CFJV00198B
CFJV00198B
HONG KONG
Material Submission
For
MSF/00017
Revision No.: B
Three Runway System Project Contract 3310 :
North Runway Modification Works
DOCUMENT /
ITEM DRAWING
COMMENT CONTRACTOR’S RESPONSE
NO. REFERENCE
NO.
Air Valve
1. General Please specify which type and size of air valve you propose. Please refer to the attached page.15
Please page.14
Gate Valve
1. General Please specify which type, grade and size of gate valve you propose. Pleaserefer
Please referto
tothe
theattached
attached page.51-54
page.50-53
3. General Gate valve for pipes larger than DN350 seems missing. Please provide. Pleaserefer
Please refertotothe
theattached
attachedpage.53-54
page.52-53
4. WSD approval Please provide valid WSD “General Acceptance” letter. Please refer
Please refer to
to the
the attached
attached page.70-73
page.69-72
letter
-1-
Title of Submission: Material Submission for Gate Valve, Air Valve, DI Pipe and Fitting (Rev. A)
Submission No.: CFJV/3310/M/00198/A
Comments by: Airport Authority Date of Comments: 21-Dec-2020 Comments Ref. No.: AA Ref: CFJV-TRANSMIT-000469
DOCUMENT /
ITEM DRAWING
COMMENT CONTRACTOR’S RESPONSE
NO. REFERENCE
NO.
DI Pipe & Fittings
1. General Please specify which BS standards, pipe class, pipe sizes, pipe fittings, external Please refer
refer to
to the
the attached
attached page.82,93,95-123
page.81,92,94-122
Please
coating, and internal linings you propose in the catalogue.
2. General Please note that the D.I. pipe shall be lined with cement with epoxy coating Pleaserefer
Please refertotothe
theattached
attachedpage.284-285
page.160-161
according to AGMWS Clause 14.3.2. No WSD approval letter is found for this epoxy-
coated pipe material, please provide.
3. General Please provide the product data sheet for each and every product used in the coating Please refer
refer to
to the
the attached
attached page.293-296
page.88
Please
system proposed in accordance to GMWS A14.4.14
4. General Please provide test certificates of proposed DI pipes and fittings in according to Please refer
Please refer to
to the
the attached
attached page.136-272
page.135-155
GMWS & AGMWS A14.4.16
5. WSD approval Please provide valid WSD “General Acceptance” letter. Please refer to the attached page.284-289
page.160-165
letter
6. Manufacturer’s Please provide the manufacturer’s recommendation for the cut and repairing Pleaserefer
refertotothe
theattached
attachedpage.131
page.130
Please
recommendation of the pipe
-2-
Title of Submission: Material Submission for Gate Valve, Air Valve, DI Pipe and Fitting (Rev. A)
Submission No.: CFJV/3310/M/00198/A
Comments by: Airport Authority Date of Comments: 21-Dec-2020 Comments Ref. No.: AA Ref: CFJV-TRANSMIT-000469
DOCUMENT /
ITEM DRAWING
COMMENT CONTRACTOR’S RESPONSE
NO. REFERENCE
NO.
A.O.B
1. Please propose all required sizes of pipes, fittings and valves in according to the Under separate submission
working drawings. E.g. check valve etc.
2. Please follow GMWS 14.4.2 for submitting the proposed pipes, joints, fittings for Noted
water supply pipework.
-3-
Three Runway System Project Contract 3310 :
North Runway Modification Works
Product Description
Cllflfl MEIIIJES
Sllllf IIIIIII
ISIllIlllI! SEPIIITEIlllf
II-llllllflllllll"
PllllflEffltlilfl
—-—E—3
日g No.
Fig. No12`2Dovb e0ri6ce
I272 Double APε
Orifice APEXX Air Relief
Re"ef F:g N°
Fig. N o . 1282
1282 APEX
APEXDovble
DoubleClvsler
Cluster Air
Air
Valve
Volve w;Ih ButterflyV¤
withBv"erfly lve Isolator.
Valve lsoIoIor Relief
Relief V¤ wilh Butterfly
ˇe with
Valve Valve
Bv"erfly V¤ lve Iso|o忄 or
Isolator.
TYPEs AND
TYPES AND DuTIEs・ JAEROKINETIC'PRlNCI
DUTIES ° 'AEROKINETIC' PLE
PRINCIPLE
TYρ Es AND
TYPES AND DVTIEs
DUTIES pRINCIPLE
INETlC′ PRINCIPLE
’AEROKINETIC'
Three lypes
Three typesore areoˇ o"oblθ for varying
available
^ER0κ
The C,1ENFIELD
ˇorying The ⅡAerokinel c・ prtnc;ple
GLENFIELD ‘Aerokinetic' principle of of 忄he or,ftce
the To°
orifice. To achieve
chieˇ θ Ihe desired
the de蓟 action
red ocl on
duties:-
dvIies: l° rgθ orfce
large orifice oir
air re"efˇ o丨 ˇ
relief valve e opθ r° I:° n
operation detnα nded by
demanded byIhθ 'Aerokinetic'
the .人 θrok;neⅡ principle
p`inc9pIθ
c・
Fi° No
Fig. No. 9250
l250 Fig NNo
Fig. o . 1260
1260
sm¤ Orifice APEX
Small 0Ⅱ Ⅱce APEX
1° rgθ Orifice
Large APEX
"0""ce
Re"efˇ
Air Relief ValveAPEX
olˇ ew"h
with Air “ef Valve
Relief
A r Rθ Vo/e with
wIh Fig NNoo .1271Dovblθ
Fig. 0Ⅱ Oce APEX
1271 Double Orifice APEX
sCrewed inlet
screwed nleIfe"ve
ferrule. I I ireWed inlet
screwed
s【 n eIfe仃 de
ferrule. Air Relief
Air ew"h
Valve
Re"ef Volˇ Ⅱonged in丨
with flanged inlet.
el
APEX Air
APEX Air ReIief Vglves
Relief Valves
sIzING AND
SIZING AND sELECTION
SELECTION DIsCHARGE CAPAC盯
DISCHARGE IEs
CAPACITIES
L¤ rge and
Large ond Double
DoubIe0riOce
OrificeV¤
Valves
lves
32 II |丨 !I
maX1wOrk
max. ng t
working \i
The svpe"or
The superior performonce
performanceofof APEX
APEXv¤ lˇ es
valves `
embodying Ihe
embodying the^erokine"c′ principle makes
‘Aerokinetic' principle mokes 2̀5b
2L
/
2
4
g, 24
6
1
ˇe′’sizes’
8
Valve
V口 ¤reIhe
sizes′ are moXimvm me"ic
the maximum pipe
metric sizes
pipe sizes 3{ 5
/
a
seIec"on shovld
Selection shouldIheref°
thereforere be
be m¤ de on丨
made hoI 3
on that 16b
16b
g as“ J
ˇ
bosis` except
basis, excepI where where airflow
¤irf ow copociIy
capacity ‘6 /
reqviremenIs¤
requirements re known,
are known'when9he
when thegr¤ phs m¤
graphs may y 8 /
hon80mm / 10b
厂独
be used.
be vsed Volve
Valvesize400is
size 400 iso仟
offered with an 80mm E
n° min° I fl¤
nominal nge size`
flange size, which
whichc¤
ered wi忄
can n be
be used
∪sed wiIh
with
(5% /
¢ Bl-
'
△
'
6b
Ihe80mm
80mmbr。
the
fire hydrant
fire hydronl Iee`¤
nch size
branch
tee, and
size of lhe reod"y
of the readilyov¤
isolation is by an
nd isoI¤
available
"obIem ?
n80Iη
80mm /
1/
(If320’?
'
彐 all
di¤ valve.
dia. ˇoIve Where
Where opp"c¤ "on involve
applications is by¤ pipelines
/
‘ 丽 Q4/6513
丝
larger than
l¤ rger ih¤ n900mIη
900mm dia. "onsinvoIve
dio volˇ es can
valves bepipe"nes
con be fittedin
fi"ed in 0o o2 0.2 04
0.4 060.6
dvsIers
clusters. Discharge
D sCharge oⅠ of Free DryAⅡ
Free Dry Air sld malmin
std. mVm n
see Fig
See No. 1282
Fig. N° 1282.
ENQVIRY DATA
ENQUIRY DATA
Enquiries or
Enquiries or orders
ordersfor APEX
forAPEX AirAir Relief
Relief V¤Valves
lves
sho∪ Id be
should be supported
svppo"ed wi9h
withinform¤
information relevant nI
LARCE0RIFICE
LARGE ORIFICE VALVEs
VALVES AND AND
lo the
to the following:
fo"owing∶ "on reIev¤ DouBLE oRIFICE
DOUBLE ORIFICE VALVEs
VALVES
ˇ
l V。
1. lˇ e type
Valve Iype byby catalogue
colologue nUmbernomber and ¤nd
(Broken curves
(Broken curVesfor Fig NNo
for Fig. o . I272)
1272).
descriplion
description.
234
Volve size
. Valve or¤
size or air req∪ iremenis
c¤ p¤ ciIy requirements.
ir capacity
. Valve
V¤ lve inlet
inleI flange size and
flonge size¤ Iion
specification.
ΦΦ●弼Φˇ"° Φˇ
nd specific¤
Pipe"ne pressures
. Pipeline pressvres-— moXijmvm
maximum working`
working,
minimum working。
minimum working andnd Iesl
test.
●ΦΦΦ〓
5 . Temper°
Temperature 丨vre conditions.
cond"ions
● Φ <一●●一
‘. Liquid
Liquidif olher than
if other lhon w¤water.
Ie∴
5
●
vi:
stadrn’r‘min 4 — I n fl o w
Φ〓舄 φ 志 ° Φ芑 拐
60
50 100
100 150
150 0峒
Outflow →
—>
Discharge of Free
0悔 ∞ a咱 o|,l Dγ Air
Fr∞ Dry 腓 $旧
stdm'tmin
m● lm n
N0TE:
NOTE:
It
e●
For siting
For s"ing°off Air Valves
Air V¤ |ves
E●
se refer
refer|op¤ ge
to page ll
只 J'
please
p|e¤ 11.
APEX
APEXAir
Air ReI:ef VoIves
Relief Valves
sUPPLEmETARΥ FITTINGS
SUPPLEMETARY FITTINGs
sURGE ALLEVlATI
SURGE ON
ALLEVIATION
Fig 1291
Fig. 1291Venied
VentedNon
NonReiurn
ReturnVoIve
Valve svrge AIIevi¤
Surge Alleviation
"on Alr Valve '
碰 0△
wlth 盯Rv
V.N.H.V 冖 Tank
Ta泳
Polnt of fluid H V
Two f"Iings
Two fittings are ¤v¤ b|e lo
¤re available to assist 丨
¤ssisI in thehe
alleviation
o"evi¤ pipe1ine Bolh¤
of surge in a"¤
pipeline. Both are
re伍fitted
Iions where
situations
In siiv¤ where pipe"ne
pipelineprof"ec¤
profile can lead
n le¤ d
in place
in pl¤ "onof
ce ofsvrge
then°
oflhe in¤
rm¤ lcover
normal cover and cowl. "ed
ond cowI
Io water
to WgIer ColvIη
columnn separation
seporo"on onon‘o ap∪ mρ trip,
pump I冖 p`
high shockpressvres
high sbock can
pressuresC¤ gener¤ Ied when
be generated
n be when
lhe sep¤
the rOIed column
separated CoIumn reioins
reioins.
Piped0v"ets
Piped Outlets.
The APEX
The APEXv¤ lve combined
valve combined wiihwithVen丨 ed Non
Vented Non
ReIvrn VoIve¤
Return Valve allows air ir to
Ioenter
enIerthe
ihe pipeline
pipe"ne
freely on "ows¤
n`bvI
on separation,
seporo"。 butcontrols lhe expulsion
controls the expvIsion
of
of¤air as
ir¤ sIhe
the colvmn
columnreioins
rejoins.this
ThishosIhe
has theefecl
effect
creo"ng onanoir
of creating airb∪ 仟er between
buffer beween ihe column
the column
inierf¤ ces`red∪
interfaces, cing the
reducing lhe;mp¤
impact cl velocity
veIoC"y of the
of9he
reioining mn ond
column
rei° ining col∪ andlhethesvrge
surgepoIen"oI
potential ofof
Ihe system.
the syslem TheTheskeIch
sketch shows¤ lyp;c。 I profile
shows a typical prof"e
subiect
svbiecl I。 Ihe risk
to the riskofofseparation,
seporo"on`wh" e Ihe
while the
gr¤ ρh shows
graph showsIhe ¤ir floˇ
the, air flow poCily of the
capacity
v c¤ Ihe
¤rrongemenI
arrangement.
In situations
s"v¤ povrs may
where odour or vapours moy be
be
Fig.1292Imˉ
Fig. FIow Check
1292 In-Flow CheckV¤ Iˇ e
Valve
a "ons where
¤ probleIη
problem, odour
rge orifice
the large or v¤ cowl
orifice cowI can
con be
be
` lhe I¤
repl¤ ced by
replaced by oa p;pe
pipe arrangement
¤rr¤ ngeIη eni inIerˉ
inter-
conneded w"h
connected withIhe
thesm¤
small orifice.
"orilce
This fitting
This f""ng is
is used
used in
in situations
s"vo"ons whe氵 e lhe
where the
hydr¤ v"c gr¤
hydraulic dienI falls
gradient fo"s below peakk poinl
beIow¤a pe¤ point
during normal
during n° rm¤ Ioperations nd where
opero"ons¤and where¤air inflow
irinf ow
wOuId¤adversely
would 仟ec丨 the
dverseIy¤affect he surge
丨 surge chorocieris"C
characteristic
of9he
of the oysIem
system.
APEX A:r
APEX Air ReIief
Relief V¤ Iˇ es
Valves
sJVlALL0RIFICE
SMALL VALVEs
ORIFICE VALVES
0 1 2 5 1 - 1 2 5・
1250・ 1251
1250 2
1253
1252・0 1253
0R|f CE COVER
ORIFICE C0VER
DEsIGN AND
DESIGN AND ACTION
ACTI0N
C0VER
COVER
The o丨 ˇ
Theˇvalvee consists
con“ s`ofofo acolη
combined lever
bined Ieˇ er and ool
ond∮float
丨
oRIFICE BRACKET
ORIFICE BRAC KET orrongemenI seoing
arrangement sealingo仟 off a “ηo‖ orifice
° small en9
orf ceˇvent.
FV1CRVm P|N
FULCRUM PIN Whenthe
When thechomberenc丨
chamber enclosing the float is filling
°“ng Ihef|ooIis而 I"ng
wiIhˇ
with water,
oIe△ the orificei‘
1he orifice c丨 osed in
is closed iio"y by
initially by Ihe
the
vp""obIoined
uplift obtained from
fromIhe∮ 丨oolIhr°
the float vgh9he
through theIever
lever
ro"o of
ratio of5:l 、Vhen woIer
5:1. When waterisis pre$eni
present in in 9he
the
sEA凵 NC FACE
SEALING FACE chomber vnder
chamber underpres‘ ure ihe
pressure the or"ce
orificei|,
is heId
held
ADJusT!NG SCREW o$ed by
closed by Ihe combined vρ
the combined IhrvsI0f
upthrust ofIhe
thefIool
float
ADJUSTING sCREW c丨
ond Ihe
and the di仟eren"oI
differential pressure
ρ θr the
over Ihe orifice
orfce
area. `essvre oˇ
FLOAT AN
FLOAT AND1Eˇ
D LEVEER
R Air occvmv丨
accumulatingo"ng inin9hethesysIetn
system eˇ enIVo"y
eventually
B0DΥ
BODY enIer$9heˇ
enters oIˇ e body
the valve body vnder
underworkin9pres$v
working pressurere
ond depresses饣
and depresses the ˇo9er Ieˇ
he、water eIin
level Ihe chamber.
in the chombe△
Whenlhe
When thewoIerIeˇ
water level o、 ~ered to
is lowered
e|is丨 lo aopoint
poin|when
when
lhe weight
the w△ gh9°off9hethefIool
floatisissv竹 icienI to
sufficient vncoˇ er
Io uncover
lhe orifice,
the orif ce`oir`exρ at workingpres$v
e"ed ol、~orking
air is expelled re
pressure
until
vnIⅡ the
Ihe water level
wolerIe・ /eI again The1oo‘
rises. The
ogoin rise‘ weighI
float weight
is such thati氵
$vch IhoI it over‘ ome$ Iho
overcomes the Vnbolonced
unbalanced
pressvre oˇ
pressure over theorfi‘
er Ihe orificee when
when oρopening, °nd
ening, and
$l"lhossu仟
still has sufficient
iciθ ni∮flotation to seal off
loIo"on lo|,eo丨 o仟 the o`伍 ce
he orifice
Ⅰ
whθ
whenn the
ihe water
woIerloˇ
level
el rises.
ri$e$
MATERlALs0FC0NsTRVCTI0N
MATERIALS OF CONSTRUCTION
Body ond
Body andCove`
Coverfinesl
- finestCosI
Castl`onio
Iran to EN1561
EN 156.1
ENˉ GJ1ˉ 250or
EN-GJL-250 orDvc"Ie:ron
Ductile IronIo
to EN
EN15‘ 3EN
1563 EN-
0Js45010V
GJS-450—10U.
0rifice
O BrotkeI ond
r i f i c e Bracket a n d Coˇ er - inieci°
Cover n
iniection
mov|ding$of
mouldings glos$f"Ied
of glass A190NyIon
filled A190 Nylon
FI。 °
Float nd 1ever~
and
I° Lever -iniedi° n m。
iniection vlding of ABS
moulding ABs
p丨 ¤
plastic‘
$"ci
seol∶ ng Fo‘
Sealing Facee~mov丨 ded EPDM
- moulded EPDM
JoiniingMaterials
Jointing MoIer ols~EPDM
- EPDM
1 ABs
1. ABS lAcry° n""e BvIod
(Acrylonitrile ene s,yrenΘ
Butadiene Styrene} is
s o_a
c。 p。 Iymer ofˇ
copolymer ery high
of very high imρ ocI strength.
impact slreng9h
Fig No.
Fig. No 1250sIond°
1250 Standard
rdˇvalve within|e氵
oIˇ e wilh inlet FIg No.
Fig. No 1251$Iondordˇ
1251 Standard valve ˇ inlet
olˇ e、with
ferrv e screwed
ferrule screWed 1
l in
in BSPTr
BsPTr male.
mo e isolating
isoIoIing c° crewed l1 in
ck‘screwed
cock BsPTr"hmale.
in BSPTr in|e}
mo|e INLET AND
INLET AND0uTLET
OUTLETsIzEs
SIZES
there is°
There is only
nIy° ne valve
one ˇ° e size withonan
蓟ze wiIh
lˇ inlet
in丨 ei of
of
25mm sc`ewed
25mm 1 1ininBsPTr
screwed BSPTr.
TO m°
To nl° in m。
maintain ×mvm oⅡ
maximum ⅡoW coρ
air flow capacity he
oc0/’the
°v"el orifice
outlet °r fi‘ e di° mθ Iθ r is
diameter ˇoried lo
is varied t o sv"
suit9he
the
tη oX mVm opefoIin9
maximum operating serˇ ice pressure.
service pressvre The-
The
oˇ oiloble ovIleI
available outletofifice
orificesizes
sizesore,
are:
0v"eI orf∶
Outlet ce
orifice moximvm°operating
Maximum ρe`oI∶ ng
diome忄er
diameter Pressvre
pressure
._-_-
1 75mm
1.75 mmdi¤dia. 25bor
25 bar
225mmmmdI¤
2.25 dia. 1‘ bor
1 6 bar
.—
300mm
3.00 mmdiodia. 10bor
1 0 bar
350mm
3.50 mmdiodia. bor
6‘bar
The300
The 3.00ond
and350 mm mm
3.50 dio dia.
o`fices oreare
orifices on|y
only
q—u—u—
svpp"ed9o
supplied to ordei
order.
Fig No.
Fig. No 1252slondord CoI No.
1252 Standard Cat. No 1250
1250 Fig.
Fi° NNoo .1253sIond° rd Cat.
1253 Standard Co{ No.
No 1251
1251
os$emb|yw"hf丨
assembly on9e screwed9o
with flange screwed toferrv|e
ferrule o$$embly with
assembly w"h fon9e
flangescreWed
screwed}oto
ond faced
and ∮oced ond
andd了
drilled to appropriate isolating
isoIoi ng cock
cock and
ond machined $for
mochined¤ as Co}
for Cat.
flange "Ied
on
specification
Ⅱonge $pecificoⅡ lo oppropr
according
°ccordin9 oIe
to Ihe
{o No 1252
the No. 1252.
oximvtη worki^g
maximum
|η ρre$svre of
working pressure of }he
the
ˇo|ˇ e
valve.
APEX Air
APEX Air ReI∶ ef V¤
Relief Iˇ es
Valves
sMALL0RIFI
SMALL CE VALVEs
ORIFICE VALVES
1250・' 11251
1250 ・
2 5 1 ' 1 21252・ 1253
5 2 - 1253
pERF° RMANC
PERFO RMANcEE
diomeIer;s‘
As the inlet diameter is cansiani the equation
onsloni Ihθ for cal-flaw
oqvolion for° ro ρoc"yoismo$Iconˇ
vIˉ fo、ˇcapacity enien"y wrIIon
most conveniently written as:-
os:ˉ
^s Ihe;nIe丨
0
Q =ˉ 06θ 8Cs dZP,
0.688Cs d20
whθ re
where
Q0 =ˉ ro|e
rate offree
of freedry¤ n° w n
dry airir flow insIdnd¤
standard mγ m|n
fd Ina/min.
Cs
C5 =ˉ 00115meIrk
0.0115 metric.
dd =ˉ oⅡ d洄 me9ef mm.
Ⅱce diameter
orifice mm
卩,
P‘ == obsoIvle of valve
pressureoIˇ
ubsolufepressVre oIVe inlei in bar.
inlei in bor
DIsCHARCE CApAc叮
DISCHARGE IEs
CAPACITIES
Dischorge cop°
Discharge v吖 es are
tiiy‘curves
capacity ore shown
shown on
on page
poge03.
RATINCs AND
RATINGS AND END
END CONNECTIONS-
C0NNECTI0Ns
Maximum ximvm
Maximum
^^oxim v m
Pressvre
Pressure Tempor。
^^°
Temperaiure
Iv re End 'Conneclion
End Connedion
侃盹
Cai. 0rfce
Orifice W° rking
Working Tesi
TesI Liquid
1iqv;d Ar
Air
No. rnm (Hydra-
lHydro
‘
slaiic)
IoI‘ ) screwed
Screwed Fl° n9od・
Flanged'
bor
bar bor
bar 0C
°C 0C
°C
1250
1250 75
1.75 255
2 40 4O 7700 BsPT
BSPTr —
^o ^0
225
2.25 1166 255
, 2 40 700
7 BsPTf
BSPTr —
^0
1251
1251 175
1.75 255
2 彳0
4 彳0
40 770
0 BsPT
BSPTr —
2225
.25 1l‘6 25
25 彳0
40 700
7 BsPTr
BSPTr -—
1252
1252 1 75
1.75 2255 40
40 4400 70
70 BsPTr
BSPTr NP25/ll
NF 25]”
225
2.25 16
l‘ 25
25. 40
40 7700 BsPTr
BSPTr NP16/11
NP 16/11
1253
1253 1 75
1.75 255
2 40
40 40
40 70
70 BsPTr
BSPTr NP25/1】
NP 25/1 1
225
2.25 16
16 25
25 40
40 70
70 BsPTr
BSPTr NPl‘
N /11
P 1 6 /11
‘’ FIongos
Flangesore
are normo"y
normallysvpp"ed
supplied
lo to 2:1997¤
BS 1092-2:1997
Bs1092ˉ nd^sA‘
and ASA specifications
ρetifit¤ on be
can bo suPP"ed
suppliedIotoorde"
order.
"ons‘
DIMENsI0Ns
DIMENSIONS
Cuf.
C¤ I ˇ¤Ive
Valve A
A B Aρ
B prox
Approx.
N°
No. Size
$ize WeighI
Weight
Fi° 1250
Fig 1250
mm
mm mm mm
mm kgkg |NLET
INLET
1250
1250 25 192
192 138
138 62
6.2
1251
1251 25
25 255
255 138
138 69
6.9
1252 25 200 138
138 98
9.8
1253
1253 25 270
270 138
138 105
10.5
g1252
Fig
F∶ 1252 Fig1253
Fig 1253
|NLET
INLET
ˇ
L^RCE ORIFICE
LARGE ORIFICEVA1VEs
VALVES
1261 -1262・
1260・- 1261
1260 126:
1262 - 1263
FL0WC0EfFICIEN
FLOW COEFFICIENTS 阝 RATINCs^N0EN0C
RATINGS AND END 0NNEC了 I0Ns
CONNECTIONS
Cat.
Ca△ l/aˇ e
Valve CC C
C lvkX)mVm
Maximum M献lmum
Maximum End Connection
End ConneCt on
pressvre TemW‘tu"
T。 mρ erature
No.
No s讵 e
Size (Metric) (Imp)
Met"c) ompl at ""55“":
m盹
〈
3,-
1260 25mm 6 21 No. VVoikio8
Working (Hitdsfiw
Test Liquid
L|qVid Ar
Air
1260 25mm 86 21 (H/dro
1269/,
1261/7 400
400: 37
37 90
90 static)
stkluc〉 screwed FFlanged'
Screwed anBed
600
600 74
74 180
1 80 bar
bar bar
bar ●C
ac 0C
ac
900
900' 1135
35 330
330
∞∞∞ ∞∞∞
劬莎狁 ∞⑽⒛
12‘ 2
1262 400' '27
66 彳260
1260 116
6 255
2 40
40 700
7 BsPTr
BSFTr ˉ
—
600' 53 128
1261 116 255 40 70 - NP16/11
(,1
1263/11 600'
400'
12‘ :/B 37
74 90
180 彳267
1267 25
25 440
0 440
0 770
0 .
._
_ NP25刀
NP 25/11
1
900' 33°
135 1262
12‘ 2 16
16 25
25 4o
40 70
70 -
— NP 16/11
NP16`勹 1
Xa丨 ˇ
' Valvee“ ze numbers
size 400 600
numbe‘ 400, 600and90o
and 900 彳26a
1253 16
16 25 40
4o 70
70 _
—- NP16沟
NP 16/11 1
nd cateinn millimetres.
indicate. m"|metres the
therecommended
recommended
maximvm piPe"ne
maximum pipelined|ameIe阝
diameters. 1268
1268 25
25 40
40 40
4O 70
70 -— NP25/11
NP 25/11
'・Flanges aienoma"y
FIanB它 ‘are normallysuρ
supplied toBs450・
P"ed tO BS 4504:1969.
l:1969
Flan召 esto8s10:1902and^s^‘
Flanges to BS10:1962 and ASA specifications
ρec“ Icat;onsCan
canbe
besuρ ρ 0
supplied
DlsCH^RCE CAPACITIEs
DISCHARGE CAPACITIES border.
toordej "●
Discharge capacity curves
D‘ chaige capaciˇ hown°on
are shown
curves are‘ o
page
Page22,
DIMENsI0Ns
DIMEN SIONS
扯 ⒍
cN
Pe茁
mm mm mm
mni mm mm mm
mm mm mm mm kg
kg
12Cll
1260 25mm
25mm 25+ 251'170 170 亻02
102 - — ˉ
— —- 24
2.4
^ C ¨
1261'冫
1261/7 400・
400' 50¨
501' 56
256 162
162 --— -—
— — 1111.8
8
400・
400' 80
80 256
256 彳62
162 -ˉ
— -ˉ
— -— 129
12.9
600・
600‘ 80t
801' 327
327 222
222 -ˉ
— -ˉ
— — ‘ 249
24.9
900'
900・ 100丨
100+ 410
410 292
292 —
-ˉ ˉ
—ˉ _ 444
44.4
400・
400' 80
80 340
340 162
162 175
175 157
157 — 208
20.8
600
600・
I I
80+
80+ 415
415 222
222 175
175 157
i57 —
-ˉ 322
32.2 1261/7
900・
900' 100|
1001' 500
500 292
292 230
230 177
177 -ˉ—- 594
59.4 T
I
1263/:
彳2‘B/B 400°
400・ 501
50t 472 194 425425 245245
601 194
472 601 553
55.3 “1.1.3:: A
E
400'
400・ so
80 434 686 241
484 686 241 492
492 245
245 802
00.2 L ,
600'
600・ 80+
801' 5F95
555 695
695 241
241 492
492 245
245 Bo2
80.2
900'
900・ 1001
100↑ 664
664 781
781 270
270 540
540 245
245 112.5
9125
'・Vaˇ eszenumb邯
Valve size numbers400,4∞ 泅 ∞ and p【
600and Kn山
900 tate in
indicate, h millimetres.
m""metres thetheieCommended
recommended
maXimVm p”
maximum pipeline mete阝
diameters.
e"ne d讼
+^soVa
1' Ve nIets泛
Also valve inlet sizes.
es
7
APEX Air
APEX Air ReIief
Relief V¤ Iˇ es
Valves
D0VBLE ORIFICE
DOUBLE VALVEs
ORIFICE VALVES
1271 '・1272
1271 1273
1272・0 1273
Y B00Υ
BODY
slno"0rfke
Small
Body ‘
VoIve∶
Orifice
Body -ˉfinest
∶
Valve:-
ne$I Cast
CosI Iran
EN 0刂 Lˉ 250ororDvcI"e
EN-GJE-250
Iron to
Ductile Ir°
IoBS
Bs EN
n to
Iron
EN 1561
io BS
1561
Bs EN
EN
11563EN
5 6 3 E NC,刂
- G J s450ˉ
S - 4 5 0 - 1l0∪
0U.
