LAMPIRAN
RENCANA ANGGARAN BIAYA
PEMBANGUNAN KANTOR
CALL CANTER ADMEDIKA
KERTEN SURAKARTA

HARGA SUB

NO JENIS PEKERJAAN SPESIFIKASI VOLUME SATUAN JUMLAH JUMLAH BOBOT


Rp Rp
I. PEKERJAAN PERSIAPAN

1 Autzet + blouplang 1.00 Ls 0.38


15,000,000 15,000,000
2 Air kerja 1.00 Ls 0.13
5,000,000 5,000,000
3 Barak kerja 1.00 Ls 0.20
8,000,000 8,000,000
4 Pembersihan lokasi 1.00 Ls 0.30
12,000,000 12,000,000
5 Pembongkaran bangunan existing 1.00 Ls 0.30
12,000,000 12,000,000
Sub Total Rp. 52,000,000 1.32

II. PEKERJAAN TANAH

1 - Galian tanah FP1 216.00 m3 0.96


175,000 37,800,000
- Galian tanah FP2 188.16 m3 0.83
175,000 32,928,000
2 Galian tanah pondasi menerus 101.52 m3 0.45
175,000 17,766,000
3 Urug kembali foot-plate 471.20 m3 0.80
67,000 31,570,400
4 Urug kembali pondasi menerus 197.40 m3 0.33
67,000 13,225,800
5 Urug pasir bawah pondasi 29.70 m3 0.28
375,000 11,137,500
6 Urug tambahan 295.20 m3 0.71
95,000 28,044,000
Sub Total Rp. 172,471,700 4.37

III. PEKERJAAN STRUKTUR

Lantai 1

1 - Footplat FP1 uk. 130x130 cm 14.11 m3 1.52


4,250,000 59,976,000
- Footplat FP2 uk. 110x110 cm 10.37 m3 1.12
4,250,000 44,064,000
2 Sloof 1

a. SL 01 uk. 15x35 cm 10.10 m3 1.09


4,250,000 42,903,750
b. SL 02 uk. 15x25 cm 6.92 m3 0.74
4,250,000 29,388,750
c. SL 03 uk. 15x20 cm 2.84 m3 0.31
4,250,000 12,048,750
3 Kolom struktur

a.KU 01 uk. 15x40 cm 9.60 m3 1.03


4,250,000 40,800,000
b.KU 02 uk. 15x30 cm 7.08 m3 0.76
4,250,000 30,090,000
c. KU 03 uk. 15x25 cm 5.27 m3 0.57
4,250,000 22,376,250
d.KP 15 x 15 8.01 m3 0.78
3,850,000 30,838,500
4 Balok latai 15 X 15 7.89 m3 0.77
3,850,000 30,376,500
5 Paving area parkir 56.00 m2 0.92
650,000 36,400,000
lantai 2

1 Balok struktur

a.Balok 15 x 40 7.08 m3 0.76


4,250,000 30,090,000
b.Balok 15 x 30 4.76 m3 0.51
4,250,000 20,208,750
c.Balok 15 x 25 6.53 m3 0.70
4,250,000 27,731,250
2 Plat Beton lantai 2 tebal 0.12 m 19.80 m3 2.13
4,250,000 84,150,000
3 Plat tangga tebal 0.12 m 1.20 m3 0.13
4,250,000 5,100,000
4 Kolom struktur

a.KU 03 uk. 15x25 cm 9.60 m3 1.03


4,250,000 40,800,000
b.KP/KS 15 x 15 8.25 m3 0.89
4,250,000 35,062,500
5 Leufel/topi2 4.17 m3 0.41
3,850,000 16,054,500
lantai 3

1 Balok struktur

a.Balok 15 x 30 14.10 m3 1.52


4,250,000 59,925,000
b.Balok 15 x 25 6.84 m3 0.74
4,250,000 29,070,000
c.Balok ring 15 x 20 9.19 m3 0.99
4,250,000 39,036,675
2 Plat Beton lantai 3 tebal 0.12 m 19.80 m3 2.13
4,250,000 84,150,000
3 Plat tangga tebal 0.12 m 1.20 m3 0.13
4,250,000 5,100,000
4 Kolom struktur

a.KU 03 uk. 15x25 cm 11.06 m3 1.19


4,250,000 46,983,750
b.KP/KS 15 x 15 9.98 m3 1.07
4,250,000 42,393,750
5 Leufel/topi2 4.17 m3 0.45
4,250,000 17,722,500
6 Plat dak tandon tebal 0.10 m 14.40 m3 1.55
4,250,000 61,200,000
Sub Total Rp. 1,024,041,175 25.93

IV. PEKERJAAN PASANGAN

Lantai 1

1 Pasangan batu kali 51.70 m3 0.88


675,000 34,897,500
2 Pasangan bata hebel 291.89 m2 2.03
275,000 80,269,200
3 Plester-Aci 583.78 m2 2.59
175,000 102,160,800
4 Lantai kerja keramik tebal 0.05 m 24.75 m3 0.42
675,000 16,706,250
Lantai 2

1 Pasangan bata hebel 327.60 m2 2.74


330,000 108,108,000
2 Plester aci 655.20 m2 3.48
210,000 137,592,000
Lantai 3

1 Pasangan bata hebel 327.60 m2 2.74


330,000 108,108,000
2 Plester aci 655.20 m2 3.48
210,000 137,592,000
3 Gunung-gunung 18.90 m2 0.16
330,000 6,237,000
Lantai Jemuran (tandon air)

