PROTOCOL OF SITE ACCEPTANCE TEST
AND HANDING OVER
A) General
The upkeep work in accordance with the regulations serves to preserve or to restore the specified
condition of the fire alarm system, which also includes restoring the rated sensitivity of the detectors. This
optimisation of the response sensitivity of the detectors not only improves the operational readiness of the
system for the early detection of fire, but also enhances the sensitivity of the system to unpermissible
sources of deception, which are to be avoided.
As we have no influence on the operating and ambient conditions in which the system is installed, we draw
attention to the fact that corresponding deception variables deriving from the operating environment are to
be avoided in respect of the criteria for the detectors. Sources of deception are for example welding /
burning ; exhaust gases from internal-combustion engines ; process-related concentrations of aerosols or
dust ; emissions through ventilation ducts ; gases/vapours ; non-compliance with the ban on smoking.
B) RELATED DOCUMENTS
System must be checked according to the following documents with the latest release / revision
Page 2 von 23
PROTOCOL OF SITE ACCEPTANCE TEST
AND HANDING OVER
Page 3 von 23
PROTOCOL OF SITE ACCEPTANCE TEST
AND HANDING OVER
D1) Detectors:
Clean the Fire Panel, check all clamping joints to make sure they are tight [ _____]
Test the proper function of all buttons and switches by actuating them [ _____]
Check the setting values of all detector alarm, control and monitoring lines by
measuring (line voltage, line current, fault threshold) [ _____]
Then check all detector alarm, control and monitoring lines for indications of
fire, wire break and/or short-circuit by means of the test switches (only FMZ
/ 5000) [ _____]
In intrinsically safe circuits, check the Zener barriers for effectiveness by
measuring [ _____]
Measure the line input voltage [ _____]
Measure and adjust the output voltage on the power supply unit [ _____]
Check and adjust the charging voltage [ _____]
Check voltage L1 and N against ground [ _____]
Check uninterrupted operation in case of line and battery failure. [ _____]
Measure the system current that flows from the battery to the system when
the line voltage is switched off. measured value: ................mA [ _____]
If the battery is monitored, disconnect the battery cable on the battery.
The fault message must appear. [ _____]
Carry out a load test on the battery to check the battery capacity that is still
