Img 20230208 165247

You might also like

Download as pdf
Download as pdf
You are on page 1of 2
E. SSOCIA NO. PMC UMC. Date: 07/02/2023 To City Engineer, Ulhasnagar Municipal Corporation, Ulhasnagar ‘Sub: Empanelment of Project Management Consultancy for Gol / GoM Funded Schemes for Ulhasnagar Municipal Corporation area, Ref: - 1.Work order No UMC/ WS / EE/801 Dated 12.1.2023 2. Your office letter No dated 14.11.2022 Dear Sir, With reference to above work order work of preparation of Detailed Project Report for Development of own source of water supply for Ulhasnagar Municipal Corporation is allotted to our firm. Accordingly detailed Investigation / Survey economical design of existing water supply system and Proposed scheme is carried out and from this data of Detailed Project Report for Development of own source of water supply for Ulhasnagar Municipal Corporation amounting to Rs. 222.53 Cr.is prepared. The Technical feature of the scheme are as under. TECHNICAL DETAILS 1No PARTICULAR OF SUB WORK Jack Well and Designing Constructing Intake well Pump House at Mharal MS Raw Water Rising main from Head works to WTP | 1550 mm OD 16 mm Kansai thick 3.10 KM Construction of Water Treatment Plant at Kansai with | 192 MLD ml WTP & 4.27 MBR ML MBR Construction Recirculation Sump Pump House at WTP | 1 No 2 ML Kansai Raw water Gravity main from WTP to Recirculation | 600 mm DIK7 Raw water Rising main from Recirculation Sump to | 400 mm DI K9 wrTP. 250 mm DIK9 2.60 Km Li | Ret etaining wall and land g at WTP & Head work Water Transmission main from WTP to

You might also like