Professional Documents
Culture Documents
Sumatera Utara
Sumatera Utara
~ JOURNALOFBUILDINGCONSTRUCTION,INTERIOR&MATERIALPRICE I
STANDAR HARGASATUAN BANGUNAN GEDUNG NEGARA
(HSBGN)
HARGA GEDUNG PER M2
GEDUNG GEDUNG TIDAK
NO. NAMA KABUPATEN/ KOTA BERTINGKAT RUMAHNEGARA
BERTINGKAT
KE LAS KLSTDK KE LAS KLSTDK
jSEDERHANA SEDERHANA SEDERHANI SEDERHANA TIPEC TIPEB TIPEC
Eo1s133 TAHUNXX 2014 JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI & INTERIOR 159
----------------------------
I
JOURNALOF BUILDING. CONSlRUCTION, INTERIOR&MATERIALPRICE <Q>
HARGASATUANPAGARBANGUNANGEDUNGNEGARA
HARGA PAGAR DEPAN PER M2 HARGA PAGAR SAMPING PER M2
NC. NAMA KABUPATEN/ KOTA GEDUNG RUMAH NEGARA GEDUNG RUMAH NEGARA
KELAS KLSTDK TIPEC TIPEB TIPEA KE LAS KLSTDK Ti!'EC Ti!'EB TIPEA
SEIJ:RWIA
1. KABUPATENLANGKAT 1.213.000 1.334.300 851.000 936.870 936.870 1.015.000 1.116.500 835.900 919.490 919.49(
2. KABUPATEN DELI SERDANG 1.373.000 1.510.300 986.400 1.085.040 1.085.040 1.217.00 1.338. 700 1.005.00 1.11li600 1.105.50(
3. KABUPATENKARO 1.296.000 1.425.600 947.900 1.042.690 1.042.690 1.540.000 1.269.400 949.500 1.044.4&1 1.044.451
4. KABUPATEN DAIR! 1.375.000 1.512.500 1.001.000 1.101.100 1.101.100 1.214.000 1.335.400 994.000 1.f.G3AOO 1.093.41
5. KABUPATENPAKPAKBHARAT 1.410.000 1.551.000 1.030.000 1.133.000 1.133.000 1.241.000 1.365.100 1.019.000 1.120J!Xl 1.120.90C
6. KABUPATENSERDANGBEDAGAI 1.382.000 1.520.000 961.000 1.057.000 1.057.980 1.164.000 1.280.400 962.800 1.059.00J 1.059.08(
7. KABUPATENBATUBARA 1.420.000 1.562.000 .003.000 1.103.300 1.103.300 1.210.000 1.331.000 1.001.000 1.101.100 1.101.10(
8. KABUPATENASAHAN 1.419.000 1.560.900 980.600 1.078.660 1.078.660 1.190.000 1.309.000 985.200 1.®.720 1.083.72(
9. KABUPATENSIMALUNGUN 1.288.000 1.416.800 945.500 1.040.050 1.040.050 1.130.000 1.243.000 930.000 1DZ!221l 1.023.22(
10. KABUPATENTOBASAMOSIR 1.351.000 1.486.100 976.800 1.074.480 1.074.480 1.179.000 1.296.900 969.000 1.006J!Xl 1.065.901
11. KABUPATENSAMOSIR 1.367.000 1.503.700 967.300 1.064.030 1.064.030 1.170.000 1.287.000 962.100 1.058.310 1.058.311
12. KABUPATEN HUBANG HASUNDUTAN 1.288.000 1.416.800 959.100 1.055.010 1.055.010 1.101.000 1.211.100 909.200 1.000.120 1.000.121
13. KABUPATENTAPANUUUTARA 1.339.000 1.472.900 980.000 1.078.000 1.078.000 1.155.000 1.270.500 949.200 1.044.120 1.044.121
14. KABUPATEN LABUHAN BATU UTARA 1.448.000 1.592.800 .027.000 1.129.700 1.129.700 1.208.000 1.328.800 990.500 1.!189.5&1 1.089.55(
15. KABUPATEN LABUHAN BATU 1.413.000 1.554.300 1.000.000 1.100.000 1.100.000 1.191.000 1.310.100 976.200 1.073.820 1.073.82C
16. KABUPATENLABUHANBATUSElATAN 1.445.000 1.589.500 999.200 1.099.120 1.099.120 1.183.000 1.301.300 970.300 1.007.33) 1.067.33(
17. KABUPATENPADANGLAWASUTARA 1.433.000 1.576.300 1.047.000 1.181.400 1.181.400 1.240.000 1.364.000 1.019.000 1.120J!X) 1.120.90(
18 • KABUPATENPADANGLAWAS 1.435.000 1.578.500 .075.000 1.182.500 1.182.500 1.244.000 1.368.400 1.023.000 1.125.:lll 1.125.30(
19. KABUPATENTAPANULJ SELATAN 1.448.000 1.592.800 1.051.000 1.156.100 1.156.100 1.244.000 1.368.400 1.016.000 1.117.60 1.117.601
20 . KABUPATENMANDAIUNGNATAL 1.422.000 1.564.200 1.020.000 1.122.000 1.122.000 1.237.000 1.360.700 1.011.000 1.112.100 1.112.101
21 . KABUPATENTAPANULJTENGAH 1.450.000 1.595.000 .053.000 1.158.000 1.158.300 1.248.000 1.372.800 1.026.000 1.128.600 1.128.601
22 . KABUPATEN NIAS 1.623.000 1.785.300 1.110.000 1.221.000 1.221.000 1.312.000 1.443.200 1.084.000 1.192.40 1.192.40'
23 . KABUPATENNIASBARAT 1.637.000 1.800.700 1.093.000 1.202.300 1.202.300 1.329.000 1.461.900 1.096.000 1.206.600 1.205.60!
24 . KABUPATEN NIAS UTARA 1.604.000 1.764.400 1.084.000 1.192.400 1.192.40 1.266.000 1.392.600 1.040.000 1.144.000 1.144.00C
25 • KABUPATENNIASSElATAN 1.669.000 1.835.900 .125.000 1.237.500 1.237.500 1.336.000 1.469.600 1.102.000 1212.200 1.212.20(
26 . KOTABINJAI 1.374.000 1.511.400 954.200 1.049.620 1.049.620 1.189.000 1.307.900 978.700 1.076570 1.076.57(
27 . KOTAMEDAN 1.155.000 1.270.500 901.400 991.540 991.540 1.089.000 1.197.90 0 896.400 986.040 986.041
28 . KOTATEBINGTINGGI 1.359.000 1.494.900 943.700 1.038.070 1.038.070 1.128.000 1.240.800 938.900 1.D32.790 1.032.791
29 . KOTAPEMA.TANGSIANTAR 1.307.000 1.437.700 942.600 1.036.860 1.036.860 1.138.000 1.251.800 933.300 1.!126.630 1.026.631
30 . KOTATANJUNG BALAI 1.305.000 1.435.500 908.300 999.130 999.130 1.098.000 1.207.80 0 910.100 1.001.11 o~.001.111
31 . KOTAPADANGSIDEMPUAN 1.389.000 1.527.900 .001.000 1.101.100 1.101.100 1.176.000 1.293.600 960.70 0 1.006.770 1.056.77
32. KOTASIBOLGA 1.309.000 1.439.900 958.50 0 1.054.350 1.054.350 1.128.000 1.240.80 0 922.90 0 1.01&1001.015.19(
33 • KOTAGUNUNG srrou 1.626.000 1.788.600 .102.00 0 1.212.200 1.212.200 1.301.000 1.431.00 0 1.076.000 1.183.600
160 JURNAL HARGA 8ATUAN BAHAIN BANGUNAIN, KONSTRUKSI &INTERIOR EDIS/ 33 TAHUN )()( 2014
--------------- ----- ----- .-----
~ JOURNALOFBUILDINGCONSTRUCTION,INTERIOR&MAlERIALPRICE I
REKAPITULASI ANALISA HARGASATUAN
~i
PERUMAHAN DAN PERMUKIMAN
1 2 3
A.
