A.

Rajendran
Light Driver

A.Rajendran Focused, organized driver with a great safety record and 10 years of
experience driving for established companies. Deeply familiar with all applicable
state and federal safety guidelines, including regulations concerning hazardous
freight and bulk liquids. Excellent driver who plans trips for maximum efficiency.
Great communication skills, with a friendly and professional demeanor at all
times.
Educational Qualification : Bachelor of Technology (Mechanical Engineering)

PROFESSIONAL EXPERIENCE:

S.No Company Name / Project Name Position Duration Client

Mina Abdulla Debottlenecking of April 2022 to Till KNPC / MAB


Mechanical Engineer
1 Coker Unit 20 Date

2 GOPCO Nitrogen & Oxygen Plant April 2021 to GOPCO


Mechanical Engineer
Construction Works March 2022
KNPC /
Electromechanical Works for the
3 Process Sub-area of the EPC & C of Mar 2019 to Tecnicas
Mechanical Engineer
GT5 Project, MAA Refinery, April 2021
Reunidas
Kuwait
EPC of Balance Activities of New Mar 2017 to
4 AGRP Project, MAA Refinery, Mechanical Engineer Aug 2018 KNPC / MAA
Kuwait
May 2016 to
5 M/s. Sai Preci Tech (Mechanical Vizag Steel
Mechanical Engineer Feb 2017
Construction Activities), India Plant

Presently Working:
Company : Gulf Spic General Trading & Contracting Company W.L.L, Kuwait
Position : Mechanical Engineer
Project : De-Bottlenecking of Coke in Unit-20 MAB Refinery(Kuwait)
Client : KNPC-MAB

Previous Experience:

Company : Gulf Spic General Trading & Contracting Company W.L.L, Kuwait
Position : Mechanical Engineer
Project : GOPCO Nitrogen & Oxygen Plant Construction Works

Emp # 16580 //Server/Project cv’s/ Curriculum Vitae


A.Rajendran
Light Driver

Client : GOPCO

Previous Experience:

Company : Gulf Spic General Trading & Contracting Company W.L.L, Kuwait
Position : Mechanical Engineer
Project : GT-5 Project, MAA Refinery (Kuwait)
Client : TECNICAS REUNIDAS/KNPC

Previous Experience:

Company : Gulf Spic General Trading & Contracting Company W.L.L, Kuwait
Position : Mechanical Engineer
Project : EPC of balance activities of NAGRP facility in MAA Refinery(Kuwait)
Client : KNPC-MAA

Previous Experience:

Company : M/s. Sai Preci Tech, India


Position : Mechanical Engineer
Project : Mechanical and Piping works at Blast Furnace & Rolling Mills
Client : Vizag Steel Plant

RESPONSIBLITIES:

 Action for commencement of execution of work coordinating with Client, other disciplines and Subcontractors
under the Direction by Piping lead and HOD.
 Responsible for guiding, training, and effective supervision of assigned personnel.
 Associated closely in review of P&ID, Isometrics & various piping related documents, follow Up Contractors
Managers and supervisors for expedite the erection of piping and fabrication status for execution.
 Review and study the latest issue status of "For Construction Drawings, Specifications and Procedure / Quality
Manuals for Construction" and expedite issuance of drawings and other.
 Coordinate with engineering for design documents, contractors for expedite the erection jobs, materials
controller for field materials like field run pipes, fittings fabrication shop for spools, quality departments for
ensure the quality and coordinate with civil, structural, electrical engineers for site collision problems.
 Study and understand project specification, scope of work and scope of supply.
 Plan work to meet the required schedule with minimum use of overtime.

Emp # 16580 //Server/Project cv’s/ Curriculum Vitae


A.Rajendran
Light Driver

 Coordinate all job related to Safety Department before commencing of every single task and HSE
Implementation in the production activities.
 Ensure safety practices on site report in routine observation reports cases of good or bad practices Which might
affect the safety on site
 Studies production schedules and estimates worker hour requirements for completion of job Assignment.
 Attend weekly meeting with client & subcontractor to discuss weekly progress achieved and any Other
Construction issues.
 Reporting the status of work and problems resolution, progress and Collect the quantity of work Accomplished
to Project Manager.
 Responsible to coordinate of interfacing work with other discipline.
 Direct subcontractors and monitor on the matter of Productivity, actual progress and resource mobilization
(workforce, construction equipment and tools) to meet with plan. Execution plan, procedures, schedule and
progress.
 Monitor of daily and weekly work progress. Safety work performance and weekly safety inspection and
Clearance of used materials (immediate housekeeping).
 Submission of progress reports effectively & accurately.
 Prepare and issue the "Job Confirmation Sheet" to clients for the additional/modification work. Prepare
and issue the "Site Instruction" to subcontractors for the additional/modification work. Initiate of
construction execution plan target.
 Organize and set up piping data sheet for piping works control and monitoring. Instruct all related supervisor to
Maintains and update the data timely.
 Organize piping test group to control and execute piping test activity such as test package Preparation, punch
List, pressure test and reinstatement.
 Establish sequence of priority system for piping completion with related section, ensure work and Materials are
Plan in accordance with the same sequence.
 Organize and control field fabrication activities in small bore and big bore piping fabrication.

 Authorized Permit to Work (PTW) Acceptor and authorized valuator for contractor workers.

 Entrusted with the onus of carrying out erection, inspection, testing and commissioning various piping Systems
as per isometrics.
 Activity involved in mechanical inspection of the system as per P &ID, test packages, turnover package
clearance and preparing punch list. Coordination with all discipline, for successful completion of project
in time and schedule.
 Planning & execution of Pre-Commissioning activities like Air Blowing, Rupture Blasting, water
Flushing.
 Mark-up P&ID preparation identified the temporary spool & Temporary fitting required for Pre-
Commissioning activity by fabrication and delivery to the site.
 Air Blowing, Rupture Blasting and Water flushing Scheme Preparation and Execution.
 Co-Ordination with the PD & Operational Team for close out the Pre-Comm Activities.
 Blowing, flushing of pipelines under pre-commissioning activities after completion of hydro test of
pipe line.

Emp # 16580 //Server/Project cv’s/ Curriculum Vitae


A.Rajendran
Light Driver

 Exercising professional and technical competence in order to monitor the quality of work Under Progress and
certifying the contractor's work for billing.
 Exercising professional and technical competence in order to monitor the quality of work under Progress and
certifying the contractor's work for billing.
 Been involved in Recruitment of manpower for various projects on behalf of the firm in which I worked at that
time.
 Prepared Technical Query with field Sketches as per site requirements and Carried out Rerouting.
 Involved in piping Mechanical clearance, hydro test, re-in-statement and box up, pre Commissioning and
Commissioning activities.
 Involved in recruitment process of manpower required for the projects by conducting various assessments.

PERSONAL DETAILS:

Age : 28

Nationality : Indian

Civil ID No : 294102602199

Emp # 16580 //Server/Project cv’s/ Curriculum Vitae