DAILY REPORT

REPORT DATE Thursday, 09 February 2023


COMPANY PT. MEGA GLOBAL ENERGY
PROJECT AREA WIUP PT. PERTAMBANGAN BUMI INDONESIA
LOCATION SOUTHEAST SULAWESI

DAILY DRILLING PROGRESS


Cummulative Holes Daily Rig Production Cummulative Production By Meters

Drillholes Survey* Infill Twinhole No. RIG Hole ID Daily Production Daily Production Total Depth/Hole EOH (m) Actual Core Actual Core Status Remark No. RIG Cummulative Production
Infill Holes Twin Holes Total Holes Total Holes Plan/Day (m) Core Recovery Total Production (m)
(m) Recovery (m) Loss (m) (m) (m)

63 0 Stake Out 0 0 0 LX-01 3 37


Planned 63
Holes**

LX-01 PBI_B405 3.00 10 30% 3.00 0.00 0.00 3.00 100.00% Continue
0 0 Re-survey 0 0 0 LX-02 4 59
Holes In-Progress 0
Holes*

8 0 *Survey activity is using RTK


Finish Holes 8

LX-02 PBI_B403R 4.00 10 40% 9.00 9.00 1,07 7.93 88.11% Finished Sudah Redrill 1x
Holes Remaining 55 0 55 Total 7.0 96

Cancel 0 0 0 Cum Production Target(m) 0

Percentage Finish % 12.70% #DIV/0! 12.70%


Production Progress Percentage #DIV/0!
Percentage Remaining % 87.30% #DIV/0! 87.30%

Drill Pad Ready 1 0 1 Cum CTBP (m) 13.45

Daily Rig Production Core Recovery Per Holes

100%
All Rig LX Perfomance Chart
20.00 45% 45 3000
90%
18.00 40%
Summary Cummulative Holes Infill Holes 40
Twinholes
0.00% 16.00
80%
35% 2500
12.70% 12.70% 70%

Recovery Percentage
14.00 35
30%

Production (m)
60%
12.00
25% 30 2000
10.00 50%

Cum Depth (m)


standby (tidak ada excapator)
0.00% 20%

Depth (m)
8.00 40% 25
15% 1500
6.00 30%
87.30% 20
87.30% 10% 17
4.00 20%

5% 15 14 1000
2.00 10% 12
11
Finish Holes 0.00 0% 0% 10 9
Finish Holes Holes Remaining Finish Holes Holes Remaining 8
PBI_B405 PBI_B403R 7
500
5
Daily Production Plan/Day Series3 Core Recovery Recovery Tolerance 5 4 4
33
0 00000000000000000000000000000000000000000000000000000000
0 0

44957
44960
44963
44968
44971
44954
44955
44956
44958
44959
44961
44962
44964
44965
44966
44967
44969
44970
44972
Depth (m) Target Cum (m) Target Cum

Daily Core Recovery Preparation Monitoring RIG Performance

Limonite Saprolite Recovery 0 Total Percentage


No. RIG Hole ID Core Recovery Finish Sample (holes) No. RIG* LX-01 LX-02
Recovery Recovery Tolerance

Sample In Progress 0 5%
Transportation 0 60 60
LX-01 PBI_B405 100.00% 100.0% 0.00% 90% (holes)
Pending Samples (holes) 0 Safety Talk 0 0 0 0%
LX-01 Performance LX-02 Performance
Percentage % 0.00% Check Rig 0 30 30 3% Transportation; 19%
LX-02 PBI_B403R 88.11% 98.3% 0.00% 90%
Drilling 120 165 285 26% Check Rig; 10%

Total Sent To Lab 0 5%


Water problem 60 0 60 Drilling
(holes) 22% Water problem
Total Sent to Lab 11%
0 Moving 30 0 30 3%
(samples) Moving
6%
Finish Assay (holes) 0 Setting 0 0 0 0% Resting/Lunch; 19%
Resting/Lunch
Daily Core Recovery Standby
11%
50%
Finish Assay (samples) 0 Resting/Lunch 60 60 120 11%
100%
90%
80% Percentage Finish Assay #DIV/0! 0% Setting; 0%
Technical Problem 0 0 0 Drilling; 52%
70% %
Core Recovery

60%
50% Mechanical Problem 0 0 0 0%
40%
Sample Type No. of Samples Waiting pad 0 0 0 0%
30%
20% Original Samples 0 Waiting Dozer/Exca 0 0 0 0%
10% Loss Samples 0 Weather Cond. 0 0 0 0%
0% OB Samples 0 Standby 270 215 485 44%
PBI_B405 PBI_B403R QAQC Samples 0 Reporting 0 30 30 3%
Hole ID
Total Samples 0 Others 0 0 0 0%
Series4 Series1 Series2 Series3 Total 540 560 1100 100%
Batch Delivered Date of *Rig performance units are in minutes
Sample Delivery Phase
to Lab* Delivery Summary RIG Performance

Check Rig
*Sample Delivered to Succofindo Lab Reporting 3% Drilling
3% 27%
Transportation
Material Zonation Documentation 6%
Zone Thickness (m)
No. RIG Hole ID Remarks
Top Soil LIM TRN SAP BRK Material Zonation
Moving
3%
LX-01 PBI_B405 1 2 PBI_B405 PBI_B403R
0 Setting
0%
1
LX-02 PBI_B403R 1 5 3 Resting/Lunch
2 11%

4
Depth (m)

Standby Weather Cond.


5 Mechanical
0% Problem
47% Waiting Dozer/Exca
0%
6 0%

8 Waiting pad
0%
9
Safety Issue
10

Bedrock Saprolite Transisi Limonite Top soil

Performance All Rig

All Rig LX Perfomance Chart


45 3000

40

2500

35

30 2000
Cum Depth (m)

25
Depth (m)

1500

20

17
standby (tidak ada excapator)

15 14 1000

12
11

10 9
8
7
500
5
5 4 4
3 3

0 00000000000000000000000000000000000000000000000000000000
0 0
44954
44955
44956
44957
44958
44959
44960
44961
44962
44963
44964
44965
44966
44967
44968
44969
44970
44971
44972

Depth (m) Target Cum (m) Target Cum