available; if necessary, replace the battery. [ _____]
Check the alarm relaying and the dependence, safety and logic circuits for
effectiveness. [ _____]
Page 4 von 23
PROTOCOL OF SITE ACCEPTANCE TEST
AND HANDING OVER
Input Groups Loop 1
MODULE Group FUNCTION ADDRESS OK REMARKS
10CYE10CU251-B01
A1 101/Det.1 1 Fire Group
Optical smoke detector OMX95
10CYE10CT251-B02
A1 102/Det.2 2 Fire Group
Heat detector WMX5000
10CYE10CH254-S52
A1 104/Det.2 3 Fire Group
Manual call point DMX3195-I yellow
10CYE10CH256-S62
A1 121/Det.2 4&5 Fire Group
Status indicator IP66 lamp controlled
10CYE10CH200-S03
A1 110/Det.3 6 Fire Group
Manual call point DMX3195-I red
10CYE10CH254-S53
A1 104/Det.3 7 Fire Group
Manual call point DMX3195-I yellow
10CYE10CH256-S63 Extinguishing
A1 121/Det.3 8&9
Status indicator IP66 lamp controlled Group
10CYE10CH256-S64 Extinguishing
A1 121/Det.4 25 & 26
Status indicator IP66 lamp controlled Group
10CYE10CH254-S54
A1 104/Detc.4 27 Fire Group
Manual call point DMX3195-I yellow
10CYE10CH216-S61 Extinguishing
A1 122/Detc.1 10 & 11
Status indicator IP66 lamp controlled Group
10CYE10CH214-S51
A1 109/Detc.1 12 Fire Group
Manual call point DMX3195-I yellow
10CYE10CR211-B01
A1 106/Detc.1 14 Fire Group
Flame detector FMX5000 IR 3GD
10CYE10CT211-B01
A1 106/Detc.2 15 Fire Group
Heat detector WMX5000 3GD
10CYE10CT211-B03
A1 107/Det.1 16 Fire Group
Heat detector WMX5000 3GD
10CYE10CR211-B04
A1 107/Detc.2 17 Fire Group
Flame detector FMX5000 IR 3GD
10CYE10CQ211-S01
A1
Isolator ISX 284 3GD
10CYE10CR211-B05
A1 107/Det.1 18 Fire Group
Flame detector FMX5000 IR 3GD
10CYE10CT231-B01
A1 111/Det.1 Heat detector WMX5000 FS Flex 3GD (HTC) 19 Fire Group
260°C
10CYE10CT231-B02
A1 122/Det.2 Heat detector WMX5000 FS Flex 3GD (HTC) 20 Fire Group
280°C
10CYE10CH214-S53
A1 251/Det.2 21 Fire Group
Manual call point DMX3195-I yellow
10CYE10CH200-S05
A1 110/Det.5 22 Fire Group
Manual call point DMX3195-I red
10CYE10CH216-S63 Extinguishing
A1 122/Det.3 23 & 24
Status indicator IP66 lamp controlled Group
Page 5 von 23
PROTOCOL OF SITE ACCEPTANCE TEST
AND HANDING OVER
Input Groups Loop 2
MODULE Group FUNCTION ADDRESS OK REMARKS
10CYE10CR221-B01
A1 201/Det.1 1 Fire Group
Flame detector FMX5000 IR
10CYE10CT221-B02
A1 202/Det.2 2 Fire Group
Heat detector WMX5000
10CYE10CT221-B04
A1 202/Det.4 3 Fire Group
Heat detector WMX5000
10CYE10CH224-S51
A1 204/Det.1 4 Fire Group
Manual call point DMX3195-I yellow
10CYE10CH200-S01
A1 110/Det.1 5 Fire Group
Manual call point DMX3195-I red
10CYE10CH314-S51
A1 314/Det.1 6 Fire Group
Manual call point DMX3195-I yellow