0rifi‘ e Brockei
Orifice Bracket aond Cover -ˉsingle
n d Cover ÷,ing丨 e
DEsI0N
DESIGN AND
A N DACTI0N
ACTION iniec"° nm°
iniection vIdings of
mouldings of glass
gIoss filled
fi"edA190
Al90
NyIon
Nylon.‘ '
The ˇoIˇ e combines
Thθ valve combines smo"ond
small and Iorge
largeoff Ces
orifices.
The $mo"orif
Thθ small oIˇ e comprises
ceˇvalve
orifice compr$esoacomρ o“ le
composite FIoo,ond1everˉ
Float and Lever - iniection
iniecI° n tη °VIding of
moulding of
float and leverer assembly
os鸵mbIy seo"ng
sealingo矸 osmo"
off a small ABS plastic‘
ρlos"ci
orifice
°rificeˇ
"ooI en{
ondvent. When the
Ieˇ When ↑he fIooI
float is chamber
chomber isis ^Bs
seo"ng Foceˉ
Sealing movlded EPD^^
Face - moulded EPDM
∮i"ng wiIh
filling withwoIe△ 9he or∮
water, the cei$closed
orifice is closedin"io"y
initially
by
by忄thehe fIooI working9hrovgh
float working thr0ugh o leˇ er ratio
a lever ro"o of
of Join↑ ing Material
Jointing EPDM
MoIorio丨 - EPDM
5:1 When
5:1. WhenIhe thechomber
chamber is611θ
is filledd with
wIh wo9er
water
under
vndθ r pressure. theorf
orifice
ce isisheId
heldcIo‘
closeded by
by 1o`ge0rⅡ
Large ‘e VoIˇ
Orifice Valve:-
e△
ρre$svre 9he
ihe c°
the tnbined vp9hrvsl
combined upthrust of the lho fIooI ond the
float and Ihe Cover and
Eod彡 Cover
Body, ond Cowl
CowI - finest
彷nesI Cast
Cosl Iron
Iran
diWerθ nl∶ oI pressure
differential Pre$vre oˇovererlhe fi‘ e area.
theororifice oreo O0nn lO BS
to Bs EN
EN 1561 G刂 1ˉ 250or
1561ENEN-GJL-250 or DvcI"e
Ductile
occvmvIo↑ ed in the
oir accumulated
air Ihe system
sys9em entering
θnIering Ihethe ⅡonIo
Iron Bs EN
to BS EN1563EN G刂 s450ˉ l0U
1563 EN-GJS-450-1OU.
chomber vnder
chamber underworking ρre$vre`ihe
working pressure, the woler
water
}eˇ eI in
level io the
lhe chamber
chomber ;$isdepressed
depressed vn"I i{ it
until Float, 0vide ond
Float Guide
FIoo9、 fIoo忄 andseol
SeatR∶ ng -
Ring
reaches
reothe‘ a o point
po;nI when
when Ihe
the weighl
weight ofihe
of thefIooi
float iniec"° nm°
iniection moulding ofABs
vlding of ABS os"ci
plastic‘
p丨
is sufficient
;ssv矸 to vncoˇ
icieniio uncover theorfice
er}he orificeond
ande× hovsi
exhaust seoI Ring
Seal Ring - movIded
mouldedEP0^^
EPDM
oir^ir
air. Air is expelled
expe"ed vn"Ilhe
until thewoIe`leˇ
water level rises
el ri$e|,
ogoin ond
again andcov$es
causesIhe thefIooIlo
float tocIose
closeIhe
theorf
orifice.
ce l ABs(Acry丨
1. ABS [Acrylenitrile Butadiene
on"r"e Boiodiene Styrene}
sIyrene)
Ihe large
The 丨
orge orif ce ˇ
orifice oIˇ e cons:sls
valve Ⅱoo9
consists of oa float 0c0ρ
a ymerofˇ
copolymer
0丨 of very
e,γ high impact
high itη Poc丨 strength.
renglh
s↑
Fig N
Fig. Noo . 1271
1271sIondord ~"h
、
ˇo|ˇ e with
Standard valve $eo"ng off
sealing off oa large
丨orge orifice ˇenI Io
orifice vent to Ihe
the
flonged faced
oced ond
anddr‖ |ed to
Io BS
Bs EN
EN oImo$ρ here The
atmosphere. The foo9
float isis held
held oI at oa
flanged
109221997
1092-2
∮
19-97.
drilled
predetermined height in
ρredeIermined heighIin its casing
iI$co$ing bybyoa ribbed
ribbθ d PERF0RMANCE
PERFORMANCE
F∶ g No.
Fig. No 1277PN25ˇ ers on
1277 PN 25 Version. cage whichoIso
coge whiCh alsogvidesIhe
guides the floatonlo
fIooI ontoihe
theseol
seat. smo"0rifi‘
Small eˇ
Orifice o丨 ve_
Valve:-
Dvr;ng pipeline
During ρipe"ne f"Ⅱ n9 or emρ
filling 9yin9` the
emptying, Ihe
'Aerokinetic' feoIvre hoIds
‰ rokinei:c′ feature holdsIhe∮
the float
丨ooI o矸 Ihe
off the As lhe
As the sm¤ ories only
Small Orifice side varies on y in
in
ov"e9orf
outlet "0r
ce“
orifice f ce
size, thesideˇ
ze`Ihe ov忏
outflow ρoc"y;s
capacity
|ow c¤ is
given by:-
giˇ eo by,ˉ
0 ==
Q 0‘ θ86C蠢 d2P,
0.6886Csd’P‘
hN where
where
Q
¤ ==role
rate of free
offrθ e dry
dry air now in
oⅡ flow m,/
In m”!
min.
C5
C‘ =
o 0-0115
ol15|η metric.
eIric
d == oⅡ
d d° meIer mm.
Ⅱce diameter
orifice mm
Pi == ob$oIvie
P1 absolutepressvre
pressureoIˇ o|ve
at valve
inlet
inleI in
in bar.
bor
1° rge0rf∶
Large ‘eˇ
Orifice oIve;
Valve:-
Large 0Ⅱ Ⅱce outflow
1orgθ Orifice and
ov"Iow ond wc。
inflow
inn° P。 c"y
capacity
is given
i$giˇ by:-
en by:ˉ
Q == C(△
Q PP丿 %
C (AEPIJ‘I‘:
where
where
Fig No.
Fig. No 1273s↑ ond° rd Cat.
1273 Standard CoI No.
No 1271
1271 C =ˉ fow‘
C flow coefficient.
oe“ ic enI
ˇoIˇ ew"hi$o丨
valve o"ng Bs51‘
with isolating BS 5163 3引 viceˇ
sluice o|ˇ e
valve ΔP== di矸
AP differential pressure
ere n{oI Pressofe oˇ er{he
over'the
h° ˇ ing mitre
having mi|re gearing
geor ng。 nd end
and endflonge$
flanges ˇoIˇ ein
valve inbo‘
bar.
faced
f。 ced and edlo
drilled
ond dr‖ Bs EN
to BS EN 1092-2
iO92 21997
1997.
Fig No.
Fig. No 1272sIondord
1272 StandardCoiCat.NoNo.1271
1271 F∶ g No
Fig. N o .1278
1 2 7 8PN
PN25 ˇers on Also
2 5 Version. A$o
ˇoIˇ ew"hi$o|o|ng
valve bviIe汀
with isolating butterfly
Iyˇvalve.
o|ˇ e Aˇ o"ob|ew"h
Available withHondwheeI
Handwheeloperoled
operated
Go{e Voˇ
Gate e
Valve.
APEX A:r
APEX Air Relief
Relief V¤ Iˇ es
Valves
DOuB1E oRIFICE
DOUBLE VALVEs
ORIFICE VALVES
・
2 7 1 ' 11272・
11271 1273
2 7 2 ° 1273
The刊flow
The ow coeif oenI泌
coefficient dependeni on
is dependent onvtˇ
valve e RATlNCs
RATINGSAND
AND END C0NNECTI0Ns
END CONNECTIONS
“ze and
size he manner
ond丨the tnonner ofof mounting
movn9in9iheˇ oIˇ e
the valve
on lhe
on ρipe"nθ Th8coemcien,sg∶
the pipeline. ˇon in
The coefficients given ihe
in the Maximum MoⅪ mvm
Maximum
fo"o、 ving lob|e
following tableorθ
are those o丨 ˇ
for valves m° vnied
es mounted
汹鲴
Ihose forˇ ^^oximvm
Pre$svre
Pressure Temρ ero9vre
Temperature End Conned∶ on
End Connection
⑾⒗
on BS
on Bs2035Tees
2035 Teesororsim£ Io:
similar.
M
Cat. Working
Working Test 1|qvid
Liquid Air
Hydr°
For outflow, AP and P, are, respectively, the
gauge
孔 罗 and 邕 I蹋pressures
朊 absolute 甘u衤 f潲 in the W当 妆
pipeline. No. {Hydro- '
℃
ow AP
ΔP;slheˇ vge Pre$svre static) FIon° edˇ
Flanged"
b°
For inflow,
Forln∮ ocvv m g°
is the vacuum gauge pressure 0C
r
in lhe
the piρ ph8r;t bor
bar bar °C °C
ne ond
pipline andP,P1Ihe
theo9mo‘
atmospheric
pressure.
Pre$svre 1271
1271 16
16 24
2彳 40 70 NP1‘
NP 16/11
/11
FL0WC0EFFICIENt
FLOW s
COEFFICIENTS 1277
1277 25
25 375
37.5 40 70 NP25/ll
NP 25/11
1272
1272 16
16 24
2彳 40 70
70 NPl‘
NP 16/11
/ll
CoI
Cat. Vo ve
Valve CC
No
No. s汔 e
Size (Mel冖 o
(Metric) 1273
1273 16
l‘ 24 40
4O 70
70 NPl‘
NP 16/11
/ll
1278
1278 25
25 375
37.5 40 70 NP25/11
NP 25/11
11271/7
2 7 1 /7 400…
400* 7
37 ^o
600…
600* 4
74 ‘・Flon° es¤
Flanges re normally
are norlno"y svρ
supplied Bs lo92ˉ
to BS
pⅡ ed l° 2;1997
1092-2:1997
9° °…
900* 35
135' ond^sA
and ASAspec"iC¤
specifications can be supplied to order.
"ons con be sVpp"ed Io orde“
I272
1272 400…
400* 27
7
6° °…
600* 53
90° …
900* 97
7 DIsCHARCE CAPACITIEs
DISCHARGE CAPACITIES
Dischorge coρ
Discharge capacity es°
curves
o0ly cvtˇ rθ shown on
areshown ρoge3
on- pqge 3.
1273/8
1273/8 400…
400* 37
7
6° °…
600* 4
74
9° °…
900* 35
135
sEALlNC PREssVRE
SEALING PRESSURE
‘・VoIˇ
Valve e size
“ze numbers
nv`nbers 400`
400, 6‘o0
0 0 ond
and 90o
900
The minimum
The min mvm prθ
pressure
每sVre rθ qV red ol
required at Iheˇ
the"valve togiˇ
oIˇ e Io give effective
e effet"ˇ ,eo|n0is
e÷sealing is
ndi‘ ole in
indicate, inmillimetres,
m"imeIfes`Ihe recommended
the recommended
0.1
o l bo△
bar.
moX mVm pipeline
maximum otη elers
ρiρ ehne ddiameters.
DlMENsI0Ns
DIMENSIONS
Br¤ nch A
A
peze
P c°
CoI
Cat. Pipe Branch B C D E Appr° x
Approx.
No
No. Size Size
size WeighI
Weight
mm mm mm
mm mm mm mm
mm mm mm mm mm kg
kg
1271/7 400Ⅱ
1271/7 400* 80
80 256 212 81
256 212 81 162 —
162 _ 204
20.4
600*
600Ⅱ 80
80 327 239 l11
327 239 111 222 _—
222 31 7
31.7
900*
900Ⅱ lO0
100 410 259 146
410 259 146 292 -ˉ
292 — 517
51.7
900*
900艹 150
150 410 259 146
彳10 259 146 292 -ˉ
292 — 727
72.7
1272 400衤
1272 400* 80
80 340 212 81
340 212 81 157 —
157 — 286
28.6 Fig No.
Fig. No 1271/7
1271/7
600*
600Ⅱ 80
80 415 239 111
415 239 111 157 —
157 — 390
39.0
WU
900*
900衤 100
100 500 259 1彳
500 259 1466 177 —
177 — 667
66.7
1000 900*
900衤 150
150 50o 259 1彳
500 259 146 6 177
177- —— 743
74.3 Fig No.
Fig. No 1272
1272
1273/8 400艹
1273/8 400* 80
80 461 519 373
461 519 373 249 541
249 541 876
87.6
Size 600*
600艹 80
80 532 519 373
532 519 373 249 612
249 612 1126
112.6
900*
900艹 100
100 641 673 392
641 673 392 2犭 9 717
249 717 1456
145.6
1000 900*
900Ⅱ 150
150 679 685 475
679 685 475 258 815
258 815 177‘
177.6
'・ Pipe
PiPe size
sizenumbers
nvmbers40o'‘ oo t,nd900indi‘
400, 600 oIe`in
and 900 indicate, mi"ime9res'Ihe
in millimetres, the
reCo`n`nended mox∶
recommended lnvm pipe"ne
maximum pipelinediolnelers
diameters.
Fig No.
Fig. No 1273/8
1273/8
EPEX Air
EPEX Air ReⅡ ef V¤
Relief Iˇ es
Valves
Forsewoge
For sewageond
ande仟 IuenI systems
effluent sysIems
the EPEX
The EPEXro"ge
rangeofofAirAir ReIief VoIves combines
Relief Valves combines Ihe the proven
proven feo9ures
features ofIhe
of the GIe"fieId
Glenfield
sewoge Air
Sewage AirReⅡ ef Valves
Relief Volves and
o"d ihe
the APEX
APEXAir
AirReⅡ
Relief lves,The
Valves.
ef V¤ TheesI¤ b"shed fe¤
established Iures of
features of oa
I¤ rge oper¤
large Iing float
operating fIooI chamber
chomber Iotocon9¤ in the
contain Ihe liquid
Iiquid under
under o"service
all servicecondiIions
conditionsisis
reIoined;Incorpor¤
retained; Iioo of
incorporation of^pEX deslg"fe¤
APEX design Iures
features h¤
hass dovbIe
double coρ ¤
capacity of
cIl`of’ he
the du¤
dualI orifice
orifice
voIves and
valves o"d odoρ 9ion of¤
adoption pe亻ormo"ce poIymer
of a high performance polymer flo¤
floatth。
hass increased
increosed Ihe ρressure
the pressure
roIi"g$ubsIo"ii¤
rating substantially.
"y.
ReⅡ ¤b"i″ has
Reliability h¤ s been
bee" oaforemosi
foremostco"s∶ deroiiom Ihro凹
consideration ghouI Ihe
throughout the develoρ menI0fofIhis
development this
v¤ Ive,The
valve. TheAPEX
APEX iype Iorge
type largeori仿
orifice Ive with
valve
ce v¤ wiIh its
iIsproven
prove"Aeroki"eIic′ primc:pIe allows
’Aerokinetic' principle o"ows
flowr¤
high flow
high tes into
rates inIo and
o"d out
ouI of
ofIhe
the p:peⅡ
pipeline with complete valve ¤Iˇ e sI¤ ¤ without
b"i″ and
stability
ofpremature
risk of premoIvre cIosVre。 Fu"hermore、 the
closure. Furthermore, "e large
wmh
ihe I¤
compIeIeˇ
rge oper¤
operating
Ii"g fIooI chamber
float ch。 "d wiIhouI
mber compIeIeIy
completely
e"m:"¤ ies fouⅡ
eliminates ng ofihe
fouling of thev¤ Ive elements
valve eIeme"Is ond
ande"sures
ensuresreⅡ obIe oρ
reliable er。 Ⅱon°
operation all times.
ati¤
"Iimes。
FEATuREs
FEATURES BENEFITs
BENEFITS
0◆ AerokineⅡ c Principle’
’Aerokinetic Princiρ Ie′ O
◆ Pipe"ne Efficiency
PipelineE矸 ic;ency
0◆ Stable c"on
sIoble¤action ConnoI bIow
0◆ Cannot blowshvI
shut
9◆ Increased
Increosed Ai浒 I° w CopociIy
Airflow Capacity ◆ Ventilates
O rger pipelines
larger
VenIiI¤ Ies I° pipe"nes
L¤ rge0pero"ng
0◆ Large OperatingFlo¤ Ch¤ mber
FloatI Chamber No fou"ng
◆ No
O foulingof working
workng po汁
parts
s
Higherr Pressure
9◆ H:ghθ Pressure Rating
Ro"ng 9◆ Lower
Lowerv¤ lving cosIs
valving costs
0◆ Simple
simp丨 e and
ond Robust
RobvsI Construction,
ConsIrudion 9◆ Ease m¤ in,en¤ nce&minimo丨
of maintenance
E¤ se of & minimal servicing
servic:ng
9◆ Developed
DeveIoped from
fromProven Products
ProvenProdvcIs ◆ ln-built
O reliability
Inˉ bu"I reIi¤ b"iiy
ComponenIs
Components Material
Ier:¤ l
^n¤
Lorge0rifice
Large Orifice ABs Plos"c
ABS Plastic
seo"ng Ring
Sealing Ring MovIded EPD^^
Moulded EPDM
sm¤ Orifice
Small Glass ed Nylon
filled
0I¤ ss fⅢ NyIon
"0rifice
sm¤ Orifice Lever
Small er P° Iyproρ yIene
Polypropylene
" 0rifice Leˇ
Air VoIve
Air Float
ValveF|oo丨 ABs
ABSPl¤
Plastic-
siic
Toρ peI
Tappet slo;n|ess sIeel
Stainless Steel
Air Valve
Airˇ Floati Guide
¤ˇe Flo¤ Cuide s"c
ABS Plastic
^Bs P¤
Air
Air V° ˇe Unit
Valve uniI C¤ sl Iron
Cast Iron
Eleˇ ¤ior
Elevator Steel
sl¤ inless sIeeI
Stainless
Gvide sleeve
Guide Sleeve Polyρ ropylene
Polypropylene
Moin Cover
Main Cover Cast n
Iron
CosI lr°
H° °ICh¤
Float mber
Chamber Cast Iron
C¤ sI Ir° n
0perOIing Flo¤
Operating Floati P° Iyc¤ rb° noIe e
Polycarbonat
礻
*Also ˇ¤ ble in
available in dvc"Ie
ductileiron n
construction
ironconsIrVCIi°
^Iso¤ "¤
1100
EPEX J刂
EPEX VgIˇ es
ReⅡ ef Valves
Airr Relief
Use of
Use ofA∶ VoIˇes
Airr Valves
Where ond
Where when
and when
im Pipeline
Air in Pipe"ne Systems
sysIems Air Ive1Vpes
Valve
Air V¤ Types
A"qvid
A liquidc¤ rrying pipeline
carrying piPe"ne connoi operate
cannotoρ efficiently
erOIe eflicieni y if air
if oii Therθ are
There oro two
hvo basic
bosic″types:
ρes:
or
or0os nd
is allowed to accumulate in the pipeline. Air, and
gasis¤ 1l Dual
DVoI0riⅡ Voˇ e'pe汗
ce Valve,
Orifice performing ons
°rmin0¤all functions
¤ir with
air "owed
s'moy
gas,
wilh g¤ mayIo
beoccvmVIole
be resent
present
ρ in
bec¤ ihe
because:
vse: pipe"ne Air,¤ 2singIe0rifice
2 Single OrificeVolve`ρ θdorming fVndion
Valve, performing "fVncⅡ O¤
function nd44.
3 and
11The0pe"ne
The pipelinewosfv"y chorged
was fully chargedw"h° i〃 °os when
with air/gas when empty
emp″ opp"coⅡ ons conCerned
ln applications
In v"h sew¤
、
concerned 'with Sewage or lndvs丨
°e of Industrial
riol
22Airis
Air isen|ro ned¤atl pump
entrained pvmP svdion
suction Effluent
E仟 lven’ Systems, there is
sysiems'Ihere;s every
evo丨 γ likelihood that the fluid
33Aifis
Air isdrown
drawnin|hrovgh gI¤ nds hondIed will
being handled w"Iimρ ¤irlhe
impair "ke"hood
fvnc"on
the function ofiho||he
of conˇ fIvid
enlion¤
conventional
in through fgv"y ioints°
faulty )oints orr glands |
44^ir/o°
Air/gass is
is trapped in pocke|s
If0pped in during
pocketsdvring Piρ eline filling
pipeline f""ng ¤ir valves
air v¤ Iˇ es which become
which becoiη service.The
Vnre"oble ininservicθ
e unreliable TheEPE×
EPEX
55Ai〃
Air/gas
g¤ sin on is released
solution
insolv丨 feleosed due
due io【 Ihongesininpressvie
to changes pressure ˇ° es°
valves
Iˇ ˇefcome lhis
overcome operOIion臼 ldi矸
this operational by using
icvI″ by
difficulty r° e
large
vsin91¤
v° lvme。
volume auxiliary ch¤ mbersIOto
oo丨 chambers
vx"i° ryffloat containIhe
con1oin operating
theoperoling
°nd temperature.
and lemperoIVfe
f vid under
fluid vnder¤all service conditions; ns, in this way
woy Ihe°
the air
ir
Air
Air or gas
or g° sin
in ao pipeline
Pipe"ne has
hoslhe
the efec|of
effect ofredvcing
reducinglhe pipe
the piPe ˇ。Ive elements
valve eIemenIs" ore
service
arenol in
notcond"i°
incon丨 oc9wiIh
contact withIhe
thefluid
fluid ond
and
¤reo ond
area andsosoresIficls fl。
restricts w lIIt is
flow. ¤Iso elastic
is also e|osIc and
ond con
can re"° b"i″ is
reliability chiθˇed
achieved.
is¤
00gr0ˇ 0ie Ihe
aggravate the e仟 et|s of surge.
effects sVrge
P。 sm。 ning of
Positioning of^:rV¤ Ives
Air Valves
Since s tends
air/gas
theoir/g口
since Ihe tends9o
toco"ecl
collecto|
at h;0h is
ρoinIs ilit is
high points
reI¤ Ⅱˇe|ye°
relatively easy toreIe¤
sy|o se by
release by9he ρroρ er use
the proper vse°off°air
irˇ °lˇ es
valves. The diagram
The diogfom show
show″ pic。 Isew¤
typical sewagege oirˇ ¤lˇe Ioc¤
air valve location points.
ρoinis
ˇ¢here lhe
Where theflvid pvmρ ed9hrov°
fluid is pumped through the pipeline it "on
is
h Ihe pipe"ne"is des desirable
fobIe
Iˇ e Functions
Fv"c"ons sIre。 m
Air V¤
Air Valve bc° 怡d iust
that dvo o●
a dual
lh° i¤ Oce valve
orifice Ⅱoˇ e肉
vo~e (valve be located
A) be iVsId0腼
downstream
the EPEX
The EPEXr¤ nge ofˇ
range °lˇ es perform
of valves perlofm automatically
ico"y Ihe
¤vIo m¤ 丨 the ofihe
of pvmP deⅡ
the pump very valves.
delivery vt|ves
fo"owing fvncⅡ
following °ns:
functions: Dvol orficθ
Dual ˇ peˇ
orifice type valves
oIˇ es are reqviΓ ed oI
Iso required
ore¤also o"pe¤
at all peakk points
Poin,s
whkh¤are
which re defined
def ned涫 ⒗I ve to
relative the hydraulic
io|lle gradient
hydrodk gr。 o ld not
d诌 n丨 and nol
1l The
The reIeose
releaseofofoi〃air/gas dvⅡ ng pipeline
°¤s during ρipe"ne fi"ing
fillingoIoˇ oIViη e
at a volume
necessof1y lO
necessarily to Ihe
theh° Ⅱz°n1° I In practice
horizontal. prtdiCe oape¤ peak m¤ y be
k may be
r¤ le sufficient
rate sv仟icienI to preven丨 back
io prevent b¤ Ck pressure
pressvre restricting
resiriC9n9Ihethe
c° n“ dered°
considered ny pipe
ass°any PiPe sedion
sectionwhwhich
ch sIopes
slopes vPup towards
it,words Ihethe
f""ng rOIe
filling rate. hydrov"c°gradient
hydraulic rod;θ n9ofrvns
or runsp¤
parallel
fo"eII° ¤
to it. In the latter se the
case lhe
22The° dmission of¤
The admission of air to the
ir i° ρiPe"ne dvring
ihe pipeline during emρ ″in9¤atl
emptying "erc¤
minimVm reqViremenIis¤
minimum duol°
requirement is a dual air valve
irˇ eo9eoch
" lˇln
¤ the丨
at each end
endoflhe
ofthe
¤rate
a rOIe sV饰sufficient to prevent
Cieni l° ¤cvvm pressure
excessive vacuum
Preven|exCessiveˇ ρressvre sedion(ˇ
section 臼 eB)wi|h°
(valve
lˇ dd"iono|ˇvalves
B) with additional bou980O
at about
olˇ es oI¤ 800lmetre
metre
Ihe pipe.
in the pipe
lvoIˇ eC)These
n|θ rvo吣 (valve
intervals C). Theseu+erˇ ¤ es may
latter valves
lˇ moy be of single
beof引 Oce
orifice
ng e oⅡ
33TheTherele°
releasese of g¤ s accumulating
air/gas
of oi〃 occvmvIot ng in in e"ne durin°
pipeline
piρ during
normoI pfessvrised
pressurisedopero“ on`io ″pe
type-
'
normal operation, ρreˇ enI resIr
to prevent restriction to
dion lo
flvid fiow.
fluid f ow Pos"ons whefe¤
Positions where an
n incre¤ se in
increase downs slope
ndt,wn oCCVrs will
oρ e occurs require
w"reqv re
44TbeThefeienIion fluidin ven"bⅡ °n by
ventilation by oa sm创 oⅡ fce valve
small orifice voIve which
whth shov旧 o‘ o be
should also be
retentionof|he
of thefIvid in ihe ρiρ e"ne Wilh°
the pipeline withoutuI loss
Ioss
vnder¤
under er¤ in9c°
all operating conditions.
ndiIions installed
insloⅡ ed oI of decrease
poin、 of
at points decre¤ se in up slope
inVρ sloρ e(ˇ ° eD)
(valve D).
Iˇ
Datum
D a t u m Line
Line
—-—-—._.—.—.—..—._-—.—.—.—...__g_.—--—-—-—-_.—._.—.-.—.—.—._.—
section
Fa"in° Section
Falling
Datum Line
Datum Line
—-—-—.—.—-—--——.—_-—.—-—.—-w—u.—
'I'l
EPEX Air
EPEX Air ReI∶ VgIˇ es
ef Valves
Relief
oper¤ Iiom
Operation
Exh¤ vs"ng¤
Exhausting nd Vem"I¤
and iing Pipeline
Ventilating Pipe"ne Exh¤ vs“ ng Under
Exhausting Vnder Pressure
Pressure,
When Ihe
When ρipe"neis
the pipeline emP,Ihθ
is empty, sρ heric¤ lOperating
the spherical opero"n0fIo¤ float9 DVring norm¤
During oper° iing condiIi°
normall operating conditions air/gassw"I
ns oir/g¤ will be
be
is suspended
is svspended fromfromIhe
theeleˇ ¤IOr within
elevator wilhin Ihetheiηmain choiη bef
¤in chamber reIeosed from丨
released v"l collect
nd、will
hθ liquid and
from the co"ec9vnder
underpressvre
pressure
°nd Ihe
and thetyⅡ ndfc¤ I float
cylindrical fIooi element
elemen|o∮ of the9he air
¤irˇ olve is
valve is in theiη
in |he main mbef
chamber
¤in ch° depfessing
depressinglhe
"qvid¤ the"qvid
liquidlevel
level.The
The
svρ ρ0|忄 ed by
supported byihe
theguide
guidec¤ °e The
cage. TheoperoⅡ
operating ng lever of|hθ
lever of the operating
0ρ e冂 floatlf。
falls with the liquid but system pressure
sm。 orifice
small r们 ceˇ ¤Ive is
valve isheld open byby
he|d open tappet
o alopρ ei0n饣
on the oior
elevator.
he eIeˇ 、v"lh°
will "ng
hold n0。
ld丨the
ho cy "sw"hvalve
cylindrical
indrico丨 ˇ¤Ihe"quio bulonon
θlemenI
lˇ o element syslem
Ihe pressvre
large
theIorge orifice
orificθ
"° hoˇ
A;〃 0os
Air/gas ing been
having beeninh°
inhaled θxρ e"ed fr°
or expelled
led or fromm Ihe ρipe"ne
the pipeline sool As
seat. AsihetheoperOIing
operating fI。 。(°
float pProoches thθ
approaches its
limitofofils
the "m;I
is。
is ble丨°
able to flow freeIy Ihrovgh bolh
freely through both orf ces and
orifices ¤nd Ihethe 9foˇ e1the9¤
travel, ρρθ|0n9he
the tappet on thee|eˇ olor°
elevator pensihe
opens the smo"°
small orifice
rif ce
pfinciPle°off|hθ
lAerokinei c′ principle
'Aerokinetic' the Apex
Aρ ex V¤ Iˇ e element
Valve eIemenI ensVres
ensures ˇ¤ e、 releasing
valve,
Iˇ reIeosing the
Ihe accumulated
occvmvl¤ led¤ ir/9° s under
air/gas vndef pressvre
pressure.
