2.3 Function Analysis Phase April 2019
2.3 Function Analysis Phase April 2019
2.3 Function Analysis Phase April 2019
MALAYSIA
LAB STAGE –
FUNCTION ANALYSIS
PHASE
LECTURE CONTENTS
STAGE 2 – LAB
3- 5 Days (Within 1 Week)
NO
5 -7 Weeks
YES
6. Presentation 5. Development
Phase Phase
Decision VE Reporting
? STAGE 3 – POST LAB
2- 3 Weeks (For reporting only)
• SPACE LEVEL :
- Defining the function of Spaces within project
• ELEMENT LEVEL :
- Defining the function of Elements
• COMPONENT LEVEL :
- Defining the function of Components
FUNCTION ANALYSIS TOOLS
PROJECT FUNCTION ANALYSIS:
• FUNCTION ANALYSIS SYSTEM TECHNIQUE
(F.A.S.T.) DIAGRAMMES (STRATEGIC / TECHNICAL F.A.S.T.)
• REQUIRED GOALS AND SYSTEMS
• FUNCTIONS COMPLIANCE
JKR PROJECT
STRATEGIC F.A.S.T.
CONCEPT
OPTIONS?
OR
TECHNICAL
SOLUTIONS?
2. BRIDGE LINK PROJECT
CONCEPT
OPTIONS?
OR
TECHNICAL
SOLUTIONS?
3. BRIDGE LINK PROJECT (OVER NAVIATION CANAL)
CONCEPT
OPTIONS?
OR
TECHNICAL
SOLUTIONS?
4. DIRECTIONAL RAMP / FLYOVER PROJECT
CONCEPT
OPTIONS?
OR
TECHNICAL
SOLUTIONS?
5. SLOPE STABILIZATION PROJECT
Provide safety
NEEDS Ensure Provide stability
safety (to slope
to users embankment Provide durability
and road)
Provide resilience
JPS PROJECT
STRATEGIC F.A.S.T.