10CYE10CH200-S07
A1 110/Det.7 7 Fire Group
Manual call point DMX3195-I red
10CYE10CR311-B01
A1 312/Det.1 8 Fire Group
Flame detector FMX5000 IR
10CYE10CT311-B02
A1 311/Det.2 9 Fire Group
Heat detector WMX5000
10CYE10CT231-B03
A2 111/Det.2 Heat detector WMX5000 FS Flex 3GD 22 Fire Group
(HTC) 260°C
10CYE10CT231-B04
A2 113/Det.1 Heat detector WMX5000 FS Flex 3GD 23 Fire Group
(HTC) 280°C
Page 7 von 23
PROTOCOL OF SITE ACCEPTANCE TEST
AND HANDING OVER
10CYE10CH214-S55
A2 109/Det.5 24 Fire Group
Manual call point DMX3195-I yellow
10CYE10CH216-S65 Extinguishing
A2 122/Det.5 25 &26
Status indicator IP66 lamp controlled Group
Page 9 von 23
PROTOCOL OF SITE ACCEPTANCE TEST
AND HANDING OVER
Monitoring Output
MODULE Group FUNCTION TERMINAL OK REMARKS
10CYE10EH021-E61
A10 51/Unit.1 X1:1 / 2
Flash light CWB ATEX MX 24V DC red
10CYE10EH021-E62
A10 51/Unit.2 X1:1 / 2
Flash light CWB ATEX MX 24V DC red
10CYE10EH021-E63
A10 51/Unit.3 X1:1 / 2
Flash light CWB ATEX MX 24V DC red
10CYE10EH021-E64
A11 52/Unit.1 X1:1 / 2
Flash light CWB ATEX MX 24V DC red
10CYE10EH021-E65
A11 52/Unit.2 X1:1 / 2
Flash light CWB ATEX MX 24V DC red
10CYE10EH021-H01
A12 53/Unit.1 X1:1 / 2
Sounder DS10 MX Ex
10CYE10EH021-H02
A12 53/Unit.2 X1:1 / 2
Sounder DS10 MX Ex
10CYE10EH021-E51
Unit.1 X103-3&4
Warning light panel LWA 90-KT red
10CYE10EH021-E52
Unit.2 X103-3&4
Warning light panel LWA 90-KT red
10CYE10EH021-E53
Unit.3 X103-3&4
Warning light panel LWA 90-KT red
10CYE10EH021-E54
Unit.4 X103-3&4
Warning light panel LWA 90-KT red
10CYE10EH021-E55
Unit.5 X103-3&4
Warning light panel LWA 90-KT red
10CYE10EH020-H01
A13 54/Unit.1 X1:1 / 2
Sounder PA 5, IP 66
10CYE10EH020-H02
A13 54/Unit.2 X1:1 / 2
Sounder PA 5, IP 66
10CYE10EH025-H01
A14 55/Unit.1 X1:1 / 2
Sounder PA 5, IP 66
10CYE10EH025-E61
A14 55/Unit.2 X1:1 / 2
Flash light PY X-S-05-SSM 24V DC, red
10CYE10EH025-E51
Unit.1 X103-1&2
Warning light panel LWA 90-KT red
10CYE10EH025-E52
Unit.2 X103-1&2
Warning light panel LWA 90-KT red
10CYE10EH025-E53
Unit.3 X103-1&2
Warning light panel LWA 90-KT red
10CYE10EH025-E54
Unit.4 X103-1&2
Warning light panel LWA 90-KT red
10CYE10EH025-E55
Unit.5 X103-1&2
Warning light panel LWA 90-KT red
10CYE10EH022-H01
A15 56/Unit.1 X1:1 / 2
Sounder PA 5, IP 66 1
10CYE10EH022-E61
A15 56/Unit.2 X1:1 / 2
Flash light PY X-S-05-SSM 24V DC, red
10SGC22AA101-Y01
A16 57/Unit1 X1:1 / 2
Impulse Solenoid
10CYE10EH031-H01
A17 58/Unit1 X1:1 / 2
Sounder PA 5, IP 66
10CYE10EH031-E61
A17 58/Unit.2 X1:1 / 2
Flash light PY X-S-05-SSM 24V DC, red
Page 10 von 23