Ih¤ I the
that lhe airflow
oir flow creates
creoIes¤ posiiive do、
a positive downˇn force
force Ioto hold the
hoId Ihe This
this in丨 vrn allows
in turn o"oWs9he"qvid|eˇ
the liquid level eI to
Io rise¤ goin and
rise again ond Ihe
the
cylindrical floatI element
cy"ndricoI fIo¤ eIemenI sioblθ Wi饣 hin the
stable within ihe guide
guide cage.
co0e AsAs s而 ° orifice
small r们 ceˇ ¤ eio
valve
Iˇ toc|ose'Ihv§ c° mPleIin° a
close, thus completing ¤【cycle.
Iyc|e
Ihe¤
the ir/g口 s is exhausted
air/gas from
exhous9ed fr° m Ihe piPe"ne`"qvid
the pipeline, liquideniers
enters "°
the
’ m¤ in chamber
he main and
chombef ond the
lhe operating
oPero丨 float thenrises
in0f|ooIIhen with
riseswilh The0per¤
Epex・- The
Epex limg Cycle
Operating CycIe
ihe Iiqvid
the liquid.theThee|eˇ °9° 。raised
elevator, roised by 1releoses9he
float,
thef|o¤
bylhe releases the
VenⅡ ng
1l Venting _
sm° ll orifice
small α e and
valve
or O【 Ieˇ Iˇ ond engages
engoges9hethebose
baseofihe
of thecy"ndⅡ
cylindrical
c¤ l
Pipe"ne emp”
Pipeline empty, ”all pen-oir
¤ orifices open — airfI。
flows freelyin
ws freely or
in or
eIemen1which
element, rises
which un"t
rises seoIed
until on olhe
seated rvbbef
n the foceface
rubber of of
9hel¤
the r° e orifice.
large orif9ce Aiihis ov亻 I0w ceases
air/gass outflow
pointoir/o¤
At thisPoinI ceoses and
ond
°vI°
out ρiρ e"ne "orif ces°
off pipeline. ‘
fu"herin"ow°
inflow off"qvid9olhe mber vnder
2F""ng
2 Filling
further liquid to themoin
mainch°chamber ρipe"ne
under pipeline
Liquid
Liqvid rises into nooIch。
risesini。 mber°and
float chamber raisesoρ
nd rtises operating float.
ero’ in0n。。 I
Pressvre compresses
pressure Comρ resses Ihe air/gas
the qi〃 untilImaximum
gos vnⅡ moX mvm w° rk ng
working
33CIosvre
Closure -
pressvre is reached.
pressure reoched The
ThePropodions
proportions oflhe moin
of the mber
ch¤chamber
main
¤re such
are that||he
suCh Ih¤ level will
liquidIeˇeI
theliqvid w"I noI bovelhe
rise above
notrise¤ bo"om
the bottom
0pero"ng n°
Operating float,
。1rising、 ˇ liquid, closes large and
rising with ndsmo"
small
°ri们 ceˇvalve
orifice o丨 ˇ eiη en|s "h iiqvid'cIoses lorge¤
elements.
ee丨
foce of
face ofihe
the m¤
main ch° mber coˇ
in chamber eG
cover.
44seo"ng
Sealing
When
ˇVhen Ihe e"ne is
pipeline
thepiρ emPlied`9heˇ
is emptied, ¤ em。
the valve in chamber
main Iˇchomber Increosed Vρ
Increased -9hrus|from
up-thrust fromrsin0"qvid
rising liquidseoIs I¤
seals large orifice.
rge oⅡ fice
will
w"I dr¤ in into
drain inlo Ihe ρ e"ne
the pipeline
iρ os
as pressvre
pressurefols
fallsond
and9he
the 55pressvrisσ
Pressurisation
oPer¤ 丨
in0flo¤
operating float, wing Ihe
following
1foII° the "quid
liquidleve`
level,reIeoses
releaseslhe
the lncreosin0"on
Increasing ρiρ e"ne pressure
pipeline ρressvre compresses
compresses oir air bvI
but
cylindrical
cy"ndⅡ coI fIool o"o、v丨the
to allow
floatl° large
hθ l¤ rge ori"ce to open
orificel° ˇhen
°Pen、when ρr0p0"i0ns ensVre
proportions ensureliqv|d conloined
liquid contained in in
I口large
rge ch° mber
chamber
Ⅱpe"ne pressure
pipeline ρressvre fo"s Im° spheⅡ C'ond
to atmospheric,
fallslo¤ and opehsihe
opens thesmoⅡ
small oi°
at mes
all times.
orf;cθ ˇ
orifice ¤ e The
valve.
Iˇ 丁he piρ e"ne is丨
pipeline hen¤
is then ble to
able Ioˇ free|y
enⅡ Io怡 freely
ventilate 66Re"eˇ "Ⅱing
Relieving
and
¤nd svb mosρ hθ rc pressure
atmospheric
subo丨 ρfessVfe cond"i° ns¤
conditions are
re¤ ˇoided
avoided. Air,
Ai△ released
reIeosed from
froms°
solution, depressesliqv;d|oˇ
IuI on'depresses liquid level
eI and
ond
Again the ’Aerokinetic'
A0oin Ihe∶ Aef° kinei c'ρ θnsvres complete
r nCiρ le ensures
principle compIeIe slobi"″
stability falling
fo"in° float ⒒0Ws|oppeI,°
fIooi¤allows tappet to operate
°pefOIe siη
small
¤ orifice to
of thev。
ofIhe Ive element.
valve elemθ n9 re"eˇ e oirfr°
relieve m sysiem
air from system. " orif;ce Io
1. Venting 3 . Closure
'II“
Q-:.-J. ‘
4 . Sealing 5. Pressurisation l 6 . Relieving
1122
EPEX Air
EPEX Air ReⅡ VgIˇ es
ef Valves-
Relief
singIe Or:fice
Single Orifice V¤ Ives
Valves
M¤ Ieri¤ Is
Materials
*ⅡFloat
Flo¤ 9Ch¤ mber&Coˇ
Chamber ef
& Cover Cosl lron
Cast Iron
Fl° ¤I
Float Polycarbonate
Polyc¤ rb° n¤ ie
Gvide Rod
Guide Rod sI¤ inless s|eeI
Stainless Steel
0ri"ce
Orifice Stainless Steel
s|¤ inIess s9eel
Voˇ e Seat
Valve seoI EPD^^
EPDM
礻AIs° available
*Also 。ˇo"¤ ble in ductile n construction.
iron
dvcIle ir° consIrvcIion
0pem"on
Operation
As oir/g°
As ccvmul¤ les in
air/gass¤accumulates in lhe valve
thevoIˇ e under
vnder prθ ssvre`Ihe
pressure, the
liquid level
.eIis ressed0nd
depressed
is deρ and the
lhe fl° o丨 moves
float down
iη oˇes do、 ˇn° ρening
opening
"qvidorifce
the
ihe Ie・ io
orifice tooⅡ cv/Ihe
allow occumvIo怡 do〃
the accumulated °be
g° s忄to
air/gas be exρ e"ed
expelled.
The
△he orince ¤ins open
remains
orificereiη open unⅡ the liquid level
untilIihθ el¤and float
nd fI° ¤|
o reclose
rse丨to
rise rec|ose the
iheˇ olˇ e
valve. "qvid Ieˇ
n
3 l 2 mm
Ronge
Range
FlG 1240
FIG I240
The
The vo丨 ˇe is¤
valve is available ˇ h one
vo"¤ ble、with
i丨 inletsize氵
one inIeI foIedat
is rated
size; itI;s 6.0
oi60
ˇ
Nominal
NO雨 n创 Nom"d
Nominal △¢Pressure
Tast Φ°n
Pre,‘ u田 (liar) A99rox
Approx.
b¤ r It
bar. " con
can bebe svpp"ed
suppliedw"h
withor、or without isolating sluice urε
Ⅱo0 D。
Pressure[liar] (mm) a°
Din. (mm) Body 8.Float
dy&F⒗ Seat 朊 咱ll“
Weight ω
(kg)
ˇ¤|ˇe The
valve. 丁he reIeˇ
relevant Co|oI° gve nvmbers
¤nl catalogue "hovI
numbers ore:ˉ
iso|o"ng s|uice
are:- ‘
"e“ 6 8α8|) 9 9 " s耐
‘
6 5恩5E
I240Air
1240 AirV¤ Iˇ e only
Valve onIy
1241Air
1241 AirV¤
Valve withIsoI¤
lve w:Ih e
Isolating Valve io BS
F丨 onge‘ to
Flanges Bs EN
EN l092ˉ 2 1997.
1092 -2 1997
"ng Volˇ
Fig 1240
Fig. 1240 _ m
345mm
J.
s/
硫m←
一丬仓
¤ =
Q =0688CP)
0.688 Ct’1
where
where
Q = =roIe
Q of of
rate free dry
freρ dfy oif"【 ,v/in
air flow m3/min
in m3/min
C == 102(meirc
C vn"slˉ
1.02 (metric units] - the w coeficieni
flow
Ihe fI° coefficient
Pa == obsolvIe
P, absolutepiρ e"ne pressvres;n
pipeline pressures inbof
bar
1 22 33 4
The°
The roρ h shows
graph shows dischor°
dischargeθcapacity 。fIhe
c¤ p0ci″ of fv"openˇ
the full 。Iˇ e
open valve D scha咱 θof
Discharge arInnSTDmii'min
dγ air
tree dry
offreθ sTDme/mh
vndefˇvarious
under ipe"ne
ori° vs pipeline
ρ pressvres
pressures.
l13
3
EPEX`刂
EPEX Airr Relief
Re"ef Valves
Volves
u a l I0"仳
DDu¤ Orifice e VoIˇ es
Valves
R¤ nge¤
Range nd perform¤
and nce
performance
R¤ nge
Range Fig. /1248/1248H
1246/1248/1248H
Fig 124‘ F;g 1247/1
Fig. 249/12491-1
1247/1249/124
the volve
The valveis° ˇ° ble with
is available w"h one
oneinIei
inletsize
size only,bvlin
only, but inhv°
two
ρressVre f¤
pressure Ⅱngs
"° "It con
ratings. canbebesvρ
supplied 、ˇilh or
P"ed with of without
w"houI
is° I° i° n sIvice
isolation sluice volve
valve.TheTherelev¤
relevant IoI° gve numbers
catalogue
nl c¤ nvmbers
are:-
1246DV¤
1246 Vglˇ e only,
DualI Valve onIy,6b¤ rating
6 barrr¤
1247Du¤
1247 DuallV¤ Ive with
Valve isolator, "ng
w"h isoIgIor,6b¤6 barr rating
ro,in0
1248DVoI
1248 DualVoIˇ
Valvee only,
onIv,10b¤ rgⅡ ng
1 0 barr rating
1249DV¤
1249 DuallV¤ wiih isolator,
Ivθ with
Valve isoIoIor,10bor
10 barr¤rating
124gH Du°
1248H DualIV¤Valvee only,
onIy/16b¤
lˇ 16 barrr¤ ,ing
rating "ng
1249H DV¤
1249H Valve
DualIV¤ Iˇ e wiIh I° Ior/1‘
isolator,
withis° 1 6 bar rating
b¤ rr¤
‘Hi° her ratings
‘I-ligher ro"ngs¤arere¤ˇ σ bIe
available. "ng
"¤
FIonges1o
Flanges Bs EN
to BS EN1092ˉ 21997
1092-2 1997.
F】 Ⅱo
⒐Ila.
Fig. Nom π
Nominalo Ⅱom an
Nominal ‘
9№
Test
l治 刂旧(hurl
Pressure
,‘
0。 r oY″ 训
Overall 防mε n∮ o“ (mm)
Dimensions ⅡⅡ Approx.
灬
PrII$urε [hurl
Pressure (b° r) 9(,mε 丫
lliameter
|ε(mm)
(am) Cc“ πg&冂
(using ool
8. flout sεSam A llB (( 0
D E
: F
F Weight [kg]
"t,,
Wε ghI(kg)
1246
I24‘ 5‘ 仓o
80 9
9 E"
‘ ε^o
all 9‘ I
96“ 50s
545 s2‘
526 — — 180
lBo
1I247
247 5‘ ⒔o
110 9
9 6‘ Ⅱ o
ill] ln‘
165s 7sO
7511 ,‘
525 373
979 346
;4‘ 2sa
233
1240
I24B 10
lo ⒔
110
o ls
15 lo111 110
9o 111511
lO5〗 ‘42 ,a4
642 534 — — 2511
2so
1147
1249 111
10 Ⅱ
Ill]
o 15
15 1010 110
9o 1259 B07
1255 I41I ,a4
534 373
a7e θ 哟
346 3113
a⒙
124311
1248Ⅱ 16
l‘ Ⅱ
Ill]
o 24
24 1‘16 1111
Bo 12oa n2B
1243 I2! 52‘526 — — 3511
a,o
124911
1249H 16
l‘ 〗
1111
o 24
24 1‘16 Ⅱ
110
o 1449
140。 lOa0
1113452‘
526 373
aza 346
a4‘ θ
395
99
Pe亻
Pe orm¤ nce
rforma
Inc° rp° r口 Ⅱ°n of APEX
Incorporation APEX feotvres0iˇ
features give θthe
Ihe EPEX
EPEX Airˇ 口Iˇ eo
Air valve 0
high air flow
hi° h oirfIc w c¤ p¤ ci″ making
capacity,- kin° it
tpo冖 icv|or y beneficial
particularly benefic;° l° n
on
p9ρ e ines svb汩
pipelines subiect `m°
freqvenI白
to frequent
cI I° filling and emptying.″in° ThθThe
ˇ°lve w"l
s,¤ nd。 rd valve
standard willven丨 e"nes
"ing
o|e pipelines
ventilate
i丨
ρiρ vp
ond up
emρ Io 1000mm
to iO00mm
d;omeler vnder
diameter undern° fm。 I conditions;
normal condilions,grovρ
groups s of valves
of v¤ may
lvθ s iη oy
be reqvired
be requiredforI¤ r° er"nθ
for larger lines.
s
了his high
This high c口 P¤ ci,m。
capacity makes this vo!vθ
kes lhis ρo|忄 icvlofIy beneficial
valve particularly beneficioI
;n systems
in sys|ems sVbiec99° svrge¤and
subiect to surge nd auxiliary
¤ux"iory fiIiin0s ¤re
fittings are
¤ˇ° bIe lo
available to od¤ pl the
adapt lhe equipment
eqviPmen丨 to se speci¤
these
lo Ihθ special l
s"voI"¤ons
situations.
The graphs
The g冂 phs sh°w
showIhe
thefIow
flowt°capacity of9he°
ρ°ci″ of rfce while
the orifice wh"e9he
the a0珈 麇“w
m●a网m 巾麇 w
u”m亩s・・ m Ⅱ%"●
.s而
fo"owin° formvloe
following formulae o"ow Iion of
calculation
allowcoIcVI¤ of ind;ˇ
individual
idv¤ l
s"v¤ Iions
situations. Na-uramu- Luge-urine!
Orificee
L¤ rge0rifi‘
Large
F|0ˇ through
Flow IhrOugh丨this ˇould normally
orifice would
his orif;ce、 norm¤ be at sub-sonic
vθ loc"ies when
velocities when9he
thepfessVre di矸
pressure difference"y
erence¤ be olihθ
across
cross svb orifice
the sonic
orif ce
is less n091
than
Iess ih¤ 0.91bor
barfor
for ov俐 or048bor
o、 ˇor
Outflow 0.48 barforforinf° ⒕
inflow.
The oqv¤
The equation would be:-
"on
¤ == C(△
Q WoVld
PPi)吻 be:-
C(ARPJ‘I:
where
where
Q == ro,e。
Q rate offfree dryoⅡ
freedry minmin
刊ow m〃
air flow
..
C == 5θ (meiric units)
Vn"旬 for Ive mounted
movnIed on
on bronch
a:
C 58 (metric valve
f° rv。 branch
pipe
Piρ eˉ- fIow
flow coe仟
coefficient
cien| I
Δ
APP== di秆 eren"¤ l pressure
differential pressvre across
oCross orifice
orfCθ inin bar
bor 'r‘
pl == absolute w
g掺
s"no"0rifice
Small Orifice 4
This°
This rnce n。
orifice normally
fm¤ er¤ 怡s under
operates undersvpercri9coI
super critical oir刊 ow
air flow 3
c。 ndili° ns when
conditions when pressure
"y
ρ oρ
ressvre d9ference excessof
in eXcess
differenceisisin 0.91
of O91 2
bσ ∴
bar. 1
The flow
The f|° w eqvo"on is:ˉ
equation is:- 0
‘Q 0.688Csd2P,
Q ==0688Csd2P, Discharge 01Iran dry air in STD m‘lmln
where
where Mr flow - Small critic- (tut open)
Cs == 00l15(mel宀
C.s c units)
0.01 15 {metric un"sl~f|ow
- flowcoef;cienI
coefficient
D ==
D °Ⅱ们ce diameter
orifice d omeler ninmm
mm ond ihethe
and oiher unils¤
other units are
re
¤s for
as for9he
the lofge
large ori"ce
orifice.
14
14
EPEX A:r
EPEX Air ReⅡ VoIˇ es
ef Valves
Relief
Dv¤ l0r∶
Dual fice Special
Orifice AppⅡ c¤ Iions
spec;oI Applications
ˇ
svrge AlIeˇ
Surge i¤ “on
Alleviation
Two
Tw。 fittings
fi"ings are
¤fe available to ossisl
¤ˇo"¤ ble Io assistin
in 9he¤
the alleviation
ioIion°off
sVrge in
surge in ao pipeline.
pipe"ne BoIh
Both fitted
arefi"ed
ore ininpIoce of"eˇ
placeoflhe
the
n° rmol
normal
Coˇ er and
cover ond cowl.
CowI
Fig 11291VenIed
Fig. 2 9 ] VentedNon
NonReIvrn
ReturnVdIve
Valve
ˇbntod
Vented
Vbm"ε gua刂 ng " noo`eturn
nan return D i m fl f r u (蜃
螭稞忠 揪饴哿 溧锹 。 咖・
Ill’lnSTDln‘mirt
m,,。 №ˇ
va Vθ k ,n"仑
valve m芯
M u m - h m a w m s u m m}捻 mam
—— mmmmvunv
-—— Will"
C)
AMIovr-Compulun m
Tank
In vo9ions where
situations
ln si丨 whefe PiPe"ne
pipeline profile n leod
can
ρrofiIe c¤ lead 9o、 ˇ¤|θ r
to water
c° lvmn seP¤
column rotion on
separation pVmP Iriρ
on°a pump trip, high shock pressures
`h;gh shock pressures 7'铷
ε
c。 n be
can θnef¤ 饣
be°generateded when
whenlhe
theseρorOIed column reioins
separated column reioins.
The EPEX
The EPEXvolve
valve combined
combined wilh
withVen9ed
Vented Non
Non Return
Relvrn Valve
Volve //'彳
¤
allows ρiρ eⅡ ne freeIy
air to enter the pipeline freely ononsep° r¤ |on`bvI
separation, but
"t,ws oirIo
conIfo|s
controls theexρ
Ihe enIervlsion
lhe of air
expulsion oif as
os the
Ihe column
colvmn reioins
reioins.this
This
h° slhe
has thee矸 ect of
effect of creating
creo"ng¤an n air bv们orbeMeenIhe
oir buffer between thet° Ivmn
column
redvcing|hθ
inIedoces、 reducing
interfaces, impoclˇvelocity
the impact eIoci″ of theihe reioining
reioining
1.0
coIvmn ond
column and lhe
thesvfge
surge Polen|io丨
potential ofofIhe
the sysIem
system.TheTheskeIch
Sketch
shows o aiypic¤
shows ρrofile
typicall profile subiect
svbieci9° to Ihe
the risk
risk of separation,
seporOIion'
wh"e Ihe
while the graph ˇs the
shows
°r¤ ph sho、 ihe air
¤if flow oc ly°
capacity
fIow coρ off the
ihe
¤rr¤ n0emenl
arrangement.
Fig 12921nˉ
Fig. Flow Che‘
1292 ln-Flow Checkk VoIˇ
Valvee
.‘
Piped0u"eIs
Piped Outlets
This i‖ ing is used
Th;s∮fitting vsed in
in s"v¤ Ⅱons where9he
situations where thehydr° v"c in
hydraulic In situations
siiuoi onswhere
where odour
odovr orˇ °poVrs may
or vapours moy be
be oa probIem`
problem,
grodienI f。
gradient falls below a peak ρe¤ k point
poini during
duringn。 rmoI
normal ,he large
the urge。orifice cowl cann be ¤ced by
replaced
be re口 by oa pipe rft ngemen9
ρipe¤arrangement
opei¤ 9ons`ond
operations, "swhere
and below
where o inflow
air
oir;nf would¤adversely
o、 ˇwould ed
affect
dˇ ersely o矸 inIeⅡ conneded
inter-connected W"hIhe
with thesmo"o"∮
"6ce cowIc¤ small orifice.
ice
lhe svfge
the surgech° rudθ ris"C of
characteristic system.The
thesys|eiη
oflhe Thegr¤ ph sho、
graph showsˇ
s
’he ov"low
the outflowc¤ poc″ of
capacity ofIhe orfongemenl
the arrangement.
Extra Fi"i"gs
ExIr¤ Fittings
Servicing κiI
servicing Kit
A Jock
A screw Kit
Jack Screw ˇo"¤ ble丨to
κ is available assistseρ
o ossisi or0Ⅱ °n of
separation of|he
the
`ˇ
ˇ¤lˇe at
valve OI9he
the m¤ "is¤
main
in cover
coˇ eri° ini to
ioint foc""° te inspection.
Io facilitate inspeci on
page
15
15
APEX A:r
APEX AirReI∶ ef Valves
Relief VoIves
652
TYPlCA1CLUsTER
TYPICAL ARRANGEMENT§ (for
CLUSTER ARRANGEMENTS (for use
vse° nI¤
on rger pipelines)
larger pipelinesl
1280sERIEs
1280 SERIES . -
D0VBLE
DOUBLE TRIPLE
TRIPLE QVADRuPLE
QUADRUPLE
1400/150mm
1400/150mm 1800/200mm
IBM/200mm 2200/250mm
2200/250mm
(130kg)
(130kg) (195kg)
(195kg) (270kg)
【270kg)
a
200.
626 i -
I292I
320
D|sTRlB∪ TED BY
DISTRIBUTED BY
_,
(I
9781.5
GLENFIELD&κ
GLENFIELD ENNEDY LTD
8: KENNEDY LTD.
Vorks,Queens
GlenneldˇWorks,
Glenfield QueensDnve,κ
Drive, Kilmarnock,
L
. Ayrshire,scotland
Ayrshire, κA13×
Scotland KA1 "marnock,
3XF F
Tel: (01563)521150
TeⅡ (01563) 521150FaCsim"e∶ (01563)541013
Facsimile: (01563) 541013
@ °F THE
PART OF α EnfFJELDGROUP
rHE GLENFIELD onouPOF
oF∞ noP,mlEs
COMPANIES
C MnΓ
Specifications, illustrations,
sρ cc竹 ical|on$ Jlu欲 weights.
ralion$ We|ghto etc given
eto9|ˇ en he● ein are
herein nly They
typical only.
are typical° They d° n01lorη
donot form'p'art
pa^⒍ oontrad and We
of the contractand Werese″
reserve
e the right to
the igh1to ″th0vt notice.
ter、 withem
a alter nol|oe
Pinted in Sooflandby
Printed soouand by The Contour P田
The-Contour s$L|mted
Press Ayr
Limited,vA_y'r Pub
P U b l i ccation
a fi o n NO-No211(98)
211 (98)
Three Runway System Project Contract 3310 :
North Runway Modification Works
Test Report
AccepIance No1e
Acceptance Note
ofissue
Date ofisSue : 14February2018
14 February 2018
Cuslomer
Customer : ce Trading
Advance Trading&EngineCⅡ ng Limited
8:. Engineering Lim;ted
^dvaΠ
Address
Address : Unit C,
Unit C,19/∏ Best-O—Bcst
on, ,Bestˉ Centre, 3266 Perryy Sweet,
CommeriaI Cen"e,32-36Fe盯
0-Be趾 Commercial sneet,Kowloon,Hong
Kowloon HongKong
Kong
Contract
Con1raCt no
no. : l`WsD I71
UWSDII 7L
Subject
sllbJeCt : Inspecd° n of
Inspection of0ate Valves & Air
GateValVes&Air valves
Sralves
Da1c of
Date ofinspection
insriection : 22to24,31Janua,2018
22 to 24, 31 January 2018
Lacation of insction n :
LoCation ofinspecti° (i)
0)Fact° Qingdao,,PRC("em1to6〉
,atatQingda°
Factory PRC (Item'1 to 6)
(iD Kam
(ii) Kam Tin、 Vorkshop(I⒃
Tin Workshop m7to
(Item lD
7 to 11')
Product description:
Product lon:
. . . Quan"ty
Quantity
Nominal sizc
Item
IteIn no.
no Sample descrip"on
Sample description Nomlnal Size supp"ed
supplied
(D【 l)
(DN) (no)
rno、
I l 8800 2200
29 IOo
100 2200
3
3 Waterfiont series
Waterfront series263gate
263 gate valve,Bs5“ 3&EN
valve, 385-163 lO74,c/w
&.EN I O?4,-:.cr'wstem
stemCap,
cap, 150
150 20
4
4 9l flanges
PN16nanges 200
200 55
5 ‘ 2250
50 5
6 3300
00 3冫
‘′
7 AVK/Glenfeld” Series
“‘AVKJGlenfield" series851小亻 odc1125I
851 Model 1251APEX
APEX single air
single airvalve
valvein
in 25 4
7 25 4
duc“ le iron
ductile Ve0endto
screwed
iron scre、 end to Bs2! fitted
BS 21n“ ed with
with isolating stopcock
stoDcoCk
8 ˉ 50 4
: AVK/CIenneld・ Series
“AVKlGlenficld” sCrles85I
851 Modcl
Model1273APEX double
1273 APEX air air
double valvc in in
valve :3 2
9 80 4
10 ductile iron
ductile Πan~。 eto
iron flange to Bs
B S EN
ENl092ˉ
1092-2 PN16 fittedwitb
2PN16rl1,ed withmi订
mineG geared
gcared 100 6
10 】00 ‘
11 isolating gate
isolating gate valve
valvc 150 4
1! 150 4
CondusIoⅡ
Conclusion:
Based our
Based ononour n results
inspection
inspecti° rcsults and
and reviG,sing relevantdocuments,it、
therelevant
reviewingthe Ⅴas found
documents, it was found!hatthe
that the aboVe-men“
above—mentioned
oned For this
forthis
deliveq compIied
delivery compliedw^hwiththe
therequ remen‘ of:
requirements on
1 slandald
1. requircmcnt(as
Standard agFed
requirement (as withwith
agreed customer): TheThe
cuslomeil∶ Contraot
ContractspeciOcaⅡ on,Bs5I63"∶
Specification, 2004,
BS 5 l 63-1:2004,
Bs EN
BS E`IO74-2&4∶ 2000 BsEN
1074—2 & 4:28:00, BS ENI092ˉ PNI6)
I997〈(PN16),
2∶ 199?
1092-2:
BsENEN
BS I2266-l∶ 2003,、VIs4ˉ
12266-112003, 52ˉ 0l∶ 1992and
WIS 4-52—01:1992 and
2 Manufaα
2. urers drawings
Manufacturers‘ drawings
Thc inspected
The inspecteditems
itemsarc
arerecoⅢ Ⅲended for
recommended acceptance
for'acceptance.
Inspectcd by
Inspected by
ˇ丿々 0ung
、
W 1mg
t⒃'冫ector)
ed° o
Appr° ed by
Approved ˇⅡ.~冖£土 : f: 7LA’OZ-r—
sI1 Lai
S.H. Lai
(Approved sign扭
(Approved Signatory)
ory)
Fo m No∷
Form No: 1`s Att官 pa"‘ ‘Xo1启 dd
INS_Acc_cptance-_Note dd O⒈ 092"l‘
uuowzms
Page ‘of
.e I
Pa‘∶ of l1 page
page
7&-
眷氵
In
a分轰 a安 E
ie各扌 居 in伫i33虢
33 at 03
33.0nOn
KuKui
street Fan"ng
Street. H°
Fanling, n0KOn9
Hong Kong. Te∶ 25978333
Tel : 2597 3333
§香 $1343}
港 粉 簇安
43
全 街
’5':- 2% #5 29A虢
29A %% ∞ A,0n
29A. 0n Chuen
Chuen slree1Fa㈧
Street, .Hong KOn0 Fax25978399
Fanling.
m° Hong Kong. Fax: 2597' 8399
∈ maⅡ n∮
E-mail: o@castco com hk VVebs"e
info@castco.com.hk Website:WWW Castco com hk
www.castco.com.hk
fifl*fi%+©fim&fl
佳 力 高弑 膝 中心 有 限 公 司
c A S T c 0 CAsTCo TESTING
CASTC‘;£7 CENTRELlMITED
TEsTlNG CENTRE LIMITED
Date ofissue:
D岔 te of 14 I4February2018
issue; February 2018 CastCo△
Castco RN:INsO180122o2-CV
LRN: INSDISOIZ2-2-G‘V
Report
Inspection Report
of
of
Gate Valves
Gate & Air VaIves
Va1ves&Air Valves
LocatioⅡ of
Location of:ilspec(ion:
inspection: (O Factory
(i) at Qi¤
Factory at Qingdao, (Item 1】to
PRClIteⅢ
gdatl,PRC Θ
to 6)
(ii) Kam TIm wor妯
(Ⅱ l Kam Tin hop
Workshop lIteⅢ
(Item 7to】
7 to 11)
1)
of inspectioⅡ
Da1e of
Date inspection: : 22to24,31JaⅡ
22 uary2018
to 24, 31 January 2018
To:
To:
Advance TradiⅡ g&EⅡ
AdvaⅡ ce Trading Lim:teJ
g|Ⅱ ee“ ng Limited
& Engineering
(Attn: Mr.KeⅡ
(Attn:Mr Ⅱy Ho)
Kenny Hol
1Ⅱ spected by:
Inspected by: Approved by:
^pproved by:
「o艹 ln No:
Form Xo 1N、 Cato V/i、
iNS_Gatc ●s Tduk’
Valves} d d Iii/0912016
"o9|201‘
Page of8pages
Pagc 1l of 8 pages
é香 flint»
港 粉 it嵌fl安E 居 iii 33眈 BB,on
街 33% κ山 Street.