1
PEKERJAAN PERSIAPAN
1 M' Pagar Sementara dari seng gelombang tinggi 2 M 433.600 !e
2 1 M' Pek. pengujuran dan pemasangan bowplnak 88.510 (I)
i
3 1 M2 Pek Kantor Direksi keet dengan lantai plasteran 1.295.050
4 1 M2 Pembuatan gudang semen dan alat-alat 1.217.130
5 1 M2 Pembuatan Rumah jaga/Kontruksi kayu 1.410.400
6 1 M2 Membersihkan lapangan dan perataan 12.500 ~
~
7 1 M2 Pembuatan Bedeng buruh 1.233.090
8 1 M3 Bongkar beton bertulang 533.320
~
9 1 M3 Bongkar dinding tembok bata merah 533.320
10 1 m' Pasang pager kawat jaring galvanis (harmonika),tinggi 1m 146.870
B PEKERJAAN TANAH c:
1
2
Menggali 1 m3 tanah biasa sedalam 1 m
Menggali 1 m3 tanah biasa sedalam 2 m
58.750
72.000 ~
~
3 Menggali 1 m3 tanah biasa sedalam 3 m 85.450
4 Menggali 1 m3 tanah keras sedalam 1 m 78.200
5 Menggali 1 m3 tanah lumpur sedalam 1 m 94.500
6 Mengerjakan 1 m2 stripping tebing tinggi 1 m <f.250
7 Membuang 1 m3 tanah sejauh 30 m 25.750
8 Membuang 1 m3 tanah/bahan galian/adukan beton/mortar/dll sejauh 60 m 36.800
9 Membuang 1 m3 tanah/bahan galian/adukan beton/mortar/dll sejauh 90 m 45.000
10 Membuang 1 m3 tanah/bahan galian/adukan beton/mortar/dll sejauh 120 m 53.100
11 Membuang 1 m3 tanah/bahan galian/adukan beton/mortar/dll sejauh 150 m 61.300
12 Membuang 1 m3 tanah/bahan galian/adukan beton/mortar/dll sejauh 180 m 69.500
13 Membuang 1 m3 tanah/bahan galian/adukan beton/mortar/dll sejauh 21 O m 77.700
14 Membuang 1 m3 tanah/bahan galian/adukan beton/mortar/dll sejauh 240 m 85.900
15 Membuang 1 m3 tanah/bahan galian/adukan beton/mortar/dll sejauh 270 m 94.000
16 Membuang 1 m3 tanah/bahan galian/adukan beton/mortar/dll sejaull 300 m 102.200
17 Membuang 1 m3 tanah/bahan galian/adukan beton/mortar/dll sejauh 400 m 129.500
18 Membuang 1 m3 tanah/bahan galian/adukan beton/mortar/dll sejauh 500 m 156.800
19 Membuang 1 m3 tanah/bahan galian/adukan beton/mortar/dll sejauh 600 m 184.000
20 Membuang 1 m3 tanah/bahan galian/adukan beton/mortar/dll sejauh 700 m 211.300
21 Mengguruk kebali 1 m3 galian 28.480
22 Memadatkan 1 m3 tanah (per20cm) 42.500
23 Mengguruk 1 m3 pasir urug 124.290
24 Mengguruk 1 m3 tanah urug 124.290
25 Memasang 1 m2 lapisan ijuk tebal 10 cm 201.750
26 Mengguruk 1 m3 sirtu padat 164.890
27 1 m2 Pemadatan tanah timbun mengunakan alat berta 13.780
28 1 m3 Galian tanah dan pembuangan mengunakan ala! berat (cut & fill) 58.040
C PEKERJAAN PONDASI
1 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 3 PP 783.250
2 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP 733.830
3 Memasang 1 m3 batu kosong (anstamping) 415.390
4 Memasang 1 m3 pondasi siklop campuran 1 PC:2 PB : 3 KR 2.021.940
5 Memasang 1 m3 pondasi sumuran, dia 1OOcm 787.930
EDIS! 33 TAHUN XX 2014 JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI & INTERIOR 161
--------- - - -------
IJOURNALOFBUILDIN(lCONSTRUCllON,INTERIOR&MATERIALPRICE ~
~Q
1 2 3
! D PEKERJAAN BETON
...~
1 Membuat 1 m3 beton mu tu K 100 721.060
2 Membuat 1 m3 beton mutu K 100 (Mengunakan peralatan kontruksi) 725.080
3 Membuat 1 m3 beton mutu K 125 759.490
en 4 Membuat 1 m3 beton mutu K 125 (Mengunakan peralatan.kontruksi) 763.670
c: 5
6
Membuat 1 m3 beton mutu K 150
Membuat 1 m3 beton mutu K 150 (Mengunakan peralatan kontruksi)
789.410
793.740
E 7
8
Membuat 1 m3 beton mutu K 175
Membuat 1 m3 beton mutu K 175 (Mengunakan peralatan kontruksi)
825.120
829.720
~
9 Membuat 1 m3 beton mutu K 200 858.660
10 Membuat 1 m3 beton mutu K 200 (Mengunakan peralatan kontruksi) 863.270
~
11 Membuat 1 m3 beton mutu K 225 884.550
12 Membuat 1 m3 beton mutu K 225 (Mengunakan peralatan kontruksi) 889.490
13 Membuat 1 m3 beton mutu K 250 900.560
c: 14 Membuat 1 m3 beton mutu K 250 (Mengunakan peralatan kontruksi) 905.340
~
15 Membuat 1 m3 beton mutu K 275 927.900
16 Membuat 1 m3 beton mutu K 275 (Mengunakan peralatan kontruksi) 932.520
~
17 Membuat 1 m3 beton mutu K 300 936.430
18 Membuat 1 m3 beton mutu K 300 (Mengunakan peralatan kontruksi) 940.880
19 Membuat 1 m3 beton mutu K 325 1.012.890
20 Membuat 1 m3 beton mutu K 325 (Mengunakan peralatan kontruksi) 983.440
21 Membuat 1 m3 beton mutu K 350 1.023.990
22 Membuat 1 m3 beton mutu K 350 (Mengunakan peralatan kontruksi) 994.290
23 Pembesian 1kg dengan besi polos 17.430
24 Pembesian dengan besi ulir 19.530
25 Memasang 1 kg kebel presstrossed polos/strands 16.940
26 Memasang 1 kg jaring kawat baja/wire mesh 16.130
27 Memasang 1ng untuk pondasi 205.500
28 Memasang 1 m2 bekisting untuk sloff 223.670
29 Memasang 1 m2 bekisting untuk kolom 357.590
30 Memasang 1 m2 bekisting untuk balok 369.990
31 Memasang 1 m2 bekisting untuk lantai 439.090
32 Memasang 1 m2 bekisting untuk dinding 360.920
33 Memasang 1 m2 bekisting untuk tangga 321.440
34 Memasang 1 m2 jembatan untuk pengecoran beton 134.870
35 Membuat 1m3 pondasi beton bertulang (150 kg besi+bekisting) 4.445.910
36 Membuat 1m3 pondasi beton bertulang (125 kg besi+bekisting) 4.043.500
37 Membuat 1m3 pondasi beton bertulang (100 kg besi+bekisting) 3.641.090
38 Membuat 1m3 sloof beton bertulang (200 kg besi+bekisting) 6.140.030
39 Membuat 1m3 sloof beton bertulang (150 kg besi+bekisting) 5.335.210
40 Membuat 1m3 sloof beton bertulang (125 kg besi+bekisting) 4.932.800
41 Membuat 1m3 sloof beton bertulang (100 kg besi+bekisting) 4.530.380
42 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting) 9.504.400
43 Membuat 1 m3 kolom beton bertulang (200 kg besi + bekisting) 7.894.750
. 44 Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting) 6.278.960
45 Membuat 1 m3 kolom beton bertulang (125 kg besi + bekisting) 5.876.540
46 Membuat 1 m3 kolom beton bertulang (100 kg besi + bekisting) 5.474.130
47 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) 7.333.660
48 Membuat 1_ m3 balok beton bertulang (150 kg besi + bekisting) 6.528.830
162 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI &INTERIOR EDIS/ 33 TAHUN xx 2014
-~
'
---·---- ·-----
~ JOURNALOFBUILDINGCONSTRUCTION,INTERIOR&MATERJ.ALPRICE I
1 2 3
~()
1----1--------------------1---__;;_----l"tl
49 Membuat 1 m3 balok beton bertulang (125 kg besi + bekisting) 6.126.420 ...
50 Membuat 1 m3 balok beton bertulang (100 kg besi + bekisting) 5.724.010 "II
51 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting) 6.697.320 . ~
52 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) 6.213.280 ...