1 Pasangan bata hebel 98.30 m2 330,000 32,439,000 0.82

2 Plester aci 196.60 m2 210,000 41,286,000 1.05

3 Gunung-gunung 18.90 m2 330,000 6,237,000 0.16

Sub Total Rp. 811,632,750 18.53

V.PEKERJAAN KERAMIK & SANITAIR

1 Keramik lantai include lantai KM 495.00 m2 375,000 185,625,000 4.70

2 Keramik lantai tangga 42.70 m2 375,000 16,012,500 0.41

3 Keramik dinding KM/WC 98.54 m2 415,000 40,894,100 1.04

4 Kloset duduk 6.00 bh 2,650,000 15,900,000 0.40

5 Jet Washer 6.00 bh 350,000 2,100,000 0.05

6 Washtafel + kran + assesoris 6.00 bh 1,550,000 9,300,000 0.24

7 Saluran air bersih 128.00 m1 165,000 21,120,000 0.53

8 Saluran air kotor 96.00 m1 165,000 15,840,000 0.40

9 Saluran air WC 72.00 m1 165,000 11,880,000 0.30

10 Saluran air hujan 80.00 m1 165,000 13,200,000 0.33

11 Saluran pipa AC Pipa Freon & buangan 24.00 m1 575,000 13,800,000 0.35

12 Afur lantai Stainless 6.00 bh 150,000 900,000 0.02

13 Pompa air pompa & pendorong 2.00 bh 12,500,000 25,000,000 0.63

14 Water torn + aksesoris 2.00 bh 4,500,000 9,000,000 0.23


15 Sumur air bersih 2.00 bh 8,500,000 17,000,000 0.43

16 Septictank Buis beton Ø 80 cm 2.00 bh 7,500,000 15,000,000 0.38

17 Sumur peresapan Septictank 2.00 bh 7,500,000 15,000,000 0.38

18 Sumur peresapan air hujan 2.00 bh 4,500,000 9,000,000 0.23

19 Bak kontrol 6.00 bh 1,550,000 9,300,000 0.24

20 kran air Stainless 10.00 bh 150,000 1,500,000 0.04

Sub Total Rp. 447,371,600 11.33

VI. PEKERJAAN PINTU JENDELA

1 kusen & daun Pintu toko Kayu Jati hutan 2.00 unit 45,000,000 90,000,000 2.28

2 Rel & aksesoris pintu toko solid 2.00 unit 15,500,000 31,000,000 0.79

3 kusen & daun Pintu + asesoris Kayu Jati hutan 12.00 unit 6,500,000 78,000,000 1.98

4 Kusen & daun Pintu KM + handle Kayu Jati hutan 6.00 unit 5,000,000 30,000,000 0.76

5 kusen & daun Jendela Kayu Jati hutan 8.00 unit 6,700,000 53,600,000 1.36

6 kusen & daun pintu depan Kayu Jati hutan 4.00 unit 12,000,000 48,000,000 1.22

7 Bouven Kayu Jati hutan 6.00 unit 2,500,000 15,000,000 0.38

8 Sloot pintu 12.00 Set 575,000 6,900,000 0.17

Sub Total Rp. 352,500,000 5.86

VII. PEKERJAAN ATAP

1 Rangka atap baja ringan Sertifikat & bergaransi 149.70 m2 165,000 24,700,500 0.63

2 Genteng + Cat + peredam Beton (Diamond) 149.70 m2 270,000 40,419,000 1.02

3 Rangka, plafon gypsum dan list Besi hollow 495.00 m2 170,000 84,150,000 2.13

4 Listplang+cat GRC 27.00 m1 35,000 945,000 0.02

5 Kerpus beton 25.20 m1 70,000 1,764,000 0.04

Sub Total Rp. 151,978,500 3.85

VIII.PEKERJAAN PENGECATAN

1 Cat tembok luar Mowilex 1045.39 m2 45,000 47,042,460 1.19

2 Cat tembok dalam Catylac 1045.39 m2 37,000 38,679,356 0.98

3 Cat plafon Wiratex 495.00 m2 25,000 12,375,000 0.31

4 Melamin kusen & daun Pintu Spray 26.00 unit 650,000 16,900,000 0.43

Sub Total Rp. 114,996,816 2.91

IX. PEKERJAAN LISTRIK

1 Pasang Listrik Baru 22.000VA 2.00 Ls 57,000,000 114,000,000 2.89

2 MCB panel 6.00 ttk 5,000,000 30,000,000 0.76

3 Instalasi titik lampu 47.00 ttk 170,000 7,990,000 0.20

4 Instalasi Stop Kontak 34.00 ttk 170,000 5,780,000 0.15

5 Instalasi Stop Kontak AC 12.00 ttk 170,000 2,040,000 0.05

6 Instalasi Antena TV include Jek Antena 6.00 ttk 250,000 1,500,000 0.04

7 Pasang lampu hemat energy 47.00 ttk 120,000 5,640,000 0.14

8 Pasang stop kontak 34.00 ttk 40,000 1,360,000 0.03

9 Pasang stop kontak AC 12.00 ttk 30,000 360,000 0.01

10 Pasang saklar single 16.00 ttk 30,000 480,000 0.01

11 Pasang saklar double 12.00 ttk 40,000 480,000 0.01

Sub Total Rp. 169,630,000 4.30

X. PEKERJAAN LAIN-LAIN

1 Pengadaan Lift Elevator merk sanyo 450kg 1.00 ls 526,000,000 526,000,000 13.32

2 Ralling tangga Besi holow 24.00 m2 1,750,000 42,000,000 1.06

3 Ralling balkon Besi holow 18.00 m2 1,200,000 21,600,000 0.55

4 Batu alam 15.00 m2 1,500,000 22,500,000 0.57

5 Alumunium Composite Panel Merk Seven Eks 24.00 m2 1,250,000 30,000,000 0.76

6 Pertamanan rumput,tanaman dsb. 1.00 Ls 5,000,000 5,000,000 0.13


7 Tugu nomor Kavling 1.00 Ls 700,000 700,000 0.02

8 Bak sampah 1.00 Ls 500,000 500,000 0.01

9 kisi-kisi balkon 1.00 Ls 4,000,000 4,000,000 0.10

Sub Total Rp. 652,300,000 3.20

JUMLAH TOTAL Rp. 3,948,922,541 100 %


ANALISIS HARGA SATUAN PEKERJAAN (AHSP) BIDANG CIPTA
KARYA
Pekerjaan Struktur Lantai 1 Pekerjaan Footplat 130x130 -pembesian -Bekisting -Pengecoran
Start: Sun 6/5/20 ID: 2 Start: Sun 6/5/20 ID: 3 Start: Sun 6/5/20 ID: 5 Start: Wed 6/8/20 ID: 6 Start: Tue 6/14/20 ID: 4
Finish: Tue 8/16/20 Dur: 58 days Fi
nish: Fri 6/24/20 Dur: 18 days Finish: Fri 6/17/20 Dur: 12 days Finish: Sat 6/18/20 Dur: 10 days Finish: Fri 6/24/20 Dur: 10 days
Comp: 0% Comp: 0% Res: Besi beton polos[2,468.26 Kg], Kawat Res: Kayu Meranti Papan[1.49 m3], Minyak cm[11.01Kg],
Res: PC 40 Kg[6,194 kg],Pasir
Pekerja[191%],
a pembesian fpTukang
1[1] Kayu[95%],
Beton[7 m3], ton[11 m3],
Kepala
Air[3,034
TukangLtr],
Kayu[10%],
Pekerja[233%],
Mandor[10%],
Tukang Batu[39%],
Jasa BEGESTING
Kepala
FPTukang
1[1 unit]
Batu[4%], Mandor[12%], jasa pengecoran FP 1[1]

