Project: SGP_ RDP_ Renovation of admin building

Location: Dry Port Riyadh


Subject: Bill of Quantities
Date: May 16, 2022

Item Description Quantity Unit

I Renovation of I Building

1 General Preliminaries

Site inspection, Site supervision, submission 2D & 3D drawings for client approval prior to proceeds any works and as - built
1.1 1.00 lot
drawing after the complettion of the projet.( Civil, MEP, FF, IT).

1.2 Mobilization and Demobilization including hauling and dumping of debris materials to the specified and approved dumping 1.00 lot
site outside the vicinity area.

1.3
Traffic Safety and Control
1.00 lot
Provision of safety requirements; 2 units of fire extinguisher ( Powder 6 kgs. ) safety barriers, safety lights, safety signages, etc.)

Sub - Total General Preliminaries


2 Civil Works

Demolition and Removal of existing facilities and all items that are not use as directed by the client whether it is under Civil,
2.1 1.00 lot
MEP, FF, IT and others.

2.2 Sandblasting of existing exterior and interior paint and repair / filling the cracks on the walls 1.00 lot

Supply and installation of fire resistant gypsum board suspended ceiling with cob design including aluminum runner and
2.3 required accessories

2.3.1 Fire resistant gypsum board ceiling for offices, lobby, commn areas, etc.. 1240.00 m2

2.3.2 Fire & moisture resistant gypsum ceiling board for toillet and pantry area 130.00 m2

2.4 Supply and installation of plastered CHB bock wall partition 1.00 lot

2.5 Supply and installation of double dry walls partition 1.00 lot

Supply and Installation of frosted and clear glass walls partition with complete accessories ( The contractor has to specify
2.6 1.00 lot
thickness of glass )

2.7 Supply and installation of doors ( The contractor has to specify the thickness of glass )

2.7.1 Supply and installation of frameless swing glass doors with complete accessories 45.00 units

2.7.2 Supply and installation of frameless sliding glass doors with complete accessories 3.00 units

2.7.3 ACS control door 6.00 units

2.7.4 Supply and Installation of heavy-duty aluminum main doors in all toilets including all required accessories; door closer, 4.00 units
hinges, lock, handle, stopper, etc…
2.7.5 Supply and Installation of heavy-duty aluminum cubicle doors in all toilets including all required accessories; hinges, lock,
10.00 units
handle, stopper, etc…
Supply and Installation of heavy-duty wooden door including all required accessories; hinges, lock, door closer, stopper, etc..
2.8 3.00 units
( with good varnish finish )

2.9 Supply and Installation fire rated metal door ( with good paint finish ) 1.00 unit

2.10 Supply and application of paint on exterior and interior walls, ceiling and all other required area. 1.00 lot

2.11 Supply and installation of stainless railings 1.00 lot

2.12 Supply and installation of fabric window blinds 1.00 lot

Supply and installation of unglazed floor tiles in all offices, hallways, reception, entrance, pantry, toilet, etc.. Including all
2.13 miscellaneous items. 1367.00 m2

2.14 Supply and installation of wall tiles in all toilet and pantry and all required accessories; adhesive, grout, tile trim, etc.. 1.00 lot

2.15 Supply and installation of granite riser and threads in the all exterior stairs. 1.00 lot

2.16 Supply and installation of granite lavatory counter for toilets 1.00 lot

2.17 Supply and installation of granite lavatory counter for pantry including under and over hang cabinet 1.00 lot

2.18 Supply and installation of information counter 1.00 lot

Note: the contractor has to submit design thickness and specification of glass for client approval prior to proceed any works.

Sub - Total Civil Works


3 Electrical Works

3.1 Relocation of electrical main panel board including laying of cable and any other related works 1.00 lot

3.2 Complete electrical works; Rewiring, new location of switches, outlet, lighting fixtures and all other related works 1.00 lot
3.3 Supply and installation of water heater (50 liters capacity) 6.00 units

Note: the contractor has to submit electrical drawing for client approval prior to proceed any works.

