Sebaste High School


Idio, Sebaste, Antique

3rd QUARTER
TLE 9(Electrical Installation and Maintenance)
3rd SUMMATIVE TEST

Name of Learner: _______________________________________________________________


Grade and Section:________________________________________ Date: ________________

Directions: Write T if the underline word/s in the statement is true and F if false. Write your
answer on the space provided before the number.

__________________ 1. A Floor Plan is a sketch of a structure showing a top view profile.


__________________ 2. Electrical Layout indicates lighting and power outlets and other electrical
details.
__________________ 3. A lighting outlet (L.O.) should be installed in every room or area, usually
it is located at the corner to provide direct lighting.
__________________ 4. Limit the number of C.O. to 8 in one circuit, if there are more than 8
C.O’s connect it in another circuit.
__________________ 5. Service entrance and electric meter generally installed inside the
building at the property line wall or electric post for easy access to the
meter reader.

Directions: Fill up the missing word/s to complete the statement. Choose the correct word/s
inside the box. Write your answer on the space provided before the number.

centrally located door opening

every room damp or wet


2-branch circuit

6. A switch to control light is located near the ________________ or wherever convenient to place
it.
7. A power outlet (C.O.) should be installed in ____________ or area, usually it is located at a wall
where an appliance is expected to be placed.
8. A weather proof type or ground fault circuit interrupter (GFCI) type of C.O. should be used for
_______________ location.
9. It is advisable to have ____________________ for L.O. and C.O.
10.Panel board is ____________________ in the building to make the circuiting much shorter, or
in a place where it is easily accessible.