents specified in “Vendor Data
Requirements”, but not limited to.
All documents, preliminary or final, are to be stamped and signed by supplier.
Failure in dispatch of the required
equired documents shall cause the supply to be considered as
unfulfilled.
Purchaser’s approval does not relieve Vendor, in any way, from his obligation to fulfill the
requirements of the purchase order documents.
All Vendor drawings and documents shall be in English language.
All drawings and documents are to be identified as follows:
Owner’s name:
Contractor: PC Contractor Name
Plant:

You might also like