Pekerjaan Footplat 110x110 -pembesian -Bekisting -Pengecoran


Start: Sun 6/5/20 ID: 7 Start: Sun 6/5/20 ID: 9 Start: Wed 6/8/20 ID: 10 Start: Mon 6/13/20 ID: 8
Fi
nish: Tue 6/21/20 Dur: 15 days Finish: Wed 6/15/20 Dur: 10 days Finish: Thu 6/16/20 Dur: 8 days Finish: Tue 6/21/20 Dur: 8 days
Comp: 0% Res: Besi beton polos[1,814.02 Kg], Kawat Res: Kayu Meranti Papan[1.08 m3], Minyak cm[8.08 kg],Kg],
Res: PC 40 Kg[4,552.43 Pekerja[175%], Tukang
Pasir Beton[4.96 Kayu[87%],
m3], Kepala Tukang
Koral Beton[7.72 Kayu[8%], Jasa
m3], Air[2,229.55 Ltr], Begesting FP 2[1],
Pekerja[213%], Mandor[8%]
Tukang Batu[35%], Kepala Tukang Batu[4%], Mandor[10%]

Pekerjaan Sloof 15/35 -pembesian -Bekisting -Pengecoran


Start: Sat 6/25/20 ID: 11 Start: Sat 6/25/20 ID: 13 Start: Wed 6/29/20 ID: 14 Start: Sat 7/9/20 ID: 12
nish: Mon 7/18/20 Dur: 15 days
Fi Finish: Tue 7/12/20 Dur: 10 days Finish: Wed 7/13/20 Dur: 8 days Finish: Mon 7/18/20 Dur: 8days
Comp: 0% Res: Besi beton polos[2,224.29 Kg], Kawat ta Kawat beton[31.77 Kg], Pekerja[148%],
Res: Paku Tukang
5-10 cm[2.82 kg], Besi[148%], Kepala
Pekerja[18%], Kayu[44%],
Tukang Res:
Besi[15%],
Kepala
PC Tukang
40Mandor[8%],
Kg[4,433.9
Kayu[4%],
Kg],
JasaMandor[1%],
Pasir
pembesian
Beton[4.83
Jasa
sloofm3],
Begesting
1[1]Koral Beton[7.53
sloof 1[1], Kayu
m3],Meranti
Air[2,171.5
Balok[0.12
Ltr], Pekerja[208%],
m3], Papan cor[0.17
Tukang Batu[35%],
m3] Kepala Tukang Batu[4%], Mandor[10%], Jasa Pengecoran Sloof 1[1]

Pekerjaan Sloof 15/25 -pembesian -Bekisting -Pengecoran


Start: Sat 6/25/20 ID: 15 Start: Sat 6/25/20 ID: 17 Start: Wed 6/29/20 ID: 18 Start: Sat 7/2/20 ID: 16
nish: Thu 7/14/20 Dur: 12 days
Fi Finish: Sat 7/9/20 Dur: 8 days Finish: Mon 7/11/20Dur: 6 days Finish: Thu 7/14/20 Dur: 6 days
Comp: 0% Res: Besi beton polos[1,546.06 Kg], Kawat ta Kawat beton[22.08 Kg], Pekerja[129%],
Res: Paku Tukang
5-10 cm[1.38 kg], Besi[129%], Kepala
Pekerja[12%], Kayu[29%],
Tukang Res:
Besi[13%],
Kepala
PC Tukang
40Mandor[7%],
Kg[3,037.9
Kayu[3%],
Kg],
JasaMandor[1%],
Pasir
pembesian
Beton[3.32
Jasa
sloofm3],
Begesting
2[1]Koral Beton[5.2
sloof 2[1], m3],
KayuAir[1,487.8
Meranti Balok[0.05
Ltr], Pekerja[190%],
m3], PapanTukang
cor[0.08Batu[32%],
m3] Kepala Tukang Batu[3%], Mandor[10%], Jasa Pengecoran Sloof 2[1]

Pekerjaan Sloof 15/20 -pembesian -Bekisting -Pengecoran


Start: Sat 6/25/20 ID: 19 Start: Sat 6/25/20 ID: 21 Start: Tue 6/28/20 ID: 22 Start: Thu 6/30/20 ID: 20
Fi
nish: Sat 7/9/20 Dur: 8 days Finish: Thu 6/30/20 Dur: 5 days Finish: Fri 7/1/20 Dur: 4 days Finish: Sat 7/9/20 Dur: 4 days
Comp: 0% Res: Besi beton polos[639.04 Kg], Kawat tali 9.13
Res:Kg], Pekerja[85%],
Kayu Tukang Besi[85%],
Meranti Balok[0.02 Kepala
m3], Papan co Tukang Besi[8%],
kuRes:
5-10Mandor[4%],
cm[0.45
PC 40 Kg[1,246.76
kg],Jasa
Pekerja[6%],
pembesian
Kg], Pasir
Tukang
sloof
Beton[1.36
3[1]
Besi[14%],
m3],Kepala
Koral Beton[2.12
Tukang Besi[1%],
m3], Air[610.6
Mandor[0%],
Ltr], Pekerja[117%],
Jasa Begesting Tukang
sloof 3[1]
Batu[20%], Kepala Tukang Batu[2%], Mandor[6%], Jasa Pengecoran Sloof 3[1]

