LIQUID PENETANT TESTING (SPECIFICATION) LEVEL-(II)

Time: 30 min. Marks: 15

(Refer ASME Section V article 6, and answer the following question)


Q.1. The calibration frequency for UV light meters is:-

a. Once in a year
b. Whenever the meter has been subjected to repair
c. If meters have not been in use for a year or more, they shall be calibrated before being used again
d. All of the above are applicable

Q.2. The minimum visible light intensity required for proper evaluation of Visible Penetrant
indications are:-

a. 100 foot candles c. 1000 micro-watts per square centimeter


b. 2000 lux d. 100 lux

Q.3. Which of the following is not permitted as regards drying of the test surface after Aqueous
developer Application?

a. Hot air blower c. Natural air circulation


b. Blotting d. All of the above

Q.4. Which of the following is required to be part of each examination record:-

a. Procedure identification and revision level


b. Material thickness
c. Date and time of the examination
d. All of the above
e. Only “a” and “b” above are essential for recording

Q.5. What is the recommended penetrant dwell time for carbide tipped tool to detect
Discontinuities such as porosity cracks and lack of fusion(Job temperature 25˚C)
a. 1 Minute c. 7 Minute
b. 5 Minute d. 10 Minute

Q.6. Which of the following statements is/are applicable for interpretation of indication after application of
developer?

a. Final interpretation shall be done before 30 minutes after application of developer


b. The developer shall be applied as soon as possible after penetrant removal
c. Final interpretation shall be made within 10 to 60 minutes after the requirements of T-675.3 are satisfied
d. 10 minute

M/s. Smart technocrats & Consultancy Services (I) PVT. Ltd.


Sector- 18A, Plot No-5, Nerul , Navi Mmbai-400706 ( MH)

SET-S-3(IPC) Page 1of 2


Tel: 022-2770 6055 , Fax No – 022-2771 3643
E-mail : smartndt@vsnl.com, Web site :- www.smarttechnocrats.com

***********************************************************************
Q.7. In fluorescent penetrant technique, the black light intensity measured should be minimum?

a. 1000 μw /cm2 c. 100 μw /cm2


b. 100 watts d. Any of the above

Q.8. In fluorescent penetrant technique, the black light :-

a. Shall be allowed to warm up for a minimum of 5 minutes


b. Not required to warm up
c. Shall be allowed to warm up for a minimum of 5 seconds
d. None of the above

Q.9. A commonly used method of checking of overall performance of a penatrant material system is by:-

a. Determining the viscosity of the penetrant


b. Measuring the wettability of the penetrant
c. Comparing two sections of artificially cracked specimen
d. All of the above

Q.10. Which of the following types of discontinuities could be present in a welding?

a. Lap c. Lack of fusion


b. Burst d. All of the above

Q.11. Method of applying developer is:-

a. Essential variable c. Both (a) and (b)


b. Non-Essential variable d. None of above

Q.12. Personnel qualification requirement is:-

a. Essential Variable c. Both(a) and (b)


b. Non-Essential variable d. None of above

Q.13. The surface before application of pertant shall be:-

a. Wet c. Drying of part is not necessary


b. Clean and dry d. Contaminated with oil, dust etc

Q.14. Standard temperature range is:-

a. 10˚C to 52˚ C c. 5˚ C to 52˚ C


b. 5˚ C to 38˚ C d. 10˚ C to 100˚ C

Q.15. For application of Non Aqueous Developer, most suitable method is by:-

a. Brushing c. Dusting
b. Pouring d. Spraying.

SET-S-3(IPC) Page 2of 2