Professional Documents
Culture Documents
Clean Up 3 Step Audit Form New
Clean Up 3 Step Audit Form New
Monthly Audit Result from Determine the Fty and Building to Compile the Reporting and Rewarding and Punishment
Process Flow Audit Implementation Scoring Publish
each Fty be audited finding issues
ME each Fty will be send - GME Will determine the Fty and - Audit Will be conducted Twice /Week in every All findings will The final score The audit -Reward system will be given after audit complete.
the monthly audit result to building to be audited. Tuesday and Wednesday. be documented will be reportang score -Reward will be divided into 2 category : Cell/Area the best
GME - The Criteria of Building to be - 1st day Random Audit will be check 2 Building Best and will be accumulated will be sent by achievements and Building the best achievements.
No later than 3 days after audited is 2 Top best Building performance followed up by from the results email cell/Area the best achievements consist of 1st , 2nd , 3rd
the previous month performance and 1 building Bad - 2nd day Random Audit will be Check the Follow up Leaders each area of Monthly audits Winner from all building.
performance. of findings issue at Building that have Bad and random - Reward amount:
performance audits 1. Building the Best achievement, The reward consist of:
- If the Building has some area like Cut-Prep-SM-DC- - Rotating Trophy
Stitc-Assembly ) the audit will be separate into 3 - 500.000 for Building Manager+Cell Manager+Pengawas
group ( Group 1 -> Cutting area, Group 2 -> Prep + - 2.000.000 for all worker
SM/DC, Group 3 -> 2 Cell Stitching-Assembly ). 2. Cell/Area The Best Achievement, The reward consist of :
- If the buildings have the same work area Like - 1st Winner
Stockfit the audit can choose more than 2 areas or - 200.000 for Chief+pengawas
Exp. max 3 areas. - 1.500.00 worker
In the second week a random - The selection of areas and groups will be adjusted - 2nd winner
audit will be conducted at PWI to the conditions of the building and the processes - 150.00 Chief+pengawas
Based on Lottery number. in it. - 1.000.000 worker
Then determine which building - Random Audit just focus on production area and - 3rd winner
will be audited randomly based for the office area will be arranged later - 100.000 Chief + pengawas
on 2 Top Building Best - 500.000 worker
Detail Activity - Reward will be given when the audit results are in the
performance and 1 Building Bad
performance. acceptable category
PWI
Best Performance
-Building 2 (CSA+SMDC)
-Building 5 ( Stockfit )
Bad Performance
-Building 3
-Punishment will be given to the 1 Building and 3 Cell/Area
that gets the lowest achievements ( Audit result are in the
Inconsistent and Bad Category )
-The Punishment is a warning letter and cancellation of
position benefits or cut 50% position benefit in that month
(Need to disscuss and agreement with all dept )
1. Building Lowest achievement -> Who is person in charge :
Building Manager+Cell Manager in that building.
2. Cell/Area Lowest achievement -> Who is person in charge
: Chief + Pengawas in that area/cell.
ME each Fty will be send - GME and ME Will determine the building and - The random audit schedule is Twice/Week for each - The random audit will be conducted by GME ( If All findings will be - The final score will be The audit result, - Reward and Punishment system will be given after
the monthly audit result to Cell/Area to be audited in each Fty ( PWI,PWJ,PWA). Fty. Possible to Join especially for PWJ/PWA ) + ME documented by ME then accumulated from the results reward and Random audit finished.
GME Head/Lean Leader + Production Leader ( Cell report to the GME and will be of Monthly audits and random punishment will
No later than 3 days after Exp. - The random audit will be conducted between Manager/Building Manager) + SEA. followed up by Leaders each audits. be send by email. - Reward amount:
(every month). Based on the lottery number, each factory has been Tuesday, Wednesday and Thursday which will be - Random audits will validate the validity of the area 1. 1st Winner
randomly selected which building and area will be drawn again on what day each fty will be audited. results of previous audits. - If the results of the random - 200.000 for Chief+pengawas
audited: - Random audits will ensure that all findings from audit are not better than the - 1.500.00 worker
Exp. previous audits have been or are being followed up. results of the previous audit or 2. 2nd winner
PWI (Group 1) PWI (Group 1) -> Wednesday - The Document should be prepared is Audit Form, (there is no improvement), So, - 150.00 Chief+pengawas
- Building 2 (CSA+SMDC) PWJ (Group 2) -> Tuesday Latest audit result. the reward will be postponed - 1.000.000 worker
- 1 Best cell/area + 1 random PWA (Group 3) -> Thursday - Using the same audit format. until the next month and 3. 3rd winner
PWJ (Group 2) punishment is keep applied. - 100.000 Chief + pengawas
- Building 5 ( Stockfit ) - The Random audit schedule will be shared by GME - 500.000 worker
- 1 Best cell/area + 1 random Note:
PWA (Group 3) *Reward will be given when the audit results are in the
- Building 3 Acceptable category.
