Bar Bending Schedule OF Box Culvert
Bar Bending Schedule OF Box Culvert
Bar Bending Schedule OF Box Culvert
a b e
g
c
H j
B
h i c
f L
Top slab 1
Top steel a 20 mm f @ 152 mm c/c 5.69 1 10.68 70 2.469 1850
Bottom steel b 20 mm f @ 203 mm c/c 5.69 1 10.68 53 2.469 1400
Distribution j 12 mm f @ 203 mm c/c 10.68 2 5.54 54 0.889 270
Thickness T = 381 mm Clear Length 4860 mm Total Length 5622 mm
Bottom slab 1
Top steel h 20 mm f @ 203 mm c/c 5.692 1 10.68 53 2.469 1400
Bottom steel i 20 mm f @ 152 mm c/c 5.692 1 10.68 70 2.469 1850
Distribution j 12 mm f @ 152 mm c/c 10.68 2 5.54 72 0.889 360
Thickness T = 381 mm Clear Length 4860 mm Total Length 5622 mm