PROTOCOL OF SITE ACCEPTANCE TEST
AND HANDING OVER
10SGK31AA001-Y01
A19 59/Unit.1 X1:1 / 2
Solenoid
10CYE10EH029-E61
A10 71/Unit.1 X3:1 / 2
Flash light PY X-S-05-SSM 24V DC, red
10SGJ01AA003-Y01
A18 69/Unit.1 X2:1 / 2
Redundant Solenoid (CO2 Master Valve)
10SGJ01AA003-Y01
A19 70/Unit.1 X2:1 / 2
Redundant Solenoid (CO2 Master Valve)
10SGJ25AA013-Y01
A11 72/Unit.1 X3:1 / 2
Solenoid (Generator Enclosure)
10SGJ25AA003-Y01
A12 73/Unit.1 X3:1 / 2
Solenoid (Generator Enclosure)
10SGJ25AA004-Y01
A13 74/Unit.1 X3:1 / 2
Solenoid (Generator Enclosure)
10SGJ21AA013-Y01
A14 75/Unit.1 X3:1 / 2
Solenoid (GT Thermal Block)
10SGJ21AA003-Y01
A15 76/Unit.1 X3:1 / 2
Solenoid (GT Thermal Block)
10SGJ21AA004-Y01
A16 77/Unit.1 X3:1 / 2
Solenoid (GT Thermal Block)
10SGJ23AA003-Y01
A17 78/Unit.1 X3:1 / 2
Solenoid (GT Exhaust End Bearing)
10SGJ29AA003-Y01
A18 79/Unit.1 X3:1 / 2
Solenoid (Control Valve Block)
10SGJ29AA004-Y01
A19 80/Unit.1 X3:1 / 2
Solenoid (Control Valve Block)
10CYE10EH016-H01
A19 60/Unit.1 X1:1 / 2
Sounder PA 5, IP 66
10CYE10EH016-E61
A19 60/Unit.2 X1:1 / 2
Flash light PY X-S-05-SSM 24V DC, red
10SGK16AA001-Y01
A10 61/Unit.1 X2:1 / 2
Solenoid (Battery Module B1)
10CYE10EH015-H01
A11 62/Unit.1 X2:1 / 2
Sounder PA 5, IP 66
10CYE10EH015-E61
A11 62/Unit.2 X2:1 / 2
Flash light PY X-S-05-SSM 24V DC, red
10SGK15AA001-Y01
A12 63/Unit.1 X2:1 / 2
Solenoid (Starting Module K1)
10CYE10EH013-H01
A13 64/Unit.1 X2:1 / 2
Sounder PA 5, IP 66
10CYE10EH013-E61
A13 64/Unit.2 X2:1 / 2
Flash light PY X-S-05-SSM 24V DC, red
10SGK13AA001-Y01
A14 65/Unit.1 X2:1 / 2
Solenoid (Exitation Module E1)
A15 66/Unit.1 10CYE10EH011-H01 Sounder PA 5, IP 66 X2:1 / 2
10CYE10EH011-E61
A15 66/Unit.2 X2:1 / 2
Flash light PY X-S-05-SSM 24V DC, red
10SGK11AA001-Y01
A16 67/Unit.1 X2:1 / 2
Solenoid (Control Module A1)
10CYE10EH010-H01
A17 68/Unit.1 X2:1 / 2
Sounder PA 5, IP 66
10CYE10EH008-H01
A10 81/Unit.1 X4:1 / 2
Sounder PA 5, IP 66
10CYE10EH008-E61
A10 81/Unit.2 X4:1 / 2
Flash light PY X-S-05-SSM 24V DC, red
Page 11 von 23
PROTOCOL OF SITE ACCEPTANCE TEST
AND HANDING OVER
Page 12 von 23
PROTOCOL OF SITE ACCEPTANCE TEST
AND HANDING OVER
Minimax Relay Contact
RELAIS FUNCTION TERMINAL OK REMARKS
A20 FIRE AT STEP UP
RM8.01:X1 TRANSFORMER
CYE10 EG001, CARD 1, BIT 0
A20 FIRE AT AUXILIARY
RM8.01:X2 TRANSFORMER
CYE10 EG002, CARD 1, BIT 1
A20 FIRE AT BRUSH GEAR
RM8.01:X3 COMPARTMENT
CYE10 EG004, CARD 1, BIT 2
A20 FIRE AT
RM8.01:X4 AIR INTAKE
CYE10 EG005, CARD 1, BIT 3
A20 FIRE AT
RM8.01:X5 PULSE AIR SKID
CYE10 EG006, CARD 1, BIT 4
A20 FIRE AT
RM8.01:X6 FOGGING/ EVAP.