Pekerjaan Kolom KU 1 -pembesian -Bekisting -Pengecoran


Start: Tue 7/19/20 ID: 23 Start: Tue 7/19/20 ID: 25 Start: Mon 7/25/20 ID: 26 Start: Fri 7/29/20 ID: 24
nish: Sat 8/6/20 Dur: 17 days
Fi Finish: Fri 7/29/20 Dur: 10 days Finish: Tue 8/2/20 Dur: 8 days Finish: Sat 8/6/20 Dur: 8 days
Comp: 0% Res: Besi beton polos[1,893.12 Kg], Kawat tali / Kawat beton[27.04 Kg], Pekerja[126%],
Res: Kayu Tukang
Keruing Balok[0.42 m3],Besi[126%],
Minyak Kepala Tukang Res:
Besi[13%],
PC 40Mandor[7%],
cm[4.22
Kg[4,214kg],
.4 Kg],
Kayu
JasaPasir
pembesian
Meranti
Beton[4.59
Papan[0.15
KU 1[1]
m3], Koral
m3], Playwood
Beton[7.15tblm3],
9 mm[3.69
Air[2,064
Lbr],
Ltr],Dolken[21.12
Pekerja[198%],
Btg],
Tukang
Pekerja[87%],
Batu[33%],
Tukang
Kepala
Kayu[43%],
Tukang Batu[3%],
Kepala Tukang
Mandor[10%],
Kayu[4%],
Jasa
Mandor[4%],
PengecoranJasa
KU 1[1]
Begesting KU 1[1]

Pekerjaan Kolom KU 2 -pembesian -Bekisting -Pengecoran


Start: Tue 7/19/20 ID: 27 Start: Tue 7/19/20 ID: 29 Start: Sat 7/23/20 ID: 30 Start: Wed 7/27/20 ID: 28
nish: Tue 8/2/20 Dur: 13 days
Fi Finish: Wed 7/27/20 Dur: 8 days Finish: Fri 7/29/20 Dur: 6 days Finish: Tue 8/2/20 Dur: 6 days
Comp: 0% Res: Besi beton polos[1,441. at tali / Kawat beton[20.6
Res: Kg],
KayuPekerja[120%], Tukang
Keruing Balok[0.22 Besi[120%],
m3], Minyak Kepala Tukang Besi[12%],
Res: PC 40 Mandor[7%],
cm[2.26
Kg[3,108kg],
.12Jasa
Kayu
Kg],pembesian
Pasir
Meranti
Beton[3.39
Papan[0.09
KU 2[1]m3],m3],
KoralPlaywood
Beton[5.28
tbl m3],
9 mm[1.98
Air[1,522.2
Lbr], Ltr],
Dolken[11.32
Pekerja[195%],
Btg], Pekerja[62%],
Tukang Batu[32%],
Tukang
Kepala
Kayu[31%],
TukangKepala
Batu[3%],
Tukang
Mandor[10%],
Kayu[3%], Mandor[3%],
Jasa Pengecoran
Jasa KU
Begesting
2[1] KU 2[1]

Pekerjaan Kolom KU 3 -pembesian -Bekisting -Pengecoran


Start: Sat 7/30/20 ID: 31 Start: Sat 7/30/20 ID: 33 Start: Wed 8/3/20 ID: 34 Start: Sat 8/6/20 ID: 32
Fi
nish: Thu 8/11/20 Dur: 11 days Finish: Sat 8/6/20 Dur: 7 days Finish: Mon 8/8/20 Dur: 5 Finish: Thu 8/11/20 Dur: 5 days
Comp: 0% Res: Besi beton polos[1,091.48 Kg], Kawat Balok[0.14 m3], esi[104%],
days Res: Kayu Keruing Minyak Kepala Tukang Res:
Besi[10%],
PC 40Mandor[6%],
Kg[2,313.53 Jasa pembesian
s
Kg], Pasir KU 3[1]
. laywood tblm3],
ton[3.93 9 mm[1.29 Lbr], Dolken[7.37
Air[1,133.05 Btg], Pekerja[48%],
Ltr], Pekerja[174%], Tukang Kayu[24%],
Tukang Batu[29%], Kepala
Kepala Tukang TukangMandor[9%],
Batu[3%], Kayu[2%], Mandor[2%], Jasa Begesting
Jasa Pengecoran KU 3[1] KU 3[1]

Pekerjaan Kolom KP -pembesian -Bekisting -Pengecoran


Start: Sat 7/30/20 ID: 35 Start: Sat 7/30/20 ID: 37 Start: Wed 8/3/20 ID: 38 Start: Mon 8/8/20 ID: 36
nish: Tue 8/16/20 Dur: 15 days
Fi Finish: Wed 8/10/20Dur: 10 days Finish: Thu 8/11/20 Dur: 8 days Finish: Tue 8/16/20 Dur: 8 days
Comp: 0% Res: Kawat beton[21.76 Kg], Pekerja[101% Res: Kayu Keruing Balok[0.19 m3], esi[101%],
Minyak Begisting[0.96
Kepala Tukang
ltr],Res:
Besi[10%],
Paku PC
5-10
40Mandor[6%],
cm[1.92 kg], Kayu
Kg[3,516.39 Jasa Pasir
Kg], pembesian
Meranti Papan[0.07
KP[1]
Beton[3.83 m3], Playwood
ton[5.97
tblm3],
9 mm[1.68
Air[1,722.15
Lbr], Dolken[9.61
Ltr], Pekerja[165%],
Btg], Pekerja[40%],
Tukang Batu[28%],
Tukang Kayu[20%],
Kepala Tukang
Kepala
Batu[3%],
TukangMandor[8%],
Kayu[2%], Mandor[2%],
Jasa Pengecoran
Jasa Begesting
KP[1] KP[1]

Pekerjaan Balok Lantai 15/15 -pembesian -Bekisting -Pengecoran


Start: Sat 6/25/20 ID: 39 Start: Sat 6/25/20 ID: 41 Start: Wed 6/29/20 ID: 42 Start: Sat 7/9/20 ID: 40
nish: Mon 7/18/20 Dur: 15 days
Fi Finish: Tue 7/12/20 Dur: 10 days Finish: Wed 7/13/20Dur: 8 days Finish: Mon 7/18/20 Dur: 8 days
Comp: 0% Res: Besi beton polos[1,440.26 Kg], Kawat Kawat beton[20.57 Kg], Pekerja[96%],
Res: Kayu Tukang
Keruing Balok[0.14 Besi[96%],
m3], Minyak Kepala Tukang
71 ltr],
Besi[10%],
Paku P5-10
Res: CMandor[5%],
40cm[1.42
Kg[3,463.71
kg],
Jasa
Kayu
Kg],
pembesian
Pasir
Meranti
Beton[3.78
Balok
Papan[0.05
Lantai[1]
m3],m3],
KoralPlaywood
Beton[5.88
tblm3],
9 mm[1.24
Air[1,696.35
Lbr], Dolken[21.3
Ltr], Pekerja[163%],
Btg], Pekerja[29%],
Tukang Batu[27%],
Tukang Kayu[15%],
Kepala Tukang
Kepala
Batu[3%],
TukangMandor[8%],
Kayu[2%], Mandor[2%],
Jasa Pengecoran
Jasa Begesting
Balok Lantai[1]
Balok Lantai[1]

