Draft Daily Report - 090223
Draft Daily Report - 090223
Drillholes Survey* Infill Twinhole No. RIG Hole ID Daily Production Daily Production Total Depth/Hole EOH (m) Actual Core Actual Core Status Remark No. RIG Cummulative Production
Infill Holes Twin Holes Total Holes Total Holes Plan/Day (m) Core Recovery Total Production (m)
(m) Recovery (m) Loss (m) (m) (m)
LX-01 PBI_B405 3.00 10 30% 3.00 0.00 0.00 3.00 100.00% Continue
0 0 Re-survey 0 0 0 LX-02 4 59
Holes In-Progress 0
Holes*
LX-02 PBI_B403R 4.00 10 40% 9.00 9.00 1,07 7.93 88.11% Finished Sudah Redrill 1x
Holes Remaining 55 0 55 Total 7.0 96
100%
All Rig LX Perfomance Chart
20.00 45% 45 3000
90%
18.00 40%
Summary Cummulative Holes Infill Holes 40
Twinholes
0.00% 16.00
80%
35% 2500
12.70% 12.70% 70%
Recovery Percentage
14.00 35
30%
Production (m)
60%
12.00
25% 30 2000
10.00 50%
Depth (m)
8.00 40% 25
15% 1500
6.00 30%
87.30% 20
87.30% 10% 17
4.00 20%
5% 15 14 1000
2.00 10% 12
11
Finish Holes 0.00 0% 0% 10 9
Finish Holes Holes Remaining Finish Holes Holes Remaining 8
PBI_B405 PBI_B403R 7
500
5
Daily Production Plan/Day Series3 Core Recovery Recovery Tolerance 5 4 4
33
0 00000000000000000000000000000000000000000000000000000000
0 0
44957
44960
44963
44968
44971
44954
44955
44956
44958
44959
44961
44962
44964
44965
44966
44967
44969
44970
44972
Depth (m) Target Cum (m) Target Cum
Sample In Progress 0 5%
Transportation 0 60 60
LX-01 PBI_B405 100.00% 100.0% 0.00% 90% (holes)
Pending Samples (holes) 0 Safety Talk 0 0 0 0%
LX-01 Performance LX-02 Performance
Percentage % 0.00% Check Rig 0 30 30 3% Transportation; 19%
LX-02 PBI_B403R 88.11% 98.3% 0.00% 90%
Drilling 120 165 285 26% Check Rig; 10%
60%
50% Mechanical Problem 0 0 0 0%
40%
Sample Type No. of Samples Waiting pad 0 0 0 0%
30%
20% Original Samples 0 Waiting Dozer/Exca 0 0 0 0%
10% Loss Samples 0 Weather Cond. 0 0 0 0%
0% OB Samples 0 Standby 270 215 485 44%
PBI_B405 PBI_B403R QAQC Samples 0 Reporting 0 30 30 3%
Hole ID
Total Samples 0 Others 0 0 0 0%
Series4 Series1 Series2 Series3 Total 540 560 1100 100%
Batch Delivered Date of *Rig performance units are in minutes
Sample Delivery Phase
to Lab* Delivery Summary RIG Performance
Check Rig
*Sample Delivered to Succofindo Lab Reporting 3% Drilling
3% 27%
Transportation
Material Zonation Documentation 6%
Zone Thickness (m)
No. RIG Hole ID Remarks
Top Soil LIM TRN SAP BRK Material Zonation
Moving
3%
LX-01 PBI_B405 1 2 PBI_B405 PBI_B403R
0 Setting
0%
1
LX-02 PBI_B403R 1 5 3 Resting/Lunch
2 11%
4
Depth (m)
8 Waiting pad
0%
9
Safety Issue
10
40
2500
35
30 2000
Cum Depth (m)
25
Depth (m)
1500
20
17
standby (tidak ada excapator)
15 14 1000
12
11
10 9
8
7
500
5
5 4 4
3 3
0 00000000000000000000000000000000000000000000000000000000
0 0
44954
44955
44956
44957
44958
44959
44960
44961
44962
44963
44964
44965
44966
44967
44968
44969
44970
44971
44972