Sub - Total Electrical Works


4 Mechanical works

Option 1 - Checking and utilize the existing centralized AC (the contractor has to repair, replace broken or damaged parts and
4.1 reconditioning of the existing centralized AC) if not feasible go for option 2 1.00 lot

4.2 Option 2 - Supply and Installation of split type AC ( all condenser must be on the roof ) ( Carrier or Zamil )

4.2.1 Supply and Installation of 3 tons split type AC 12.00 units

4.2.2 Supply and Installation of 2 tons split type AC 13.00 units

4.2.3 Supply and Installation of 1.5 split type AC 14.00 units

4.2.4 Supply and Installation of 2 tons ceiling mounted AC 6.00 units

4.2.5 Supply and Installation of 1.5 tons ceiling mounted AC 2.00 units

Sub - Total Mechanical Works


5 Plumbing works

5.1 Supply and installation of hot and cold water line including all fittings and accessories. ( CPVC schedule 80 ) 1.00 lot

5.2 Supply and installation of sanitary pipe including all fittings and accessories. ( UPVC schedule 40 ) 1.00 lot

Supply and installation of overhead fiberglass water tank including all pipe connection, fittings, accessories and all related
5.3 1.00 lot
materials to complete the works.

5.4 Supply and installation of new plumbing fixtures and all required accessories.

5.4.1 Water closet (English type) 9.00 units

5.4.2 Water closet (Arabic type) 4.00 units

5.4.3 Under conter lavatory 10.00 units

5.4.4 Lavatory with pedestal 1.00 set

5.4.5 Stainless kitchen sink 2.00 units

5.4.6 Lavatory mixer (hot and cold) 13.00 units

5.4.7 Kitchen sink mixer (hot and cold) 2.00 units

5.4.8 Bidet sprayer ( cold only ) 12.00 units

5.4.9 100 mm x 100 mm stainless floor drain. 20.00 units

5.4.10 Glass mirror ( as per approved sample ) 10.00 units

5.4.11 Soap dispenser 12.00 units

5.4.12 Tissue holder (big) 10.00 units

5.4.13 Tissue holder (small) 12.00 units

5.4.14 Heavy duty garden faucet 10.00 units

5.4.15 clothes hanger 10.00 units

5.4.16 Hand drier 8.00 units

Sub - Total Plumbing Works


6 FireFighting Works

Complete checking, repair and recondition of existing fire fighting system and not limited to; Pump room or supply room, Fire
6.1 1.00 lot
hose reel cabinet, Sprinkler system, Fire alarm system, Fire hydrant, deluge system, etc..

Note: The contractor has the full responsibility for all firefighting system and it must be working and in good condition.

Sub - Total FireFighting Works


7 IT Works

7.1 Under IT department 1.00 N/A

Sub - Total IT Works


Note : the contractor shall include in the pricing for all materials, labor, tools /equipment, etc.. and also the contractor must
check the actual measurement and include all items not mentined in the BOQ but required in the project to complete the works.
( The contractor has the full responsiblity for all the missing items with no cost )

Total amount exclusive VAT

15 % Value Added Tax ( VAT )

Total project cost inclusive 15 % VAT


Unit cost ( SAR ) Total cost (SAR )

85,000.00 85,000.00

20,000.00 20,000.00

15,000.00 15,000.00

120,000.00

705,600.00
705600
297,600.00
297600

272,800.00
220
28,600.00
220
180,000.00
180000
36,800.00
36800
4,316,800.00
4316800

540,000.00
12000
48,000.00
16000
16,800.00
2800
14,400.00
3600
23,000.00
2300
10,500.00
3500
3,000.00
3000
1,512,000.00
1512000
32,000.00
32000
46,800.00
46800
341,750.00
250
107,800.00
107800
56,000.00
56000
30,000.00
30000
48,000.00
48000
36,000.00
36000

8,704,250.00

1,890,000.00 1,890,000.00

366,000.00
366,000.00
9,600.00
1,600.00
-

2,265,600.00

55,000.00
55,000.00

72,000.00
6000
71,500.00
5500
56,000.00
4000
78,000.00
13000
20,000.00
10000
352,500.00