33. On Kui HOn0κKong.
Fanling, Hong
streel FadⅡ on0
g‘ Tel 25θ 78000
Te!∶: 2597 8333
街 29A虢
1}
港 粉 #1
香 5&5}? 全 (£29,:
安 :9:
蓣a? ∞A,on
at 29A. Onohuen
Chuenslr。
Street. Fad"0,Hon9κ
et Fanling. ong
Hong Kong. 2597θ
FaX∶ 2597
Fax: 8399
3θ θ
E-mail: inlo@castco colη hk
E ma"∶ info@castco.com.hk VVebs WWW castco com hk
tθ ∶www.castco.com.hk
Website:
验 TIN
佳 cΑ
限 凵
fi s弑fi ‘ i ’中
E fi力e ‘高 m心 ‘ fi fi fl公 司
fi l有
sTCO TESTING
CASTCO CENTRE LIMITED
TEs G CENTRE ⅢITED
CastcO LRN
Castco INsOI80I22⒓ ˉ
LRN∶ : 1N80180122-2-GV GV
Imsoection Report
Inspection Re,ort
Customer
Customer Advance Trading
Advance ttading&Engineσ
& Engineering
ing Limited
Limited
Addfess
Address Unit CC,19`T,Best-0ˉ Best Commercial
, 1 9 m , Best—O-Best Commercial Centre.
Cente,32-36Fety
32—36 Ferry steet,KOWloon,Hong
Street, Kowloon, HongKong
Kong
Contract
Contract no
no. 1/WsD/17L
iJ’WSDfl 7L
subJect
Subject Inspection
InspeCtion of
ofCate
GateVaIˇ es&Air
Valves '& AirVaIves
Valves
Assigned inspector
Assigned inspector Mr WW KK .Leung
Mr. Leung
1
1. Date
Date ofinspeCtion
of impaction :∶ 22to24,3】 Janua,2018
22 to 24, 31 January 2018
2 LoCatlon
2. Lee-alien ofinspectlon
o f inspection : : (i)
Θ Factory Q"配 ao,PRC(ItcⅢ
a t Qingdao,
Fact° ry哎 P R C (Item Ilto
t o 6Θ)
(ii).
0O KamKamTln
Tin W° rkshop(Item7to
Workshop (Item 7 tolI)
I 1)
and the
and the manufactlrers’ dra△vings
manufacmrers’ drawings
4
4. scope
Scopeof、 v° rks
of works :: (l)
(1) sampIing允
Sampling forr inspection
inspectlon
O) V。
m ual appearance
Visual appearanCe CheCk
check
(3)
(3) DimensionaI cheCk
Dimensional check and
and markIng
markingcheck
cheek
(o Winlessing
W hydrostatlc
Witnessing prcssure
hydrostatic pressuretest
test
(5) Wttnessing∞
m Witnessing coating tests
a"ng tests
(6) Review
w ReviewofCustomer’
of customer’ss provide in轸 and
drawings
provide dra△ verification o f
and ve"flcatlon°
measuHng&tesⅡ
measuring ng equipments
& testing equipmentsfor
forvalidlty
validity
(7) Concluslon
m Conclusion
®
(8〉 Issue acceptance
Issue note
acCeptanCe note
'(9〉 Ifssueinspecti°
® Issue repon“
inspectionn rep°
【Ns G钮 ・V引
Farm No. INS-53m
r。 Vc‘ △dd0l`Og201‘
Vaivcsj' dd 0.] motto I IS
"mN°
Page 2 off8pages
Page2° 8 pages
é香fi港fl fi粉fi攮g fi安fi居fi 街 33兢 BB,0nK山 streetFanllng.
33. On Kui Street, Fad"0,HOng KOng Te2507BO∞
Hong Kong. Tel:259?8333
fi § $攮&安fi 仝
§香$氵客粉 EA 断fi29A虢 29A,On
29A. OnChuen
Chuen street Fan"n0Hong
Street. Fanling. KOng FaX:2sg7Ba09
Hong Kong. Fax: 2597 8399.
ma"inf° @CaslCo Com hk
E—mail: info®cestco.com.hk
Eˉ ˇeb由 te∶ WWW
ˇ
Website: CastCo Com hk
www.castco.eom.hk
有 TR
e e腧a a中a a
e佳a力s a高e弑 `心 限 公 司
CAsTCo TESTING
CASTCO CEN E凵
TEstING CENTRE MITED
LIMITED
CastCo LRN
Castco INS0I80122,-CV
LRN∶:1N30180122-2-GV
InspeCtion d∝
5. Inspection a"s&results∶
details & results:
(1) Sampling in♀ for
for iinspection
Quantity of sampleseIected
Quantity ofsalnple selected
Nominal Quantity
Quantlty for ins section
insDeCtion
Itetn no.
Item no sample description
Sample description size
Size supphed
supplied Hydfo哽 atic
Hydrostatic Coating tests
Coating tests
(DN)
(DN) (no.)
(n° D pressure test &
pressure test &other
othertests
tests
(n。 )
(no.) (no)
(no.)
11 80 20 20 5
5
2 lOo
100 20
20 20 5
5
^z
30 Vater丘 ont series
、
Waterfront sehes263ga te valve,
2 6 3 gate valve,Bs51 63&ENIO74,
385 163 & EN1074, 150
150 2200 20 5
4 c/W stern
c/w stemcap, PN16 flanges
cap,PN16na nges 20o
200 5 5 2
5 250
250 5 5 2
6 300 3
0 3 2
..AVKlClenneld’ 9series851
“AVKfGlenfield” ModeI1251A
Series 851 Model 1251 pEX
APEX single
single
7 Ⅴalve iu
air valve ductileiron
in ducti!e Ved end
screwed
ironscre、 endtO
to BS 21 fitted with
Bs216tted、 vith 25
25 4 4 2
isola“ ng stollcoCk
isolating stopcock
8 9series851ModeI127 APEX 50 4 4 2
d’ Series 851 Model 1273 3ApEX
ⅡAVlC/01ennel
3 “AVKfGlenfield” :3 Z 2 3
9 80 4 4 2
double air valve
double air valveiuinducti1e
ductile iron
iron nangc Bs EN
flanget。to BS EN1092-2
1092-2
10
10 . . . . 100
100 6 6 2
l1 PN16 fitted
「N16fl仗 W⒒ h mitre
ed Wlth mi0e geaKd
geared isol扯 ing gale
isolating gate vaIˇ
valvee 1 SO 4 4 2
1I 150 4 4 2
-~ FOr
Forlot
lot size
size less than20∶
less than 20 nos., thesa∶
1os,1he sample
np1e size shall
sha"bebeequalto
equal tolot
lotsize
size.Forlot
For lotsize
sizeequalto
equal toorormore
more than
than
220nos,the sa∶
0 nos., the ηp1e size
sample size shall
shallb ebe20nos
20 nos.
(B) FOr
(B) coating
For tcsts
coating testsandand
other
other testss(Visual
tc“ appearance,ddimensional
(Visual appearance, imcnsional measurement,
measurement, marking
mark checks)
ng checks,
- Sample
sample size sban be determined
size shall detemined in
in accordance、vith Bs6001-l
accordance with BS 1999inspecti
6001-1:1999 inspection levelII,singIe
on1eVel 11, single samp"ng
sampling
plan,Λ
plan, QL=40
A.Q.L. = 4.0
(2)
(2) Visua1appear
Visual ance check
appearance check
ˉ There、 Ⅴas no
There was no obvious
obvious defect
defect observcd
observedononthe
theinspected
inspectedsample
sampleofofD1DJ. gate Ⅴalves and
valves & air valves and they
they
gate valves&air
、vere all
were a"genela"y
generallyacceptable
acceptable.Tbc
ThevalVes、
valves were coated with
velc coated、 Yith blue
blue epoxy ng as required.
coating
epoxy coa“ required
(3)
(3) Dimensional measurement
Dimensional measurementand marking
and marking check
check
ˉ The
Thedi1η ensions of
dimensions of1he
the inspected
inspected samples,ere
samples were
n】measured bythc
casured by theinspector
inspector.
TheThe
I飞requirements
;quirements and
andactua1
actual
dimensions、were
dimensions vcrc tabuIated
tabulatedasa follo、
s following:
Ving∶
(l“ row-】
(1St equirGment;2"drowˉ
row = requirement; 2'1d row = actual
aCtuaI dimensions)
dhnensionsl
mark on sample
' 80mm 200mm 160mm 19mm 3mm 8—-ol 9mm 203mm 5530mm
0vcrau
Overall 0、 eran
Overall |oⅤ e忄 a"
Overall 0vera"
Overall |0vcran
Overall |ovefan
Overall |overa"
Overall |。 Overall
veraⅡ
measurCIments|n9ea、
nleasufcmcn1s measurements
measurements measurements mea・ urmelts me凼
uremCnts measurements uFmCn1s measuCmenls
measurements measurementsIη easuremc"s|measutmen1s
measurements measurements
lNSO180122ˉ
IN 80180122-2-2ˉ oofa"selcc1ed
f all selected oofau
f allselec1ed
selectedl ofau selected o⒍
o f allseIccted m sdccω
f all selectedd|・o ff汕 sdeα ed iof
all selected m se△
o f all ctd|矿
selected m sdcckd|⒍
o f all ms刳
selected o f all etω d
selected
GV I lto5
GV-l-l to 5 samples:
satnp∶ es∶ samp1es:
samples: |samples
samples: samp es
samples: |samp1es∶
samples: samples:
|samples samples:
|samp1es ηples
samples:
|s⒛
|CΛ S、 VK
CAS-WK
Min÷ 78mm
Min.=78mm M"l÷ 202mm|Mn÷
Min.=202mm 159mm
Min.=159mm Mh÷ 20mm
Min.=20mm {Mh÷ 25mm | 8`o19mm
Min.=2.5mm 8—-o19mm {Minˉ 。o3mm|Mhˉ
Min.=203mm +04mm
Min.=404mm
Ma`÷ 79mm
Max.=79mm Max÷ 203mm|Max÷
Max.=2()3mm 160mm Max.=22mm
Max.=160mm XIa\ˉ 22n)Iu |lvlax÷ 3n1tu
Max.=3mm Mdx~⒛ Ⅱnn、 |M扒
Max.=204mm △07mm
Max.=407mm
Bod)marking【
Body marking: 迄氽莰g冖 口 2017
w 2017 D、DN8080 sG5 6 CFCFPNI‘
PN16 Bs51631 △
[385163-1 EN1074-2
△abel n】
Label marflg
arkit、 R∶ VsD`17L 61ˉ
l/WSD/17L
l`、 3ˉ 351o54
61-3-35 to 54 24KG
24KG `1074-2
『o""、
Form No. INS_Gate
o l`` Va、 ‘ ‘f JdO
C● to Valves__T dd 01/09/2016
`09|]‘ 16
Page3of8p
Page 3 o f 8 ages
pages
香 ass-as
7; s e33就
港 粉 萘 a安s s居e s街 s ∞ O
33, 0nK山 s"eel FamⅡ
n Kui Street, g HOng
Fanling, Hong Kong
Kong. 25978333
t0I∶: 2597
Tel 8333
a e e羧a 安
a香s e港a 粉 全a街 29Λ 硫 29A0n
rzm 29A, O nohuen跏 eet FamhgⅡ
C h u e n Street, κong
Hong Kong.
Fanling, Hong Fax{259783
Fax: 99
2 5 9 7 3399
E-mail: nfo@castco com hk VVebs"e
E maⅡ info@castco.com.hk Website:WWW castC0com hk
www.castco.com.hk
y g心
sa中
a佳n 力 a高s s弑e s膝 aa有 限 公 司
CAsTCO TEsTING
CASTCO LIMITED
CENTRELlMITED
TESTINGCENTRE
Castco lNsO180122-2ˉ GV
RN∶: INSOlSOlZZ-Z-GV
Castco lLRN
Fo""`●
Form No. 1NS_Gate V"`cs I dd
lNs G“ ‘Valves_T dd0⒈ ◆
01/09/2016
9∫ 201‘
page4of8page
Page s
4 of 8 pages
2151}
港 粉 ii
a香 :e 萤§
安E居 lit
街 3333虢
as 330nK山 s"eelⅡ Fammg
33. On Kui Street. Fanling,HOng
HongKOng 25978330
T0l∶: 2597
Kong. Tel sass
2;
港 粉 at
香 seats}
5;:-
擐 安 é全 fit 29Λ at:
街 29A 29A, chuen
虢 29A0n 0 n Chuen Fa俐 mg H°
Street. Fanling,
slreetⅡ κong
ng Kong.
Hong Fax: 25978399
Fax∶ 2597 8399
∈ maⅡ info@castco.com.hk
E-mail: nfo@castcO cOm hk VVebs"e∶ WWW castCo com hk
Website: www.castco.com.hk
限
e r拭
a a高
e佳n 力 a n中a a心 有 公 司
l u腧
ELˉ
CAsTCo TESTING
CASTCO CENTR LIMITED
TEsT∶ NG CENTRE ⅢlTED
CastCO LRN
Castco INsO180122ˉ
LRN∶ : INSOISO 2ˉ CV
l 22-2-GV
Item
I (5) DN250 Waterfront series PNI6
263 gate valver 885163 & EN1074, e/w stem “2: PN16M
§erie§ 263
Castco s 0utside
. aft“)? . . . Outsrde Diamα cr of
Diameter of Γlan8e
Flange . No `bolt ho1e
No.-bolt hole race~10~flvc
Face-to-face Max∶ mum
Maximum
identi伍 ca1ion
identificatlon Nomina s'c
Nommalsme diametcf of
diameterof . . F|an1∶ |c facmg
Flange fdking . . . .
bolt Circle
bo1t circIe lhickness
thickness d1a】 ueter
diameter dimen“ on
dimensmn ovcran heiε
overall height
ht
ma爪 oonn sample
mark. sampIC nmgc
flange
__ 250mm
250mm 405〖 u∶ n
405mm 35s llm
355mm 22mm
22mm 3mm
3mm 12-o’ 8m〖 u
12~928mm 330【 nm
330mm <940mm
5940mm
0vera"
Overall overall
Overall overa"
Overall overa"
Overall ovcraI1
Overall 0vcran
Overall ovefaⅡ
Overall 0veiau
Overall
】ηeasure∶uCn】 ; measurements
measurements me岱urments measurements
measurements measurements mcasuiements measurements
mt・ asurε ments mcasurcmcnts measurements
measuremen1s measurements
measurements me△suremonts
lNsOI80122ˉ 2ˉ
INSOl80122-2- ofal
of all sc!ec1cd oFall
scICc1ed o
selected ofall selected ofa"sclected
sc1ccted of
f all selected oFa"selectcd
all selected of all selected of an selected of
all selected all selected
o1aII ofa"se1ec1cd
scleC1ed of all selected
CVˉ 51to2
GV-S-l to 2 samples:
samples∶ samples:
sa:nples: samples:
satnplcs∶ samples:
sa〖uplCs∶ samples:
sa:npIcs∶ s lmplcs∶
samples: sampks∶
samples: samples:
satupIes∶
C^sˉ 、
OAS-WKVK
Min÷ 249mm Mirt.=405mm
Min.=249mm Min÷ 405mm Min.=355mm
Minˉ 35smm Min.=23mm Minˉ 25mm
Minˉ 23mm Min.=2.5mm 12~o281nm
l2~928mm Min-33Imm Min.=725mm
Min.=33lmm Min-725mm
Mtxˉ 2sOmm Max.=406mm
.Vlax.=250mm Max÷ 406mm Max.=356mm MⅨ ˉ24mm Max.=3mm
Max÷ 356mtn Max.=24mm MaXˉ 3mtn Max÷ 727mm
aXˉ 332mm Max.=727mm
Max.=332mm
Body m。
Body w 当刂 20t7
rking u萤
marking: 20I7 D`250
DN250 sGSGCΓ CF PNI6
PNIG Bs5I63I
BSSI63-l 0`lO7⒋ 2
EN1074-2 `犭
DN300Waterfl
Item [6} DN300 on series§ 263 gate valve,
Waterfront PNI6ma
IVe 885163 & EN1074, e/w stem can, PN 16 flanges
Cdcos
. 01.5,“)?
idtnti‘ ca"on
Identification
. .
Nommal
`o血
.
久 d:::戋
lOutSIde
n1●Size diameter o ff
D该 mc1cr of
Diameter
.
bol1circlc
bolt Circle
Flange
.
J器 s
thickness nm吵 咂
.
Flange facmg .
、bo!t hole
No. -bolt
`o diameter
diame1er
hole Facotoˉ ruCe
Face-to—face
. .
dimension
dimensmn
M公 ImVm
Maximum
overall
.
height
oVCialI height
ma丨 k on
mark on sample
samD I n^n‘flan c・ ,‘
300Iuin
300mm 460mm
460tη lη 410mm
410mm 245mm
24.5mm 4mm
4mm 12~o28mtn
12~028mm 35‘ mm
356mm <!030mm
51030mm
Overall Overall ' Overall Overall Overall 0vcru"
Overall Overall
0vcr,a" 0vera"
Overall
wms衷 盟 s志 盐mms靶 挂
衷盟】
measurements measurements measurements m涮 s
m咖 measurements measurements mc岱utrcn1s measurements
measurements 〖 medsu记 mcnts
ueasuremen1s measurements
INSOISOIZZ-Z- of all selected of all selected of all selected of all selected of all selected ofa"
of allseIcclcd
selected of all selec1ed
orall ofa11selec1cd
selected of all selected
GV-fi-l to 2 samples: samples: samples: samples: samples: samples:
salnplcs: samples:
sumpIes∶ samples:
samples∶
GAS-WK
Min.=297mm Mn.=460mm Min.=4{l9mm Min.=25mm Min.=3.5mm 12`o28mm
l2~928mm Mnˉ 357mm Min.=805rnm
Min.=357mm Minˉ 805mm
|、 ÷
IΔ 2佻 mm
Max.=298mm Max.=46|mm Max.=410mm Max.=26mm Max.=4mm Max.=358mm ~1Δ ˉ808mm
Slu\÷ 358mm Max.=808mm
Body marking:
Body marking 洲w 2017
2017 D`300
DN300 sG SGCΓCF PN16
PNl6 Bs51631
B85163-l r`1074,
ENl074-2
m∝ “ng V、
Labcl marking:
Label VsD`I7I 6Ⅱ
IIWSDH7I. 12ˉ 37to39
61-12-37 to 39 194KG
194KG
Item‘{7)
Item 7、 DN25‘ ‘AVB'CIenOeld” Series
DN25 “AVK/Glenfield” ser:es8s1iModel12s1APEX siⅡ
8 5 ] Model 1251 APEX 21e air
single air valve
VaIVe in
in ductile
duc(iIe iron screweded end
iro"screΨ end to
Bs 21 fitted with isolating stogock
BS
Ca$tco・ s identification
Castco’s mark
identiflca“ on ma∫ k on
on saI△ p1e
sample A
Λ B
255mm
255mm I38mm
138mm
_ ove庀 measurements of all selected
Overall 0ˇ erallmeasurements
Overall mcasurcmcnts of
ofa"scIeCted
all selected
"measurements of an selected
ηples
to22 sample“
samples∶
[N50
!N$O1801222ˉ CV7Ⅱ to
1so122-2-Gv—7-1 samples‘
sa】
CAs-WK
CAS'WK Min.=255mm
Min-255nun Min.=l'38mm
Minˉ 138mm
— Max=256In〖 △
Max.=256mm aX÷ 139mIη
Max.=l39mm
marking: CILENΓ
Body marking∶
Body IE△ D 8510258t
GLENFIELD 8510258! D∫ 500`7 AVK
D1500/7 AVK PN16
PN16 DN25
DNZS ^犭
Rn"\。
Form No: }`s
IN$_Gate V奁 、‘ dd 01:09:20“
`l ddO⒈ Oq201‘
Cm‘ Valtes‘T
a琵 5 of 8 pages
Page
1E
港 粉 fi
眷 513*? 安 居 街 33虢 oo滥
辏 9*:Efii‘33‘sfi 33. On Kui:斟 h1ing9IOnq
留 耸Fanling.
Street. κon⒐
Hong Kong. : 2597783∞
TeTel 2∞ 8333
fiiéibl'fi’iéétiimAi-fi
香 港 粉 猿 安 全 待子29Λ 睨 29A,0n0huen street
29A. On Chuan FamFanllng.
Street. n9,H°Hong κ°n0
ng Kong. FaⅪ 25978399
Fax: 2597 8399
E maⅡ inf°
E-mail: @caslCo Com hk VVebs"e
info@caslco.com.hk Website: wWw oaslco oom hk
www.castco.com.hk
佳a
e 中a
a黢e e
力s高a弑 a公 司
心e有a限
CAsTCO TEsTING
CASTCO TESTINGCE"TRE
CENTRELIⅢ ITED
LIMITED
Castco LRN
Castco INsO1801222ˉ
LRN∶ 1INSO GV
I 30122-2-GV
8)
Item‘{8)
Item DN50“
DNSO series851Model!273APEX
eld” Series
“AVKfGlenl'teld” £51 Model 1273 APEX doubIedouble
air vaIve in duCtileiron
air valve nnmε
in ductile iron e to
flange to
^VKlClen“
BS EN 1092-2 P N
V16 fitted initli titltre geared lsola lug gate valve
Va
C|,“ ‘os
Casiea‘s Outside
0tl“ d‘ _
_ Dhin“ 。●of
Diameter °f f1o"s
Flange _ No. -Iio|i little Faee-io-{ace
li.cⅡ σ faok・
ido、 “Ιε
;"o"
identification Nomh创 size
Nominal sizk・ dia】 n● tof
diameter of
t‘ _ _ Fl食 n苫 (、
Flange facing
ing `o b・
t・ _ "loIe . _ A
A C
C E
bo"εcircle
belt l。 tti【 |\Ⅱ ‘
thickness 1,s diameter
di‘ 刂i"onsion
dimension
ma汉 o,,am"e
mafkunsemple flange
n由 nk。 `● "1o1cr
"
measurements
me急 s1`● mcnt,i ,0‘ 食
measurements
s↓ romont‘ m● 灬 tr● mc汛 s
measurements 01e食 m∞ s",‘ mems
me‘ s urk|ments meaata'ements
0m‘ ,ts measurements measuremems measurements
nieasmemenis measurements measurements
`"●
】NsO802⒉ 2 of
{NSOISUIZZ-il- ofa‖ t官 d
all selected ofa‖
of sd心 ●
all selected
`dc●
tod of创 丨
ofall selected
so e● ted ofaⅡ ‘
ufallaeleeted
o1||● tk|d of^‖ selected
efall sd启 tted ofallselected
k,fa‖ sc1||ct官 d of
0f食 ‖‘
all selected 。ra⒒
deC1ed of (ted
all selected of
of‘ ‖selected
all sdt|(ted oIa‖
of st|t∝ 佗d
all selected l。
`。
GV81】
a o22
v e - i to 贸mple9
samples: samρ 灬
samples: 蜘mⅡ ‘9
samples: ‘
samples:
aii|pl‘ ,∷ 嘲m洌 。ˇ
samples: samples:
s钔 ,∷ ‘
samples:
aioρ lk|‘ samples: s贫 pl‘ ‘
samples:
1日 ∷ 啪m,e⒌
samples:
"pl‘ `a"),les∷
C怂 WK
CAB-WK
Minˉ 49,n‘ n
Miltnlllmm l‘ 5mm
[65mm 12,mm
125mm M而 ˉ20mm
Min.-20mm M而 ˉ2,mm
Mia-2.5mm 4`o9mm
4~e19mm Mi,・ 78mm
Mia-118mm Miti.=2‘?9mm I,-210mm
Mmˉ279mm Mini-llama:
、 M"ˉ 2‘ 7mm
Min-Zflmm
Maxˉ ‘(itl,"
Max.=5llinm Ma`・ 21mm
Max.-?.lmm Ⅰ
Mas-3min
a’ 1∞ Mox∷ 179mm
Max.-l?9tnm MaX 28Ω mm Mav._=2llmm
Max.=280mni MaXˉ 212mm Max.=268ram
M食 268om
"a`。 `ˉ
B“ y natkin芒 :(Fo‘ a9v日 、忄)6LEN「 l£ lD D【
Budymarking:{Feralrtalve)GLENFIELO DI 500`7 PNliS
500i? PNI6 DNfill
DN50 ^VK
AVK E、 lO744
ENiilT-l-Il
:|,t0、 备、0) W
(D× galewtlve}
(For V
Vu出 st R1s
past: 50 ResPX1‘ assms-i
PNlt}Bs,丨 ‘s丬 EX10Ⅱ 2 2017
ENIOT-l-z 301?
" DN5。
Item‘(9)
Item 9、 DN80“ AVK`CIenncId” Series
DNBO “AVKfGlenl'ield” series85I Model
851IⅥ 2,3APEX
odel】1273 APEXdouble
dongleaⅡ
air valve iron flange-to
ductile iron
ln ductile
valve in nange to
ENN 1092-2 P V l é fitted with mitre
BS E itre2eared
gearedisolatin旦
isolatin 2ate
ate val
va ve
Ca‘ (o‘
Casieo‘s o"、 do
Outside _
_ D“ muer°
Diameter off Flange
F|a"刂 e _ 、o -l.inlt
No. bo"Ⅰlittle
o e Fn∝ △¢f洳 o
Face-to-l'aee
id息 t,t6‘ a"oo
identification No"""a size
Nominal ‘ze d心 md。 r of
diameter of I I F食 ⒒苫・fitting
Flange fa‘ n冬 . I I A
A C
C E[
halt ‘‘
bo⒒ eirele
|||心 thickness
t1i● k"‘ s‘ d11、 ‘
diameler
)l。 t i、 dimenSien
di、 o"sio"
natk o"s食
mark m凵 e
on sample nu".‘
flange
80,,",
80mm Zillintm
2lk订 l‘ 0,"Ⅱ
160mm 19mm
l,"in ;n""
3mm 8o19in m
SeeIQmm 203nm:
2031o,灬 Sultan!
:‘ li""9 239mm
139mm a27mm
321mm
"m
l|∶
Overall
o、 trtlⅡ Overall
over|ill Oserall
O、 e ri‖ o、 ●m"
Overall Overall
0、 erkIⅡ 0κ ,i"
Overall Overall
0、 定riⅡ o、 。
Overall
,,‖ Overall
0、 oid】 α ●ra‖
Overall
m eask● ‘ hts
measurements measurements measurements measurements m・ △
measurements measurements measurements measurements
s1‘ cm【|庥 t` measurements measurements
")‘
INsOl※ O1222
INSOIEOlJZ-L °f‘ ‖‘
afall ‘
'l● △
‘】
●d4 of a‖ ‘
ofall ‘‘l‘ ‘
‘t● "J of a‖ ‘
nfall ‘‘}c|・ t‘ ‘d 0f讧 ‖ '
ofall ‘d f a l‖
of日
e l ‘ ‘t息 d“ d
ofu"`‘ 'let1k・ “
ofall of‘ ‖s|・‘lek・ ‘__“
efall ted ●fn‖
ofall 'lk|‘ ‘t● d‘ fall ‘ ‘
ofa⒒
n 1‘ d
'l of讧 ‖s,,1|Ⅱ
ofall ' 1△ d‘
`d0t1|・ `dok・ `● `||1‘
GV9 I lo2
GV-9—l :02 Ⅱo,e,
‘ ' , 'l‘
sainρ ‘ ‘ ,‘
a",pl● 、
● ,pl‘
' , △ ‘lc` ‘ r' ,-
9,;,l‘ samples:
心 s∷ ‘m,.・
samples:
1、 蜘mp“
samples: ‘仓 p{(s
samples:
i⒒
` "‘ ",卩 `t‘ `珈 P丨 `
CAsV K
GAS—WK
M M
s刂 im
・l⒒ 20|"m |‘ 0 ,n M而 2‘ m" 8 ul9,"n 203mm Mi ;‘ mm M“ 2‘ σmm M" :29mm
in
M。
Mass-302mm
` 2u2"""
Ma、 21,,to
Mae-20mm Nla` ;,"o
Mav.-3mrn Mate-204nm
=04、 "m
Mam-463mm M讧 mm Max-329mm
M^` 3‘ 3"m Mate-241mm M仓 、ˉ329mm
` 2・
ˉ
Bodywtktnxzfiorairuh'e] GLENFIELD D Dl
Bm、 m。 rkm刂 :(Fo,a‘ 、i`e)GLE`FlE【 007 P`】
D I SDDJ'T é D`80
PNI‘ DNSCI 八 VK ENl0,‘
AVK ENl0?-l-l ●
(阢 ●
{For 坠记、刊、 ‘ sG RLs
DNSO SG
iii“
)1由
gamut-e} PNlEi
RESP`16 BSSIfiS-I
Bs,l‘ j丬 E、amen—2 son
‘2 20I7 lO’
" DN8o
Item {-101
o、 DN100“ AVK`Clen冂 eId” Series
DNIOO ”AVIOGlenfield” seⅡ es851MOde11273APEX
851 Model 1273 APEXdouble airˇ
double a!ˇ e in
air valve in ductile iron flagge
duGⅡ le irOn man2e to
to
"em r〗 BS EN 10923 P\'16 fitted with mitre eared isolatin ate valve
.