CYE10 EG007, CARD 1, BIT 5
A20 FIRE AT SPARE
RM8.01:X7 HIGH FOGGING
CYE10 EG008, CARD 1, BIT 6
A20 FIRE AT SPARE
RM8.01:X8 GT FIRE FIGHTING MODULE
CYE10 EG009, CARD 1, BIT 7
Page 13 von 23
PROTOCOL OF SITE ACCEPTANCE TEST
AND HANDING OVER
Minimax Relay Contact
RELAIS FUNCTION TERMINAL OK REMARKS
A22 FIRE AT
RM8.03:X1 ELECTRICAL MODULE CABLE
CELLAR
CYE10 EG019, CARD 2, BIT 0
A22 FIRE AT
RM8.03:X2 GT THERMAL BLOCK ENCLOSURE
CYE10 EG021, CARD 2, BIT 1
A22 FIRE AT
RM8.03:X3 AUXILIARY MODULE
CYE10 EG022, CARD 2, BIT 2
A22 FIRE AT
RM8.03:X4 EXHAUST END BEARING
CYE10 EG023, CARD 2, BIT 3
A22 FIRE AT GENO PRESSURITATION
RM8.03:X5 SKID
CYE10 EG024, CARD 2, BIT 4
A22 FIRE AT
RM8.03:X6 GENERATOR COMPARTMENT
CYE10 EG025, CARD 2, BIT 5
A22 FIRE AT
RM8.03:X7 SEAL OIL UNIT
CYE10 EG027, CARD 2, BIT 6
A22 FIRE AT
RM8.03:X8 IGNITION PROPAN GAS CABINET
CYE10 EG028, CARD 2, BIT 7
Page 14 von 23
PROTOCOL OF SITE ACCEPTANCE TEST
AND HANDING OVER
Minimax Relay Contact
RELAIS FUNCTION TERMINAL OK REMARKS
A24 FIRE AT ST COMPARTMENT
RM8.05:X1 ST OIL FOUNDATION TRENCHES
CYE10 EG041, CARD 3, BIT 0
A24 FIRE AT
RM8.05:X2 ST IP/LP BEARINGS
CYE10 EG043, CARD 3, BIT 1
A24 FIRE AT
RM8.05:X3 ST HP BEARING
CYE10 EG044, CARD 3, BIT 2
A24 FIRE AT AREA
RM8.05:X4 BELOW ST OPERATING FLOOR
CYE10 EG046, CARD 3, BIT 3
A24 FIRE AT
RM8.05:X5 ST HYDRAULIC OIL UNIT
CYE10 EG047, CARD 3, BIT 4
A24 FIRE AT
RM8.05:X6 ST CABLE TRAY
CYE10 EG048, CARD 3, BIT 5
A24 GT FIRE EXTINGUISHING SYSTEM
RM8.05:X7 RELEASED
CYE10 EG050, CARD 3, BIT 6
A24 ST FIRE EXTINGUISHING SYSTEM
RM8.05:X8 RELEASED
CYE10 EG051, CARD 3, BIT 7
Page 15 von 23
PROTOCOL OF SITE ACCEPTANCE TEST
AND HANDING OVER
Minimax Relay Contact
RELAIS FUNCTION TERMINAL OK REMARKS
A26 GT FIRE FIGHTING MODULE
RM8.07:X1 VENTILATION COMMAND OFF
CYE10 EG309, CARD 4, BIT 0
A26 CONTROL & LV MODULE A1
RM8.07:X2 VENTILATION COMMAND OFF
CYE10 EG311, CARD 4, BIT 1
A26 NOX & FUEL OIL FC AND TRANSFORMER
RM8.07:X3 MODULE Z1
VENTILATION COMMAND OFF
CYE10 EG312, CARD 4, BIT 2
A26 EXITATION TRANSFORMER MODULE E1
RM8.07:X4 VENTILATION COMMAND OFF
CYE10 EG313, CARD 4, BIT 3
A26 EXITATION SYSTEM TRANSFORMER
RM8.07:X5 MODULE P1 VENTILATION COMMAND OFF
CYE10 EG314, CARD 4, BIT 4
A26 SSD SES COMBI UNIT MODULE K1
RM8.07:X6 VENTILATION COMMAND OFF
CYE10 EG315, CARD 4, BIT 5
A26 DC UPS AND BATTERY MODULE B1
RM8.07:X7 VENTILATION COMMAND OFF
CYE10 EG316, CARD 4, BIT 6
A26 ACTIVE GENO MODULE