56,000.00
56,000.00
12,000.00
12,000.00
24,000.00
24,000.00

16,200.00
1800
5,600.00
1400
12,000.00
1200
1,100.00
1100
4,000.00
2000
20,800.00
1600
6,400.00
3200
1,800.00
150
2,400.00
120
40,000.00
4000
9,600.00
800
9,000.00
900
6,600.00
550
18,000.00
1800
3,000.00
300
12,000.00
1500
260,500.00

145,000.00
145,000.00

145,000.00

-
220,000.00 220,000.00

11,847,850.00

1,777,177.50

13,625,027.50
Project:
Location:
Subject:
Date:

Item

1.1

1.2

1.3

2.1

2.2

2.3

2.4

2.5

2.6

2.7
2.8

2.9

2.10

2.11

2.12

2.13

2.14

2.15

2.16

2.17

2.18

3.1

3.2

3.3

4.1
4.2

5.1

5.2

5.3

5.4
6

6.1

7.1
SGP_ RDP_ Renovation of admin building
Dry Port Riyadh
Bill of Quantities
May 16, 2022

Description

Renovation of I Building

General Preliminaries

Site inspection, Site supervision, submission 2D & 3D drawings for client approval prior to proceeds any works and
drawing after the complettion of the projet.( Civil, MEP, FF, IT).
Mobilization and Demobilization including hauling and dumping of debris materials to the specified and approved
site outside the vicinity area.

Traffic Safety and Control

Provision of safety requirements; 2 units of fire extinguisher ( Powder 6 kgs. ) safety barriers, safety lights, safety sig

Sub - Total General P


Civil Works

Demolition and Removal of existing facilities and all items that are not use as directed by the client whether it is und
MEP, FF, IT and others.

Sandblasting of existing exterior and interior paint and repair / filling the cracks on the walls

Supply and installation of fire resistant gypsum board suspended ceiling with cob design including aluminum runn
required accessories

2.3.1 Fire resistant gypsum board ceiling for offices, lobby, commn areas, etc..

2.3.2 Fire & moisture resistant gypsum ceiling board for toillet and pantry area

Supply and installation of plastered CHB bock wall partition

Supply and installation of double dry walls partition

Supply and Installation of frosted and clear glass walls partition with complete accessories ( The contractor has to sp
thickness of glass )

Supply and installation of doors ( The contractor has to specify the thickness of glass )

2.7.1 Supply and installation of frameless swing glass doors with complete accessories

2.7.2 Supply and installation of frameless sliding glass doors with complete accessories
2.7.3 ACS control door

2.7.4 Supply and Installation of heavy-duty aluminum main doors in all toilets including all required accessories; do
hinges, lock, handle, stopper, etc…
2.7.5 Supply and Installation of heavy-duty aluminum cubicle doors in all toilets including all required accessories;
handle, stopper, etc…
Supply and Installation of heavy-duty wooden door including all required accessories; hinges, lock, door closer, sto
( with good varnish finish )

Supply and Installation fire rated metal door ( with good paint finish )

Supply and application of paint on exterior and interior walls, ceiling and all other required area.

Supply and installation of stainless railings

Supply and installation of fabric window blinds

Supply and installation of unglazed floor tiles in all offices, hallways, reception, entrance, pantry, toilet, etc.. Includi
miscellaneous items.

Supply and installation of wall tiles in all toilet and pantry and all required accessories; adhesive, grout, tile trim, et

Supply and installation of granite riser and threads in the all exterior stairs.

Supply and installation of granite lavatory counter for toilets

Supply and installation of granite lavatory counter for pantry including under and over hang cabinet

Supply and installation of information counter

Note: the contractor has to submit design thickness and specification of glass for client approval prior to proceed an

Sub - Total
Electrical Works

Relocation of electrical main panel board including laying of cable and any other related works

Complete electrical works; Rewiring, new location of switches, outlet, lighting fixtures and all other related works

Supply and installation of water heater (50 liters capacity)

Note: the contractor has to submit electrical drawing for client approval prior to proceed any works.