53 Membuat 1 m3 dinding beton bertulang (125 kg besi + bekisting) 5.810.870 (I)
54 Membuat 1 m3 dinding baton bertulang (100 kg besi + bekisting) 5.408.450 C:
55 Membuat 1 m' kolom praktis beton bertulang (11x11) cm 123.390 •:::.
56 Membuat 1 m' ring balok beton bertulang (1Ox15) cm 144.320 ~
57 Membuat 1 m3 plat beton bertulang (150 kg besi+bekisting) 6.518.960 ilil
58 Membuat 1 m3 plat beton bertulang (125 kg besi + bekisting) 6.116.540 ~l'li
59 Membuat 1 m3 plat beton bertulang (100kg besi+bekisting) 5.714.130
E PEKERJAAN DINDING
Memasang 1 m2 dinding bata merah tebal 1 bata, campuran spesi 1 PC:2 PP 260.450
~
2 Memasang 1 m2 dinding bata merah tebal 1 bata. campuran spesi 1 PC:3 PP 247.240 c:
~
3 Memasang 1 m2 dinding bata merah tebal 1 bata, campuran spesi 1 PC:4PP 238.730
4 Memasang 1 m2 dinding bata merah tebal 1/2 bata, campuran spesi 1 PC:2 PP 126.190
~
5 Memasang 1 m2 dinding bata merah tebal 1/2 bata, campuran spesi 1 PC:3 PP 120.170
6 Memasang 1 m2 dinding bata merah tebal 1/2 bata, campuran spesi 1 PC:4 PP 116.570
7 Memasang 1 m2 dinding terawang campuran spesi 1 PC:4PP 307.890
8 Memasang 1 m2 dinding batako 1PC:5PS 96.560
9 Memasang 1 m2 dinding bata bata ringan 160.900
F PEKERJAAN PLESTERAN
Memasang 1 m2 plesteran+acian 1PC:1PP. tebal 15mm 63.470
2 Memasang 1 m2 plesteran+acian 2PC:1PP, tebal 15mm 56.700
3 Memasang 1 m2 plesteran+acian 3PC:1PP, tebal 15mm 53.680
4 Memasang 1 m2 plesteran+acian 4PC:1PP, tebal 15mm 51.690
5 Memasang 1 m2 plesteran ciprat 1PC:2PP 41.620
6 Memasang 1 m2 acian 31.520
7 Memasang 1 m' plester 13.340'
G PEKERJAAN KAYU
Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I 13.090.440
2 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas II 10699.680
3 Membuat dan memasang 1 m2 daun pintu panel, kayu kelas II 693.610
4 Membuat dan memasang 1 m2 daun pintu [anel kayu, kelas II lapis seng 819.610
5 Membuat dan memasang 1 m2 pintu dan jendela kaca. kayu kelas II 594.810
6 Membuat dan memasang 1 m2 pintu dan jendela jalusi kayu kelas II 857.260
7 Membuat 1 m2 pintu plywood rangkap,rangka expose kayu kelas II 642.540
8 Membuat 1 m2 pintu plywood rangkap,rangka tertutup kayu kelas II 601.240
9 Membuat 1 m2 pintu plywood rangkap,rangka tertutup kayu kelas. II lapis seng 727.240
1O Memasang 1 m2 jalusi kusen, kayu kelas II 717.700
11 Memasang 1 m3 kontruksi kuda-kuda konvensional, kayu kelas II 9.558.280
12 Memasang 1 m3 kontruksi gordeng, kayu kelas II 8.849.340
13 Memasang 1 m2 rangka atap genteng keramik, kayu kelas II 364.750
14 Memasang 1 m2 rangka atap genteng beton, kayu kelas II 507.940
15 Memasang 1 m2 rangka atap seng BJLS 0,25, kayu kelas II '139.200
16 Memasang 1m2 dinding plywood/triplek 4mm 111.780
EDIS/ 33 TAHUN XX 2014 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI & INTERIOR 163
I
JOURNALOFBUILDING CONSTRUCTION, INTERIOR&MA1ERV\l.PRICE ~
1 2 3
17 Memasang 1m1 Lisplang uk.(1,5" x 8") cm, kayu kelas II 105.730
18 Memasang 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas Ill 166.570
19 Memasang 1 m2 dinding partisi plywood rangkap, rangka kayu kelas Ill 286.290
20 Memasang 1 m2 dinding plywood /triplek 4mm 30.410
PEKERJAAN LANGIT-t..ANGIT
1 Memasang 1 m2 langit-langit asbes semen 30.010
2 Memasang 1 m2 langit-langit triplek uk. (120 x 240) cm 46.040
3 Memasng 1 m2 langit-langit lambrizing kayu, tbl 9 m 207.490
4 Memasang 1 m2 langilangit gypsum board uk. (120 x 240 x9)mm, tbl 9mm 42.460
5 Memasang 1 m2 langit-langit gypsum board uk.(120x240x6)mm,tbl 6mm 39.000
6 Memasang 1 m2 langit-langit gypsum board uk. (120x240x12)mm,tbl 12mm 50.280
7 Memasang 1 m' list langit-lan9it kayu profil 15.300
8 Memasang 1 m' list plafond gypsum profil 6" 23.420
9 Memasang 1 m' list plafond gypsum profil 4" 21.320
1O Memasang 1 m' list plafond gypsum profil 3" 17.170
11 Memasang 1 m' list plafond gypsum profil 2" 16.070
12 Memasang 1 m2 system plafon akustik rangka tampak 144.890
164 JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI & INTERIOR Eo1s1 33 TAHUN XX 2014
--------·-- -- ·--··---
~ JOURNALOFBUILDINGCONSTRUCTION,INTERIOR&MA1ERIALPRICE I
~
~
1 2 3
5 Memasang 1 m' pipa galvanis diameter 1/2" 36.420
6
....~
Memasang 1 m' pipa galvanis diameter 314" 42.780
7 Memasang 1 m' pipa galvanis diameter 1" 52.860
8 Memasang 1 m' pipa galvanis diameter 1 1/2" 81.480
9 Memasang 1 m' pipa galvanis diameter 2"
10 Memasang 1 m' pipa galvanis diameter 2 1/2"
96.340
109.990
fl>
11 Memasang 1 m2 pintu besi baja 743.600
i
•~
12 Memasang 1 m2 jendela besi 477.340
13 Memasang 1 m2 pintu alumuniun 1.070.820
. 14 Memasang 1 m2 sunscreen alumunium 749.200
15 Memasang 1 m2 venetian blinds 240.270
16 Memasang 1 m2 vertical blinds
~
250.270
17 Memasang 1 m2 jendela naco + teralis 227.950
18 Memasang 1 m' tulang seng bjls 35 161.180
L PEKERJAAN SANITASI
1 Memasang 1 buah closet duduk/monoblok 2.575.000
2 Memasang 1 buah kloset duduk I mono blok setara TOTO 3.680.000
3 Memasang 1 buah kloset jongkok porselen 437.020
4 Memasang 1 buah kloset jongkok setara TOTO 519.230
5 Memasang 1 buah urinior 1.213.230
6 Memasang 1 buah westafel 966.730
7 Memasang 1 buah westafel setara TOTO 1.584.230
8 Memasang 1 buah bank mandi fiberglass.volume 0.30 m3 731.980
9 Memasang 1 buah bak mandi batu bat, volume 0,30 m3 905.240
10 Memasang 1 buah bak cuci piring stainless steel 852.600
11 Memasang 1 buah kran 3/4" atau 112" 27.350
12 Memasang 1 buah floor drain 33.530
13 Memasang 1 m' pipa pvc tipy aw 1/2" 14.910
14 Memasang 1 m' pipa pvc tipe aw 314" 16.420
15 Memasang 1 m' pipa pvc tipe aw 1" 20.290
16 Memasang 1 m' pipa pvc tipe aw 1 1/2" 22.140
17 Memasang 1 m' pipa pvc tipe aw 2" 28.420
18 Memasang 1 m' pipa pvc tipe aw 2 1/2" 26.340
EDIS/ 33 TAHUN xx 2014 JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI &INTERIOR 165
________ ,.. _______ -----. ---------·---·-·---
I
JOURNALOF BUILDING, CONSTRUCTION, INTERIOR&MATERIALPRICE ~
,,~ 1 2 3
~....
