ZPC Field Report
ZPC Field Report
disposal by tender proceedings and includes documents inviting potential tenderers to pre-
Invitations to Tenderer
Instructions to Tenderers
Specifications
Drawings
Bill of Quantities
Tender Form
Letter of acceptance
Form Security
Integrity
When I was in the field in tender document I started by fill in the invitation of tender
organization is normally provide these number and can be differ to every organization, W
mean tender is for work and it can be G for goods, S for service depend for tender it
self, NCB is method to be used in the tender, LOT number in the tender and 2018/2019
is current finincial year and 18 is tender number itsejf, name of the project
HOUSES, bid security such as All bids must be accompanied by a bid security Banker’s
Cheque or Banker’s Guarantee in the amount of two percent (2%) of the Bid Price,
receiving and opening date of tender that is all tenders in one original plus three (3)
copies, properly filled in, and enclosed in plain envelopes must be delivered to the address
below Secretary of Tender Board, Zanzibar Port Corporation, Malindi, Zanzibar at or before
10:00am Local Time on 31th October, 2018. Tenders will be opened promptly thereafter in
public and in the presence of Tenderers’ representatives who choose to attend in the
opening at the time stated in the Invitation Notice, also method of tender such as a
Tendering will be conducted through the National Competitive Bidding procedures specified
in the Public Procurement Act No 11 of 2016 and open to all Bidders as defined in the Act
Instructions to tender, generally involve table of clause and it used by procurement officers
as references incase at the time of fill tender document and by any chance the
procurement officer become unfamiliar with terms a clause is been used to direct the
procurement officer with exactly what he or she is supposed to fill in the tender document
Tender data sheet, providing information regard the tender quotation to supplier as well as
the term and condition a supplier must have and detail contents required in the tender
Describe the goods to be provided using this Contract and the location where the
Name and identification number of the Contract: [insert: name and identification
General Condition of Contract, it contains standard terms and conditions which are
generally applicable for all contracts irrespective of the nature of work, supplier type and
other factors.
Special Conditions of Contract or SCC relates to the specific contract. It includes terms
and conditions which are applicable for that particular contract only and will vary for each
contract depending upon the nature of work, supplier type and other factors such as
Project name
Site location
Specifications, here is all about sets of precise and clear specifications to respond
realistically and competitively to the requirements of the employer and normally comes
CHAPTER THREE
LITERATURE
Procurement
According to Public Procurement Act (PPA) of 2004 and its Regulations of 2005,
Procurement means buying, purchasing, renting, leasing or otherwise acquiring any goods,
Tender
According to Public Procurement Act (PPA) of 2004 and its Regulations of 2005, Tender
Tendering
Lyson (2004) refers tendering as purchasing where by potential suppliers are invited to
make and unequivocal offers of the price and terms which all acceptances shall be basis
of subsequent contracts.
According to PPRs, 2005 the word procuring entity means a public body and any other
body, or unit established and mandated by government to carry out public functions.
User department
A user department is any division or unit by whatever name known of that ministry,
authority or other body; that initiates procurement and disposal by tender requirements and
Public procurement is the process through which official government agencies obtain goods
and services, including construction services or public works. It also includes all functions
(Kerisa, 2010).
Supplier
supplying goods or services, hiring equipment or providing transport services and who is,
according to the contract, a potential party or the party to a procurement contract with the
Goods
Goods means raw materials, products, equipment and other physical objects of every kind
and description, whether in solid, liquid or gaseous form, electricity, intangible assets and
intellectual property as well as services incidental to the supply of the goods provided that
value of the services does not exceed the value of the good themselves (PPA, 2004).
Services
Services means any object of procurement other than gods or works, which involve the
furnishing of labor, time or effort including the delivery of reports, drawings or designs, or
the hire or use of vehicles, machinery or equipment for the purpose of providing transport,
or for carrying out work of any kind, with or without the provision of drivers, operators or
Work means all works associated with the construction, reconstruction, demolition, repair or
renovation of a building, structure, road or air field. Works also means any other civil
materials, decoration and finishing. Works also means services which are tendered and
Nair (1990) defined ‘Tender’ as the process of ascertaining availability and price of
materials in sealed covers which are opened and scrutinized at a predetermined time by a
tender committee. He then propounded that, the tender system includes the bidders to
quote the lowest price, safeguards the interests of both the buyer as well as that of the
Margaret Griffiths and Ivor Griffiths (2002), propounded that ‘Tender’ may be seeking to
establish two different types of contract between the person inviting the offer and the
person submitting the successful tender, and there by entering in a contract. Jonathan
Mrope (2005) talking note given to BBA (PLM) during procurement day said that, the
reasons for tendering are making the best use of public funds and ensure value for
money, put in place a fair practice in the public sector procurement, ensure maximum
competition and accordingly fair treatment among suppliers, contractors and consultants.