Sub - Total Elec


Mechanical works

Option 1 - Checking and utilize the existing centralized AC (the contractor has to repair, replace broken or damaged
reconditioning of the existing centralized AC) if not feasible go for option 2
Option 2 - Supply and Installation of split type AC ( all condenser must be on the roof ) ( Carrier or Zamil )

4.2.1 Supply and Installation of 3 tons split type AC

4.2.2 Supply and Installation of 2 tons split type AC

4.2.3 Supply and Installation of 1.5 split type AC

4.2.4 Supply and Installation of 2 tons ceiling mounted AC

4.2.5 Supply and Installation of 1.5 tons ceiling mounted AC

Sub - Total Mecha


Plumbing works

Supply and installation of hot and cold water line including all fittings and accessories. ( CPVC schedule 80 )

Supply and installation of sanitary pipe including all fittings and accessories. ( UPVC schedule 40 )

Supply and installation of overhead fiberglass water tank including all pipe connection, fittings, accessories and all
materials to complete the works.

Supply and installation of new plumbing fixtures and all required accessories.

5.4.1 Water closet (English type)

5.4.2 Water closet (Arabic type)

5.4.3 Under conter lavatory

5.4.4 Lavatory with pedestal

5.4.5 Stainless kitchen sink

5.4.6 Lavatory mixer (hot and cold)

5.4.7 Kitchen sink mixer (hot and cold)

5.4.8 Bidet sprayer ( cold only )

5.4.9 100 mm x 100 mm stainless floor drain.

5.4.10 Glass mirror ( as per approved sample )

5.4.11 Soap dispenser

5.4.12 Tissue holder (big)


5.4.13 Tissue holder (small)

5.4.14 Heavy duty garden faucet

5.4.15 clothes hanger

5.4.16 Hand drier

Sub - Total Plum


FireFighting Works

Complete checking, repair and recondition of existing fire fighting system and not limited to; Pump room or supply
hose reel cabinet, Sprinkler system, Fire alarm system, Fire hydrant, deluge system, etc..

Note: The contractor has the full responsibility for all firefighting system and it must be working and in good condit

Sub - Total FireFigh


IT Works

Under IT department

Sub - Tot

Note : the contractor shall include in the pricing for all materials, labor, tools /equipment, etc.. and also the contracto
check the actual measurement and include all items not mentined in the BOQ but required in the project to complet
( The contractor has the full responsiblity for all the missing items with no cost )

Total amount exc

15 % Value Added

Total project cost inclusiv


Quantity Unit Unit cost ( SAR ) Total cost (SAR )

1.00 lot 85,000.00 85,000.00

1.00 lot 20,000.00 20,000.00

1.00 lot 15,000.00 15,000.00

120,000.00

1.00 lot 705,600.00


705600
1.00 lot 297,600.00
297600

1240.00 m2 272,800.00
220
130.00 m2 28,600.00
220
1.00 lot 180,000.00
180000
1.00 lot 36,800.00
36800
1.00 lot 4,316,800.00
4316800

45.00 units 540,000.00


12000
3.00 units 48,000.00
16000
6.00 units 16,800.00
2800
4.00 units 14,400.00
3600
10.00 units 23,000.00
2300
3.00 units 10,500.00
3500
1.00 unit 3,000.00
3000
1.00 lot 1,512,000.00
1512000
1.00 lot 32,000.00
32000
1.00 lot 46,800.00
46800
1367.00 m2 341,750.00
250
1.00 lot 107,800.00
107800
1.00 lot 56,000.00
56000
1.00 lot 30,000.00
30000
1.00 lot 48,000.00
48000
1.00 lot 36,000.00
36000

8,704,250.00

1.00 lot 1,890,000.00 1,890,000.00

1.00 lot 366,000.00


366,000.00
6.00 units 9,600.00
1,600.00
-

2,265,600.00

1.00 lot 55,000.00


55,000.00
12.00 units 72,000.00
6000
13.00 units 71,500.00
5500
14.00 units 56,000.00
4000
6.00 units 78,000.00
13000
2.00 units 20,000.00
10000
352,500.00