. 19 Memasang 1 m' Pipa PVC lipe AW 3" 43.140
20 Memasang 1 m' Pipa PVC tipe AW 4" 52.040
21 Memasang 1 m' rial uk. 150 mm 93.630
22 Memasang 1 m' rial uk. 200 mm 98.880
(I) 23 Memasang 1 m' rial uk. 300 mm 124.080
~
25 Memasang 1 m' rial uk. 500 mm 224.270
26 Memasang 1 m' rial uk. 600 mm 282.760
27 Memasang 1 m' rial uk. 800 mm 405.010
~ 28
29
Memasang 1 m' rial uk. 1.000 mm
Memasang 1 m' rial uk. 1/2 150 mm
668.750
74.730
~
30 Memasang 1 m' rial uk. 1/2 200 mm 96.780
31 Memasang 1 m' rial uk. 1/2 300 mm 98.040
c: 32
33
Membuat 1 unit bak kontrol (30 x 30)
Membuat 1 unit ban kontrol (40 x40)
196.160
281.900
~
1 1 buah pasang kunci tanam antik 236.400
2 1 buah pasang kunci tanam biasa 117,350
3 1 buah pasang kunci tanam kamar mandi 108.170
4 1 buah pasang kunci silinder 86.950
5 1 buah pasang engsel pintu 31.970
6 1 buah pasang engsel jendela 20.300
7 1 buah pasang hak angin 31.730
8 1 buah pasang pegangan jendela 23.100
9 1 buah pasang door closer 269.500
10 1 buah pasang pegangan pintu/door holder 164.500
11 1 m2 pasang kaca tebal 5 mm 149.910
12 1 m2 pasang kaca tebal 3 mm 116.850
13 1 m2 pasang kaca tebal 8 mm 292.850
14 1 m2 pasang kaca buram/reyben tebal 5 mm 155.350
15 1 m2 pasang kaca cermin tebal 5 mm 193.850
16 1 bh pasang rel pintu dorong 271.400
17 1 buah pasang kunci lemari 42.250
N PENGERJAAN PENGECATAN
1 1 m2 pelaburan bidang kayu dengan venis 39.360
2 1 m2 pengecetan bidang kayu lama 30.560
3 1 m2 pengecetan bidang kayu baru 43.680
4 1 m2 pengecetan tembok plafon baru setara ninilex (11ps cat dasar,2 lps cat penutup 28.060
5 1 m2 pengecetan tembok/plafon lama setara vinilex (1 lps cat dasar,21ps cat penutup) 22.730
6 1 m2 pengecatan tembok /plafon lama setara vinilex (21ps cat penutup) 18.850
7 1 m2 pengecetan tembok/plafon baru setara pargon(1 lps plamur, 11ps catdasar,21ps cat penutup) 26.160
8 1 m2 pengecetan tembok/plafon lama setara paragon (11ps cat dasar,21ps cat penutup) 21.230
9 1 m2 pengecatan tembok/plafon lama setara paragon (21ps cat penutup) 17.340
1O 1 m2 pengecetan permukaan baja dengan meni besi 10.380
11 1 m2 pengecetan bidang besi dengan cat perak 37.630
12 1 m2 mengikis/mengerok permukaan cat tembok lama 12.250
166 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI & INTERIOR EDIS/ 33 TAHUN XX 2014
·-------------· ____,,_____________ ---·--·- ·-"
~ .Kll.JRNALOFBUILDINGCONS1RUCTIO'J, INTCRKJR&MATERIALPRJCE I
~
~
1 2 3
0 PEKERJAAN PEMASANGAN KOZEN PINTU I JENDELAMETAL
....~
1 1 unit kozen metal type PJ 1 1.995.000
2 1 unit kozen metal type P1 1.285.200
3 1 unit kozen metal type P2 882.000
4 1 unit kozen metal type P3 856.800 en
i
5 1 unit kozen metal type P4 585.900
6 unit kozen metal type J 1 2.809.800
7
8
9
10
unit kozen metal type J 2
1 unit kozen metal type J 3
1 unit kozen metal type J 4
1 unit kozen metal type V1
2.142.000
1.455.300
774.900
1.638.000
•~
11
12
1 unit kozen metal type V2
1 unit kozen metal type V3
1.234.800
837.900 ·~
13
14
1 unit kozen metal type V4
1 unit kozen metal type PJ 1 K
434.700
1.978.200 c:
~
15 1 unit kozen metal type P1 K 894.600
16 unit kozen metal type P2K 686.700
~
17 unit kozen metal type P3K 667.800
18 1 unit kozen metal type J1 K 2.034.900
19 1 unit kozen metal type J2K 1.549.800
20 1 unit kozen metal type J3K 1.064.700
21 1 unit kozen metal type J4K 579.600
22 1 unit kozen metal type V1 K 863.100
23 1 unit kozen metal type V2K 655.200
24 1 unit kozen metal type V3K 447.300
25 unit kozen metal type V4K 239.400
EDIS/ 33 TAHUN XX 2014 JURNAL HAAGA SATUAN BAHAN 8ANGUNAN, KONSTRUKSI & INTERIOR 167
IJOURNi'l.OFBUILDIN<:;CONSlRUC!lON.INTERIOR&MATERIALPRICE ~
DAFTAR UPAH KERJA PER ORANG PER HARi
Kota Medan
Provinsi Sumatera Utara
Kota Medan
Provinsi Sumatera Utara
UPAHPEMBONGKARANBANGUNAN
1 Upah bongkar atap genteng/sirap/asbes.seng m2 4.750
2 Upah bongkar lantai lama m2 12.800
3 Upah bongkar rangka atap kayu m2 20.000
4 Upah bongkar plafon + rangka m2 5.500
A BAHANBANGUNANGEDUNG
Bahan-bahan Galian, Semen
1 Batu gunung m3 158.230
2 Batu kali m3 153.720
3 Batu koral m3 168.520
4 Batu pecah 10 - 15 cm m3 225.000
5 Batu pecah 5 - 7 cm m3 228.000
6 Batu pecah 3 - 5 cm m3 232.000
7 Batu pecah 2 - 3 cm m3 240.000
8 Batu kelapa m3 168.520
9 Batu Alam m2 210.000
10 Batu templek m2 157.500
11 Batu bata cetak mesin bh 875
12 Bala ringan bh 11.000
13 Batu kerawang bh 8.170
14 Bataco bh 3.500
168 JuRNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI & INTERIOR Eotst 33 TAHUN XX 2014
----· ---·--------
~JOURNALOFBUWINGCONS1RUCTION,INTERIOR&MA1ERIALPRICE I
--
NO. NAMABAHAN SATUAN HARGASATUAN(Rp)
Eo1s133 TAHUNXX 2014 JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNsTRuKs1 & INTERIOR 169
- - - - - - - - - - - - --------------- ---------
·--- -------.·---- ---
IJOURNALOFBUIL.DING,CONS1R\JCT10N,INTERIOR&MATERW.PRICE <$>
NO. NAMABAHAN SATUAN HARGA SATUAN(Rp)
170 JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI &INTERIOR EDIS/ 33 TAHUN XX 2014
·---·-------------
·-----·---- - - - - ------- ----- ·----·----------~-··--------
~ JOURNALOFBUIL.DINGCONSTRUCTION,INTERIOR&MAlCRIALPRICE I
BAHAN-BAHAN KACA
1 Kaea 5 mm m2 120.060
2 Kaea 3 mm m2 90.000
3 Kaea 8 mm m2 250.000
4 Kaea buram /reyben5 mm m2 125.000
5 Kaea cennin 5 mm m2 160.000
6 Kaea jendela nako+rangka m2 126.000
7 Kaea blok bh 25.000
BAHAN-BAHANATAP
1 Atap asbes gelombang lbr 35.280
2 Atap zincalum gelombang 0,35 mm kaki 13.650
3 Atap super dex kaki 21.000
4 Atap plastik gelbang fiber lbr 63.000
5 Atap genteng metal 0,35 m2 86.000
6 Genteng keramik keping 15.000
7 Genteng beton warna keping 8.070
8 Rabung genteng beton keping 8.400
9 Rabung genteng metal 0,35 m' 43.050
10 Rabung zincalum 0,35 m' 21.000
11 Rabung seng lebar 30 cm lbr 23.940
12 Rabung genteng keramik keping 16.800
EDIS/ 33 TAHUN XX 2014 JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI & INTERIOR 1.71
-------··----- ---·- ------· ---------------------------------
I
JOURNALOFBUILDING,CONSlRUCTION,INTER!OR&MATER!ALPRICE <Q>
NO. I NAMABAHAN SATUAN HARGASATUAN(Rp)
BAHAN-BAHANCAT
1 Cat kilat setara bee brand kg 52.500
2 Cat perak setara bee brand kg 59.290
3 Cat tembok setara paragon kg 19.060
4 Cat tembok setara Vinilex kg 24.850
5 Cat vennie kg 53.510
.