Ckls‘ os o“ “d● I
Caslcos Outside
_ _ _ I _ _ D am‘ t。 r° f
Diameternl’ Flange
Fla,】 |`) I _ \。 `u° ⒒h° 官 Face-to-t‘aee
Nn.~bnlthole fa‘ △t← face
id官 ⒒t k1"io"
identification No"i"“ 、zo
Nominiilsrze d tlmd"●off
diameter I I 「⒈m苔 c ljk・ ing
Flangetaemg _ I . A
A C
C EE
bo"‘CllClE
halt itl心 t ‘
thickness
k"‘ d‘ ‘、
‘t
diameter dimenston
d,,c"‘ io^ 1‘
ma,ko"№
marl: m创 e
on sample flange
n‘ 。 `、
"‘
】00"",
IOOnirn 22j,,m
210mm Bflnim
I180"、 i" 19mm
l9l)、 、
∶
3min
t9,l 8`ol,i"m
Swel‘Jnuii 129mm
229"、 33mm
a,a",⒒ , 2,9mm
259mm 刂:Omm
410mm
"9
o、 ●l念 Ⅱ
Overall ⒍ en‖
Overall Overall
o、 t● i△ o、 ●ia"
Overall o、 αA‖
Overall Overall
0、 ●“ o、 官
Overall
m‖ Overall
o、 1`1" Owrall
o、 t ri" o、 ‘“‖
Overall
"
‘
measurements
iti||么 ‘
t1t tt‘ 、
measurements
i・ l‘ ,"e仓 ‘‘
measurements
c",c"t‘ measurements measurements
,,lca‘ ,"‘ nts measurements
in● ‘
s1i‘ ‘
nent‘ ‘
it‘ 、
measurements
s rt|men】 measurements
9"oa“ l1|n‘ m● u`⒒ ‘
measurements
c9"e"ts m心 仓
measurements
ink。 t,ts
}∶
`‘
Gˇ △0丨 1o2
GV-lO-l to 2 ●,,l、 p(‘
samples: ‘
samples:
ainρ lc` sainplo9
samples. ‘
samples:
a"、 pl。 钮
samples: samples:
′查 氵 l。 s∷ s:1‘ ‘
‘
samples: ;’
珀1’ ρ‘
samples: samples:
s:1itiρ l心 |i 、
samples:
o",p1||s∶
` "pl‘ ` "、 `
CAs WK
{JAE-WK
l‘ 0i",
lllflinni 22h、
22|tiim 180mm
18(、 Nlj9 l9"""
Mia.‘—'19mm Mo 2‘ mm
M‘mfilimm 8~al9mm
8‘ )l Mi" 230mω Minn-SNmm
Mini-'230mni M讪 ”刂ti m Mi" 2‘ 1mm
Mum-261mm Mi) 4 "m1
Min.=4llmiu
" "
"9、
Maxnllhmit
Xl‘ 】 s1"i"
Max.v3mni M。 、 2a mm
Max.'-231mm Ma、 a’ 5mm
Mellfimm Ma` 2‘ 2mm MaitFJlllmm
Max.=262mm. M母 ‘12mm
` =Ol,,"1 "a、
`ˉ
Body",a‘ ki,芒 ∷ (民 ●ait`食
Bhdyll'lalkingfinrait 、‘)Cl£
\alve) XF【 [lD
GLENFIELD Dl 5007 P`l‘
D ] 500” PNIIS 0`1k,0
DNIOIJ ^VK
INK E`lO9刂
ENIIJ'M-l -I
(F0丫 9at。 、“ ●) W
(Forgarevaive) 幽 l、 DNlOo
DNIOO so RES
sC R】 s PNI6
∶ 3t ENIOT4-2
Barres-i
emsBs,l‘ 101'?
[`lO7{] 2017
r。 ,"ix。
Form Ne. I、 s〈 ∶‘Valves}
INS_Gate Vo`o`T dd‖
a】 ⒈09∫ 201‘
dd ll “093016
Page6of8pages
Page 6 o f 8 pages _ _
7E-
香 are
港 粉 ii裰 a:- 居街
安 E— 3a藐
fir33ss ∞ 0n
33. κu streel,Fan"n0,HOng
On Kui κon0 Te|∶
Street. Fanling. Hong Kong. 25978303
Tel: 2597 8333
港 粉 it
a香 sets IE-
锁安 & 仝 is? 29Λ at
街 29A 虢 ∞A,0n
29A, Onchuen
Chuenslreet,Fadhg,HOn0κ ong FaⅪ
Street. Fanllng. Hong Kong. Fax: 25978399
2597 . 8 3 9 9
inf° @CastCo com hk
E ma"∶ lnfo@ea_stco:com.hk
E-mail: Vebs"e∶ WWW
Website:
ˇ cas℃ o com hk
www.castcoeomhk
有 TR
限
t佳i fi力$ e高£ $弑+骏 fi fi心fi é l 公 司
i fi中
ELˉ
CAsTCO TEsTlNG
CASTCO CEN
TESTING CENTRE LIMITED
MlTED
Castco I.RN∶
Castco INsO180!22-2-CV
LRN: INSU l 80122-2—GV
nn l,N】
IteⅢ ['11]
Item 5o“
DNlSl} AVK`CIe∏ 臼eId” Series
“AVKfGlenfield” serics8s1Modcl1273APEX
§51 Model 1 2 7 3 APEX air ValVe
doubledouble in duc"Ie
a i r valve ironiron
in ductile flangeet。
nan£ to
BS IO92-2PNI6
EN 1093-}
Bs EN Wi‘ h mitre geared isolating
P V16 fitted with Ia gate valve
Ca“ ‘
Castco's
o‘ o“ “dc
Outside
' ‘ _ _ . Di^"‘ ‘ ,of
Diameterot‘ Flange _ No. 4301! hole
o t Face△ o fa.e
Face-to-face
id● nt诉 ‘
Identification
at on No"n扪 size
Nominal s砭 ● di,、 ,o‘ r of
drainetcrof _ =ln":1 Flange i● in:
Fl tig仓 facing `0`ln"Ⅱ A C
C L
E
b【,"<ifcl(
boll circle thickness
ck,e冬 s dinm‘ 【
diameter
e, dimension
d""o"‘ ion ^
ma● ko"sa
mark m●
on sample l官 flange
l‘ "、
":。
1l,Omm 285,"l" 24Cmm ∶ 8ˉ o23mm 2‘ 7n1m 2‘ 9mm 4‘
1lO"lm
I1; ;n)n,
.“.=,’__': ' 50mm 285mm Zilllmrn 9mm
11c,ii,", 3min 8~o13inm 267mm 468mm
4‘ 8io in 259mm 0mm
Overall
o,‘ ,a‖ 0、 e‘ 创
Overall l ⒍ cta‖
Overall o、 启∞tt
Overall oi|,i"
Overall 0、 官
Overall
raⅡ O、 e血 ‖
Overall Overall
Cl,eralt 0、 e妞 ‖
Overall 0、 eri‖
Overall
m官 a‘ 1● ‘
measurements measurements
i"k・ nts ine灬 ・
measurements measurements
i"【 ,n丨 s ‘
0・ 母 t|"‘ nt谷
measurements m● a, f・ m【 |nt`
measurements
9、 |● m ea礅 ‘
measurements measurements measurements mea‘
measurements
"艹 "。 "● "ts ",。 "le"(s
INsO80】 22,
{NSUIBllllZ-Z- ofall
ofa l scl・ △d
selected t‘ ofa"9d(‘ lcd
ofallselectcd ・
°fa‖ sdk・ 【
ofallselected
ted orallselected
ofa‖ sd‘ tted ofallselccted
ofa‖ sc1oi|led ofallselected
of all so1● ttk・ d 冬
ofa‖ selected
ofall cl‘ c1ed ol‘ ・
of Ii‖ ‘
ofallaelceled
ted 官
ofa‖ sclt‘ 【d
ofallselected ofallsclecled
of Ft‖ solck・ tt|d
G、 △
GV—ll-ltoZ
2 ‘amⅡ ‘
simples: san)p丨 ‘∶
samples::‘ ∷
samples:
sI1氵:)‘ :‘ 铂mp‘ ⒌
samples: ‘
samples:
amρ ‘, 嘲m洌 ‘ˇ
samples: jium"‘ 9
samples: samples:
sam9● s amⅡ Ⅱ
‘
maples: 蜘m洌 ・
samples: ,i
C^s、 Ⅳ【
GAS-WK
"l⒑
150mm
丨,θ t9、 286mm
28‘ 24θ ⒒it
240mm M∶ n 2Qmm
Mid-20mm “i, 2,Ill∞
】
Min.==2.5'tnm s-。 2ainm
B~o23mm Min.=268n1m M仓 ˉ{四 nⅡ
Mo 2‘ smm Milt.~469inm λf"ˉ 2‘ 0"m
Mn.u260mrn M∶ tl-{"mm
Mia-411mm
"""
M食 、ˉ2mm
Mam-213nm ・la、 ˉ3n"
Max-3mm M‘ 、ˉ2‘ 9mm
Matt.-269mm ・i。 、 470m"
Max-470mm Ma、 2‘ 1mm
Max-1261mm M食 43mm
Mat-45mm
`ˉ
Bod)"l1● k1n芒 :(F∝ aⅡ 、a卜 ol CLE′ FE】 D D】
BodymatltingiforairvalwlfiLI-INFIELD 0! ● |7
50!!!! PNl‘
W 16 DX1,C AVE E`lO9(4
DNISO AVK ENIG'M—vl
u"、 创
(F。 ・ 、Θw
(Forgalevalve) u扫 ,o so
nurse sC RES PNHSBs51‘
R1s P、 E`lO742 2cm
3~l ENlin-i-z
355163.:1‘ 20I7
" D′
Note∶ The
Note: measuredd"nensions
Tbe measured of theinspectcd
dimensionsoftbe inspectedgate- valves & airvaIVes、
gate valVes&air fOund to
vele found
valves were Comp1y、with
to comply vith the
the四requirements of
quirements of
Bs5!63-1∶
BS 5163-12004, BSEN
2004,Bs ENlO92ˉ 997(PNI6)and
2Ⅱ1 997
1092-2: (PN16) and manufacturcrs・
thethe manufactttrers‘ drawings.
dⅡ 小Ⅳings
Witnessinghydro呲
(4) W"nessing
(4) hydrostatic
dtiC pressure test
p【 ssure test
-ˉ The
TheinspeC1cd sampleof
inspectedsample of gate
gate valves & airvaIvcs、
vaIves&air valves wore
vere witnessed
Witnessed forforhydr°
hydroSt‘atic
static pressure by the
test by
pre$ure test the inspect°
inspector.
r
There ~as no
there、was ofleakage,s、
sign of
no sign leakage, sweating anddeteCt
vea(ing and defectobserved
observed during
dunng the the
tes(stests.
The The results
lest test lⅣ were
results foundt。
ere round to
comply
C with
、 th the
the requirement of
V∶ Bs廴EN
or BS "374-22&4∶
N lo74ˉ 2000&Bs△
& 4:2000 (it BS ENN 12266-l∶ 2003
12266-112003.
Nomina
Nominal she"Test
Shell Test Seat Test
seat Test
Item no
IteI△ no. size
s;zC Castco’s
Castco・ s identification markononsa∶
identihcaⅡ on mark ηple
sample Pressure
Pressure Duration
Durau。 n M0T
MOT Pressure
Preasure Duralion
Duration
(DN)
(ON) (MPo
(MPa) (sec)
(sec) (Nm)
(Nrn) (`犭 Pa)
(MPa) (sec)
(sec)
’ 一
1 1 80 NsO180122-2ˉ
INSO] 80122-2-GV-GV"△ to20CΛ
|-1 to s-、 VK
20 CAS-WK 2.5 60 I40
140 76
1.76 60
’ 一
9
2' l00
100 INsO180122-2ˉ
INSOISO GVˉ 2"to20CΛ
122—2-GV-2-1 sˉ WK
to 20 GAS-WK 2.5 60 160
160 76
1.76 ‘0
60
’ 一
31to20CΛ
'°
3j 150
150 INs0I80122-2ˉ GVˉ
1N30180122-2-GV-3—1 to 20 GAS-WK sˉ XVK 2.5 60 2Io
210 1.76 60
’一
ˇK i 25
'°
4 200 INs0180I222-GV4ˉ l to
1N50180122-2-GV—4-I to5C^sˇ
5 GAS-WK 、 2.5 ‘o
60 260 76
1.76 60
5"0 250 INso 80 222ˉ 0Vˉ 51to5CΛ
1N50180122—2-GV-5-1 sˉ WK
to 5 GAS-WK 25
2.5 180
180 310
31.0 76
1.76 60
6‘ 300 INso 80 22-2ˉ GVˉ 6I to3CAso、
1N80180122-2-GV-6-1 to 3 GAS-WK ˇΚ 2.5 180 360 76
1.76 60
0
一
’ 一
^z
7 25 「 80 22-2-GV-7△ to
1N30180122—2—GV-7—t to4CΛ
4 GAS-WK
sˉ VV K 2.5 60 -- 76
1.76 ‘0
60
`s0 WK
,一
F● i,"`●
Form lNS_GarcVa、
No. I\s(o1c e、 IuuO⒈
\L'tilvi:s_‘1~ 0,2o1‘
dd 0170912016
_ Page7of8pages
Page 7 o f 8- pages
香 5%
i3 3E
粉 i掼 安 3'
港 if} 居 iii
街 33 6%”,o30nκ
33虢 山 Street,
33. On Kiri Fooling.
slreet Famm° ,H° κon9 Te25978333
ng Kong.
Hong Tel : 2597 8333
43
港 粉 辂 32-
a番 $513} 29A虢
街 29A
安%全{if at 2θ A,0n
29A, On Chuen slreet%"mg,HOn°
Chuen Street. KOn0 FaⅪ
Fanling. Hong Kong. 259`8399
Fax: 2597 8399
∈ˉma"info@castco
E-mail: com hk VVeb引
info®castco.e;om.hk WWW castco com hk
Website:le∶ www.castco.com.hk
喻a
a佳a力a a高a弑e m s a有 限 公 司
中a心
CAsTCo TESTING
CASTCO TEsTlNG CENTRE
C E N T R ELIMITED
LIMITED
Castco LR●
Castco INsO180I22-2ˉ GV
LRNl∶:1N80180122-2-GV
(5) 、
Vitnessing Coa1ing
Witnessing tests
coatingtests
- Thc inspeCω
The sample
inspectedd satη ple of
ofg扯gatee valves
valvcs&“
& airr valves Ⅳitnesscd for
vere、witnessed
Valvcs、were for coating tests by
Coa1ing tests the inspeCtor
by the inspector.
Tcst results
Test resultswere
were⒌ ated as below:
stated as below;
No
Item No. l l 2 3j 4 5 6
^ˇ
DN
DN 80 100 150
150 200 250 300
Ca“ co’ s
Castco’s INsO180122ˉ 2ˉ INS0180122-2-
TNS0180122-2- INs0180122ˉ 2- 1N30180122-2- INsO180122-2- IN
lNs0180122ˉ 2- 1N30180122-2- INs0180I22-2- INsO180I22-2-
SO]80 122-2— IN80180122-2-
identiflcation mark
identification mark GVⅡ lto5
GV~l-l to 5 0V2△ to
GV-2-1 to55 CV31to5
GV-3-l to 5 CV丬 J to2
GV-4-1 to 2 GV51to2
GV-5-l to 2 CV-61to2
GV-6-l to 2
on sample
on salη Ie
l・ CAs-、 VK
CAS—WK CAs-、 VK
CAS-WK CAs-、 VK
CAS—WK CASˉ XVK
CAS—WK CAs WK
GAS-WK CAsˉ XVK
CAS—WK
Codting thickness
Coating thickness 4486to
8 6 t olO21 p m 5509to99311m
1021utη 0 9 to 993 p m 492to975uln
492 to 9 7 5 p m 5503to lO26um
0 3 t o 1026 p m 521521to964um
to 964 p m 532to986um
532 to 9 8 6 um
1heε was
There 、vas no
no obvious
obVious defect observedononthe
defect obserVed coating surface
theC0ating valvesand
of inspectedvalves
surface ofinspected theylⅣ
andthey all generally
ere all
were gcnera11y
Visual inspection
Visual inspection
acceotab1e
acceptable.
Ho"daV detection
Holiday detection No alann
No alarm signal
signal was adiv,tted
was activated du"ng
during the tests the oftests(ie
(i.e. Free Free p岍
holiday/pinhole).
Adhesion te欲
Adhesion test vas no
l here、was
There no adhesive
adhe“ ve disbondment
Jlsbond1△ ent exhibited
exhlb⒒ ed on ng surface.
coating
on COa“ surfaCe
This
This test、 nainly speCined
vas∶mainly
test was by manufacturer’s
specifiedby∶ ηanufacturer・ s in-house
in-housc method.
method Added
Addedseveral drops oFAcetone
several dfops the
ontothe
of Acetoneonto
Cure test testing coated
coated sur负 ce of
surface ofinspected and waited
valvesand、
inspected va1ves Vaited for
fOt30seconds 、
30 seconds. Wiped
Viped the test surface
thetest usingaaclean
surfdce using clean
Cure test
c1oth,no
cloth, no CoⅡ osion and
corrosion and smear、 vas observed
smear was observed ononthe
thevalves thethe
andand
valves cloth
cloth remained
remained Cleanclean.
The test vere
test results were
Theresu1ts、
satisfactorV
satisfactory. ~
ImDact resistance
Impact resistance The coated、
The Dieces、were
vollv pieces
coated work vere exhibit
eXhibit an
an impact
impact energy greater than
energy greatcr 2.1.
than2J
Itcm NNoo .
Item 77 8 9 1100 lll1
^ˇ
UN
DN 25
25 so so
80 100 150
150
Castc【 ∶s
INSO180122-2ˉ GVˉ 1N30180122-2-GV-
INsO1801222ˉ GVˉ INS0180122-2-GV-
INS0180122-2-GV- INSOI801222-GVˉ
INSO1801222ˉ GVˉ 1N80180122-2-GV-
lNsOI801222ˉ GVˉ INS0180122-2-GV-
)’
identicfiflggnsmark
identiflcation lnark
on sample 7-l to
7—1 81to2CAsˉ
2 CAS-WK 8-1
to2CAs-slrK WK
to 2 GAS-WK 91to2CAs-、
9-1 VK 10—1
to 2 CAS—WK 10I to
to2CAs-WK
2 CAS-WK 11-1 to2CAs-WK
I1Ⅱ to 2 CAS-WK
on samolc
Coati⒔ g thickness
Coating thickness 2290to618um
9 3 to 618 p m 3316to629u∶
1 6 to 629 pmn 291to608uln
291 to 608 p m 3304to576uln
04 to 576 pm 295to587"m
295 to 5 8 7 p m
Therc Xwas
There as no
no obvious
obvious dcict
defectobserved
observedononthethe coating
coa“ facc oofinspectcd
surface
ng su∶ f inspected valves
valves and
and they、 vere all
they were an generally
genera"y
Visual inspection
Visual inspection
acceptable.
acceptable ~ ~
HohdaV detectiOn
Holiday detection No
Noalann vas activated
na1、was
signal
alarmsIε actiVated duriggjhe
during the tests (i.e.eFree
tests(i Freeof holiday/pinhole).
ofhohdaJ/pinhoI e)
This test was
This test、 ain1y specified
mainly
vas tη speci6ed bybynlanuIacttrer・ house method.
in-house
manufacturer’ss inˉ method Added
Λdded scVefal Λcetone onto
dropsofof Acetone
several dmps onto the
Cure test testing coated
testing coated surface
surfdce of
ofinspeCted
inspected valves
valves and、 vaited for
and waited for30seCOnds
3 0 seconds. 、 Viped thc
Wiped thetest surface using
test surface usingaa clean
clean
Cure tcst
cIoth,no
cloth, n o corrosion
corrosion and
and smear、 Ⅴas observed
smear was obserVed on
on the Ⅴalves and
the valves and the Ⅰemained clean
cloth remained
the c1oth The
clean.the testresults、
test Vere
results were
satis伍 ctorY
satisfactory.
Note: the
Note∶ above
Theabove test resultsofofCoating
testresu1ts Ⅳere found
tests were
coatingtests、 to colnply、
fouud to Ⅴith the
comply with require ilentsof
the requirements the Contract
oftIle Specincati。 n
Contract Specification
and、VIs4-52-OI∶
and 1992rcspective
WIS 4-52-01 :1992 ly
respectively.
(6) ReviewⅤof
r6) Revie、 customer’ss provide
of custoiner・ DroVide drδ vings and
drawings verificationoof measuring
andveriflCation ∶
△easuring&testin
& testing equipments
g equipt△ ents lor validity
forVa∶ idi l
ADoendiX no
Appendix no. DoCumenttvpe
Document type Remark
Remark
A
A Manufacturers’
:、 draw"1gs
Manu亻 cturers・ drawings For evieW and
For∶review andinfo∶ 1na1ion
information
B Met11od of
Method o feXDolt
exportpaCking andand
packing on
protection
llro1ec“ Revi钭 Ⅴed and
Reviewed and found
found tto bcreasonable
o be reasonable&pra
& practicable
ctiCable
C
C Calibration certificateofofprcssure
Calibration cellinCate gauge
pressuregau e CheCk JOr
Check validity
for va1iditY
D Cahbration celli而
Calibration catc o
certificate oftorvlue、 Vrench
f torque wrench Check for
Check valdity
for validity
E Cahbration certincate。
Calibration a1inq thickness
coating
certificate o ffc。 auge
thickness只gauge Check for
Check for va"dir,
validity
F Calibration Ⅴemier caliper
certificate off vemier
Calibration cellincate。 caliper Check f,rva1idi
Check for validity
G
G Calibration CediΠ cate of
Calibr耐 ion certificate ofmeasurinˇ
measuringctape
tapc Check lor
Check Vabdi
for validity
H
II Calibration cc仗
Calibration certificate o ffh°
inc,△ te。 hday detector
holiday detector Check for、
Check for validity
ahdit、
Conclusion
(’7) Conclusion
-~ Based
Basedononourinspection r6ults
our inspection andand
results reVie、
reviewing
Ving the
thc relevant
releVant documents, the DDJ.
docuinen1s,the gate va1ves&air
I ga1e valves & air Ves
valves
Va∫
thisdelivery
for this dehvcry、Ⅳ foulld to comply
ere found
were ith the
comply・ with ents of
requirements
the rcquiretη ofthe ContraGtSpecification,
the Contract speci6cation,B BS 3-l∶ 2004,
5163-lz2004,
s51‘
Bs EN
BS EN 1074-2&4∶ 2000,Bs
1074-2 & 4:2000, BSENENIO92-2∶ 1997(PNI6),Bs
1092—22199? (PN16), BSEN EN122‘ 2003,WIs4-52ˉ
12266-12003,
6ˉ WIS 4-52-01
l∶ 1992and
0I∶:1992 and the
the
anu负 cturers・ drawings
manufacturers’
1η dra、 Ⅴings respectively.
respectively
EEnd
n d of Report
of R eport
⒈o"、 No.
Form X● l`s Gu‘ Valves_T
[NS_Gate dd
Vu、 t`~丨 dd θl|・ 9|2nl‘
01/09/2016
Page 8 o f 8 pages
iii}
港 粉 a枭 安 3‘
杳 2%
%‘
5E
居 iii
街 3333锍 咀 On
it? 33. Jf混 Kuil罐 』F滗
Street, m lq№
Fanling, Hong Kong. V259783∞
ng KOn⒐ Tel : 2597 8333
{35
杳 $3415}
£5 港 .,辕 全 往,29A兢
43$ 安 %i5 29A, On
29A if}? 29A0n Chuen
Chuen street,Fan‖ ng Hon0κ
Street, Fanling. ong FaX25978399
Hong Kong. Fax: 2597 8399
|nfo@castco com hk
E ma"∶ info@castco.com.hk
E-mail: ・v v v castco c0m hk
ˇVebs"e∶ www.castco.com.hk
Website:
Three Runway System Project Contract 3310 :
North Runway Modification Works
Certificate
The certificate by itself is not evidence of a valid WRAS Approval. Confirmation of the current
status of an approval must be obtained from the WRAS Directory (www.wras.co.uk/directory)
November 2024
1911048
Certificate No.
June 2017
éWRAS
APPROVED PRODUCT
Dear Sir/Madam
1. Production samples of the products described in Approval Information (“Products”) have been subjected to relevant
mechanical and water quality tests contained in the “Regulators’ Specifications” for the purposes of your application for
WRAS Approval.
2. After considering the test reports and examining the Product/s, The Water Regulations Advisory Scheme Ltd. (“WRAS
Ltd” / “WRAS”) finds that their use, when correctly installed (see paragraph 3) complies with the requirements of The Water
Supply (Water Fittings) Regulations 1999, The Water Supply (Water Fittings) (Scotland) Byelaws 2014, The Water Supply
(Water Fittings) Regulations (Northern Ireland) 2009 and all other applicable WRAS requirements from time to time.
The non-metallic materials of construction, in contact with the water, are suitable for contact with wholesome water
intended for domestic purposes having met the requirements of BS 6920-1: 2000 and/or 2014 ‘Suitability of non-metallic
products for use in contact with water intended for human consumption with regard to their effect on the quality of the
water.
WRAS Approvals are granted subject to and in accordance with the Standard Terms and Conditions of WRAS Fittings
Approval as amended from time to time (“Standard Terms of Approval”). You have confirmed your acceptance of the
Standard Terms of Approval by submitting your application for WRAS Approval. A copy of the current Standard Terms of
Approval are attached to this letter as Appendix B and are also available from the WRAS website: www.wras.co.uk.
Terms defined in the Standard Terms of Approval shall have the same meaning in this letter unless the context otherwise
requires.
3. Installation Requirements & Notes (IRNs) are set out in Appendix A. WRAS Product Approvals may include one or more
IRNs, which must be followed by the installer to ensure that the product is installed correctly to comply with The
Regulations and Byelaws. Since the incorrect installation of products could result in contravention of the Regulations or
Byelaws requirements, the attention of your customers should be drawn to any IRNs.
4. Please note that the use of the Products described in any particular area of supply is at the discretion of the Water
Undertaker in that area.
5. Approval Holders may quote in their sales literature that WRAS finds that the use of these products, when correctly
installed, will not contravene the requirements of The Water Supply (Water Fittings) Regulations 1999, The Water
Supply (Water Fittings) (Scotland) Byelaws 2014, The Water Supply (Water Fittings) Regulations (Northern Ireland) 2009.
6. The “WRAS Approved Product” logos are certification marks registered under the Trade Marks Acts 1994 (“Certification
Marks”). Approval Holders may use the Certification Marks in accordance with the Standard Terms of Approval.
7. Please verify the details of your Product as set out in the approval information and advise us of any discrepancies by no
later than 27th December 2019
Yours Faithfully
Jason Furnival
Secretary, Product Approval Group
The Water Regulations Advisory Scheme Ltd. Registered in England No, 06663930 Registered office: 6D Lowick Close, Hazel Grove, Stockport, SK7 5ED
Tel:+44(0)333 207 9030 Fax:+44(0)1495 248 540 Email:info@wras.co.uk website:www.wras.co.uk
Approval Number: 1911048 27th November 2019
APPROVAL INFORMATION
Validity dates: This approval is valid for fittings (as listed below in model) manufactured AND installed between
November 2019 & November 2024
Product description: S851 series of air venting valves, with blue epoxy coated ductile iron bodies, bonnets, side chambers
and cowls, with ABS floats and EPDM seals.
Maximum working pressure 16.0 bar. Maximum operating temperature 50°C
Identification Marking: AVK, PN, and DN on body. AVK, WRAS and other technical information on adhesive label on body.
The Water Regulations Advisory Scheme Ltd. Registered in England No, 06663930 Registered office: 6D Lowick Close, Hazel Grove, Stockport, SK7 5ED
Tel:+44(0)333 207 9030 Fax:+44(0)1495 248 540 Email:info@wras.co.uk website:www.wras.co.uk
Approval Number: 1911048 27th November 2019
APPENDIX A
You are advised to draw customers’ attention to the installation requirements and notes set out below which must be followed to
ensure that the fittings described above are installed in accordance with the requirements of the Regulations and Byelaws:
IRN R001
IRN R110
For above ground use, cold water services only, unless indicated otherwise in the description of entry.
IRN R535
The length of connecting pipework to this fitting should be kept to a minimum in order to prevent stagnation.
The Water Regulations Advisory Scheme Ltd. Registered in England No, 06663930 Registered office: 6D Lowick Close, Hazel Grove, Stockport, SK7 5ED
Tel:+44(0)333 207 9030 Fax:+44(0)1495 248 540 Email:info@wras.co.uk website:www.wras.co.uk
Approval Number: 1911048 27th November 2019
The Water Regulations Advisory Scheme (WRAS) administers the WRAS Product Approval and Material Approval Scheme on
behalf of the UK Water Supply Industry.