CHAPTER THREE
ANALYSIS
GAPS BETWEEN THEORY AND PRACTICES
department, I focused on several issues like general performance of the organization that
According to the theories learnt in the class is that; in order to improve the preparation of
tender document as the one whose deal with such activity must cooperate well, and keep
well all necessary records at the required place. User department also need prepare early
In the market what appears relate to what we lean in class, e.g. in procurement process in
case 1 step skipped it may lead the entire process to be scrapped. And the most important
thing in the procurement process and stores operation is coordination and cooperation
TRAINING ASSESSMENT
Training assessment was excellent since the given supervisors were ready to direct and
lead me on performing the task given appropriate and competent, so that to improve my
career. Hope the organization enjoyed my presence at their organization and the services I
rendered.
The skills learnt during the practical Training were a lot though; I was able to enhance
some of them, so relate to my carrier that I will be able to improve my professional. The
skills enhanced were like to prepare tender document as one of activities that I did, also to
PROBLEMS FACED
There were times customers with complains faced me and even abused me without
knowing that I was just a student. Most of these complains came after physical visits and
ZPC had a good and well organized registry room but the only problem was misplacement
of files due to human errors. Because I was still new when I went back without a file they
never trusted me and they also went back to search for the same file and if they would
not find it that’s when they believed. This was a bit embarrassing to me.
ZPC never had computers specific for field students this made our operation of duties to
be slow and in case of any assignment one had to work and the other had to wait for the
Since ZPC is a very large organization it should at least try to organize for some
computers that would be used by field students because the work that the Practical
training students do is for their own good since they are the ones that benefit much
.The problem of complaints from customers was a bit out of my control but the staff
members tried to help us in case one tried to disrespect us so at least this was reduced
Close relation for employment opportunity. My first main expectation of taking my practical
training at ZPC was to create a closer relationship with the organization so that I would
work with it in the future after accomplishing my studies at the institute. I would like to say
that to a greater extent my expectations were met because I was able get close to many
of the organization staff and got a chance to ask them on ways of how to get an
opportunity to work with ZPC and they were free to give as the information. I was also
able to get most of the staff contacts so that in case of any query I would ask for their
assist once. Most of the ZPC staff members used to praise us over how hardworking and
Though everything went on well but there were some problems on this because
• ZPC does not get its employees direct from school.
• Most of the workers of ZPC do not want to retire at the right age of
CHAPTER FOUR
CONCLUSION
Practical Training session is among the valuable programs set to enhance student’s
learning and understanding the facts about their career. The Training exposes students to
new challenges and opportunities in their chosen profession. Most of the things taught
theoretically are practiced during this period. It enables students to experience different
working environment before they are actually employed or self-employed upon completion
of their studies.
For instance, at ZPC I learn many things among of those is preparation for the tender
document which in my career and I have obtained something in excess and which is
beneficial. Further I gained personal confidence and self-trust as I working with different
Most of the courses taught at the Tanzania institute of accountancy are taught manually
which is very common to the really world because most of the organizations are
specialized in software’s like Epicor. So by including it in the syllabus this will introduce
students to different knowledge of the software’s and easy their application at the office.
The practical Training duration should be extended or be done in both first and second
year because most of the students get to learn few of the tasks done by the organization
because of limited time compared to how large the organization and its duties are. In case
it seems to be costly to the institute because it requires paying the lectures for supervision
the Training can just take place and the students required to prepare reports but and
I would like to encourage the institution to organize regular visits to specific organization
that are related to some courses like Procurement and Logistic Management. Students
who study these courses should arrange for regular visits to organizations like Councils,
PPRA and others to learn the practical part of it because most of the students do not
understand when they are taught but just claim because of limited time and having many
other courses to study with a short period of time of four months. So by having these
visits this will help them understand most of the important basics to grasp on their theory.