6 Cat Manie Beal kg 45.280
7 Cat menie kayu kg 45.280
8 Cat dasar kg 48.850
9 Dempul kg 8.190
10 Filler kg 22.050
11 Plamur kg 8.080
12 Flinkote kg 35.280
13 SodaApi kg 15.000
14 Residu/Kolter ltr 7.000
172 JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI & INTERIOR EDIS/ 33 TAHUN xx 2014
--- ------·---··--------··---··------·-- --··
BAHAN-BAHAN SANITAIR
1 Bak air fiberglass bh 438.370
2 Bak cuci piring 1 lobang kemplot unit 816.900
3 FILTER Plastik m2 15.750
4 Floor Drain bh 21.180
5 lnstalasi air bersih titik 70.000
6 Klose! duduk dengan bak air bh 1.650.000
7 Klose! duduk dengan bak air setara TOTO. bh 2.500.000
8 Klose! jongkok porselin bh 167.790
9 Kloset Jongkok Setara TOTO bh 250.000
10 Kran air lokal bh 15.000
11 Kran air bebek lokal bh 40.000
12 Kran air setara San el bh 117.600
13 Kran air bebek setara San El bh 147.000
14 Kran shower bh 150.000
15 Kran bidek/cebok bh 120.000
16 Stop kran 3/4 bh 25.000
17 Septi tank kapasitas 3 M3 bh 3.832.500
18 Tern pat sabun keramik 1Ox20cm bh 38.850
19 Urinoir bh 840.000
20 Wastafel biasa bh 525.000
21 Wastafel biasa bh 1.000.000
BAHAN-BAHAN LISTRIK
1 lnstalasi titik nyala titik 108.150
2 lnstalasi stop kontak titik 108.150
3 Lampu XL 24 watt komplet set 38.000
4 Lampu XL 18 watt komplet set 32.000
5 Lampu XL 10 watt komplet set 29.000
6 Lampu TL 1X20 watt kompolek kotak set 80.000
7 Lampu TL 1X40 watt kompolek kotak set 120.000
8 Lampu TL 2X20 watt kompolek kotak set 160.000
9 Lampu TL 2X40 watt kompolek kotak set 240.000
10 Lampu pijar 5 watt + fitting set 15.000
11 Lampu pijar 10 watt + fitting set 20.000
12 Lampu pijar 20 watt + fitting set 25.000
13 Lampu pijar 40 watt + fitting set 35.000
14 Lampu pijar 100 watt + fitting set 40.000
15 Bok zekering 1group set 40.000
16 Bok zekering 2 group set 50.000
17 Saklar tunggal bh 12.500
18 Saklar double bh 16.000
19 Saklar tripel bh 19.000
20 Stop kontak tanam bh 15.000
21 Downlight lengkap bh 80.000
22 MCB2A bh 35.000
23 MCB4A bh 42.000
24 MCB6A bh 65.000
25 MCB8A bh 90.000
26 Bok zekering 1 group unit 30.000
EDIS/ 33 TAHUN xx 2014 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI &INTERIOR 173
----·------ ·-·--- -------~------ ....
I
JOURNALOFBUILDING,aJNSTRUCTION,NIERKlR&MAIERIALPRICE ~
NO. NAMABAHAN SATUAN HARGASATUAN(Rp)
BAHAN PENDUKUNG
1 Am pl as lbr 3.150
2 Ku as bh 15.750
3 Kipas angin steenlesstell lengkap bh 1.050.000
4 Hot Roll sheet ton 933.450
5 Oxygen las kg 10.500
6 Water proff kg 55.000
BAHAN-BAHAN MINYAK
1 Bensin ltr 4.500
2 Minyak pelumas/silinder ltr 40.900
3 Minyak gemuk ltr 21.100
4 Minyak solar ltr 4.500
5 Minyak tanah / lampu ltr 8.820
6 Kerosene ltr 8.820
7 Minyak bekisting kg 26.250
8 Minyak gerdang ltr 28.350
9 Minyakcat ltr 12.700
BAHAN-BAHAN RIOL
1 Rio Uk. 1/2 9150mm panjang 1m bh 25.200
2 Rio Uk. 1/2 e2oomm panjang 1m bh 47.250
3 Rio Uk. 1/2 9300mm panjang 1m bh 48.510
4 Rio Uk. 9150mm panjang 1m bh 44.100
174 JURNAL HARGA 8ATUAN BAHAN 8ANGUNAN, KONSTRUKSI & INTERIOR EDIS/ 33 TAHUN XX 2014
---···-- · - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - · · - - - , · · - - - - ----------------,·----- · · - - - - -----·---------·----
~ JOIJRNAlOFBUILOINGCONS1RUCllON,INTERIOR&MA1ERIALPRICE I
BAHAN-BAHAN PERPIPAAN
1 Pipa Porous m' 17.850
2 Pipa PVC 6 M 1/2" m' 4.480
3 Pi pa PVC 6 M 3/4" m' 5.740
4 Pipa PVC 6 M 1" m' 8.960
5 Pipa PVC 6 M 1 1/2" m' 10.500
6 Pipa PVC 6 M 2" m' 11.750
7 Pipa PVC 6 M 2.5" m' 14.000
8 Pipa PVC 6 M 3" m' 18.060
9 Pipa PVC 6 M 4" m' 25.480
10 Pipa PVC 6 M 6" m' 37.240
11 Pipa Galvanis 6 m 1/2" m' 12.700
12 Pipa Galvanis 6 m 3/4" . m• 16.800
13 Pipa Galvanis 6 m 1" m' 21.000
14 Pipa Galvanis 6 m 1 1/2" m' 31.500
15 Pipa Galvanis 6 m 2" m' 43.050
16 Pipa Galvanis 6 m 2 1/2" m' 52.500
EDIS/ 33 TAHUN xx 2014 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI &INTERIOR 175
., ' '
'
840.000
55 Coupling modifit 1 O" bh 5.768.000
56 Coupling modifit 6" bh 1.344.000
57 Coupling modifit 4". bh 1.008.000
176 .· JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI & INTERIOR EDIS/ 33 TAHUN XX 2014
-----~---- -~-----
~ JOURNALOFBUILDINGCONSJRUCTION,INTERIOR&MA1ERIALPRICE I
~:!
NO. NAMABAHAN SATUAN HARGA SATUAN(Rp)
....~
60 Bolt & nut 518x3" bh 4.000
61 Gip u /sarungan 8" m' 975.000
62 Pipa PVC untu sarungan 110mm m' 68.000
63 Pig Busa 6" bh 980.000 (I)
64 Pig Busa 4" bh
i
728.000
65 Pig Busa 3" bh 566.000
66
67
68
69
Valve Cover CL
Valve Sock 63mm
Screwed Gate Valve
Simple Joint
2"
2"
bh
bh
bh
bh
224.000
40.000
207.000
63.000
•~
~
70 Elbow 160mm bh 581.000
71 Elbow 110mm bh 205.000
72 Elbow 90mm
73 Elbow 63mm
bh
bh
124.000
58.000 c:
~
74 Cup PVC 160MM bh 191.000
75 Cup PVC 110MM bh 82.000
~
76 Cup PVC 90MM bh 34.000
77 Cup PVC 63MM bh 20.000
78 Water meter Type Helix 400 250MM bh 31.920.000
79 Double air valve 3". bh 3.926.000
HDPEPIPES
1 Pipa HOPE PE 1004 10 dia m' -
2 Pipa HOPE PE 1004 10 dia m' -
3 HOPE Spigot Tee dia 3"x3" bh -
4 HOPE Spigot Tee dia 3"x3" bh -
5 HOPE Spigot Tee dia 2"x2" bh 446.000
6 HOPE Spigot reducer dia 3"x2" bh 399.00
7 HOPE Spigot bend dia 3"x90" bh 465.000
8 HOPE Spigot bend dia 3"x90" bh 380.000
9 HOPE end cap dia 2" bh 498.000
10 HOPE end Cap dia 3" bh 498.000
11 HOPE straight coupler dia 2" bh 225.000
12 HOPE straight coupler dia 3" bh 599.000
13 Pipa HOPE Dia 112" bh 6.000
14 HOPE Clamd Sandie dia 3"x1/2" bh 36.000
15 HOPE Clamd Sandie dia 2"x1/2" bh 33.000
16 HOPE Female thread elbow aqua 20x1/2" bh 21.000
17 HOPE Male Thread elbow 20x112" bh 17.000
18 HOPE Double male thread elbow 20x1/2" bh 37.000
19 Sreewed gate valve 1/2 bh 69.000
20 Pipa PVC dia 112" bh 4.000
21 PVC FAUCET ELBOW DIA 112" bh 6.000
22 PVC Elbow dia 112" bh 2.000
23 PVC Foucet socket dia 112" bh 6.000
24 Kran air 112 bh 12.000
25 Water meter 1/2" komplt bh 196.000
Eo1s133 TAHUNXX 2014 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI & INTERIOR 177
------ ------ - - - - - - -
IJOIJRNALOFBUILDING,CONS1RUCTION,INTERIOR&MATERJl!l.PRICE.