WRAS Approval of products is granted subject to the following standard conditions, which holders of approvals accept on signing
the WRAS Approval application form (Form F2).
1. Introduction
1.1. The WRAS Approval Scheme and the WRAS Product and Materials Directory are owned and operated by the
Water Regulations Advisory Scheme Ltd (“WRAS Ltd” or “WRAS”).
1.2. WRAS Approvals are granted by the WRAS Product Assessment Group (“PAG”). Members of the PAG are
suitably experienced representatives of the UK Water Supply Industry appointed by the WRAS Technical Committee.
1.3. In these Standard Terms of Approval, the following definitions shall apply:
“Agent” means any third party agent nominated by the Applicant for the purposes of the Application and whose
details are set out in section 4 of the Application Form;
“Applicant” means any person, company or other organisation / entity that applies for WRAS Approval in respect of
a Product;
“Application” means an application for WRAS Approval;
“Application Form” means the F2 application form to be used when applying for WRAS Approval and which can be
found on the WRAS website www.wras.co.uk;
“Approval” / “WRAS Approval” means approval granted by WRAS on behalf of UK Water Suppliers once WRAS is
satisfied that the Product complies with the requirements of the Water Supply (Water Fittings) Regulations 1999 and
BS 6920 and any other applicable requirements from time to time;
“Approval Holder” means the holder of an existing WRAS Approval, which includes holders of both Primary
Approvals and Secondary Approvals;
“Approval Period” has the meaning set out in clause 3.5;
“Approved Product” means any water fitting, plumbing product, material or component which is the subject of an
existing WRAS Approval;
“Approval Letter” means the letter from WRAS to the Applicant confirming the grant of WRAS Approval in respect of
a Product;
“Approval Scheme Installation Requirements and Notes” means any installation requirements and notes issued
by WRAS as part of a WRAS Approval;
“Certification Mark” has the meaning set out in clause 20.1;
“Committee” means the WRAS Technical Committee;
“Directory” means the WRAS Product & Material Directory;
“Event Outside Our Control” means any act or event beyond WRAS’s reasonable control, including without
limitation strikes, lock-outs or other industrial action by third parties, civil commotion, riot, invasion, terrorist attack or
threat of terrorist attack, war (whether declared or not) or threat or preparation for war, fire, explosion, storm, flood,
earthquake, subsidence, epidemic or other natural disaster, or failure of public or private telecommunications
networks [or impossibility of the use of railways, shipping, aircraft, motor transport or other means of public or private
transport;
“Factor” a factor is generally an organisation that did not manufacture the Product, typically being a retailer, reseller
or wholesaler;
“Primary Approval” means an Approval granted pursuant to the first Application for a Product and any subsequently
renewals of that first Approval;
“Product” means any water fitting, plumbing product, material or component submitted to WRAS for WRAS
Approval;
“Sample” samples of the Product to be sent to WRAS for evaluation as part of the Application;
“Scheme” means the Water Regulations Advisory Scheme;
“Secondary Approval” means an Approval granted pursuant to a second Application for a Product; a Secondary
Approval relies on the existence of a Primary Approval and is typically used where the Product has been re-branded
but maintains the same mechanical specifications as the Product submitted for Primary Approval and therefore does
not require any further mechanical or materials testing;
“Standard Terms of Approval” these standard terms and conditions of WRAS Approval as amended from time to
time in accordance with clause 24.2;
“Test Facility” means any WRAS suitably accredited test laboratory;
“WRAS Guidance” means the WRAS Product Approval Guidance available on the WRAS website www.wras.co.uk
The Water Regulations Advisory Scheme Ltd. Registered in England No, 06663930 Registered office: 6D Lowick Close, Hazel Grove, Stockport, SK7 5ED
Tel:+44(0)333 207 9030 Fax:+44(0)1495 248 540 Email:info@wras.co.uk website:www.wras.co.uk
Approval Number: 1911048 27th November 2019
The Water Regulations Advisory Scheme Ltd. Registered in England No, 06663930 Registered office: 6D Lowick Close, Hazel Grove, Stockport, SK7 5ED
Tel:+44(0)333 207 9030 Fax:+44(0)1495 248 540 Email:info@wras.co.uk website:www.wras.co.uk
Approval Number: 1911048 27th November 2019
The Water Regulations Advisory Scheme Ltd. Registered in England No, 06663930 Registered office: 6D Lowick Close, Hazel Grove, Stockport, SK7 5ED
Tel:+44(0)333 207 9030 Fax:+44(0)1495 248 540 Email:info@wras.co.uk website:www.wras.co.uk
Approval Number: 1911048 27th November 2019
6. Termination
6.1. Either party may close an Application at any time upon giving the other party written notice.
6.2. In the event that an Applicant withdraws an Application they shall pay to WRAS Ltd all sums due or committed up
to the date of withdrawal.
6.3. WRAS will retain a copy of the F2 Application Form for the entire duration of the Approval Period (including any
renewal period granted by WRAS) and for up to 5 years after expiry of the Approval Period.
7. Ownership of documents
7.1. All intellectual property owned by either party or any third independent party shall remain exclusively the property
of the owner.
7.2. Subject to any confidential information or other intellectual property belonging to the Applicant, all Application
forms are the property of WRAS Ltd.
8. Confidentiality
8.1. Without prior written consent, both WRAS and the Applicant undertake not to divulge to any third party any
information which was designated as confidential by the owner at the time it was made available (“Confidential
Information”).
8.2. It is acknowledged and agreed that WRAS shall be entitled to retain information provided by an Applicant
including any test results / analyses of the Confidential Information for up to seven years following expiry of any
approvals granted and/or renewed by WRAS provided that the Confidential Information is kept confidential at all
times in accordance with this letter.
9. Performance testing
9.1. WRAS will only accept applications which include test reports covering in full the Scheme’s acceptance criteria.
(See WRAS Guidance documentation for further information.)
9.2. Products must be tested in accordance with the requirements identified in the Test Code Sheet (TCS) matrix
published on the WRAS website or as notified by WRAS Ltd.
9.3. Where a product is an assembly of components, all individual constituent components must satisfy the TCS
requirements applicable to that component and unless already WRAS Approved will require testing.
9.4. In the case of non-standard products clarification of the testing required should be sought from WRAS in
advance.
9.5. The scope of an Approval is restricted to those conditions applied during testing. Consequently should an
Applicant wish to obtain Approval for use with a variety of pipe materials at a range of maximum working pressures
and temperatures, testing must include these variables. (See WRAS Guidance Documents for further information.)
9.6. Mechanical testing of products must have been completed no more than two years before the report is presented
to the PAG.
10. Samples
10.1. A Sample should have been manufactured no more than 12 months before the date of its receipt by the Test
Facility (please refer to the WRAS Guidance for further information.)
10.2. In the case of product ranges, or products manufactured or assembled at more than one site representative
Samples must be tested (please see WRAS Guidance documentation for further information).
10.3. Where alternative materials are used testing of these variants shall only be undertaken where they could have
an impact upon the opacity, endurance or pressure testing appropriate to that product. (Please refer to the WRAS
Guidance documentation for further information.)
11. Markings
11.1. It is a condition of WRAS Product Approval that all products be adequately and consistently marked to facilitate
identification. (See WRAS Guidance documentation for further information.)
12. Testing Failure
12.1. Should a Product undergoing mechanical performance testing fail to satisfy the requirements of an individual
test code sheet then a record of the failure will be reported to WRAS by the Test Facility. Complete retesting of a new
Sample will be required unless WRAS accepts that replacement of the failed component or product would not affect
the performance of the other tests already carried out on the Sample which failed. (See WRAS Guidance
documentation for further information.)
12.2. Should a replacement Sample subsequently fail the same test then it is deemed to be an outright failure and will
be reported as such to the PAG. If the replacement fails a different test it is considered to be a first failure and treated
as a failure during testing.
13. Modified replacement samples
13.1. If a Product fails to satisfy the requirements of an individual test code sheet and is then modified, the Applicant
must provide a declaration detailing the nature and full extent of all modifications. In such cases the status of any
earlier testing should be clarified with WRAS.
13.2. Where a modified Product is re-tested it is only deemed to be an outright failure if two failures are recorded for
the same test.
The Water Regulations Advisory Scheme Ltd. Registered in England No, 06663930 Registered office: 6D Lowick Close, Hazel Grove, Stockport, SK7 5ED
Tel:+44(0)333 207 9030 Fax:+44(0)1495 248 540 Email:info@wras.co.uk website:www.wras.co.uk
Approval Number: 1911048 27th November 2019
The Water Regulations Advisory Scheme Ltd. Registered in England No, 06663930 Registered office: 6D Lowick Close, Hazel Grove, Stockport, SK7 5ED
Tel:+44(0)333 207 9030 Fax:+44(0)1495 248 540 Email:info@wras.co.uk website:www.wras.co.uk
Approval Number: 1911048 27th November 2019
The Water Regulations Advisory Scheme Ltd. Registered in England No, 06663930 Registered office: 6D Lowick Close, Hazel Grove, Stockport, SK7 5ED
Tel:+44(0)333 207 9030 Fax:+44(0)1495 248 540 Email:info@wras.co.uk website:www.wras.co.uk
Approval Number: 1911048 27th November 2019
The Water Regulations Advisory Scheme Ltd. Registered in England No, 06663930 Registered office: 6D Lowick Close, Hazel Grove, Stockport, SK7 5ED
Tel:+44(0)333 207 9030 Fax:+44(0)1495 248 540 Email:info@wras.co.uk website:www.wras.co.uk
Three Runway System Project Contract 3310 :
North Runway Modification Works
Job Reference
Page 1
Project Name User Date
Widening of Tolo Highway - HY/98/02 Highway 2000
Western Railway - CC302 KCRC 2000
Western Railway - CC202 KCRC 2000
West Kowloon Reclamation - WK28/98 WSD 2000
Tin Shui Wai Further Development - YL46/99 TDD 2000
Butterfly Valley Primary Service Reservoir - 7/WSD/96 WSD 2000
Central Reclamation PhII - HK4/94 WSD 2001
WSD Replacement WSD 2001
Tai Po Development TDD 2001
Water Supply to Yuen Long - 20/WSD/98 WSD 2001
Queen's Mary Hospital ASD 2001
Chinese University Replacement *CU 2002
Water Supply to Discovery Bay WSD 2002
Discovery Bay Pumping Station WSD 2002
Water Supply to Tai Long Wan - 13/WSD/99 WSD 2002
HK Island & Ap Lei Chau - 2/WSD/97 WSD 2002
Water Supply to Lo Wai Village - 25/WSD/99 WSD 2002
Water Supply to West Kowloon Reclamation - 33/WSD/98 WSD 2002
Water Supply to Lui Kung Tin - 14/WSD/99 WSD 2003
WSD E&M Maintenance WSD 2003
Cyberport Development TDD 2003
Shek Wu Hui STW - DC/97/91 DSD 2003
Tai Po STW - TP31/98 DSD 2003
Discovery Bay STP DSD 2003
Shatin STW - DE/98/06 WSD 2003
Water Contract - 10/WSD/01 WSD 2003
Water Supply to Yam O - CV/2001/11 TDD 2003
Yuen Long STP DSD 2003
Water Supply to Tai Po - 19/WSD/01 WSD 2003
Penny's Bay Development - CV/2000/09 TDD 2003
Penny's Bay Development - CV/2001/10 TDD 2003
WSD Contract - 15/WSD/01 WSD 2003
Stonecutter Island DSD 2004
WSD Contract - 17/WSD/02 WSD 2004
Ngong Ping STP DSD 2004
Airport Replacement *AA 2004
Product Description
Coating
Electrostatically fusion powder coated
epoxy with full tests of effect on water
quality of BS6920.
Testing
All valves are machine tested on each
face to the nominal pressure and on the
body to the test pressure in accordance
with BS5163 -1&2, BS EN1074 – 1&2, BS
EN12266-1.
DN L ~H ~ H1 ØW ~ KG
Size
50 178 285 352 160 15
The right to change or modify product design without prior notice is reserved Issue 01/2016
Waterfront Fluid Controls Ltd.
www.waterfrontfluidcontrols.co.uk
h. UVDB
Suite 8, Maritime House, 143 Woodville Street, Glasgow, G51 2RQ
empowered by Achilles
C/
Waterfront is accredited by
Tel: +(44) 0141 4453781 Fax: (44) 0141 4455101 "3 UVDB Verify UVDB, UVDB VERIFY and ISO 6E
Email: Sales@waterfrontfc.co.uk empowered by Achilles 9001: 2008 ISO 9001mm
Finn
WATERFRONT
P Waterfront 223 Resilient Seated Wedge Gate Valve 50 - 300mm ‘J
Specifications
Grade
H1 H
Body / Bonnet / Stem Seal Housing Bridge Spheroidal Graphite Cast Iron BS EN1563 Grade
450-10 or 500-7
Obturator and Wedge Gate Spheroidal Graphite Cast Iron BS EN1563 Grade
450-10 or 500-7
Resilient Seat EPDM or NBR BS EN681-1 and BS6920
Fixing Bolts / Nuts / Studs / Washers Stainless Steel BS EN10088-1 Grade 1.4301
The right to change or modify product design without prior notice is reserved Issue 01/2016
Coating
Electrostatically fusion powder coated epoxy with full
tests of effect on water quality of BS6920.
Testing
All valves are machine tested on each face to the nominal pressure and on the body to the test
pressure in accordance with BS5163 -1&2, BS EN1074 – 1&2, BS EN12266-1.
*The right to change or modify product design without prior notice is reserved. Issue: 07/2020
Gear ~ KG
DN L ~H ~ H1 Spur Bevel
Ratio
All dimensions in mm
COMPONENT MATERIAL
Body/Bonnet/Stem Seal Spehroidal Graphite CAST Iron BS EN1563 Grade 500-7
Housing Bridge
*The right to change or modify product design without prior notice is reserved. Issue: 07/2020
Test Report
Approval Letter
Job Reference
Remarks
SV = Sluice Valve RV = Reflux / Check Valve
MSV = Motorized Sluice Valve Ball V = Ball Valve
BV = Butterfly Valve MBall V = Motorized Ball Valve
MBV = Motorized Butterfly Valve Flap V = Flap Valve
Three Runway System Project Contract 3310 :
North Runway Modification Works
Product Description
BS Standard
Contents
Introduction Page 2 Double Socket 90° Bend 28
Manufacturing Process - Double Socket 45° Bend 28
Ductile Iron Pipes 3 Double Socket 22.5° Bend 29
Ductile Iron Fittings 4 Double Socket 11.25° Bend 29
Quality Checks & Assurance 5 All Socket Tee 30-32
6 Double Socket Level Invert Tee with Flanged 33
Ductile Iron Properties
Branch
Material Characteriestics & Chemical 7 34-35
Double Socket Taper
Composition
Normative References 8 All Socket Crosses 36-37
Technical Specification Data All Socket 45° Tee 38
9 Cast on Pipe/ Puddle Pipe (Double 38
Wall Thickness
Flanged/Flanged Spigot/Double Spigot)
Allowable Pressures 9 Flanged Spigot 39
Operation Temperature 10 Flanged Socket 39
Straightness of Pipe 10 Mechanical Collar 40
Angular Deflection for Flexible Joints 10 Double Socket Collar 40
Permissible Straight Draw for Flexible Joints 10 41
Blank Flange
(Axial Movement)
Coating & Lining 11 PN16/PN25 Flange to BS EN1092 / BS4504 42-43
Jointing (Flexible Joints and Flanged Joints) 12 Pipe Blocks 43
13-14 EPDM Gasket for Flanges to BS EN1092 / 44
Dimension of Pipes
BS4504
Dimension of Fittings P-Trap (Socket x Spigot) 45
Double Flanged 90° Bend 15 Long Radius Bend (Socket x Spigot) 45
Double Flanged 45° Bend 15 Installation Guide - Socket Joint 46
Double Flanged 22.5° Bend 16 Installation Guide - Flanged Joint 47
Double Flanged 11.25° Bend 16 Repair 48
17 Recommendations for Handling, Packing & 49-50
Double Flanged 90° Long Radius Bend
Storage
Double Flanged 90° Duckfoot Bend 17
All Flanged Tee & Radial Tee 18-20
Double Socket Tee with Flanged Branch 21-23
Double Flanged Taper 24
All Flanged Crosses 25
All Flanged Level Invert Tee 26
All Flanged 45° Tee 27
Flanged Bellmouth 27
1
ductile iron pipe and fittings
Introduction
KEY brand Ductile Iron Pipes & Fittings are manufactured by SUNS PIPELINES COMPANY LIMITED while
BUN KEE has been appointed as the sole distributor in Hong Kong and Macau region.
Not only KEY by SUNS consistently delivers first & foremost the best quality products to clients, but also the
most practical technical supports and honorable shipment against customer commitments with proven
supplied track records.
SUNS PIPELINES COMPANY LIMITED, which is under SUNS industry group, was founded in 2002 with the
registered capital of 400 million. SUNS is a member of the drafting committee of ductile iron pipe’s
standard GB/T13295-2013 in China, and we also produce various international standards such as ISO2531,
BS EN545 , BS EN598 and ANSI/AWWAC 151 while a great variety of requirements from different end users
are mostly fulfilled. SUNS is indeed a professional manufacturer of water-cooling ductile iron pipes and
matched fittings.
SUNS strictly perform ISO9001 international standard system on maintaining the product quality system.
From raw material procurement to finished products, every little process is comprehensively controlled.
SUNS has also been approved by many product system certification organization such as BV, WRAS, KSD
and SGS. SUNS‘s products have been widely exported to more than 50 countries and regions aboard such
as America, Spain, Belgium, England, Italy, Germany, Brazil, Saudi Arbia, Syria, Iraq, Ethiopia, Singapore,
Vietnam and Hongkong ….ect.
SUNS succeed in winning the bid of products’ supplier towards 2008 Beijing Olympic Games, Nanjing Youth
Olympic Games, Shanghai Expo Site, Wanjiazhai diversion project and many fire protection projects. In
the past ten years, SUNS has already established long-term good cooperation relationship with more than
1000 water utility companies of Beijing, Tiajin, Taiyuan, Shanghai Pudong Veolia and so on. Our products as
well as our services have been well acknowledged and accredited by the public.
2
ductile iron pipe and fittings
Manufacturing Process
Ductile Iron Pipes
Spectral analysis
3
ductile iron pipe and fittings
Zinc rich
Polishing Machining Hydrostatic test Cement lining
painting
4
ductile iron pipe and fittings
Cerifications
arm-“ulna: u.
5
ductile iron pipe and fittings
The key yardstick to clasify the grade between Ductile Iron to Grey Cast Iron is by comparing their
Mechanical Property, namely to measure their tensile strength & elongation values.
6
ductile iron pipe and fittings
Material Characteriestics
Mechanical Properties
Tensile strength
≧ 420 150-260 ≧ 400
(N/ mm2)
DN80-1000 ≧10
Elongation (%) Neglect ≧ 18
DN1100-2000 ≧7
Hardness
≦ 230 ≦ 210 Approx. 140
(HB)
Chemical Composition
Chemical components Ductile iron pipe Grey cast iron pipe Steel pipe
Magnesium 0.03-0.06 - -
7
ductile iron pipe and fittings
Normative References
BS EN 545 Ductile iron pipes, fittings, accessories and their joints for water pipelines.
BS EN 598 Ductile iron pipes, fittings, accessories and their joints for sewerage applications.
Suitability of non-metallic materials and products for use in contact with water
BS 6920 intended for human consumption with regard to their effect on the quality of the
water.
BS EN 14901 Epoxy coating (heavy duty) of ductile iron fittings and accessories.
Elastomeric seals. Material requirements for pipe joint seals used in water and
BS EN 681-1
drainage applications.
BS EN ISO 6506 - 1 Metallic materials, Hardness testing, Brinell test, Part 1 : Test method.
Circular flanges for pipes, valves, fitting and accessories, PN designated – part 2:
BS EN 1092-2
cast iron flanges.
Specification for bitumen-based coatings for cold application, suitable for use in
BS 3416
contact with potable water.
Ductile iron pipes - External Zinc coating part 2 (Zinc rich paint with finishing
ISO 8179-2
layer)
Rubber seals joint rings for water supply , drainage and sewerage pipelines
ISO 4633
(specification for materials).
8
ductile iron pipe and fittings
e = K ( 0.5 + 0.001 DN )
Referring to the latest BSEN 545:2010, the minimm iron wall thickness of pipes is given as a functin of the
nominal size, DN, and pressure class C, in table 16 and 17 of BSEN 545:2010
In general, all Ductile Iron Pipes & Fittings under KEY brand are fully in compliance with BSEN 545:2002,
BSEN 545:2006, and BSEN 545:2010 respectively.
Allowable Pressures
- Socket & Spigot Joint pipe pressures :
**Remarks** (Socket & Spigot Joint also named as Flexible Joint, Tyton Joint & Push-in Joint)
The maximum values of PFA, PMA and PEA are calculated as follows:
a) Allowable Operating Pressure (PFA) - Internal pressure, excluding surge, which the pipeline
can safely withstand in permanent service.
= 20 x e min (min. pipe wall thickness in mm) x 420 (min. tensile strength of DI)
(DE - e min) x 3 (safety factor)
b) Allowable Maximum Operating Pressure (PMA) - Maximum internal pressure including surge,
which the pipeline can safely withstand in service.
= 1.2 x PFA
b) Allowable Test Pressure (PEA) - Maximum hydrostatic pressure applied on site to a newly
installed pipeline, for a relatively short duration
= PMA + 5 bar
9
ductile iron pipe and fittings
80 40 48 53
40 48 53
100 to 600 16 20 25
25 30 35
700 to 2000 - - -
Operation Temperature
Suitable for fluid temperatures between 0℃ to 50℃, excluding frost.
Straightness of Pipe
Pipes have a maximum deviation of 0.125% of their pipe length.
10
ductile iron pipe and fittings
Coating & Lining options are provided as follows upon different applications and requirements:
A) External Coating:
□ Metallic zinc with a coat of etching primer and epoxy top coat ;
B) Internal Linings:
□ High Alumina Cement mortar lining (HAC) ( For Drainage & Sewage Application );
11
ductile iron pipe and fittings
Jointing
- Flexible Joint (also named as Socket Joint, Tyton Joint, Push-In Joint or Push-On Joint)
The most popular, quickest, and easiest-to-assemble joint for Ductile Iron pipe-lines while mainly adopted
for underground water supply and gravity sewage applications. For accommodation of angular deflection,
this joint consists of a single rubber gasket placed in a groove inside the socket end of the pipe. After
lubricating the jointing areas in accordance with the manufacturer’s instructions, the spigot end of the
pipe is being pushed to insert while a pressure-tight and dependable seal is formed by means of the
gasket. Proper anchorages shall be applied whilst flexible joint is non-restrained.
_ L’llllllllllllllll‘
Momln-I I-yln. loo-um
' THIIIIIIIIIIIIIII‘
- Flanged Joint
Flanged joint is generally utlitized for above ground exposed pipeworks including water mains, rising
mains, air, oil and/or other liquids where rigid, restrained joints are needed. It is widely used in industrial
piping systems such as water treatment plants, sewerage treatment plants and other interior pipe-works.
The flanges have a machined raised face and drilled holes. They can be attached by screw-on, cast-on or
factory welded.
12
ductile iron pipe and fittings
Dimension of Pipes
' 905
Pipe Class
Model No. P5-09
External Diameter DE
Minimum wall thickness e (mm) Approx.mass
(mm)
Pipe Size DN kg/M
Limit Class Class Class Class Class Class
Nominal
Deviations 25 30 40 50 64 100
K9 (K9)
80 98 +1
/ -2.7 4.7 6.0-1.30 12.80
100 118 +1
/ -2.8 4.7 6.0-1.30 15.80
150 170 +1
/ -2.9 4.0 6.0-1.30 24.00
200 222 +1
/ -3.0 3.9 6.3-1.50 32.30
250 274 +1
/ -3.1 4.8 6.8-1.55 42.50
300 326 +1
/ -3.3 4.6 7.2-1.60 50.50
350 378 +1
/ -3.4 5.3 7.7-1.65 67.10
+1 -1.70
400 429 / -3.5 6.0 8.1 80.30
+1 -1.75
450 480 / -3.6 6.8 8.6 96.10
+1 -1.80
500 532 / -3.8 5.6 9.0 111.50
600 635 +1
/ -4.0 6.7 9.9-1.90 147.00
700 738 +1
/ -4.3 7.8 10.8-2.00 187.10
800 842 +1
/ -4.5 8.9 11.7-2.10 232.30
900 945 +1
/ -4.8 10.0 12.6-2.20 281.80
1000 1048 +1
/ -5.0 11.1 13.5-2.30 336.10
1100 1152 +1
/ -6.0 12.0 14.4-2.40 395.30
1200 1255 +1
/ -5.8 11.1 15.3-2.50 459.60
1400 1462 +1
/ -6.6 12.9 17.1-2.70 611.50
1500 1565 +1
/ -7.0 13.9 18.0-2.80 695.80
1600 1668 +1
/ -7.4 14.8 18.9-2.90 778.00
1800 1875 +1
/ -8.2 16.6 20.7-3.10 967.10
2000 2082 +1
/ -9.0 18.4 22.5-3.30 1,173.80
13
ductile iron pipe and fittings
‘7
80 98 +1
/ -2.7 4.7 7.0-1.38 14.60
100 118 +1
/ -2.8 4.7 7.2-1.40 18.50
150 170 +1
/ -2.9 5.9 7.8-1.45 29.10
200 222 +1
/ -3.0 5.0 8.4-1.50 41.50
250 274 +1
/ -3.1 6.1 9.0-1.55 55.30
300 326 +1
/ -3.3 7.3 9.6-1.60 70.30
350 378 +1
/ -3.4 8.5 10.2-1.65 87.00
400 429 +1
/ -3.5 7.5 10.8-1.70 104.80
450 480 +1
/ -3.6 8.4 11.4-1.75 124.60
500 532 +1
/ -3.8 9.3 12.0-1.80 145.10
600 635 +1
/ -4.0 11.1 13.2-1.90 191.80
700 738 +1
/ -4.3 10.4 14.4-2.00 244.10
800 842 +1
/ -4.5 11.9 15.62.10 303.10
900 945 +1
/ -4.8 13.3 16.8-2.20 366.60
1000 1048 +1
/ -5.0 14.8 18.0-2.30 437.80
1100 1152 +1
/ -6.0 16.2 19.2-2.40 514.10
1200 1255 +1
/ -5.8 17.7 20.4-2.50 597.50
1400 1462 +1
/ -6.6 15.5 22.8-2.70 791.00
1500 1565 +1
/ -7.0 16.6 24.0-2.80 898.10
1600 1668 +1
/ -7.4 17.7 25.2-2.90 1,004.50
1800 1875 +1
/ -8.2 19.9 27.6-3.10 1,246.30
Pipes are supplied in standard length of 6.0 metres and fully complied with BSEN 545:2002, BSEN 545:2006 &
BSEN 545:2010 standards. Lengths of pipes other than those shown may be supplied by agreement
between the purchaser and manufacturer.
14
ductile iron pipe and fittings
Dimension of Fittings
All flanged joint fittings are equipped with PN16 flange as standardize flange whereas PN10, PN25 and PN40
are also available on request.
Limit deviations on lengths for socketed joints is ±20mm and for flanged joints is ±10mm.
15
ductile iron pipe and fittings
16
ductile iron pipe and fittings
.4 I i
_V . ' -___.
A \1
:l:
E .—
f L
17
ductile iron pipe and fittings
18
ductile iron pipe and fittings
19
ductile iron pipe and fittings
20
ductile iron pipe and fittings
21
ductile iron pipe and fittings
22
ductile iron pipe and fittings
23
ductile iron pipe and fittings
Concentric “Kylie
Double Flanged Taper
L L
24
ductile iron pipe and fittings
Li] up:
my?