1.00 lot 56,000.00


56,000.00
1.00 lot 12,000.00
12,000.00
1.00 lot 24,000.00
24,000.00

9.00 units 16,200.00


1800
4.00 units 5,600.00
1400
10.00 units 12,000.00
1200
1.00 set 1,100.00
1100
2.00 units 4,000.00
2000
13.00 units 20,800.00
1600
2.00 units 6,400.00
3200
12.00 units 1,800.00
150
20.00 units 2,400.00
120
10.00 units 40,000.00
4000
12.00 units 9,600.00
800
10.00 units 9,000.00
900
12.00 units 6,600.00
550
10.00 units 18,000.00
1800
10.00 units 3,000.00
300
8.00 units 12,000.00
1500
260,500.00

1.00 lot 145,000.00


145,000.00

145,000.00

1.00 N/A -

220,000.00 220,000.00

11,847,850.00

1,777,177.50

13,625,027.50
ProjecSGP_ RDP_ Renovation of admin building
LocatDry Port Riyadh
SubjecBill of Quantities
Date: May 16, 2022

Item Description Quantity Unit Unit cost ( SAR )

I Renovation of I Building
1 General Preliminaries
Site inspection, Site supervision, submission 2D & 3D drawings for client approval prior to
1.1 proceeds any works and as - built drawing after the complettion of the projet.( Civil, MEP, 1.00 lot 35,000.00
FF, IT).

Mobilization and Demobilization including hauling and dumping of debris materials to the
1.2 1.00 lot 20,000.00
specified and approved dumping site outside the vicinity area.
1.3 Traffic Safety and Control

Provision of safety requirements; 2 units of fire extinguisher ( Powder 6 kgs. ) safety 1.00 lot 15,000.00
barriers, safety lights, safety signages, etc.)
Sub - Total General Preliminaries
2 Civil Works
Demolition and Removal of existing facilities and all items that are not use as directed by
2.1 1.00 lot
the client whether it is under Civil, MEP, FF, IT and others. 198450
2.2 Sandblasting of existing exterior and interior paint and repair / filling the cracks on the walls 1.00 lot 223200
Supply and installation of fire resistant gypsum board suspended ceiling with cob design
2.3
including aluminum runner and required accessories
2.3.1 Fire resistant gypsum board ceiling for offices, lobby, commn areas, etc.. 1240.00 m2 110
2.3.2 Fire & moisture resistant gypsum ceiling board for toillet and pantry area 130.00 m2 150
2.4 Supply and installation of plastered CHB bock wall partition 1.00 lot 150000
2.5 Supply and installation of double dry walls partition 1.00 lot 276000
Supply and Installation of frosted and clear glass walls partition with complete accessories
2.6 1.00 lot
( The contractor has to specify thickness of glass ) 2953600
2.7 Supply and installation of doors ( The contractor has to specify the thickness of glass )
2.7.1 Supply and installation of frameless swing glass doors with complete accessories 45.00 units 8000
2.7.2 Supply and installation of frameless sliding glass doors with complete accessories 3.00 units 14000
2.7.3 ACS control door 6.00 units 2000
2.7.4 Supply and Installation of heavy-duty aluminum main doors in all toilets including all
4.00 units
required accessories; door closer, hinges, lock, handle, stopper, etc… 2500
2.7.5 Supply and Installation of heavy-duty aluminum cubicle doors in all toilets including
10.00 units
all required accessories; hinges, lock, handle, stopper, etc… 1600
Supply and Installation of heavy-duty wooden door including all required accessories;
2.8 3.00 units 3000
hinges, lock, door closer, stopper, etc..( with good varnish finish )
2.9 Supply and Installation fire rated metal door ( with good paint finish ) 1.00 unit 3000
Supply and application of paint on exterior and interior walls, ceiling and all other required
2.10 1.00 lot 1134000
area.
2.11 Supply and installation of stainless railings 1.00 lot 24000
2.12 Supply and installation of fabric window blinds 1.00 lot 28800
Supply and installation of unglazed floor tiles in all offices, hallways, reception, entrance,
2.13 1367.00 m2
pantry, toilet, etc.. Including all miscellaneous items. 220
2.14 Supply and installation of wall tiles in all toilet and pantry and all required accessories; 1.00 lot 107800
adhesive, grout, tile trim, etc..
2.15 Supply and installation of granite riser and threads in the all exterior stairs. 1.00 lot 21000
2.16 Supply and installation of granite lavatory counter for toilets 1.00 lot 30000
Supply and installation of granite lavatory counter for pantry including under and over
2.17 1.00 lot 48000
hang cabinet
2.18 Supply and installation of information counter 1.00 lot 36000
Note: the contractor has to submit design thickness and specification of glass for client
approval prior to proceed any works.
Sub - Total Civil Works
3 Electrical Works
Relocation of electrical main panel board including laying of cable and any other related
3.1 1.00 lot 2,890,000.00
works
Complete electrical works; Rewiring, new location of switches, outlet, lighting fixtures and
3.2 1.00 lot 282,000.00
all other related works
3.3 Supply and installation of water heater (50 liters capacity) 6.00 units 1,600.00
Note: the contractor has to submit electrical drawing for client approval prior to proceed
any works.
Sub - Total Electrical Works
4 Mechanical works
Option 1 - Checking and utilize the existing centralized AC (the contractor has to repair,
4.1 replace broken or damaged parts and reconditioning of the existing centralized AC) if not 1.00 lot
feasible go for option 2 3,500.00
Option 2 - Supply and Installation of split type AC ( all condenser must be on the roof )
4.2
( Carrier or Zamil )