BIAYAPEMASANGAN
1 Lobang Potong Hotmix 10" tpt 690.000
2 Lobang Potong Hotmix 6" tpt 414.000
3 Lobang Potong Hotmix 4" tpt 276.000
4 Lobang Potong Hotmix 3" tpt 207.000
5 Lobang Potong Trotoar 6" tpt 276.000
6 Lobang Potong Trotoar 4" !pl 184.000
7 Lobang Potong Trotoar 3" !pl 138.000
8 Lobang PotongTrotoar 2" !pl 92.000
9 Gal/Timb. Cross Hotmix 6" tpt 518.000
10 Gal/Timb. Cross Hotmix 4" !pt 345.000
11 Gal/Timb. Cross Hotmix . 3" !pl 259.000
12 Ga/Pot berm (Tanah) 6" tpt 449.000
13 Ga/Pot berm (Tanah) 4" tpt 299.000
14 Ga/Pot berm (Tanah) 3" tpt 225.000
15 Ga/Pot berm Holmix 6" m' 56.000
16 Ga/Pot berm Hotmix 4" m' 37.000
17 Ga/Pot berm Hotmix 3" m' 28.000
18 Ga/Pot berm Hotmix 2" m' 19.000
19 Gal/Timb. Trotoar (cor) 6" m' 49.000
20 Gal/Timb. Trotoar (cor) 4" m' 33.000
21 Gal/Timb. Trotoar (cor) 3" m' 25.000
22 Gal/Timb. Trotoar (cor) 2" m' 17.000
23 Gal/Timb. sirtu/berm 10" m' 75.000
24 Gal/Timb. sirtu/berm 6" m' 30.000
25 Gal/Timb. sirtu/berm 4" m' 45.000
26 Gal/Timb. sirtu/berm 3" m' 23.000
27 Gal/Timb. sirtu/berm 2" m' 15.000
28 -Upah Pasang Pipa 10" m' 15.000
29 Upah Pasang Pipa 8" m' 12.000
30 Upah Pasang Pipa 6" m' 9.000
31 Upah Pasang Pipa 4" m' 6.000
32 Upah Pasang Pipa 3" m' 5.000
33 Upah Pasang Pipa 2" m' 3.000
34 Upah pasang pipa steel m' 18.000
35 Upah pemotongan pipa steel m' 52.000
36 Upah Jos pipasteel m' 50.000
37 Pengelasan pipa,bend,!lange m' 216.000
38 Upah pemotongan pipa ttk 203.000
39 Upah pasang gate valve 10" bh ' 403.000
40 Upah pasang gate valve 6" bh 242.000
41 Upah pasang gate valve 4" bh 161.000
42 Upah pasang gate valve 3" bh 121.000
43 Upah pasang Collar 250mm bh 115.000
44 Upah pasang Collar 200mm bh 92.000
45 Upah pasang Collar 160mm bh 69.000
46 Upah pasang Collar 110mm bh 46.000
47 Upah pasang Collar 90mm bh -
48
49
Upah psg Coupling Modifit
Upah psg Coupling Modifit
6"
4"
bh -
bh -
178 JURNAL HARGA SATUAN BAl'!AN BANGUNAN, KONSTRUKSI &INTERIOR Eo1s1 33 TAHUN XX 2014
---------·-------._ _________________________ ______ _, ---· ---
~ JOURNALOFBUWNGCONSTRUC110N,INTERIOR&MA1ERIALPRICE I
~ NO.
,....0
NAMABAHAN SATUAN HARGASATUAN(Rp)
...~
19 Gal./Tim Trotoar 6" m' 17.000
20 Gal./Tim Trotoar 4" m' 12.000
21 Gal./Tim Trotoar 3" m' 9.000
en 22 Gal./Tim Trotoar 2" m' 6.000
c: 23
24
Gal/Timb.sirtu/berm
Gal/Timb.sirtu/berm
10"
6"
m' 12.000
E
m' 7.000
25 Gal/Timb.sirtu/berm 4" m' 5.000
26 Gal/Timb.sirtu/berm 3" m' 4.000
~
27 Gal/Timb.sirtu/berm 2" m' 3.000
~
c KOMPONEN PEMBUATAN TANGKI FILTER DAN TANGKIAERATOR
1 Plate steel T=6 MM, 4' X 8' lbr -
c: 2
3
Plate steel T=8 MM, 4' X 8'
Disc end lengkung T = 8 MM
lbr
bh 6.670.000
-
~
4 Flange steel-it 600 MM bh 3.450.000
5 Blind Flange steel 600mm bh 3.450.000
~
6 Flange gate valve e 4" bh 1.093.000
7 Flange steel e 300 mm bh 391.000
8 Bend steel-it 3" X 90 ° bh 248.000
9 Pipa steel-e 600 mm m 2.530.000
10 Pipa steel-it 3" mm T=4, 0,5 MM m 299.000
11 Profil WF.125.125.5.7 -12 big 3.910.000
12 DOUBLEAIRVALVEe3" bh 4.025.000
13 Manometer bh 403.000
14 Nozel filter bh 84.000
15 Pasir kwarsa 0.1 - 0.2 CM kg 4.000
16 Pasir kwarsa 0.2 - 0.4 CM kg 3.000
17 Batu gravel 0.5 - 1.0 cm kg 3.000
18 Batu gravel 3.5 - 5.0 cm kg 3.000
19 Ruber packing T=3mm bh 161.000
20 Bolt & Nut 5/8 x 3" bh 32.000
21 Bolt & Nut 1" x 14" bh 104.000
22 Angker bolt & Nut 3/4 x 16" steel bh 28.000
23 Tiang .wencis unit 19.550.000
24 Stabiliser type ETS - 7000 - M2 + Asesoris unit _ ____ 40.26Q.QOO
25 Air compresor 5 HP + aseoris - -·--
unit 20.700.000
180 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNsTRUKSI & INTERIOR Eo1s1 33 TAHUN XX 2014
- - - - · - - - .. - - - -
• JOURNAl_OFBUILOINGCONSTRUCTION,INTERIOR&MAlffilALPRICE I
~
22 Penyempurnaan, · pemeliharaan dan pembersihan lubang · titik 4.. 600.000
sumur,pemompaan uji(pumping test)termasuk step draw test, time draw , ,_
down test.recovery test · · . ·
23 Pembersihan lokasi,penutupan spull bak saluran air
.
titik. 1.380,000 c::
~
24 Laboratorium air titik 805.000
Eo1s133 TAHUNXX 2014 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI &INTERIOR 181
·---· ----··· ·---
~()
REKAPITULASI ANALISA HARGASATUAN PEKERJAAN
§f-A.1-+-~~~~~~~~2-'-~-'--~~~~~~--1~~~-=-3~~~~
VI PEKERJAAN PERSIAPAN 1
._ 1 1M' Pagar Sementara dari kayu tinggi 2 meter . 260.987.75
Cl) 2 1M' Pagar sementara dari seng gelombang tinggi 2 meter 245.038.42
C:: 3 1M' Pengukuran dan pemasangan bouplank 101.796.70
::Ill 4 1M2 Membersihkan lapangan dan perataan 14.375.00
~ 5 1M2 Pembuatan jalan sementara 155.630.08
.. 6 1M3 Bongkaran beton bertulang 613.323.75
:!
111
7
8
1M3 Bongkaran diding tembok bata merah
1M' Pasang pagar kawat jaring galvanis,tinggi 1.00 m
460.000.00
168.900.50.