RM8.07:X8 VENTILATION COMMAND OFF
CYE10 EG318, CARD 4, BIT 7
Page 16 von 23
PROTOCOL OF SITE ACCEPTANCE TEST
AND HANDING OVER
Minimax Relay Contact
RELAIS FUNCTION TERMINAL OK REMARKS
A28 CLOSED COOLING WATER MODULE
RM8.09:X1 VENTILATION COMMAND OFF
CYE10 EG333, CARD 5, BIT 0
A28 EXHAUST END DIFFUSOR
RM8.09:X2 VENTILATION COMMAND OFF
CYE10 EG335, CARD 5, BIT 1
A28 FIRE - STAND BY DIESEL GENERATOR -
RM8.09:X3 VENTILATION COMMAND OFF
CYE10 EG336, CARD 5, BIT 2
A28 GT THERMAL BLOCK
RM8.09:X4 VENTILATION COMMAND ON
CYE10 EG421, CARD 5, BIT 3
A28 GENO COMPARTMENT
RM8.09:X5 VENTILATION COMMAND ON
CYE10 EG425, CARD 5, BIT 4
A28 H2 SEAL OIL UNIT
RM8.09:X6 VENTILATION COMMAND ON
CYE10 EG427, CARD 5, BIT 5
A28 FUEL GAS MODULE
RM8.09:X7 VENTILATION COMMAND ON
CYE10 EG429, CARD 5, BIT 6
A28 SPARE
RM8.09:X8 CARD 5, BIT 7
A30 SPARE
RM8.11:X5
A30 SPARE
RM8.11:X6
A30 SPARE
RM8.11:X7
A30 SPARE
RM8.11:X8
Page 17 von 23
PROTOCOL OF SITE ACCEPTANCE TEST
AND HANDING OVER
Minimax Relay Contact
RELAIS FUNCTION TERMINAL OK REMARKS
A31 GT LOAD SHEDDING TRIP X10:5
RM8.12:X1 CYE10 EG062 X10:6
K03
A31 GT TRIP CHANNEL 2 X10:11
RM8.12:X2 CYE10 EG092 X10:12
K06
A31 SPARE
RM8.12:X3
A31 SPARE
RM8.12:X4
A31 SPARE
RM8.12:X5
A31 SPARE
RM8.12:X6
A31 SPARE
RM8.12:X7
A31 SPARE
RM8.12:X8
A32 SPARE
RM8.13:X8
Page 18 von 23
PROTOCOL OF SITE ACCEPTANCE TEST
AND HANDING OVER
Minimax Relay Contact
RELAIS FUNCTION TERMINAL OK REMARKS
A33 GT FIRE FIGHTING MODULE X35:1
RM8.14:X1 VENTILATION COMMAND OFF X35:1
CYE10 EG309, CARD 4, BIT 0
A33 CONTROL & LV MODULE A1 X35:3
RM8.14:X2 VENTILATION COMMAND OFF X35:4
K15 CYE10 EG311, CARD 4, BIT 1
A33 NOX & FUEL OIL FC AND TRANSFORMER X35:5
RM8.14:X3 MODULE Z1 VENTILATION COMMAND OFF X35:6
CYE10 EG312, CARD 4, BIT 2
A33 EXITATION TRANSFORMER MODULE E1 X35:7
RM8.14:X4 VENTILATION COMMAND OFF X35:8
K16 CYE10 EG313, CARD 4, BIT 3
A33 EXITATION SYSTEM TRANSFORMER X35:9
RM8.14:X5 MODULE P1 VENTILATION COMMAND OFF X35:10
CYE10 EG314, CARD 4, BIT 4
A33 SSD SES COMBI UNIT MODULE K1 X35:11
RM8.14:X6 VENTILATION COMMAND OFF X35:12
K17 CYE10 EG315, CARD 4, BIT 5
A33 DC UPS AND BATTERY MODULE B1 X35:13
RM8.14:X7 VENTILATION COMMAND OFF X35:14
K18 CYE10 EG316, CARD 4, BIT 6
A33 ACTIVE GENO MODULE X35:15
RM8.14:X8 VENTILATION COMMAND OFF X35:16
CYE10 EG318, CARD 4, BIT 7
Page 19 von 23
PROTOCOL OF SITE ACCEPTANCE TEST
AND HANDING OVER
Minimax Relay Contact