Pekerjaan Struktur Lantai 2 Pekerjaan Balok 15/40 -Pengecoran


Start: Wed 8/3/20 ID: 43 Start: Mon 8/8/20 ID: 44 Start: Wed 8/31/20 ID: 45
Finish: Sat 9/24/20 Dur: 44 days Fi Thu 9/8/20 Dur: 27 days
nish: Finish: Thu 9/8/20 Dur: 8 days
Comp: 0% Comp: 0% Res: PC 40 Kg[3,108.12 Kg], Pasir Beton[3.39 m3], Koral Beton[5.28 m3], Air[1,522.2 Ltr], Pekerja[146%], Tukang Batu[24%], Kepala Tukang Batu[2%], Mandor[7%], Jasa Pengecoran Balok 15/40[1]

-pembesian -Bekisting
Start: Mon 8/8/20 ID: 46 Start: Thu 8/11/20 ID: 47
Finish: Fri 8/19/20 Dur: 10 days Finish: Sat 8/20/20 Dur: 8 days
Res: Besi beton polos[1,053.47 Kg], Pekerja[ Res: Kayu Keruing 70%], Tukang
Balok[0.27 Besi[70%],
m3], Minyak Kepala Tukang Besi[7%], Mandor[4%], JasaKayu
pembesian
MerantiBalok
Papan[0.12
15/40[1]
m3], Dolken[13.45 Btg], Pekerja[47%], Tukang Kayu[27%], Kepala Tukang Kayu[3%], Mandor[3%], Jasa Begesting Balok 15/40[1], Playwood tbl 9 mm[2.35 Lbr]

Pekerjaan Balok 15/30 -Pengecoran


Start: Wed 8/3/20 ID: 48 Start: Wed 8/31/20 ID:49
nish: Mon 9/5/20 Dur: 28 days
Fi Dur: 5 days
Finish: Mon 9/5/20
Comp: 0% Res: PC 40 Kg[2,089.64 Kg], Pasir Beton[2.28 m3], Koral Beton[3.55 m3], Air[1,023.4 Ltr], Pekerja[157%], Tukang Batu[26%], Kepala Tukang Batu[3%], Mandor[8%], Jasa Pengecoran Balok 15/30[1]

-pembesian -Bekisting
Start: Wed 8/3/20 ID: 50 Start: Sat 8/6/20 ID: 51
Finish: Tue 8/9/20 Dur: 6 days Finish: Thu 8/11/20 Dur: 5 days
Res: Besi beton polos[791.03 Kg], Kawat tali / Kawat beton[11.3
Res:Kg], Pekerja[88%],
Kayu Tukang Besi[88%],
Keruing Balok[0.14 Kepala Tukang Besi[9%], Mandor[5%], Jasa pembesian
m3], Minyak Kayu Meranti
BalokPapan[0.06
15/30[1] m3], Playwood tbl 9 mm[1.25 Lbr], Dolken[7.14 Btg], Pekerja[40%], Tukang Kayu[24%], Kepala Tukang Kayu[2%], Mandor[2%], Jasa Begesting Balok 15/30[1]

Pekerjaan Balok 15/25 -Pengecoran


Start: Fri 8/12/20 ID: 52 Start: Wed 8/31/20 ID: 53
nish: Tue 9/6/20 Dur: 21 days
Fi Finish: Tue 9/6/20 Dur: 6 days
Comp: 0% Res: PC 40 Kg[2,866.67 Kg], Pasir Beton[3.13 m3], Koral Beton[4.87 m3], Air[1,403.95 Ltr], Pekerja[180%], Tukang Batu[30%], Kepala Tukang Batu[3%], Mandor[9%], Jasa Pengecoran Balok 15/25[1]

-pembesian -Bekisting
Start: Fri 8/12/20 ID: 54 Start: Tue 8/16/20 ID: 55
Finish: Mon 8/22/20 Dur: 8 days Finish: Tue 8/23/20 Dur: 6 days
Res: Besi beton polos[1,141.95 Kg], Kawat tali / Kawat beton[16.31
Res: Kayu
Kg], Pekerja[95%],
Keruing Balok[0.16
Tukang
m3],
Besi[95%],
Minyak Begisting[0.85
Kepala Tukangltr],
Besi[9%],
Paku 5-10
Mandor[5%],
cm[1.7 kg],
Jasa
Kayu
pembesian
Meranti Balok
Papan[0.08
15/25[1]
m3], Playwood tbl 9 mm[1.48 Lbr], Dolken[8.49 Btg], Pekerja[40%], Tukang Kayu[23%], Kepala Tukang Kayu[2%], Mandor[2%], Jasa Begesting Balok 15/25[1]

Pekerjaan Plat Lantai -pembesian -Bekisting -Pengecoran


Start: Sat 8/13/20 ID: 56 Start: Sat 8/13/20 ID: 58 Start: Sat 8/20/20 ID: 59 Start: Wed 8/31/20 ID: 57
nish:
Fi Sat 9/17/20 Dur: 29 days Finish: Fri 9/2/20 Dur: 17 days Finish: Tue 9/6/20 Dur: 15 days Finish: Sat 9/17/20 Dur: 15 days
Comp: 0% Res: Besi beton polos[1,523.9 Kg], Kawat tali / Kawat beton[21.77
Res: Kg],
KayuPekerja[60%],
Meranti Balok[2.8
Tukang
m3],
Besi[60%],
Multiplek
Kepala
9 mm[3.95
TukangLbr],
Besi[6%],
Paku 2"-5"[65.97
Res: Mandor[3%],
PC Kg],
Jasa
40 Kg[7,603.2Pekerja[220%],
pembesian
Kg], Pelat
Tukang
Lantai
Pasir Beton[9.79 Kayu[550%],
2[1] Kepala Tukang Kayu[55%],
4,257 Ltr],
Mandor[11%],
Pekerja[218%],
JasaTukang
Begesting
Batu[36%],
Pelat Lantai
Kepala
2[1]Tukang Batu[4%], Mandor[11%], Jasa Pengecoran Pelat Lantai 2[1]