4.2.1 Supply and Installation of 3 tons split type AC 12.00 units


5000
4.2.2 Supply and Installation of 2 tons split type AC 13.00 units
4000
4.2.3 Supply and Installation of 1.5 split type AC 14.00 units
3500
4.2.4 Supply and Installation of 2 tons ceiling mounted AC 6.00 units
13000
4.2.5 Supply and Installation of 1.5 tons ceiling mounted AC 2.00 units
10000
Sub - Total Mechanical Works
5 Plumbing works
5.1 Supply and installation of hot and cold water line including all fittings and accessories. 1.00 lot 32,000.00
( CPVC schedule 80 )
5.2 Supply and installation of sanitary pipe including all fittings and accessories. ( UPVC 1.00 lot 12,000.00
schedule 40 )
Supply and installation of overhead fiberglass water tank including all pipe connection,
5.3 1.00 lot
fittings, accessories and all related materials to complete the works. 18,000.00
5.4 Supply and installation of new plumbing fixtures and all required accessories.
5.4.1 Water closet (English type) 9.00 units 1800
5.4.2 Water closet (Arabic type) 4.00 units 1400
5.4.3 Under conter lavatory 10.00 units 1200
5.4.4 Lavatory with pedestal 1.00 set 1100
5.4.5 Stainless kitchen sink 2.00 units 2000
5.4.6 Lavatory mixer (hot and cold) 13.00 units 1600
5.4.7 Kitchen sink mixer (hot and cold) 2.00 units 3200
5.4.8 Bidet sprayer ( cold only ) 12.00 units 150
5.4.9 100 mm x 100 mm stainless floor drain. 20.00 units 120
5.4.10 Glass mirror ( as per approved sample ) 10.00 units 4000
5.4.11 Soap dispenser 12.00 units 800
5.4.12 Tissue holder (big) 10.00 units 900
5.4.13 Tissue holder (small) 12.00 units 550
5.4.14 Heavy duty garden faucet 10.00 units 1800
5.4.15 clothes hanger 10.00 units 300
5.4.16 Hand drier 8.00 units 1500
Sub - Total Plumbing Works
6 FireFighting Works
Complete checking, repair and recondition of existing fire fighting system and not limited
6.1 to; Pump room or supply room, Fire hose reel cabinet, Sprinkler system, Fire alarm system, 1.00 lot
Fire hydrant, deluge system, etc.. 122,000.00
Note: The contractor has the full responsibility for all firefighting system and it must be
working and in good condition.
Sub - Total FireFighting Works
7 IT Works
7.1 Under IT department 1.00 N/A