L (mm) H (mm) L (mm) H (mm)
DN (mm) DN (mm)
L H L H
# 80 x 80 330 165 # 400 x 300 900 450
# 100 x 80 360 175 # 400 x 350 900 450
# 100 x 100 360 180 # 400 x 400 900 450
# 150 x 80 440 205 # 450 x 100 950 375
# 150 x 100 440 210 # 450 x 150 950 375
# 150 x 150 440 220 # 450 x 200 950 375
# 200 x 80 520 235 # 450 x 250 950 375
# 200 x 100 520 240 # 450 x 300 950 475
# 200 x 150 520 250 # 450 x 350 950 475
# 200 x 200 520 260 # 450 x 400 950 475
# 250 x 80 700 270 # 450 x 450 950 475
# 250 x 100 700 275 # 500 x 100 1000 400
# 250 x 150 700 300 # 500 x 150 1000 400
# 250 x 200 700 325 # 500 x 200 1000 400
# 250 x 250 700 350 # 500 x 250 1000 400
# 300 x 100 800 300 # 500 x 300 1000 500
# 300 x 150 800 325 # 500 x 350 1000 500
# 300 x 200 800 350 # 500 x 400 1000 500
# 300 x 250 800 375 # 500 x 450 1000 500
# 300 x 300 800 400 # 500 x 500 1000 500
# 350 x 100 850 325 # 600 x 100 1100 450
# 350 x 150 850 325 # 600 x 150 1100 450
# 350 x 200 850 325 # 600 x 200 1100 450
# 350 x 250 850 325 # 600 x 250 1100 450
# 350 x 300 850 425 # 600 x 300 1100 550
# 350 x 350 850 425 # 600 x 350 1100 550
# 400 x 100 900 350 # 600 x 400 1100 550
# 400 x 150 900 350 # 600 x 450 1100 550
# 400 x 200 900 350 # 600 x 500 1100 550
# 400 x 250 900 350 # 600 x 600 1100 550
25
ductile iron pipe and fittings
1
l
-3_._‘-7-....-,
26
ductile iron pipe and fittings
L (mm) K (mm) D L
DN (mm) DN (mm)
Body Banch (mm) (mm)
# 80 x 80 500 375 # 80 150 130
# 100 x 100 540 405 # 100 175 135
# 150 x 150 640 480 # 150 230 150
# 200 x 200 735 560 # 200 290 170
# 250 x 250 830 640 # 250 345 185
# 300 x 300 930 715 # 300 405 205
# 350 x 350 1100 850 # 350 460 220
# 400 x 400 1250 950 # 400 520 240
# 450 x 450 1400 1050 # 450 575 255
# 500 x 500 1520 1150 # 500 635 275
# 600 x 600 1700 1300 # 600 750 310
# 700 865 345
# 800 980 380
# 900 1095 415
# 1000 1210 450
# 1100 1325 485
# 1200 1440 520
# 1400 1670 590
# 1500 1785 625
# 1600 1900 660
27
ductile iron pipe and fittings
28
ductile iron pipe and fittings
29
ductile iron pipe and fittings
30
ductile iron pipe and fittings
31
ductile iron pipe and fittings
32
ductile iron pipe and fittings
33
ductile iron pipe and fittings
34
ductile iron pipe and fittings
35
ductile iron pipe and fittings
36
ductile iron pipe and fittings
37
ductile iron pipe and fittings
L (mm) K (mm)
DN (mm) DN (mm) Max. L (mm)
Body Banch
# 80 x 80 500 375 # 80 1200
# 100 x 100 540 405 # 100 1200
# 150 x 150 640 480 # 150 1500
# 200 x 200 735 560 # 200 1500
# 250 x 250 830 640 # 250 2000
# 300 x 300 930 715 # 300 2000
# 350 x 350 1100 850 # 350 2000
# 400 x 400 1250 950 # 400 2000
# 450 x 450 1400 1050 # 450 2000
# 500 x 500 1520 1150 # 500 2000
# 600 x 600 1700 1300 # 600 2000
38
ductile iron pipe and fittings
39
ductile iron pipe and fittings
40
ductile iron pipe and fittings
Blank Flange
PN16 PN25
DN D a b c DN D a b c
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
50 165 19 16 3 50 165 19 16 3
65 185 19 16 3 65 185 19 16 3
80 200 19 16 3 80 200 19 16 3
100 220 19 16 3 100 235 19 16 3
150 285 19 16 3 150 300 20 17 3
200 340 20 17 3 200 360 22 19 3
250 400 22 19 3 250 425 24.5 21.5 3
300 455 24.5 20.5 4 300 485 27.5 23.5 4
350 520 26.5 22.5 4 350 555 30 26 4
400 580 28 24 4 400 620 32 28 4
450 640 30 26 4 450 670 34.5 30.5 4
500 715 31.5 27.5 4 500 730 36.5 32.5 4
600 840 36 31 5 600 845 42 37 5
700 910 39.5 34.5 5
800 1025 43 38 5
900 1125 46.5 41.5 5
1000 1255 50 45 5
1100 1355 53.5 48.5 5
1200 1485 57 52 5
1400 1685 60 55 5
1500 1820 62.5 57.5 5
1600 1930 65 60 5
1800 2130 70 65 5
2000 2345 75 70 5
Dimension of fittings as shown in this catalogue will be supplied subject to manufacturer’s final option. Other
lengths of fittings are also available by agreement between manufacturer and purchaser.
41
ductile iron pipe and fittings
Flange
BS EN1092-2 / BS4504
Both holes shall be arranged symmetrically about the horizontal centerline through the
flange surface. In the case of tee, this horizontal cenerline is defined with the surface of the
branch flange held pallet to the vertical plane.
Dimension of fittings as shown in this catalogue will be supplied subject to manufacturer’s final option. Other
lengths of fittings are also available by agreement between manufacturer and purchaser.
42
ductile iron pipe and fittings
Pipe Blocks
DN DN
(mm) (mm)
80 500
100 600
150 700
200 800
250 900
300 1000
350 1100
400 1200
450
Dimension of fittings as shown in this catalogue will be supplied subject to manufacturer’s final option. Other
lengths of fittings are also available by agreement between manufacturer and purchaser.
43
ductile iron pipe and fittings
Dimension of fittings as shown in this catalogue will be supplied subject to manufacturer’s final option. Other
lengths of fittings are also available by agreement between manufacturer and purchaser.
44
ductile iron pipe and fittings
DN100 C = Deep
A EN598 Seal
KEY
DN A B C
(mm) (mm) (mm) (mm)
# 100 275 340 80
# 150 360 450 85
# 200 443 590 85
R R
DN R
(mm) (mm)
# 100 300
# 150 300
# 200 400
# British Standard in Series A does not mention the length of this item. Unless there is
an agreement between the seller and the buyer, the length for the items as shown in this catalogue will
be supplied as standard
Dimension of fittings as shown in this catalogue will be supplied subject to manufacturer’s final option. Other
lengths of fittings are also available by agreement between manufacturer and purchaser.
45
ductile iron pipe and fittings
Wrong
picture 1 picture 2
C. Lubricant
1) Clean spigot and rubber rings
2) Make them smooth with lubricant, as shows in the following picture.
Spigot
RupperRing i-_
Lubricant
D. Trench width
When the pipes are laid in the trench, the width of trench should be 200mm - 300mm wider than the
outside diameter of the pipe.
E. Joint
1) As for pipes ≤ DN400, please see picture 1
2) As for pipes > DN400, please see picture 2
picture 1 picture 2
F. Checking
Having been successfully inserted to the spigot, the joint should then be checked to see if the gasket is
correctly seated, which can be done by inserting a metal ruler into the socket gap.
46
123456759
57
15445
DEqtGNJlPNsIL
vwxZSXTXXVT\RSSU`WS[WbYaX]S`a\RSYbccSYYVT
vdxbcYV]X\S\RSSU`WS[WbYaX]S`TYbccSYYVT{\RSS\SYTXZWUV`\{XWWR`_TcSZ̀_
L
L
L
L
DEIpHGPLPKHLprNmsPLNIPsLPKHLpsJHPL
vwxWa`YUVUSWee^UZSXWSWSSUV]\bYSw
vdxWa`YUVUSWee^UZSXWSWSSUV]\bYSd
DEL jKHJNImLL
XzVTVTWSY\S[\RSWUV`\VT\`\RSW`]|S\^Ub\XfS\XZYbZSYVT\`\RSW`]|S\XUa`YSTWbYVT\RSXW|S\
VW]`YYS]\Z~WSX\S[
RS`VT\VWWb]]SWWabZZ~[`TS{YSX[~a`YTS\]`TTS]\V̀T_V\RUVUS`YaV\\VT
123456759
57
15445
!'"#$%"!&
'
()*+,-./012+34/*5-/678/9:;7<<:6=:=/>15/?+.-5,51?+./@?52-./
2+43*))*321+/AB-5-/4-33)-C-+3/'D/E2@5*321+/*5-/)2F-)G/31/1HH?5/
I
JKL MNOPQRQS'T'URVWPN'RQVXOYZR[Q'\O][^O'RQVZPNNPZR[QI
I
_`_ab cdefghegijkefddldfgmelfnogmfkefifkelkeelkpqfgrpsteklpkeomgqfsekofdI
I
_`uab vgiwenshegijkefddogijdfsopgxmfiyesifkeognpkkensiozogm{stonygeii|sahwkpwekkf}qfsekofdI
I
_`~ab fqogefddpdsixgjsix}fitekispfiijkesterfkeogfwwkpwkofseqfsekofdmkfeifglkeeI
lkpqjkki{npkkpiopghfqfmestkefi
I
_`ab ctenyhegijkestedegmstplstepdsspfpoitpkspdsogmpkeneiioestkefiI
I
_`ab
jkonfgsitfddefwwdoesppdsstkefijspogsogmnpqwpjgspstemfiyesI
I
I
KL NRSQOQZI
I
u`_ab fyeijkestfssteldfgmelfnogmifkewkpwekdrfdomgehwfkfdded}ostefntpstekI
I
u`uab fiyesitfddenfkeljddrwdfnenpgnegskonfddres}eegldfgmelfnogmiI
I
u`~ab gmkfeqfkyogmiplgjsiitfddfd}frilfnepjs}fklpkefiroegsolonfsopgI
I
KL ^[XO^'ZRSZOQRQS'[]'\[NZV'T'QWZVI
I
~`_ab d}frijiefwwkpwkofseiozeiwfggeksptpdstepdstefsteglogmeksomtsegfddgjsi
~`uab iefjisfdespkje}kegntspsomtsegstegjslpkwkeegsopgplpekspkje
~`~ab omtseggjsiogofqeskonfdiejegner_x~qpllogfdspkje|fiitp}gogedp}ofmkfqaI
I
~`ab wwdrux~qpllogfdspkjeogifqeiejegne{steg_logfdspkjejgsodstepogsoiiefde
~`ab vlstepogsoigpsiefdefskenpqqegelogfdspkje{ognkefier_jgsodnpqwdesopg
pdsiomtsegogmejegne
Manufacturer 's recommendation for the cut
123456759
57of
and repairing
15th
445pipe
'
! "#$ !%&
()*+,)*-+)+./01
2345656789:;58<=>?@9A;8859BC=?>D9E?989BF8C<F8C>?G
23HC?;?9?D9:5:9>C?D;??D9;89;?C@989:;589B5>;>AEC>9?C?D9@C??C<;>
:C>>5@E9G
23H9<CI9?D9B;<;79B;89;;6BJC8KA<CF>=88C=6B567>C=6B<C8?;8L5?D
D;<<98;6BACEBAD5>9EG
23MD99B79>CFAE9;89BNC69<=>?@9I98?5A;E?C?D958C6>=8F;A9G
23OE9;6L5?D;L589@8=>D?C89<CI96C6P;BD9896?<;?985;EG
23QC5>?96?D989:;58;89;G
23RF9L<56=?9>@9FC89<;S567?D989:;58T@8=>DP;::EU?D9L;?989<=E>5C6
<5V?=89TL9??567?D9C85756;E<C8?;8CI98;L5B?DCF;@C=?KA<;8C=6B?D9
9B79>CF?D989:;58NC69G
,+.WX/1YZ+.*)/+[-)*-+)+./01
23MD99<=E>5C6<=>?@9?D9>;<9;>?D;?=>9BFC8?D9S9U567AC;?G
23Q5V?D9?LCB8UAC<:C696?>T;6B?D96?D9?LCE5\=5B>T?C75I9;:;>?U
AC6>5>?96AU<C8?;8T;B]=>??D9;<C=6?CFL;?985F69A9>>;8UG
^0).+)+--[/W+./01
23M8CL9E?D9<C8?;8C6AC<:;A?5675?;B9\=;?9EU?C89>?C89?D9?D5AS69>>G
23_<CC?D?D989:;589B>=8F;A9L5?D;:;E9??9S65F9`C8>E99S98aG
23OD9AS?D;??D989;896C7;:>@9?L996?D9F89>D<C8?;8;6B?D9C85756;E
<;?985;EG
23R::EU;:8C?9A?5I9AC;?CFL;?98b9<=E>5C66C?<C89?D;6c<56=?9>;F?98
F56;E><CC?D567?C:89I96??D9:;?ADF8C<B8U567?CC\=5ASEU;6B?C75I95?
7CCB>?8967?D`ACI98L5?D;B;<:AEC?D=6?5E>9?aG
'
de! "#!&
23 H9:;58CFAC;?567>>D;EE6C?@9A;8859BC=?5F?D989E;?5I9D=<5B5?U85>9>;@CI9fgC8?D9L9;?D98
AC6B5?5C65>L9?G
23 h;<;79B;89;>>D;EE@9>A8;:9BC8L589P@8=>D?C;AD59I9B=>?;6BC5EF899G
23 MD9F58>?E;U98CFN56AP85AD:;56?>D;EE@9;::E59B?C:5:9>=8F;A99I96EU@U=>567D;6B@8=>DGi;5?=6?5E
?D9F58>?E;U987C?A=89BT;::EU?D9@5?=<56C=>:;56?C89:CVU89>56;>?D9F565>D567E;U98
23 MD9B8UF5E<?D5AS69>>CF9V?986;EF565>D567E;U98>D;EE@9<9;>=89B@U;A;E5@8;?9B<9;>=85679\=5:<96?T
5G9GjOC;?567MD5AS69>>k;=79lLD5E9<9;6?D5AS69>>mn<5A8C6>oECA;E<5<5=<m<5A8C6>;>
>:9A5F59B@Up_qrstp_qrfuGv
w
123456759
57
15445
)
!
"#!
$ %
&!
' !
(#&!
*+,-./,0
1
234546378967:;<=48><3?@AB6<9:49=?8C9C4;78A@9<<98>;D6?BC:4AE9<3<34=?FB;<84;;?@<349=6?7<98>;D57G4
<3457A4HB7<4:I;B9<7F:4@?=;9<4378A:98>6?8A9<9?8;
JKB@@96948<C?E4=@B::9@<98>>47=;37::F4B;4A
JLB9A4<34F4>98898>78A48A98>?@<34:9@<
JM78?4BN4=>48<:I
JON?9A;E98>98>D95C76<;?=C9C4;=BFF98>7>798;<?<34=C9C4;D<34>=?B8A?=<=79:4=;<78639?8;
234;4C=467B<9?8;7=4C7=<96B:7=:I95C?=<78<@?=4C?PI;47:4AC9C4;D:7=>4A9754<4=C9C4;D?=<3?;437N98>;C4697:
6?7<98>;
QRS1TUVWURX1
1
JY;43??G;E9<37CC=?C=97<4:I;37C4D6?7<4AE9<37C?:I759A4<IC4C=?<46<9?8
Z:47;46?8;B:<B;
1 1 1 1 1 [\]]^T1TUVWURX1
JY;4E9A4@:7<;:98>5798<7984A;B@@96948<:I_E9A4:I
7C7=<<?C=4N48<7669A48<7:;:9CC7>4
JZ=?39F9<E9=4=?C4;E396357IA757>4<346?7<98>
O;98>:4;:98>57IF4B;4A?8;9<4`a8<39;67;4D:9@<<34
C9C47<9<;648<=4?@>=7N9<IDE9<3<34;:98>>=9CC98><34
C9C4<?C=4N48<;:9CC7>4
1
1
[bRST^1TUVWURX1
Jcdef<?gffFB8A:4;7=4B8:?7A4AE9<3@:7<<4P<9:4;:98>;1
1
1
1
1
1
1
1
h+ij/,0
JcdkgfflC9C4;7=4C76G4A98FB8A:4;@?=4@@96948<:?>9;<96_;<?=7>4D
m9<<98>;7=4C76G4A98E?AA48F?P4;
JcdngfflC9C4;98A9N9AB7::IC76G4A98FB:G
@9<<98>;C76G4A?8E?AA48C7::4<;
Z9C4;987;;?=<4Acd7=4C76G4A98FB:G@?=6?8<7984=;39CC98>
ductile iron pipe and fittings
Storage
Storage of pipes and fittings on site must permit correct inventory control and facilitate any repair work.
The storage area must be level.
Avoid:
- Marshy ground
- Shitting soils.
Deliveries must be inspected on arrival to the storage area and there is
any damage (e.g. internal or external coating damage), it must be
repaired before going into stock.
Stack the pipes in homogeneous pipes (same diameter), in accordance
with a rational storage plan. The same applies for fittings and
accessories.
Use sufficiently strong, good quality hard woods (timbers, wedges).
It is always desirable to reduce the storage time as much as possible.
Precautions need to be taken if the pipes have special coating. Please
consult us.
Stacking
Bundle stacking
The bundles supplies by SUNS can be stacked in a pile on 80x80x2600mm timber, with 3 or 4 bundles per row, not
exceeding a stack height of 2.50m.
Check the condition of the bundles periodically: in particular, the condition and tautness of the straps, as well as the
general stack stability.
Bottom layer : the bottom layer is laid on two timbers. Arranged in parallel, one
being 1m from the socket end and the other 1m from the spigot end. The pipes
are also parallel with one another. The sockets touch and are not in contact with
the ground. The pipes at the two ends are secured at the sockets and spigots
with large wooden wedges nailed to the timbers. The intermediate pipes are
only secured at the spigot end using smaller wedges.
Upper layer : the upper layers consist of pipes laid alternately socket to spigot,
with all the sockets in one tier overhanging the spigot ends of the tier below, by
the length of the socket plus 10cm (to prevent spigot deformation). The barrels
of two consecutive tiers are in contact.
Square stacks
Bottom layer : laying and wedging after of the bottom layer is identical to the
first method, but the pipes are sockets to spigots; their barrels are in contact. In
addition, the sockets project beyond the spigots of adjacent pipes by the whole
socket length, plus 5cm. For DN>150 pipes stacking is on three timbers(instead
of 2).
Upper layer : each tier consists of parallel pipes laid socket to spigot, as in the
bottom layer. The pipes in one tier run at right angles to those in the tier below.
The pipe ends are consequently wedged naturally by the alternating sockets in
the tier below. This method keeps the packing material to a minimum, but
involves individual lifting of pipes because of the stack formation. It is strongly
recommended however that it should not be used for pipes with special coatings, in view of the type of
support(point contacts).
50
ductile iron pipe and fittings
Since 1949
Warehouse
Sections M and N of Lot no. 3719 in DD104, Yuen Long, New Territories.
Tel : ( 8 5 2) 2 4 7 1 9 0 4 8
Fa x : ( 8 5 2) 2 4 8 2 1 2 9 8
Retail Shop
Mongkok
G/F., No. 687 Shanghai Street, Mongkok, Kowloon.
Tel : ( 8 5 2) 2 4 9 5 0 1 8 1
Fa x : ( 8 5 2) 2 7 8 7 3 4 2 1
Wanchai
G/F., No. 102 Thomson Road, Wanchai, Hong Kong (MTR EXIT A3, A4).
Tel : ( 8 5 2) 2 8 6 6 6 0 0 1
Fa x : ( 8 5 2) 2 8 6 6 6 3 3 9
Tsuen Wan
G/F., No. 18 Tak Wah Street, Tak Fam Building, Tsuen Wan, New Territories, Hong Kong.
Tel : ( 8 5 2) 2 4 7 3 3 6 6 0
Fa x : ( 8 5 2) 2 4 4 2 2 7 6 6
Macau
Rua Da Ribeira Do Patane No 13, Macau.
Tel : ( 8 5 3) 2 8 5 5 3 6 9 3
Fa x : ( 8 5 2) 2 8 9 5 1 0 2 0
51
Three Runway System Project Contract 3310 :
North Runway Modification Works
Test Report
Certificate
Approval Letter
The material referred to in this letter is suitable for contact with wholesome water for domestic purposes having met the
requirements of BS6920-1:2000 and/or 2014 'Suitability of non-metallic products for use in contact with water intended for human
consumption with regard to their effect on the quality of the water'.
The reference relates solely to its effect on the quality of the water with which it may come into contact and does not signify the
approval of its mechanical or physical properties for any use.
COATINGS, PAINTS & LININGS - FACTORY APPLIED PIPE & FITTINGS COATINGS. 5030
‘Hempadur 35560 Systems’, factory applied epoxy coatings comprising of the following:
‘Hempadur 35560 light red (50900) for use with Hempadur 35560 cream (20320)’.
'Hempadur 35560 light red (50900)' is the base coat and comprises of a base and curing agent which are mixed in a 6.8:2 volume
ratio.
'Hempadur 35560 cream (20320)' is the top coat and comprises of a base and curing agent which are mixed in a 6.8:2 volume
ratio.
‘Hempadur 35560 light grey (10500)’ is a top coat and comprises of a base and curing agent which are mixed in a 6.8:2 volume
ratio.
‘Hempadur 35560 light red (50900)’ is a top coat and comprises of a base and curing agent which are mixed in a 6.8:2 volume
ratio.
An entry, as above, will accordingly be included in the Water Fittings Directory on-line under the section headed, “Materials which
have passed full tests of effect on water quality”.
Yours faithfully
Jason Furnival
Approvals & Enquiries Manager
The Water Regulations Advisory Scheme Ltd. Registered in England No, 06663930 Registered office: 6D Lowick Close, Hazel Grove, Stockport, SK7 5ED
Tel:+44(0)333 207 9030 Fax:+44(0)1495 248 540 Email:info@wras.co.uk website:www.wras.co.uk
Water Regulations Advisory Scheme
The Water Regulations Advisory Scheme Ltd. Registered in England No, 06663930 Registered office: 6D Lowick Close, Hazel Grove, Stockport, SK7 5ED
Tel:+44(0)333 207 9030 Fax:+44(0)1495 248 540 Email:info@wras.co.uk website:www.wras.co.uk
WRAS MATERIAL APPROVAL - MATERIALS WHICH HAVE PASSED FULL TESTS OF EFFECT ON WATER QUALITY
The material referred to in this letter is suitable for contact with water for domestic purposes. Approval of this material does not
signify the approval of its mechanical or physical properties for any use.
Manufacturers or applicants may only quote in their sales literature terms which are used in this letter, namely that; ‘the material
as listed, having passed the tests of effect on water quality, is suitable for use in contact with wholesome water’
This may be abbreviated to ‘Water Regulations Advisory Scheme - Approved Material’ or ‘WRAS Approved Material’.
The scope of an Approval does not extend to rebranded materials unless otherwise agreed by the Scheme.
Approval holders may use the WRAS Approved Material logo and make reference to any approval issued by WRAS Ltd. in
respect of a particular material or range of materials provided the approval is, and remains valid.
Approval holders are entitled to use the logo on the packing, promotional literature and point of sale advertising Approved
Materials.
It is a condition of WRAS Material Approval that NO changes or modifications to the Approved Material, be made without the
Approval Holder first notifying WRAS Ltd. Full details of the proposed changes must be provided to the Scheme. Failure to
comply with this condition will immediately invalidate a previously granted Approval.
Re-Approval
WRAS will write to you 1 year before the approval expires asking whether you would like to renew it. Please complete the
relevant section of the MA3 application form which will be included with the letter and return to WRAS (via e-mail or post).
Please note it is the responsibility of the Approval Holder to ensure the Approval remains valid. WRAS Ltd. accepts no liability for
the delay in granting approval where this is caused by circumstances outside of the Scheme’s control.
The Water Regulations Advisory Scheme Ltd. Registered in England No, 06663930 Registered office: 6D Lowick Close, Hazel Grove, Stockport, SK7 5ED
Tel:+44(0)333 207 9030 Fax:+44(0)1495 248 540 Email:info@wras.co.uk website:www.wras.co.uk
Product Data Sheet
Hempadur 35560
Legislation Value
Description
Hempadur 35560 is a solvent free, high-build, polyamine adduct cured EU 0 g/L [0.00 lb/US gal]
epoxy paint, which cures to a coating with good resistance to fresh US (coatings) 0 g/L [0.00 lb/US gal]
water.
US (regulatory) 0 g/L [0.00 lb/US gal]
* Other shades are available, please contact your local Hempel representative. Issued by Hempel A/S - January 2022
1/4
Product Data Sheet
Hempadur 35560
Thinning
Tool Application parameters
Cleanliness max vol.
- Remove oil, grease and other contaminants by suitable detergent
cleaning. Nozzle pressure: 220 bar [3200 psi]
Airless spray No thinning
- Remove salts, detergents and other contaminants by high pressure Nozzle orifice: 0.019-0.025"
fresh water cleaning. Brush No thinning Not Applicable.
- Concrete: According to Hempel’s Specification.
If brush or roller application is used, more coats will be necessary to achieve
the specified dry film thickness. Spray data are indicative and subject to
New build:
adjustment. Pressure is for a material temperature of 20°C [68°F].
- Abrasive blasting to min. Sa 2½ (ISO 8501-1) / SP 10 (SSPC).
- Remove dust, blast media and loose materials.
Film thickness
Maintenance and Repair
Specification range Low High Recommended
- According to Hempel’s Specification.
200 micron 600 micron 200 micron
Dry film thickness
Roughness [7.9 mils] [24 mils] [7.9 mils]
- Surface profile Medium (G) (ISO 8503-2).
200 micron 600 micron 200 micron
Wet film thickness
[8 mils] [24 mils] [8 mils]
Consult Hempel's separate Surface Preparation Guidelines for more
details. 5 m²/L 1.7 m²/L 5 m²/L
Theoretical spreading
[200 sq ft/US [69 sq ft/US [200 sq ft/US
rate
gal] gal] gal]
Pot life
Hempadur 35560
Drying time
Storage
Surface 10°C 20°C 30°C 40°C
temperature [50°F] [68°F] [86°F] [104°F] Shelf life
Determined for dry film thickness 200 micron [7.9 mils] at standard conditions, Shelf life from date of production, when stored in original, unopened
see Hempel’s Explanatory Notes for details. containers. Thereafter, the product quality must be re-inspected. Always check
the best before date or expiry date on the label.
Overcoating
Storage conditions
Hempel’s specification supersedes any guidelines indicated in the overcoating - Product must be stored according to local legislation, at maximum
table 40°C [104°F], without direct sunlight and protected from rain and
snow.
10°C 20°C 30°C 40°C
Quality name
[50°F] [68°F] [86°F] [104°F]
Additional Certifications and Standards
Immersion NSF certification applies to the product-shade as well as production
site and application specification – at present this NSF certificate is
Min 40 h 16 h 8h 5h
Hempadur 35560 valid only for paint material in shades light red/50900 and
Max 75 d 30 d 15 d 9d
cream/20320 when produced at following Hempel factories: Hempel
Overcoating times are indicative for products of the same generic chemistry. Paints Poland, Buk.
Consult Hempel’s specification for more information. The NSF approval is valid once the final coating has cured for at least
the following number of days: 10 days (20°C/68°F).
The WRAS approval is valid once the final coating has cured for at
Drying conditions least the following number of days: 10 days (20°C/68°F). Overcoat
- To obtain the drying time stated, it is important to maintain sufficient interval, min: 1 day (20°C/68°F).
ventilation during application, drying and curing.
Overcoating details
- If the maximum overcoating interval is exceeded, roughening of the
surface is necessary to ensure intercoat adhesion.
- The surface must be dry and clean prior to application.
Other remarks
- Hempel’s Specification supersedes any recommendations given in
the Product Data Sheets.
- Epoxy coats have an inherent tendency of chalking in outdoor
exposure. This does not affect the performance of the coating.
Hempadur 35560
Additional documents
Additional information is available at the Hempel website hempel.com
or at your local Hempel website:
This Product Data Sheet (“PDS”) relates to the supplied product (“Product”) and is subject to updating from time-to-time. Accordingly, the buyer/applicator should have regard to the PDS supplied together
with the relevant batch of the Product (and not an earlier version). In addition to the PDS, the buyer/applicator may receive some or all of the following specifications, statements and/or guidelines as listed
below or as are available from the Hempel website under ‘Products’ at www.hempel.com (the “Additional documents”):
No. Document description Location/comments
1. Technical Statement One-off specific advice provided on request for specific projects
2. Specification Only issued for specific projects
3. PDS This document
4. Explanatory Notes to the PDS Available at www.hempel.com and contain relevant information about the Product testing parameters
5. Application Instruction Where available, at www.hempel.com
6. Generic technical guidelines (e.g. on application and surface preparation) Where available, at www.hempel.com
In the event of a conflict of information between the PDS and the Additional documents, the order of priority of information shall be in the order as set out above. In such event you should also contact your
representative at Hempel for clarification. Furthermore, the buyer/applicator must have full regard to the relevant Safety Data Sheet provided with each Product and which can also be downloaded from
www.hempel.com.
Hempel shall not be liable for defects where the application of the Product has not been made fully in accordance with the recommendations and requirements set out in the relevant PDS and the Additional
Documents. The information and terms of this disclaimer apply to this PDS, the Additional documents and any other documents supplied by Hempel in respect of the Product. In addition, the Product is
supplied and all technical assistance is given subject to Hempel’s General Conditions of Sale, Delivery and Service, unless otherwise expressly agreed in writing.
Job Reference
Job Reference
LIST OF MAIN JOBS INSTALLED "KEY”
DUCTILE IRON PIPES AND FITTINGS (BS EN545 / 598)
Contract No. Contractor Consultant/Owner Year
1
W§E(-I5§)7EI3E’AE
BUN KEE (INTERNATIONAL) LIMITED
OFFICE : 12/F., PHASE 1, AUSTIN TOWER, 22-26 AUSTIN AVENUE, TST., KLN., H.K.
TEL : (852) 2728 7237 FAX : (852) 2387 2999 WEBSITE : www.bunkee.com
2
W§E(-I5§)7EI3E’AE
BUN KEE (INTERNATIONAL) LIMITED
OFFICE : 12/F., PHASE 1, AUSTIN TOWER, 22-26 AUSTIN AVENUE, TST., KLN., H.K.
TEL : (852) 2728 7237 FAX : (852) 2387 2999 WEBSITE : www.bunkee.com
3
W§E(-I5§)7EI3E’AE
BUN KEE (INTERNATIONAL) LIMITED
OFFICE : 12/F., PHASE 1, AUSTIN TOWER, 22-26 AUSTIN AVENUE, TST., KLN., H.K.
TEL : (852) 2728 7237 FAX : (852) 2387 2999 WEBSITE : www.bunkee.com
4
W§E(-I5§)7EI3E’AE
BUN KEE (INTERNATIONAL) LIMITED
OFFICE : 12/F., PHASE 1, AUSTIN TOWER, 22-26 AUSTIN AVENUE, TST., KLN., H.K.