Pekerjaan Tangga -pembesian -Bekisting -Pengecoran


Start: Fri 8/12/20 ID: 60 Start: Fri 8/12/20 ID: 62 Start: Tue 8/16/20 ID: 63 Start: Fri 8/19/20 ID: 61
Fi Tue 8/23/20 Dur: 9 days
nish: Finish: Thu 8/18/20 Dur: 5 days Finish: Sat 8/20/20 Dur: 4 days Finish: Tue 8/23/20 Dur: 4 days
Comp: 0% Res: Besi beton polos[138.6 Kg], Kawat tali / Kawat beton[1.98
Res:
Kg],Kayu
Pekerja[18%],
Meranti Balok[0.1
Tukang Besi[18%],
m3], Multiplek
Kepala9 mm[0.15
Tukang Besi[2%],
Lbr], Res:
PakuMandor[1%],
2"-5"[2.52
PC 40 Kg[460.8
Kg],
JasaPekerja[31%],
pembesian
Kg], Pasir Beton[0.59
Pelat
Tukang
Tangga
Kayu[79%],
m3],
L 2[1]
Koral Beton[0.91
Kepala Tukang
m3],Kayu[8%],
Air[258 Ltr],
Mandor[2%],
Pekerja[49%],
JasaTukang
Begesting
Batu[8%],
Pelat Tangga
KepalaLTukang
2[1] Batu[1%], Mandor[2%], Jasa Pengecoran Pelat Tangga L 2[1]

Pekerjaan Kolom KU 3 -pembesian -Bekisting -Pengecoran


Start: Wed 9/7/20 ID: 64 Start: Wed 9/7/20 ID: 66 Start: Sat 9/10/20 ID: 67 Start: Fri 9/16/20 ID: 65
nish: Sat 9/24/20 Dur: 15 days
Fi Finish: Mon 9/19/20 Dur: 10 days Finish: Tue 9/20/20 Dur: 8 days Finish: Sat 9/24/20 Dur: 8 days
Comp: 0% Res: Besi beton polos[1,988.28 Kg], Kawat tali / Kawat beton[28.4
Res: Kg],
KayuPekerja[132%], Tukang
Keruing Balok[0.27 Besi[132%],
m3], Minyak Kepala Tukangtr],
Besi[13%],
Paku PC
Res: 5-10Mandor[7%],
40cm[2.68 kg],Kg],
Kg[4,214.4 Jasa
Kayupembesian
Meranti
Pasir Papan[0.1
KU 3 L2[1]m3], Playwood tbl 9 mm[2.35
Beton[4.59 2,064
Lbr],
Ltr],
Dolken[13.44
Pekerja[198%],
Btg],Tukang
Pekerja[55%],
Batu[33%],
Tukang
Kepala
Kayu[27%],
Tukang Batu[3%],
Kepala Tukang
Mandor[10%],
Kayu[2%],Jasa
Mandor[2%],
Pengecoran
Jasa
KUBegesting
3 L2[1] KU 3 L2[1]

Pekerjaan KP -pembesian -Bekisting -Pengecoran


Start: Thu 8/18/20 ID: 68 Start: Thu 8/18/20 ID: 70 Start: Mon 8/22/20 ID: 71 Start: Thu 8/25/20 ID: 69
nish: Wed 8/31/20 Dur: 12 days
Fi Finish: Fri 8/26/20 Dur: 8 days Finish: Sat 8/27/20 Dur: 6 da ys Finish: Wed 8/31/20Dur: 6 days
Comp: 0% Res: Kayu
Res: Besi beton polos[1,568.69 Kg], Kawat tali / Kawat beton[22.41 Kg], Pekerja[131%],
Meranti Balok[0.08
Tukang
m3],
Besi[131%],
Papan cor[0.12
Kepala
m3],
Tukang
PakuRes:
Besi[13%],
2"-5"[1.98
PC 40Mandor[7%],
Kg],
Kg[3,621.75
Pekerja[17%],
Kg],
Jasa Pasir
pembesian
Tukang
Beton[3.95
Kayu[41%],
KP 1[1]
m3],Kepala
Koral Beton[6.15
Tukang Kayu[4%],
m3], Air[1,773.75
Mandor[1%],Ltr],
Jasa
Pekerja[227%],
Begesting KPTukang
1[1] Batu[38%], Kepala Tukang Batu[4%], Mandor[11%], Jasa Pengecoran KP 1[1]

Pekerjaan Topi-topi -pembesian -Bekisting -Pengecoran


Start: Fri 9/16/20 ID: 72 Start: Fri 9/16/20 ID: 74 Start: Tue 9/20/20 ID: 75 Start: Thu 9/22/20 ID: 73
Fi
nish: Sat 9/24/20 Dur: 8 days Finish: Tue 9/20/20 Dur: 4 days Finish: Thu 9/22/20 Dur: 3 days Finish: Sat 9/24/20 Dur: 3 days
Comp: 0% Res: Besi beton polos[350.28 Kg], Kawat Kawat beton[5Res:
Kg], Pekerja[58%],
Kayu MerantiTukang
Balok[0.55
Besi[58%],
m3], Multiplek
Kepala Tukang
9 mm[0.77
Besi[6%],
Lbr],Res:
Paku
Mandor[3%],
PC
2"-5"[12.96
40 Kg[1,601.28
JasaKg],
pembesian
Pekerja[216%],
Kg], Pasir
TOPI[1]
Beton[2.06
Tukangm3],
Kayu[540%],
Koral Beton[3.17
Kepala Tukang
m3], Air[896.55
Kayu[54%],Ltr],
Mandor[11%],
Pekerja[229%],
JasaTukang
Begesting
Batu[38%],
TOPI[1] Kepala Tukang Batu[3%], Mandor[11%], Jasa Pengecoran TOPI[1]