- 1 Best cell/area + 1 random
PIC ME GME GME GME,ME,PRODUCTION,SEA ME GME GME GME,ME, Prod, Supporting, HR, SEA
6S AUDIT FORM - PRODUC
COUNTRY
FACTORY CODE
PERIOD OF AUDIT
0 1
Tidak ada Makanan, Bahan kimia, Botol, Kain, Plastik, Kertas, Komponent, Peralatan, Alat kebersihan, etc
pekerjaan)
Tidak ada barang atau peralatan yang sudah tidak digunakan/ rusak di area kerja
Mesin, Material, Component, dan Peralatan ditempatkan pada tempat yang sudah ditentuka
Komponent/Material tidak tercampur dengan barang barang lain yang tidak diperlukan
Set In Order
Segala sesuatu ada tempat dan pada Barang pribadi dan botol minum diletakan pada tempat yang sudah disediakan
tempatnya
Barang barang yang sudah tidak digunakan diletakan pada tempatnya, disusun dengan rapih
Mesin/Meja/Keranjang/Peralatan/Visual display bebas dari debu, karat,sawang, oli, minyak d
Shine Lantai, dinding, Jendela, atap, tangga dan semua permukaan bebas dari debu, karat,oli, miny
Segala sesuatu terjaga kebersihannya
Tempat sampah atau limbah sudah tersedia, diberi label sesuai jenisnya dan tidak tercampur
Sustain
Disiplin dan saling memotivasi untuk Ada daftar temuan 6S dan tindak lanjutnya
terus melakukan kebiasaan baik
Pelindung mesin, Peralatan keselamatan, dan lampu emergency berfungsi dan difungsikan de
Kabel Listrik, Panel Listrik, Steker, dan sambungan ada pada kondisi yang aman
Safety
Mematuhi semua peraturan kesehatan
keselamatan kerja
Ventilasi, Penerangan, air minum, tempat obat dan toilet dalam kondisi yang baik
Semua tempat bahan kimia, penanganan limbah, pelabelan sesuai dengan standard
Total Score
90 - 100
75 - 89
Scoring Result
60 - 74
<60
6S AUDIT FORM - PRODUCTION
2 3
2 Finding 1 Finding
AUDIT POINT
in, Plastik, Kertas, Komponent, Peralatan, Alat kebersihan, etc di area kerja/mesin (yang tidak sesuai/tidak ada hubungannya dengan
alatan ditempatkan pada tempat yang sudah ditentukan, rapih, teratur dan sesuai dengan qty standard
dan semua permukaan bebas dari debu, karat,oli, minyak,air, sawang dan sampah
n terupdate
utnya
Total Score
Excellence
Acceptable
Inconsistent
Bad
daerah yang memperoleh prestasi 6S
0 Finding
SCORE
0
6S AUDIT RESULT
Score
No Cell Score Building
(avarage)
Percentage Criteria SCORE CRITERIA
11 Press 74
12 Uv-Deg 74
13 Stockfitt 74 B2 74 74% INCONSISTENT
14 Rolling 74
15 Cell 13 74
Main office 74 74% INCONSISTENT
16 Cell 14 74
17 All Area 74 Sablon 74 74% INCONSISTENT
3R AUDIT FORM - PRODUC
COUNTRY
FACTORY CODE
PERIOD OF AUDIT
RIGHT PLACE
Tidak ada posisi mesin, peralatan dan barang barang yang melebihi garis pembatas
정위치
Terdapat marking area untuk peralatan dan papan visual
Penggunaan mesin dan peralatan yang tepat berdasarkan BSOM dan atau SME
RIGHT GOOD
Tidak terdapat item dan peralatan yang tidak berhubungan dengan pekerjaan di area kerja
정품
Item yang tepat di setiap tempat yang telah disediakan
Total Score
8-9
6-7
Scoring Result
4-5
<4
3R AUDIT FORM - PRODUCTION
tai produksi
n dan standard operator
n peralatan kerja di line produksi
n papan visual
ine balancing
k dibutuhkan
telah disediakan
Total Score
Excellence
Acceptable
Inconsistent
Bad
3R AU
COUNTRY
FACTORY CODE
PERIOD OF AUDIT
AUDIT PURPOSE
S
oesn't Meet Expectation ) Guideline
RIGHT PLACE
정위치
RIGHT QUANTITY
정량
RIGHT GOOD
정품
0 Total
Scoring Result
3R AUDIT FORM - PRODUCTION
x9
N : 0 Point ( Doesn't Meet Expectation )
0
Excellence
Acceptable
Inconsistent
Bad
VISUAL MANAGEMENT AUDIT FORM
COUNTRY
FACTORY CODE
PERIOD OF AUDIT
Untuk mempermudah pengontrolan pencapaian hasil produksi
AUDIT PURPOSE Aksi yang cepat untuk sebuah masalah
Indikasi Visual untuk sebuah masalah
Terdapat garis visual yang jelas di area kerja, visitor, dan mesin
VISUAL WORK AREA
Terdapat implementasi kode warna sesuai dengan pedoman SME
Total Score
6
4-5
Scoring Result
3
<3
5334000 1970000
L MANAGEMENT AUDIT FORM - PRODUCTION
rekomendasi SME
Total Score
Excellence
Acceptable
Inconsistent
Bad
7304000 4587000
VISUAL MANAG
COUNTRY
FACTORY CODE
PERIOD OF AUDIT
AUDIT PURPOSE
S
oesn't Meet Expectation ) Guideline
PRODUCTION BOARD
ANDON
0 Total
Scoring Result
1987000 2487000
VISUAL MANAGEMENT AUDIT FORM - PRODUCTION
Total Score
6 Excellence
4-5 Acceptable
3 Inconsistent
<3 Bad
M - PRODUCTION
x6
N : 0 Point ( Doesn't Meet Expectation )
0
Excellence
Acceptable
Inconsistent
Bad