Sub - Total IT Works

Note : the contractor shall include in the pricing for all materials, labor, tools /equipment, 1 130,000.00
etc.. and also the contractor must check the actual measurement and include all items not
mentined in the BOQ but required in the project to complete the works. ( The contractor has
the full responsiblity for all the missing items with no cost )
Total amount exclusive VAT
15 % Value Added Tax ( VAT )
Total project cost inclusive 15 % VAT
8
Total cost (SAR )

M2 RT M2 RT

35,000.00
35000 35000

20,000.00
20000 20000

15,000.00
15000 15000
70,000.00
70000
198,450.00
441 450 198450 198450 Precast wall
223,200.00 EXTR.744 300 223200 223200 INTR 5940

136,400.00 1240 110 136400 136400


19,500.00 130 150 19500 19500
150,000.00 750 200 150000 150000
276,000.00 460 600 276000 276000
2,953,600.00
1136 2600 2953600
0
360,000.00 45 8000 360000 360000
42,000.00 3 14000 42000 42000
12,000.00 6 2000 12000 12000
10,000.00
4 2500 10000 10000
16,000.00
10 1600 16000 16000
9,000.00 3 3000 9000 9000
3,000.00 1 3000 3000 3000
1,134,000.00 6300 180 1134000 1134000
24,000.00 4 6000 24000 24000
28,800.00 36 800 28800 28800
300,740.00
1367 220 300740 300740
107,800.00 490 220 107800 107800
21,000.00 70 300 21000 21000
30,000.00 5 6000 30000 30000
48,000.00 2 24000 48000 48000
36,000.00 1 36000 36000 36000

0
6,139,490.00 0
0
2,890,000.00 1 2890000 2890000 2890000
282,000.00 1 282000 282000 282000
9,600.00 6 1600 9600 9600
- 0
3,181,600.00 0
0
35,000.00
1 35000 35000 35000
0
60,000.00
12 5000 60000 60000
52,000.00
13 4000 52000 52000
49,000.00
14 3500 49000 49000
78,000.00
6 13000 78000 78000
20,000.00
2 10000 20000 20000
294,000.00 0
0
32,000.00 4 8000 32000 32000
12,000.00 4 3000 12000 12000
18,000.00
4 4500 18000 18000
0
16,200.00 9 1800 16200 16200
5,600.00 4 1400 5600 5600
12,000.00 10 1200 12000 12000
1,100.00 1 1100 1100 1100
4,000.00 2 2000 4000 4000
20,800.00 13 1600 20800 20800
6,400.00 2 3200 6400 6400
1,800.00 12 150 1800 1800
2,400.00 20 120 2400 2400
40,000.00 10 4000 40000 40000
9,600.00 12 800 9600 9600
9,000.00 10 900 9000 9000
6,600.00 12 550 6600 6600
18,000.00 10 1800 18000 18000
3,000.00 10 300 3000 3000
12,000.00 8 1500 12000 12000
230,500.00 0
0

122,000.00
1 122000 122000 122000

0
122,000.00 0
0
- 0
0
- 0 0

130,000.00

163000 163000
10,167,590.00 10200590
1,525,138.50
11,692,728.50
SGP_ RDP_ Renovation of admin building
Renovation of I Building
SN SPACE Area(m2