~ B
.1
PEKERJAAN TANAH
c: 2
1M3 Galian tanah biasa sedalam 1 meter
1M3 Galian tanah biasa sedalam 2 meter
67.562.50
82.800.00
~
3 1M3 Galian tanah biasa sedalam 3 meter 98.267.50
4 1M3 Galian tanah keras sedalam 1 meter 89.930.00
~
5 1M3 Galian tanah cadas sedalam 1 meter 136.275.00
6 1M3 Galian tanah lumpur sedalam 1 meter 108.675.00
7 1M2 Pekerjaan triopping setinggi 1 meter 4.887.5
.8 1M3 Pembuangan tanah sejauh 15 meter 29.612.50
9 1M3 Urugan kembali (1/3 dari koefesiensi galian) 22.520.83
1O 1M3 Pemadatan tanah 48.875.00
11 1M3 Urugan pasir 142.089.40
12 1M3 Pasang lapisan pudel campuran 1:3:7 stabilisasi tanah 268.943.88
13 1M3 Pasanhg lapisan pudel campur 1:5 stabilisasi tanah 248.159.88
14 1M3 Lapisan ijuk tebal 1o cm untuk bidang resapan 232.623.50
15 1M3 Urug sirtu padat untuk penin ggian lantai bangunan 189.623.50
C PEKERJAAN PONDASI
1 1M3 Pasang pondasi batu belah 1PC:3PP 919.779.49
2 1M3 Pasang pondasi batu belah 1PC:4PP 862.962.30
3 1M3 Pasang pondasi batu belah 1PC:5PP 823.599.18
4 1M3 Pasang pondasi batu kosong 460.809.60
5 1M3 Pasang pondasi siklop 40% batau kali 2.175.646.82
6 1M3 Pasang pondasi sumuran diameter 100cm 889.483.03
D PEKERJAAN DINDING
1M2 Pasang bata merah tebal 1 bata, 1PC:2PP 299.495.65
2 1M2 Pasang bata merah tebal 1 bata, 1PC:3PP 284.312.72
3 1M2 Pasang bata merah tebal 1 bata, 1PC:4PP 274.532.31
4 1M2 Pasang bata merah tebal 1 bata, 1PC:3KP:1PP 248.674.37
5 1M2 Pasang bata merah tebal 1/2 bata,1 PC:2PP 145.118.27
6 1M2 Pasang bata merah tebal 1/2 bata, 1P.C:3PP 138.188.53
7 1M2 Pasang bata merah tebal 1/2 bata, 1PC:4PP 134.059.12
8 1M2 Pasang bata merah tebal 1/2 bata, 1PC:5PP 131.452.37
9 1M2 Pasang bata merah tebal 1/2 bata, 1PC:6PP 129.810.03
10 1M2 Pasang bata merah tebal 1/2 bata, 1KP:1SM:1PP 113.025.93
11 1M2 Pasang bata merah tebal 1/2 bata, 1KP:1SM:2PP 114.239.24
182 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI &INTERIOR EDIS/ 33 TAHUN XX 2014
- - - - - --------·-------- ----------·------------·----·----------- - ------·--
~ JOURNALOFBUILDINGCONSlRUCTION,INIERIOR&MAlERIALPRICE I
~Q
1 2 3
12 1M2 Pasang terawang (roster) 12x11x24 cm, 1 PC:3PP 348.060.84 :!
~....
13 1M2 Pasang terawang (roster) 12x11x24 cm, 1PC:4PP 343.727.81
E PEKERJAAN PLESTERAN
1
2
1M2 Plesteran 1PC : 1PP, tebal 15mm
1M2 Plesteran 1PC : 2PP, tebal 15mm
72.982.74
65.200.50
en
3
4
5
1M2 Plesteran 1PC : 3PP, tebal 15mm
1M2 Plesteran 1PC : 4PP, tebal 15mm
1M2 Plesteran 1PC: 5PP, tebal 15mm
61.732.07
59.448.19
58.038.09
i
~
~
6 1M2 Plesteran 1PC: 3PP, tebal 15mm 59.045.34
7 1M2 Plesteran 1PC : 8PP, tebal 15mm 55.576.05
~
8 1M2 Plesteran 1PC : 2PP, tebal 15mm 87.204.65
9 1M2 Plesteran 1PC : 3PP, tebal 15mm 69.470.08
10 1M2 Plesteran 1PC : 4PP, tebal 15mm 79.494.26
11 1M2 Plesteran 1PC : 5PP, tebal 15mm 77.654.78 c:
~
12 1M2 Berapen 1PC : 5PP, tebal 15mm 34.785.09
13 1M2 Plesteran skoning 1PC: 2PP, tebal 10mm 60.788.60
~
14 1M2 Plesteran ciprat 1 PC : 2PP 47.863.16
15 1M2 Finishing siar pasangan dinding bata merah (=20m') 28.362.56
16 1 M2 Finising siar psngn dinding conblock ekspose (=8m') 13.534.58
17 1 M2 Finishing siar pasangan batu kali adukan 1 PC : 2 PP 58.141.33
18 1M2Acian 36.255.48
F PEKERJAAN KAYU
1 1M3 Pasang kusen pintu dan jendela kayu kelas I 15.054.015.20
2 1M3 Pasang kusen pintu dan jendela kayu kelas II 12.304.635.45
3 1M2 Pasang pintu klam standar, kayu kelas II 481.031.89
4 1M2 Pasang pintu klam sederhana, kayu kelas Ill 334.528.33
5 1M2 Pasang daun pintu panel, kayu kelas I 908.882.03
6 1M2 Pasang daun pintu panel, kayu kelas II 797.661.39
7 1M2 Pasang pintu dan jendela kaca, kayu kelas I 640.319.22
8 1M2 Pasang pintu dan jendela kaca, kayu kelas II 573.586.83
9 1M2 Pasang pintu dan jendela jalusi, kayu kelas II 1.163.807.50
10 1M2 Pasang pintu jendela jalusi, kayu kelas II 985.854.47
11 1M2 Bual daun pintu kayu lapis tripleks rangkaprangka tertutup kayu kelas II 619.110.26
12 1M2 Bual pintu triplek rangkap, rangka ekspose kayu kelas I 742.491.30
13 1 M2 Bual pintu tripleks rangkap, rangka ekspose kayu kelas II 671.310.09
14 1M2 Pasang jalusi kusen kayu kelas I 992.186.42
15 1M2 Pasang Jalusi kusen, kayu kelas II 825.355.46
16 1M2 Pasang kontruksi kuda2 konvensional kayu kelas II 10.992.032.35
17 1M3 Pasang kontruksi kuda2 ekspose kayu kelas I 16.395.154.40
18 1M3 Pasang kontruksi gorden kayu kayu kelas II 10.175.601.35
19 1M2 Pasang rangka atap genteng keramik,kayu kelas II 165.407.01
20 1M2 Pasang rangka atap genteng beton kayu kelas II 193.635.97
21 1M2 Pasang rangka atap sirap, kayu kelas II 1.324.532.45
22 1M2 Pasang rangka langit2 uk. 50x100 cm, kayu kelas II 184.961.73
23 1M2 Pasang rangka langit2 uk. 50x100 cm, kayu kelas II 128.557.86
24 1M2 Pasang rangka langit2 uk. 60x60 cm, kayu kelas II 189.943.22
25 1M2 Pasang rangka langit2 uk. 60c60 cm, kayu kelas Ill 130.243.02
EDIS/ 33 TAHUN XX 2014 JURNAL HARGA 8ATUAN BAHAN 8ANGUNAN, KONSTRUKSI & INTERIOR 183
I
JOURNALOFBUILDING.CONSJRUCllON, IN1ERIOR&MA1CRIALPRICE ~
~
Q 1 2 3
...~(I)
26 1M' Pasang lisplang uk. 3x20 cm, kayu kelas I 151.619.96
27 1M' Pasang lisplang uk. 3x20 cm, kayu kelas II 121.590.39
28 1M' Pasang lisplang uk. 3x30 cm, kayu kelas I 152.657.59
29 1M' Pasang lisplang uk. 3x30 cm, kayu kelas II 122.071.91
30 1M2 Pasang rangka dinding pemisah 60x120 cm, kayu kelas II 294.118.85
31 1M2 Pasang rangka dinding pemisah 60x120 cm, kayu kelas Ill 191.566.36
i 32 1M2 Pasang dinding pemisah tripleks rangkap, rangka kayu kelas Ill 271.285.51
•~ 33
34
35
36