Pekerjaan Struktur Lantai 3 Pekerjaan Balok 15/30 -Pengecoran


Start: Thu 9/1/20 ID: 76 Start: Mon 9/26/20 ID: 77 Start: Fri 10/21/20 ID: 78
Finish: Mon 11/28/20Dur: 74 days nish: Fri 11/4/20 Dur: 34 days
Fi Finish: Fri 11/4/20 Dur: 13 days
Comp: 0% Comp: 0% Res: PC 40 Kg[6,189.9 Kg], Pasir Beton[6.75 m3], Koral Beton[10.51 m3], Air[3,031.5 Ltr], Pekerja[179%], Tukang Batu[30%], Kepala Tukang Batu[3%], Mandor[9%], Jasa Pengecoran Balok 15/30 L2[1]

-pembesian -Bekisting
Start: Mon 9/26/20 ID: 79 Start: Sat 10/1/20 ID: 80
Finish: Thu 10/13/20Dur: 15 days Finish: Mon 10/17/2 6Dur: 13 days
Res: Besi beton polos[2,343.19 Kg], Pekerja Res: Kayu Keruinga[104%], Tukang
Balok[0.42 m3],Besi[104%],
Minyak Kepala Tukang Besi[10%], Mandor[5%],
4.23 kg], Kayu
Jasa pembesian
Meranti Papan[0.19
Balok 15/30
m3],
L2[1]
Playwood tbl 9 mm[3.7 Lbr], Dolken[21.15 Btg], Pekerja[45%], Tukang Kayu[27%], Kepala Tukang Kayu[3%], Mandor[3%], Jasa Begesting Balok 15/30 L...

Pekerjaan Balok 15/25 -Pengecoran


Start: Mon 9/26/20 ID: 81 Start: Fri 10/21/20 ID: 82
Finish: Thu 10/27/20Dur: 27 days Finish: Thu 10/27/20Dur: 6 days
Comp: 0% Res: PC 40 Kg[3,002.76 Kg], Pasir Beton[3.27 m3], Koral Beton[5.1 m3], Air[1,470.6 Ltr], Pekerja[188%], Tukang Batu[31%], Kepala Tukang Batu[3%], Mandor[9%], Jasa Pengecoran Balok 15/25 L2[1]

-pembesian -Bekisting
Start: Mon 9/26/20 ID: 83 Start: Thu 9/29/20 ID: 84
Finish: Tue 10/4/20 Dur: 8 days Finish: Wed 10/5/20 Dur: 6 days
Res: Besi beton polos[1,196.16 Kg], Kawat tali / Kawat beton[17.09 Kg], Pekerja[99%],
Res: Kayu Tukang
Keruing Balok[0.17 Besi[99%],
m3], Minyak Kepala Tukang Besi[1%], Mandor[5%],
1.77 kg],
JasaKayu
pembesian
MerantiBalok
Papan[0.08
15/25 L2[1]
m3], Playwood tbl 9 mm[1.55 Lbr], Dolken[8.89 Btg], Pekerja[42%], Tukang Kayu[24%], Kepala Tukang Kayu[2%], Mandor[2%], Jasa Begesting Balok 15/25 L...

Pekerjaan Balok Ring 15/20 -pembesian -Bekisting -Pengecoran


Start: Wed 10/19/20ID: 85 Start: Wed 10/19/20ID: 87 Start: Tue 10/25/20 ID: 88 Start: Sat 10/29/20ID: 86
Fi Mon 11/7/20Dur: 17 days
nish: Finish: Sat 10/29/20Dur: 10 days Fi Wed 11/2/20Dur: 8 days
nish: Finish: Mon 11/7/20Dur: 8 days
Comp: 0% Res: Besi beton polos[1,227.9 Kg], Kawat Res: Kayu Keruing Balok[0.2 m3], Minyak Res: PC 40 Kg[4,034.41 Kg], Pasir Beton[4.4 m3], Koral Beton[6.85 m3], Air[1,975.85 Ltr], Pekerja[190%], Tukang Batu[32%], Kepala Tukang B

Pekerjaan Plat Lantai -pembesian -Bekisting -Pengecoran


Start: Wed 10/5/20 ID: 89 Start: Wed 10/5/20 ID: 91 Start: Tue 10/11/20 ID: 92 Start: Fri 10/21/20 ID: 90
Fi
nish: Mon 11/7/20Dur: 28 days Finish: Tue 10/25/20Dur: 17 days Finish: Fri 10/28/20 Dur: 15 days Finish: Mon 11/7/20 Dur: 15 days
Comp: 0% Res: Besi beton polos[1,523.9 Kg], Kawat tali / Kawat beton[21.77
Res: Kg],
KayuPekerja[60%], Tukang
Meranti Balok[2.8 Besi[60%],
m3], Kepala Tukang Besi[6%],
Multiplek Res: Mandor[3%],
PC 40 Kg[7,603.2
7 Kg],
Jasa
Pekerja[220%],
Kg],
pembesian
Pasir Beton[9.79
Pelat
Tukang
Lantai
m3],
Kayu[550%],
2[1]
Koral Beton[15.06
Kepala Tukang
m3], Kayu[55%],
Air[4,257 Ltr],
Mandor[11%],
Pekerja[218%],
JasaTukang
Begesting
Batu[36%],
Pelat Lantai
Kepala
2[1]Tukang Batu[4%], Mandor[11%], Jasa Pengecoran Pelat Lantai 2[1]

Pekerjaan Tangga -pembesian -Bekisting -Pengecoran


Start: Mon 9/1920 ID: 93 Start: Mon 9/19/20 ID: 95 Start: Thu 9/22/20 ID: 96 Start: Sat 9/24/20 ID: 94
nish:
Fi Wed 9/28/20Dur: 9 days Finish: Fri 9/23/20 Dur: 5 days Finish: Mon 9/26/Dur: 4 days Finish: Wed 9/28/20 Dur: 4 days
Comp: 0% Res: Besi beton polos[138.6 Kg], Kawat tali / Kawat beton[1.98 Kg],Kayu
Res: Pekerja[18%],
Meranti BaTukang
lok[0.1Besi[18%],
m3], Multiplek
Kepala
9 mm[0.15
Tukang Besi[2%],
Lbr], Res:
PakuMandor[1%],
2"-5"[2.52 Kg],
Jasa
PC 40 Kg[460 .8Pekerja[31%],
pembesian
Kg], Pasir Beton[0.59
Pelat
Tukang
Tangga
Kayu[79%],
m3],
L 2[1]
Koral Beton[0.91
Kepala Tukang
m3],Kayu[8%],
Air[258 Ltr],
Mandor[2%],
Pekerja[49%],
JasaTukang
Begesting
Batu[8%],
Pelat Tangga
KepalaLTukang
2[1] Batu[1%], Mandor[2%], Jasa Pengecoran Pelat Tangga L 2[1]