RDP Admin Building GLASS AREA


1 CEO Office 46 120
2 CEO Admin 12 91
3 CEO Confrence 46 49
4 VIP Loung 16 61
5 CFO Staff 21 48
6 CFO Manager 21 36
7 COO Staff 21 36
8 COO Manger 21 24
9 Strategy Staff 12 18
10 Head of strategy 21 216
11 Commercial Staff 30 216
12 Commercial Manager 12 221
13 Operation Staff 20 Total 1136
14 Operation Manager 10
15 Female Restroom 20
16 HR Office 71
17 HR Manager 10
18 Small meeing room 25
19 Finance Staff 48
20 Finanace Manager 10
21 Procurement Staff 35
22 Procurement Manager 10
23 HSSE Staff 20
24 HSSE Manager 10
25 Engineering Staff 20
26 Engineering Manager 10
27 TD Staff 15
28 TD Manager 10
29 IT Staff 13
30 IT Manager 10
31 Pantry 1 25
32 Pantry 2 17
33 Storage 10
34 Main Confrence room 38
35 Vacant room 20
All coridoor 60x2.5 150
HALL WAY 84
TOTAL 990
M2 PRICE
REMOVE CERAMIC TILES 990 70 69300
INSTALL CERAMIC TILES BATHROOM 990 350 346500
INSTALL CERAMIC TILES BATHROOM 32 350 11200
INSTALL CERAMIC TILES BATHROOM 59 350 20650
INSTALL CERAMIC TILES BATHROOM 252 350 88200
INSTALL CERAMIC TILES BATHROOM 252 350 88200

Gypsum board remove and install


10x2.5-25, 35,10,10,48,25,38 191 360 68760

RDP_ Renovation of Operation Control Office


Renovation of I Building
DEMULATION PRECAST CONCRETE WALL DEMULATION BATHROOM AREA
120 1 RIGHT SIDE FLOOR
91 LADY REST ROOM WALL
49
24
61 2 NEAR PANTRY FLOOR
48 WALL
48 PRICE
Total 441 1500 661500

PRICE
4000
4544000

DEMULATION PRECAST CONCRETE WALL


Ceiling lights square censor type all corridor
Ceiling Lights 60x60 All rooms
A/C Split unit type including all fitings
Gypsum board remove and install top ceilin
Gypsum top ceiling paintin
Remove ceiling t60x60
Install Ceiling Tiles 60x60
Sand blasting Painting outside building Structure Paint
Painting inside all area
Install new Glass partition including Fittings
Window Curtain
Door repair and Painting all
Remove ceramic tiles
Install Ceramic tiles
Bathroom with all fittings
Smoke detector
Stainless steel Hand reel x4ea
Spot light x6ea
Complete electrical works; Rewiring, new location of switches, outlet, lighti
Supply and installation of new plumbing fixtures and all required accessori
Complete checking, repair and recondition of existing fire fighting system a
CENTRELASED A/C REPAIR OR INSTALL NEW SPLIT UNIT TYPE
Relocation of electrical main panel board including laying of cable and any
.
CELING LIGHT 60X60 80
A/C Split unit type including all fitings 13
ATHROOM AREA INSTALL BATHROOM SAME ARE INSTALL NEW TOILET
36 LEFT FLOOR 36 3 2.4X2 4.8
216 LADY REST RO WALL 216 4 3.6X6.2 22.32 59 WALL
252 252 TOTAL WALL 32.4

36 NEAR PANTFLOOR 36
216 WALL 216
252 252

441 1600 705600


60PC 220 13200
430 pc 160 68800
47 6000 282000
1240 220 272800
191 180 34380
990 75 74250
799 200 159800
744 260 193440
6300 180 1134000
1136 4000 4544000
38 1800 68400
33 60 1980
990 70 69300
1367 250 341750
4 7963700

ocation of switches, outlet, lighting fixtures and all other related works
tures and all required accessories.
of existing fire fighting system and not limited to; Pump room or supply room, Fire hose reel cabinet, Sprinkler system, Fire alarm system,
W SPLIT UNIT TYPE
ncluding laying of cable and any other related works x4 pannel
OUT SIDE PAINTarea INSIDE BUILDING PAINT
55X3X2 324 ROOMS AREA 5940
25X2X3 150 CORRIDOOR 360
1.5X55X2 165 260 6300
0.5X25X2 25
0.5X25X2 25
55X0.5X2 55
744 193440

kler system, Fire alarm system, Fire hydrant, deluge system, etc..