TEL : (852) 2728 7237 FAX : (852) 2387 2999 WEBSITE : www.bunkee.com
5
W§E(-I5§)7EI3E’AE
BUN KEE (INTERNATIONAL) LIMITED
OFFICE : 12/F., PHASE 1, AUSTIN TOWER, 22-26 AUSTIN AVENUE, TST., KLN., H.K.
TEL : (852) 2728 7237 FAX : (852) 2387 2999 WEBSITE : www.bunkee.com
6
W§E(-I5§)7EI3E’AE
BUN KEE (INTERNATIONAL) LIMITED
OFFICE : 12/F., PHASE 1, AUSTIN TOWER, 22-26 AUSTIN AVENUE, TST., KLN., H.K.
TEL : (852) 2728 7237 FAX : (852) 2387 2999 WEBSITE : www.bunkee.com
7
W§E(-I5§)7EI3E’AE
BUN KEE (INTERNATIONAL) LIMITED
OFFICE : 12/F., PHASE 1, AUSTIN TOWER, 22-26 AUSTIN AVENUE, TST., KLN., H.K.
TEL : (852) 2728 7237 FAX : (852) 2387 2999 WEBSITE : www.bunkee.com
61 Ocean Park Tai Shue Wan Water Gammon Engineering Ocean Park 2017
World Project & Construction Co., Corporation
Contract No. TSW-C006-Waterpark- Ltd.
Main Building Works
8
W§E(-I5§)7EI3E’AE
BUN KEE (INTERNATIONAL) LIMITED
OFFICE : 12/F., PHASE 1, AUSTIN TOWER, 22-26 AUSTIN AVENUE, TST., KLN., H.K.
TEL : (852) 2728 7237 FAX : (852) 2387 2999 WEBSITE : www.bunkee.com
9
Three Runway System Project Contract 3310 :
North Runway Modification Works
Product Description
MaxiFit Plus
Versatile
➤➤ Unique three bolt design for quick ➤➤ Light product for easy and safe handling
and easy installation; available ➤➤ Wide tolerance permits lower stock holding Stainless
in sizes DN65, DN80 and DN100
➤➤ All models accommodate angularity
➤➤ Reduces installation costs between pipes, allowing for normal pipeline
➤➤ Better access to bolts especially movement caused by ground settlement* Copper PVC
Distributor details
Heldcn J
P I P E C O N N E C T I O N S • R E PA I R • F L O W C O N T R O L P R O D U C T S
46-48 Wilbury Way, Hitchin, Hertfordshire, SG4 0UD. United Kingdom
Telephone: +44 (0)1462 443322 • www.helden-web.com
MaxiFit Plus Couplings & Flange Adaptors
Specifications Coupling Flange Adaptor
A
L L
A A
[Eh
T
M Maximum Flange
T
M
Setting Gap
Maximum Gap
Setting Gap
S Maximum Gap
80 PN10:16, 3”ANSI125,
DN80 85 107 202.5 101 124 75 x 5 3.5” BS10 Table AD, 20 40 3-M12 x 115 12392/3 3.0
3.5” BS10 Table E
Note:
*Angularity - Couplings and reducing couplings: offer a maximum of 6° degrees total angular deflection. Flange Adaptors: offer a maximum of 3° degrees total angular deflection; these figures
are calculated when using the product on maximum pipe outside diameters. Larger degrees of angular deflection are achievable when product is fitted on smaller pipe outside diameters.
Every effort has been made to ensure that the information contained in this publication is accurate at the time of publishing. Crane Ltd assumes no responsibility or liability for typographical errors
or omissions or for any misinterpretation of the information within the publication and reserves the right to change without notice.
Helden MaxiFit
High Tolerance Mechanical Pipe Fittings
CRANE
A Crane Co. Company
Te l : + 4 4 ( 0 ) 1 4 6 2 4 4 3 3 2 2 ● F a x : + 4 4 ( 0 ) 1 4 6 2 4 4 3 3 1 1
Helden MaxiFit Couplings & Helden MaxiDaptor - Flange Adaptor
MaxiFitXtra Long Sleeve Couplings ■ Designed to join plain ended pipe
■ Range includes: to flanged fitting
● Helden MaxiFit Couplings - Standard Sleeve Length ■ Total angular deflection = +/- 3˚
● Helden MaxiFitXtra - Long Sleeve ■ Total expansion/contraction = 5mm
■ Total angular deflection = +/- 6˚ ■ Working pressure
= 16 bar (Water) /6 bar (Gas)
■ Total expansion / contraction = 10mm (except when used on lower rated flange)
■ Can be used to effect a repair in rigid pipes ■ Site test pressure
using a polyethylene pipe with a close fit = 24 bar (Water) /9 bar (Gas)
■ Support liner: (except when used on lower rated flange)
● MaxiFit = 1m length ■ Flanges have:
● MaxiFitXtra = 2m length PE ● Partial ‘S’ Bore, giving greater
■ Working pressure flange sealing face
= 16 bar (Water) /6 bar (Gas) ● Multi-drilling including:
■ Site test pressure ISO 7005 1:1992 (PN10/16),
= 24 bar (Water) /9 bar (Gas) BS10:1962 (Table ADE), ANSI/AWWA
■ Full details can be found in MaxiFit ■ Full details can be found in the Helden MaxiFit
Technical Data Sheet Technical Data Sheet
■ Helden MaxiDaptor cannot be used with tie
Helden MaxiThread - Threaded End Cap rods to provide restraint. If this is required
please consult QuickFit product range
■ Designed to provide a connection between
which can accomodate tie rods
plain-ended and threaded pipe
■ A Helden MaxiFit coupling body with one standard Helden MaxiCap - End Cap
end ring and one threaded end ring
■ Outlets are available with 1”, 1.25” ■ Fits inside the end ring to the Helden
and 1.5” BSP threads MaxiFit or MaxiDaptor product
®
SG4 0UD. United Kingdom
M Maximum Flange
T
Setting Gap
Maximum Gap
Flange Adaptor S
Bolt torque 55-65Nm
Spanner size A/F 19mm
For further information on all products and services contact our Marketing Department.
Helden MaxiFit
High Tolerance Mechanical Pipe Fittings
L
A
T
Coupling - Standard Sleeve
M
Setting Gap
Bolt torque 55-65Nm Maximum Gap
Spanner size A/F 19mm
Stepped Coupling T
N
M
Material Specification
Couplings, Stepped Couplings and Flange Adaptors Tee Bolts/Bolts
End Ring and Adaptor Body/Centre Sleeve Steel to BS EN ISO 898-1:1999 Property Class 4.8
Ductile Iron to BS EN 1563:1997 Grade EN GJS-450-10 Nuts
Gasket Steel to BS EN 4190:2001 Grade 4
EPDM compound Grade E to BS EN 681-1:1996, Type WA, WC Washers
Nitrile compound to Grade G BS EN 682:2002, Type G Stainless Steel to BS 1449:Part 2: 1983 Grade 304S15 Standard
DR3998_02_2008
For further information on all products and services contact our Marketing Department.
Bespoke Large
Diameter
Fittings to Suit Any Pipe Specification
PIPE CONNECTIONS, REPAIR & FLOW CONTROL PRODUCTS FOR THE UTILITIES INDUSTRY
Large Diameter
Overview
Product Capability
Large diameter couplings and flange adaptors are available
in a wide range of sizes to suit virtually any customer
requirement. Products can be supplied to suit all standard
and non standard pipe diameters from DN350 and DN5000.
Stepped couplings join pipes of different external diameters
and flange adaptors can be supplied with flanges drilled to
any national or international standard, or to customers’ own
specification with a pressure up to PN100.
Approvals
All products are designed and manufactured under quality
management systems certified to ISO 9001 and conform
to the American Water Works Association’s specification
Pipe Materials
Simple to Fit
Simple installation in any weather and trench conditions,
even underwater!
Dedicated
Corrosion Protection
Metal components are coated with Rilsan Nylon 11 which
is WRAS approved for use with potable water. The nuts and
bolts are Sheraplex coated to WIS 4-52-03, offering long term
protection to corrosion, impact and abrasion and therefore
ensures continued reliable performance.
Customer Benefits
➤ Couplings can absorb up to 10mm expansion and contraction, ➤ Flange adaptors are often
flange adaptors up to 5mm which allows for movement on used to permit dismantling
bridge crossings, in chambers and pump stations. Often of valves in flanged
eliminates the need for special expansion joints. pipe systems.
➤ Couplings can offer up to 6° of angular deflection, flange ➤ The standard finish for all Helden products is black Rilsan
adaptors 3° - to allow for the connection of misaligned pipes; Nylon 11, which is highly resistant to impact, corrosion,
take up ground settlement at structures; lay pipes to large abrasion and chemical attack. However, other coatings such
radius bends. as shopcoat, hot dip galvanising, zinc spray and epoxy coating
can be supplied as required.
Every effort has been made to ensure that the information contained in this publication is accurate at the time of publishing. Crane Ltd assumes no responsibility or liability for typographical errors
or omissions or for any misinterpretation of the information within the publication and reserves the right to change without notice.
Dedicated
1219 Steel 1.6 1.6 A2E 16 M16 x 265 23.0 1343 276 38 76 J121M 146.3
1222 Coated Steel 1.6 1.6 A2E 16 M16 x 265 23.0 1347 276 38 76 J121M 146.6
1255 DI 1 6 A2E 18 M16 x 265 25.2 1378 276 38 76 J122M 151.0
1422 Steel 1.6 3 A2E 20 M16 x 265 24.5 1546 276 38 76 J125M 170.5
1462 DI 1 7 A2E 20 M16 x 265 23.8 1585 276 38 76 J125M 174.8
1620 Steel 3 3 A2E 24 M16 x 265 20.3 1745 276 38 76 J127M 192.4
1626 Coated Steel 3 3 A2E 24 M16 x 265 20.2 1751 276 38 76 J127M 194.2
1668 DI 1 7 A2E 24 M16 x 265 19.2 1791 276 38 76 J128M 199.4
1829 Steel 3 3 A2E 24 M16 x 265 16.0 1954 276 38 76 J130M 217.5
2032 Steel 3 3 XSXG 36 M16 x 400 22.1 2167 411 57 114 J186H 418.6
Every effort has been made to ensure that the information contained in this publication is accurate at the time of publishing. Crane Ltd assumes no responsibility or liability for typographical errors
or omissions or for any misinterpretation of the information within the publication and reserves the right to change without notice.
C C
If the product required is not in the table contact Helden who can provide relevant
information
L X L X
Pressure - Working Pressure = As Noted in table (Test Pressure = 1.5 x W.P.)
Notes - LO2 / YF2 / A2E / A2H / XSXG = Section names for large diameter A A1 A A1
dedicated stepped coupling products
OD’s - If the product required is not in the table contact Helden who can
provide relevant information.
Dedicated Couplings DO NOT resist end load - adequate restraint must be provided
Pipe
Cast Iron
738 755 DI 3.4 4.5 3.3 3.3 LO2 12 M12 x 235 21.2 830 847 243 25 50 J63LS / J65LS 39.9
AB
813 842 Steel 1.6 1.6 DI 1 4.5 LO2 14 M12 x 235 18.8 903 931 243 25 50 J65LS / J65LS 44.4
Cast Iron
826 842 3.3 3.3 DI 1 4.5 LO2 14 M12 x 235 18.8 918 931 243 25 50 J65LS / J65LS 44.3
CD
Cast Iron
906 945 3.3 3.3 DI 1 5 YF2 12 M16 x 265 22.0 1017 1054 276 38 76 J67LS / J70LS 86.5
CD
914 945 Steel 1.6 1.6 DI 1 5 YF2 12 M16 x 265 22.0 1024 1054 276 38 76 J67LS / J70LS 86.5
Cast Iron
945 964 DI 1 5 3.3 3.3 YF2 12 M16 x 265 21.6 1054 1075 276 38 76 J70LS / J70LS 88.3
AB
1016 1048 Steel 1.6 1.6 DI 1 5 YF2 14 M16 x 265 18.3 1125 1156 276 38 76 J71LS / J71LS 95.9
Cast Iron
1121 1152 3.3 3.3 DI 1 6 A2E 16 M16 x 265 24.3 1247 1275 276 38 76 J120M / J121M 137.6
AB
1220 1255 Steel 1.6 1.6 DI 1 6 A2E 18 M16 x 265 25.2 1344 1378 276 38 76 J120M / J132M 150.1
Every effort has been made to ensure that the information contained in this publication is accurate at the time of publishing. Crane Ltd assumes no responsibility or liability for typographical errors
or omissions or for any misinterpretation of the information within the publication and reserves the right to change without notice.
Desalination Plant
Transfer Pipeline
Large Diameter Flange Adaptor - DN1600
Client
South Australian Water
& South Australian Government
Contractor
McConnell Dowell
Distributor
Philmac
Every effort has been made to ensure that the information contained in this publication is accurate at the time of publishing. Crane Ltd assumes no responsibility or liability for typographical errors
or omissions or for any misinterpretation of the information within the publication and reserves the right to change without notice.
Dedicated
532 DI 3 4 LO2 500 PN10 10 10 M12 x 140 624 670 153 23 20 28 25 50 J58LS 34.3
532 DI 3 4 LO2 500 PN16 10 10 M12 x 140 624 715 153 23 20 34 25 50 J58LS 42.2
532 DI 3 4 LO2 500 PN25 10 10 M12 x 140 624 730 155 25 20 37 25 50 J58LS 47.4
610 Steel 1.6 1.6 LO2 600 PN10 5 10 M12 x 140 700 780 153 23 20 31 25 50 J60LS 45.9
610 uPVC 1.9 1.6 LO2 600 PN10 5 10 M12 x 140 700 780 153 23 20 31 25 50 J60LS 45.9
610 Steel 1.6 1.6 LO2 600 PN16 - 10 M12 x 140 700 840 153 23 20 37 25 50 J60LS 58.5
610 uPVC 1.9 1.6 LO2 600 PN16 - 10 M12 x 140 700 840 153 23 20 37 25 50 J60LS 58.5
610 Steel 1.6 1.6 LO2 600 PN25 - 10 M12 x 140 700 845 155 25 20 40 25 50 J60LS 62.7
613 Coated Steel 1.6 1.6 LO2 600 PN16 - 10 M12 x 140 703 840 153 23 20 37 25 50 J60LS 58.0
635 DI 3.2 4.5 LO2 600 PN10 10 10 M12 x 140 726 780 153 23 20 31 25 50 J61LS 41.6
635 DI 3.2 4.5 LO2 600 PN16 - 10 M12 x 140 726 840 153 23 20 37 25 50 J61LS 54.5
635 DI 3.2 4.5 LO2 600 PN25 10 10 M12 x 140 726 845 155 25 20 40 25 50 J61LS 58.3
711 Steel 1.6 1.6 LO2 700 PN10 - 12 M12 x 140 802 895 153 23 24 31 25 50 J63LS 56.1
Every effort has been made to ensure that the information contained in this publication is accurate at the time of publishing. Crane Ltd assumes no responsibility or liability for typographical errors
or omissions or for any misinterpretation of the information within the publication and reserves the right to change without notice.
Every effort has been made to ensure that the information contained in this publication is accurate at the time of publishing. Crane Ltd assumes no responsibility or liability for typographical errors
or omissions or for any misinterpretation of the information within the publication and reserves the right to change without notice.
Dedicated
1222 Coated Steel 1.6 1.6 A2E 1200 PN16 8 16 M16 x 160 1347 1485 182 38 32 49 32 76 J121M 215.8
1255 DI 1 6 A2E 1200 PN10 16 16 M16 x 160 1378 1455 182 38 32 40 32 76 J122M 183.0
1255 DI 1 6 A2E 1200 PN16 16 16 M16 x 160 1378 1485 182 38 32 49 32 76 J122M 197.6
1255 DI 1 6 A2E 1200 PN25 16 16 M16 x 160 1378 1530 182 38 32 56 32 76 J122M 224.8
1422 Steel 1.6 3 A2E 1400 PN10 9 18 M16 x 160 1546 1675 182 38 36 43 32 76 J125M 245.5
1422 Steel 1.6 3 A2E 1400 PN16 9 18 M16 x 160 1546 1685 182 38 36 49 32 76 J125M 248.7
1426 Coated Steel 1.6 3 A2E 1400 PN16 9 18 M16 x 160 1550 1685 182 38 36 49 32 76 J125M 246.1
1462 DI 1 7 A2E 1400 PN10 18 18 M16 x 160 1585 1675 182 38 36 43 32 76 J125M 220.1
1462 DI 1 7 A2E 1400 PN16 18 18 M16 x 160 1585 1685 182 38 36 49 32 76 J125M 223.3
1620 Steel 3 3 A2E 1600 PN10 - 20 M16 x 160 1745 1915 182 38 40 49 32 76 J127M 309.3
1620 Steel 3 3 A2E 1600 PN16 - 20 M16 x 160 1745 1930 182 38 40 56 32 76 J127M 315.9
1626 Coated Steel 3 3 A2E 1600 PN16 - 20 M16 x 160 1751 1930 182 38 40 56 32 76 J127M 311.3
1668 DI 1 7 A2E 1600 PN10 20 20 M16 x 160 1791 1915 182 38 40 49 32 76 J128M 275.2
1668 DI 1 7 A2E 1600 PN16 20 20 M16 x 160 1791 1930 182 38 40 56 32 76 J128M 281.3
Every effort has been made to ensure that the information contained in this publication is accurate at the time of publishing. Crane Ltd assumes no responsibility or liability for typographical errors
or omissions or for any misinterpretation of the information within the publication and reserves the right to change without notice.
Please fax back to: +44 (0)1462 443311 or email to: info@helden.com
Fax
Quantity
Delivery Date
Pipe Details
Asbestos
ABS Clay Concrete
Cement
Copper Lead
Other
(Please specify)
Product Requirements
www.helden-web.com
Every effort has been made to ensure that the information contained in this publication is accurate at the time of publishing. Crane Ltd assumes no responsibility
or liability for typographical errors or omissions or for any misinterpretation of the information within the publication and reserves the right to change without notice.
www.cranebsu.com
VIKING JOHNSO
World leaders I n pipe [ o m t s and repair products
46 — 48 Wilbury Way
Date: 24th January, 2011 Hitchin, Hertfordshire
SG4 OUD
United Kingdom
We hereby confirm that the brand names ‘Helden’ and ‘Viking Johnson’ are traded under Crane —
Building Services and Utilities Company. The Couplings and Flange Adaptors under the above
brand names are identical to each other with the same functions and manufacturing standard.
For a n d o n behalf o f : -
Crane t r a d i n g as Helden
Jonathan Lean
International Sales Manager
Test Report
Certificate
Certificate of Registration
QUALITY MANAGEMENT SYSTEM - ISO 9001:2015
The design, manufacture and supply of: Valves, flow measurement devices, and
associated equipment, in malleable iron, cast iron, steel and copper alloy materials;
Threaded pipe fittings and fixings in malleable cast iron and steel; Mechanical
jointing systems, and steel and plastic transition joints for the gas, petroleum and
water industries; Under pressure drilling machines and ancillary tools and
equipment for the gas and water industries. Encompassing the following brands:
Crane Hattersley Wask Viking-Johnson Posiflex Helden NABIC Rhodes Wade
Brownall Sperryn IAT.
Page: 1 of 2
ES;
5%;C
K
003
This certificate was issued electronically and remains the property of BSI and is bound by the conditions of contract.
An electronic certificate can be authenticated online.
Printed copies can be validated at www.bsigroup.com/ClientDirectory
Information and Contact: BSI, Kitemark Court, Davy Avenue, Knowlhill, Milton Keynes MK5 8PP. Tel: + 44 345 080 9000
BSI Assurance UK Limited, registered in England under number 7805321 at 389 Chiswick High Road, London W4 4AL, UK.
A Member of the BSI Group of Companies.
Certificate No: FM 00311
Crane Limited Sales, design and procurement of: Valves, flow measurement
T/A Crane Building Services & Utilities devices, and associated equipment, in malleable iron, cast
Epsilon Terrace iron, steel and copper alloy materials; Pipe fittings
West Road manufactured from malleable cast iron and steel.
Encompassing the following brands: Crane Hattersley. Design
Ipswich authority for NABIC Rhodes Wade Brownhall IAT.
IP3 9FJ
United Kingdom
Crane Limited Warehousing, assembly and distribution activities.
Lower Farm Road Encompassing the following brand: Wade.
Moulton Park Industrial Estate
Northampton
NN3 6XF
United Kingdom
Crane Limited The design and manufacture of pipe jointing systems and
T/A Crane Building Services & Utilities fittings for use within the water and sewage, gas, oil, mining,
46-48 Wilbury Way fire protection, building services and general engineering
Hitchin industries to national, international and customer
specifications. Encompassing the following brands:
SG4 0UD Viking-Johnson, Helden and Posiflex.
United Kingdom
Design and manufacture of regulators, safety valves,
pressure release valves, low and medium pressure
compression fittings, fittings and valves for commercial and
industrial applications. Design, manufacture and supply of
flow indicators and sight glasses for process installations up
to 16 inch nominal bore. Design, manufacture of fluid
controls for use with LP, NG and compressed gasses.
Procurement and supply of ball valves, fittings, associated
tubing and accessories. Encompassing the following brands:
Sperryn Gas Controls Rhodes Flow Controls NABIC Brownall
Wask.
Page: 2 of 2
This certificate was issued electronically and remains the property of BSI and is bound by the conditions of contract.
An electronic certificate can be authenticated online.
Printed copies can be validated at www.bsigroup.com/ClientDirectory
Information and Contact: BSI, Kitemark Court, Davy Avenue, Knowlhill, Milton Keynes MK5 8PP. Tel: + 44 345 080 9000
BSI Assurance UK Limited, registered in England under number 7805321 at 389 Chiswick High Road, London W4 4AL, UK.
A Member of the BSI Group of Companies.
Three Runway System Project Contract 3310 :
North Runway Modification Works
Approval Letter
Status N/A
DETAILS
https://hk1.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1108137460&USERID=1074380455 1/6
2020/10/7 Aconex
(0 selected)
Document Revision
File Revision Title Status
No Date
MESSAGE
TITLE OF SUBMISSION: Material Submission of Coupling & Flange Adaptor for Utility Works
From: A Keung
Sent: 23/09/2020 4:01:10 PM HKT (GMT +08:00)
To: Denny Chan, Andy Ho, Jacky Lee, Bill Mar, Mark Mcgleenon, Jayaprasad Nair, David Salisbury, Andrew Keung
Cc: Robert Baxter, C Y Chai, Ada N S Chan, Calvin Chan, Kenneth Chan (TRD), Eric Cheung, K P Cheung, Vaska
Cvetanoska, Henry C Y Lau, Jimmy Lee, Peggy Leung, Yan Leung, Gavin T F Li, Andy Liu, Benson Lo, Sunny Lo, Michael
https://hk1.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1108137460&USERID=1074380455 2/6
2020/10/7 Aconex
Poon, David Salisbury, Girish Tekwani, Kelvin Tsang, Kevin Tsang, Marcus Wong, Patrick W Y Yu, Ryan Yu, Thomas
CHENG, Jason Fung, Peter Ho, Ryan Ho, Ricky Kwan, Fergus, Yue Bun Kwong, Abbe Lau, Max Mak, Lok Hei Tsang, Chi
Man Wai, Xiaoxing Zheng
Mail Number: SAPR-JV-TRANSMIT-003757
Subject: SAPR-JV-3303-M-01064C Material Submission of Coupling & Flange Adaptor for Utility Works
CONTRACTOR’S SUBMISSION
SPECIFICATION REFERENCE : GMWS VOL 1 SECTION 6.3.10
DESCRIPTION OF CONTENTS :
We are pleased to submit the RtoC form and Material Submission of Coupling & Flange Adaptor
for Utility Works for your review and approval.
From: J Nair
Sent: 17/08/2020 5:05:51 PM HKT (GMT +08:00)
To: Andrew Keung
Cc: Robert Baxter, C Y Chai, Eric Cheung, K P Cheung, Peggy Leung, Andy Liu, Benson Lo, Sunny Lo, Jayaprasad Nair,
Michael Poon, David Salisbury, Marcus Wong, Thomas CHENG, Jason Fung, Peter Ho, Ryan Ho, Ricky Kwan, Fergus, Yue
Bun Kwong, Abbe Lau, Max Mak, Lok Hei Tsang, Chi Man Wai, Zhichang Yang, Xiaoxing Zheng
Mail Number: AAHK-TRANSMIT-003160
Subject: Re: SAPR-JV-3303-M-01064B Material Submission of Coupling & Flange Adaptor for Utility Works
TITLE OF SUBMISSION: Material Submission of Coupling & Flange Adaptor for Utility Works
https://hk1.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1108137460&USERID=1074380455 3/6
2020/10/7 Aconex
From: A Keung
Sent: 04/08/2020 2:09:37 PM HKT (GMT +08:00)
To: Denny Chan, Andy Ho, Jacky Lee, Bill Mar, Mark Mcgleenon, Jayaprasad Nair, David Salisbury, Andrew Keung
Cc: Robert Baxter, C Y Chai, Ada N S Chan, Calvin Chan, Kenneth Chan (TRD), Eric Cheung, Vaska Cvetanoska, Henry C Y
Lau, Jimmy Lee, Peggy Leung, Yan Leung, Gavin T F Li, Andy Liu, Benson Lo, Michael Poon, Girish Tekwani, Kelvin Tsang,
Kevin Tsang, Patrick W Y Yu, Ryan Yu, Thomas CHENG, Jason Fung, Peter Ho, Ryan Ho, Ricky Kwan, Fergus, Yue Bun
Kwong, Abbe Lau, Max Mak, Lok Hei Tsang, Chi Man Wai, Zhichang Yang, Xiaoxing Zheng
Mail Number: SAPR-JV-TRANSMIT-003046
Subject: SAPR-JV-3303-M-01064B Material Submission of Coupling & Flange Adaptor for Utility Works
https://hk1.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1108137460&USERID=1074380455 4/6
2020/10/7 Aconex
CONTRACTOR’S SUBMISSION
DESCRIPTION OF CONTENTS :
We are pleased to submit the RtoC form and Material Submission of Coupling & Flange Adaptor
for Utility Works for your review and approval.
From: A Keung
Sent: 08/06/2020 10:53:01 AM HKT (GMT +08:00)
To: Denny Chan, Andy Ho, Bill Mar, Mark Mcgleenon, Jayaprasad Nair, David Salisbury
Cc: Robert Baxter, C Y Chai, Ada N S Chan, Calvin Chan, Kenneth Chan (TRD), Vaska Cvetanoska, Henry C Y Lau, Jimmy
Lee, Cath Leung, Peggy Leung, Yan Leung, Gavin T F Li, Benson Lo, Michael Poon, Girish Tekwani, Kelvin Tsang, Kevin
Tsang, Patrick W Y Yu, Ryan Yu, Peter Ho, Ryan Ho, Ricky Kwan, Abbe Lau, Hiu Chun Poon, Zhichang Yang, Joseph
Zhang, Xiaoxing Zheng
Mail Number: SAPR-JV-TRANSMIT-002174
Subject: SAPR-JV-3303-M-01064A Material Submission of Coupling & Flange Adaptor for Utility Works
CONTRACTOR’S SUBMISSION
DESCRIPTION OF CONTENTS :
We are pleased to submit the captioned for your review and approval.
https://hk1.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1108137460&USERID=1074380455 5/6
2020/10/7 Aconex
https://hk1.aconex.com/Logon?Action=View&ENTITY=MAIL&ID=1108137460&USERID=1074380455 6/6
Three Runway System Project Contract 3310 :
North Runway Modification Works
Job Reference
JOB REFERENCE
1
WEE(II~’%E)»
fiE’Afi
BUN KEE (INTERNATIONAL) LIMITED
OFFICE : 12/F., PHASE 1, AUSTIN TOWER, 22-26 AUSTIN AVENUE, TST., KLN., H.K.
TEL : (852) 2728 7237 FAX : (852) 2387 2999 WEBSITE : www.bunkee.com
Contract No. Contractor Consultant / Owner
8. Tsz Shan Monastery Development Chun Wo Building Hsin Yieh Architects &
Ting Kok, Tai Po Construction Ltd. Engineers Ltd.
11. Contract No. CV/2011/01 China Road & Bridge Civil Engineering &
Corporation Development
Site Formation and Infrastructural Department
Works near Tsing Lun Road and Tsz (CEDD)
Tin Road in Area 54, Tuen Mun
2
WEE(II~’%E)»
fiE’Afi
BUN KEE (INTERNATIONAL) LIMITED
OFFICE : 12/F., PHASE 1, AUSTIN TOWER, 22-26 AUSTIN AVENUE, TST., KLN., H.K.
TEL : (852) 2728 7237 FAX : (852) 2387 2999 WEBSITE : www.bunkee.com
Contract No. Contractor Consultant / Owner
3
WEE(II~’%E)»
fiE’Afi
BUN KEE (INTERNATIONAL) LIMITED
OFFICE : 12/F., PHASE 1, AUSTIN TOWER, 22-26 AUSTIN AVENUE, TST., KLN., H.K.
TEL : (852) 2728 7237 FAX : (852) 2387 2999 WEBSITE : www.bunkee.com
Contract No. Contractor Consultant / Owner
22. Contract No. 20140186 Kin Wing Engineering Hong Kong Housing
Company Ltd. Authority
Foundation of Public Rental (HKHA)
Housing Development at
Shek Mun Estate Phase 2
PR0/Q088/16/HT