Pekerjaan Kolom KU 3 -pembesian -Bekisting -Pengecoran


Start: Mon 9/26/20 ID: 97 Start: Mon 9/26/20 ID: 99 Start: Fri 9/30/20 ID: 100 Start: Thu 10/6/20 ID: 98
nish: Tue 10/18/20Dur: 19 days
Fi Finish: Sat 10/8/20 Dur: 12 days Finish: Tue 10/11/20Dur: 10 days Finish: Tue 10/18/20Dur: 10 days
Comp: 0% Res: Besi beton polos[2,290.66 Kg], Kawat tali / Kawat beton[32.72 Kg], Pekerja[127%],
Res: Kayu Tukang
Keruing Balok[0.31 m3],Besi[127%],
Minyak Kepala Tukang Res:
Besi[13%],
PC 40Mandor[7%],
3.09 kg], Kayu
Kg[4,855.34 Jasa pembesian
Meranti
Kg], Pasir Beton[5.29
Papan[0.11
KU 3 m3],
L3[1]m3],
KoralPlaywood
Beton[8.24
tblm3],
9 mm[2.7
Air[2,377.9
Lbr], Dolken[15.48
Ltr], Pekerja[182%],
Btg], Pekerja[51%],
Tukang Batu[30%],
TukangKepala
Kayu[25%],
Tukang
Kepala
Batu[3%],
Tukang
Mandor[9%],
Kayu[3%], Mandor[3%],
Jasa Pengecoran
Jasa KU
Begesting
3 L3[1] KU 3 L3[1]

Pekerjaan KP -pembesian -Bekisting -Pengecoran


Start: Thu 9/1/20 ID: 101 Start: Thu 9/1/20 ID: 103 Start: Wed 9/7/20 ID: 104 Start: Tue 9/13/20 ID: 102
Fi
nish: Wed 9/21/20Dur: 17 days Finish: Tue 9/13/20 Dur: 10 days Finish: Fri 9/16/20 Dur: 8 days Finish: Wed 9/21/20 Dur: 8 days
Comp: 0% Res: Besi beton polos[1,897.64 Kg], Kawat tali / Kawat beton[27.1
Res: Kg],
KayuPekerja[126%],
Meranti Balok[0.1
Tukang
m3],
Besi[126%],
Papan cor[0.14
Kepalam3],
Tukang
PakuBesi[12%],
2"-5"[2.39
Res: PC 40Mandor[7%],
Kg], Pekerja[15%],
Kg[4,381.22Jasa
Kg],pembesian
Pasir
TukangBeton[4.78
Kayu[37%],
KP 2[1]m3],
Kepala
KoralTukang
Beton[7.44
Kayu[4%],
m3], Air[2,145.7
Mandor[1%], Ltr],
Jasa
Pekerja[206%],
Begesting KPTukang
2[1] Batu[34%], Kepala Tukang Batu[3%], Mandor[10%], Jasa Pengecoran KP 2[1]

Pekerjaan Topi-topi -pembesian -Bekisting -Pengecoran


Start: Mon 10/10/20ID: 105 Start: Mon 10/10/20ID: 107 Start: Fri 10/14/20 ID: 108 Start: Mon 10/17/20ID: 106
Finish: Wed 10/19/20Dur: 8 days Finish: Fri 10/14/20 Dur: 4 days Finish: Mon 10/17/20Dur: 3 days Finish: Wed 10/19/20Dur: 3 days
Comp: 0% Res: Besi beton polos[350.28 Kg], Kawat tali / Kawat beton[5Res:
Kg], Pekerja[58%],
Kayu MerantiTukang
Balok[0.55
Besi[58%],
m3], Multiplek
Kepala Tukang
9 mm[0.77
Besi[6%],
Lbr],Res:
Mandor[3%],
PakuPC2"-5"[12.96
40 Kg[1,601.28
JasaKg],
pembesian
Pekerja[216%],
Kg], Pasir
TOPI[1]
Beton[2.06
Tukang m3],
Kayu[540%],
Koral Beton[3.17
Kepala Tukang
m3], Air[896.55
Kayu[54%],Ltr],
Mandor[11%],
Pekerja[229%],
JasaTukang
Begesting
Batu[38%],
TOPI[1] Kepala Tukang Batu[3%], Mandor[11%], Jasa Pengecoran TOPI[1]

Pekerjaan Plat Dak Tandon -pembesian -Bekisting -Pengecoran


Start: Mon 10/31/20ID: 109 Start: Mon 10/31/20ID: 111 Start: Sat 11/5/20 ID: 112 Start: Mon 11/14/20ID: 110
Fi Mon 11/28/20 Dur: 25 days
nish: Finish: Wed 11/16/20Dur: 15 days Finish: Sat 11/19/20 Dur: 13 days Finish: Mon 11/28/20Dur: 13 days
Comp: 0% Res: Besi beton polos[1,108.29 Kg], Kawat tali / Kawat beton[15.83 Kg], Pekerja[49%],
Res: Kayu Tukang
Meranti Balok[2.03 Besi[49%],
m3], MultipleKepala Tukang Besi[5%],
Res:kuPC2"-5"[47.98
Mandor[2%],
40 Kg[5,529.6
Kg],
Jasa
Pekerja[185%],
Kg],
pembesian
Pasir Beton[7.11
Dak
Tukang
Tandon[1]
m3],
Kayu[461%],
Koral Beton[10.95
Kepala Tukang
m3], Air[3,0
Kayu[

Page 1
Project: pelaksanaan Critical Noncritical Critical Milestone Milestone Critical Summary Summary Critical Inserted Inserted Critical Marked Marked Critical External External Project Summary Highlighted Critical Highlighted Noncritical
Date: Wed 7/18/21