RELAIS FUNCTION TERMINAL OK REMARKS
A35 CLOSED COOLING WATER MODULE X30:21
RM8.16:X1 VENTILATION COMMAND OFF X30:22
CYE10 EG333
A35 EXHAUST END DIFFUSOR X30:23
RM8.16:X2 VENTILATION COMMAND OFF X30:24
K13 CYE10 EG335
A35 FIRE - STAND BY DIESEL GENERATOR - X35:21
RM8.16:X3 VENTILATION COMMAND OFF X35:22
K19 CYE10 EG336
A35 GT THERMAL BLOCK X30:27
RM8.16:X4 VENTILATION COMMAND ON X30:28
K14 CYQ10 EG421
A35 SPARE
RM8.16:X5
A35 SPARE
RM8.16:X6
A35 SPARE
RM8.16:X7
A35 SPARE
RM8.16:X8
Page 20 von 23
PROTOCOL OF SITE ACCEPTANCE TEST
AND HANDING OVER
RELAIS FUNCTION TERMINAL OK REMARKS
A37 GT FIRE & GAS DETECTION SYSTEM X80:17
RM8.16:X1 PANEL DISABLED X80:18
K29 CYE10 EG181
A37 COMMON SIGNAL X80:19
RM8.16:X2 SPARE X80:20
K30 CYE10 EG190
A37 COMMON SIGNAL X80:21
RM8.16:X3 SPARE X80:22
K31 CYE10 EG191
A37 COMMON SIGNAL X80:23
RM8.16:X4 SPARE X80:24
K32 CYE10 EG192
A37 SPARE
RM8.16:X5
A37 SPARE
RM8.16:X6
A37 SPARE
RM8.16:X7
A37 SPARE
RM8.16:X8
Clean and carry out tests on all visual alarms (flashing lamps, rotating
beacons, notice-boards) [ _____]
In the case of monitored alarms, carry out wire break and short-circuit by
disconnecting or jumpering the line [ _____]
Clean and carry out tests on all audible alarms (hooters, sirens).
In the case of monitored alarms, carry out wire break and short-circuit by
disconnecting or jumpering the line [ _____]
Clean and carry out tests on all indicator devices outside the Fire Panel
(annunciators, parallel indicators) [ _____]
In the case of monitored alarms, carry out wire break and short-circuit by
disconnecting or jumpering the line [ _____]
Check the proper functioning of actuators outside the Fire Panel (e. .g key-
operated switches) [ _____]
Check the proper functioning of indicator devices outside the Fire Panel
(annunciators, parallel indicators) [ _____]
Check the proper functioning of all audible alarms [ _____]
Check the proper functioning of all visual alarms [ _____]
Page 21 von 23
PROTOCOL OF SITE ACCEPTANCE TEST
AND HANDING OVER
E) Commissioning Punchlist
Erection
ITEM KIND OF DEFECTS Company
Minimax GE
1
2
3
4
5
6
7
8
9
10
11
12
Page 22 von 23
PROTOCOL OF SITE ACCEPTANCE TEST
AND HANDING OVER
Remarks:
Date: 31/10/2019
Name of the Service Technician:
----------------------------------------------- ---------------------------------------------------
Signature Signature
Service Technician Execution of the work confirmed
Page 23 von 23