1M2 Pasang dinding pemisah triplek rangkap, rangka kayu kelas II
1M2 Pasang dinding lambriziring dari papan kayu kelas I
1M2 Pasang dinding lambriziring dari triplek uk. 120x140 cm
1M2 Pasang dinding bilik, rangka kayu kelas Ill
397.528.00
366.024.89
45.356.00
69.920.00
~ G
1
PEKERJAAN BETON
1M3 Membuat beton mutu fc=7.4 Mpa (K100},slump(12±2}cm,w/c=0.87 807.972.14
c: (1 PC;3,5PB:4KR}
~
2 1M3 Membuat beton mutu fc=9.8 Mpa (K125},slump(12±2}cm,w/c=0.78 852.097.50
(1 PC:3PB:3.5KR}
~
3 1M3 Membuat beton mutu fc=12.2 Mpa (K150),slump(12±2}cm,w/c=0.72 886.525.79
(1 PC:2.5PB:3.5KR}
4 1M3 Membuat lantai kerja beton mutu fc=7,4 Mpa (K100},slump (3-6}cm,w/ 736.753.25
c=0,87 (1 PC:3PB:5KR}
5 1M3 Membuat beton mutu fc=14.5 Mpa (K175}, slump (12±2}cm,w/ 927.522.62
c=O .66(1 pc:2,5PB:33KR}
6 1M3 Membuat beton mutu fc=16.9 Mpa (K200},slump (12±2}cm,w/c=0.61(1 Pc: 966.164.25
1PB:3KR}
7 1M3 Membuat beton mutu fc=19.3 Mpa (K225),slump (12±2}cm,w/c=0.58 (1 Pc 995.775.86
:PB:3KR}
8 1M3 Membuat beton mutu fc=21.7 Mpa (K250},slump (12±2}cm,w/c=0.56 (1 Pc 1.041.345.18
:2PB:2.7KR}
9 1M3 Membuat beton mutu fc=24.0 Mpa (K275},slump (12±2}cm,w/c=0.53 (1 Pc 1.046.036.03
:1.5PB:2.5KR)
10 1M3 Membuat beton mutu fc=26.4 Mpa (K300),slump (12±2)cm,w/c=0.52 (1 Pc 1.055.941.99
:1.5PB:2.5KR)
11 1M3 Membuat beton mutu fc=28.8 Mpa (K325},slump (12±2}cm,w/c=0.49 (1 Pc 1.144.178.46
:1.5PB:2KR)
12 1M3 Membuat beton mutu fc=31.2 Mpa (K350),slump (12±2)cm,w/c=0.48 (1 Pc 1.157.055.17
:1.5PB:2KR)
13 Pembesian 10kg besi polos/besi ulir 204.165.25
14 Pasang 1 Okg kabel preetressed polos/strands 199.772.25
15 Pasang 1M2 beksiting untuk pondasi 257.719.80
16 Pasang 1M2 bekisting untuk sloof 269.074.53
17 Pasang 1M2 bekisting untuk kolom 500.331.13
18 Pasang 1M2 bekisting untuk balok 523.855.27
19 Pasang 1M2 bekisting untuk plat lantai 592.331.13
20 Pasang 1m2 bekisting untuk dinding 520.750.13
21 Pasang 1 m2 bekisting untuk tangga 457.033.86
22 Pasang 1 m2 jembatan untuk pengecoran beton 155.101.04
23 Pasang 1m3 pondasi beton bertulang (150kg besi+bekisting} 5.322.624.35
24 Pasang 1 m3 sloof beton bertulang (200kg besi+bekisting} 6.685.829.87
184 JURNAL HARGA 8ATUAN BAHAN 8ANGUNAN, KONSTRUKSI &INTERIOR EDIS/ 33 TAHUN )()( 2014
-------~---
---·------------·-----· - - - - - · - - - - - - -- ·---·-------.-------··-~--- ----··-
. ~ JOURNALOFBUILDINGCONSTRUCTION,1"1fERJOR&Ml\1ERJALPRICE I
~
~
1 2 3
25 Membuat 1m3 kolom beton bertulang (300 kg besi+bekisting) 11.587.933.03
~....
26 Membuat 1m3 balok beton bertulang (200 kg besi+bekisting) 8.908.709.83
27 Membuat 1m3 plat beton bertulang (150 kg besi+bekisting) 7.990.461.51
28 Membuat 1m3 dinding beton bertulang (150 kg besi+bekisting) 7.785.433.99
29 Membuat 1m3 dinding beton bertulang (200 kg besi+bekisting) 8.158. 752.57
30 Membuat 1m' kolom praktis beton bertulang (11 x11 )cm 95.954.11
fl»
31
H
1
Membuat 1m' balok beton bertulang (1Ox15)cm
PEKERJAANPENUTUPATAP
130.982.86
54.566.35
i
~
~
1M2 Pasang roof light fiberglass (180x90)cm
2 1m2 Pasang atap asbes gelombang (1,80x0,92m)x5mm 58.092.94
3 1m' Pasang bubung stel gelombang 0,92m 42.100.35
4
5
1m2 Pasang atap genteng beton
1m2 Pasang atap genteng aspal
133.902.55
330.952.18 ~
6
7
1m2 Pasang atap genteng meteal/multi roof
1m2 Pasang atap sirap
136.390.00
122.567.00 c::
8
9
1m2 Pasang nok genteng beton
1m' Pasang nok genteng aspal
122.199.23
139.420.32 ~
~
10 1m' Pasang nok genteng metal 95.333.85
11 1m' Pasang nok sirap 112.399.11
12 1m2 Pasang atap seng gelombang 82.351.73
13 1m2 Pasang atap nok seng 50.108.49
14 1m2 Pasang atap alumunium 142.519.04
15 1m2 Pasang nok alumunium 90.032.58
16 1m2 Pasang alumunium foil/sisalation 64.917.50
Eo1s133 TAHUNXX 2014 JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KoNSTRUKSI &INTERIOR 185
I
JOURNALOFBUILDINGCONSTRUCTlON,INTERKJR&MAlCRIALPRICE ~
~l 1
H
2
PEKERJAAN PENUTUP LANTAI DAN DINDING
3
~
1 1m2 pasang lantai ubin abu-abu uk. 40x40cm 125.485.53
2 1m2 pasang lantai ubin granit uk. 40x40cm 389.356.02
.... 3
4
1m2 pasang lantai ubin granit uk. 30x30 cm 426.358.42
463.433.27
~
1m2 pasang lantai ubin teralux marmer uk. 60x60 cm
5 1m2 pasang lantai ubin teralux marmer uk. 40x40 cm 440.440.17
i
)I
6
7
8
9
1m2 pasang lantai ubin teralux marmer uk. 30x30cm
1m' pasang plint ubin granit uk. 10x 40 cm
1m' pasang plint ubin granit uk. 10x 30cm
473.316.14
78.466.83
93.434.08
152.986.83
~
1m' pasang plint ubin teralux marmer uk/ 1Ox60 cm
10 1m' pasang plint teralux marmer uk. 10x40 cm 115.341.58
11 1m' pasang pl int ubin teralux marmer uk. 1Ox30 cm 93.434.08
~ 12
13
1m2 pasang lantai keramik artistik uk. 10x20 cm
1m2 pasang lantai keramik artistik uk. 5x20 cm
125.988.54
127.857.75
c: 14
15
1m2 pasang lantai keramik uk. 30x30 cm
1m2 pasang lantai keramik uk. 20x20 cm
223.276.47
210.724.26
~ 16
17
1m2 pasang lantai mozaik uk, 30x30 cm, 1pc:3pp
1m' pasang plint keramik uk.1 Ox30 cm
342.236.84
35.002.70
~
18 1m' pasang plint keramik uk. 10x10 cm 38.032.14
19 1m' pasang pl int keramik uk. 5 x20 cm 32.231.48
20 1m2 pasang lantai granito uk. 60x60 cm 414.483.95
21 1m2 pasang lantai karpet 124.338.00
22 1m2 pasang underlayer/pelapis bawah karpet 160.994.25
23 1m2 pasang lantai parquit kayu 504.533.75
24 1m2 pasang lantai kayu (gymfloor) 377.142.50
25 1m2 pasang dinding porselin uk. 11x11 cm 287.607.53
26 1m2 pasang dinding porselin uk. 15x15 cm 284.864.78
27 1m2 pasang dinding keramik artistik uk. 1Ox20 cm 281.184.78
28 1m2 pasang dinding keramik artistik uk, 5x20 cm 303.140.35
29 1m2 pasang dinding keramik uk, 1Ox20 cm 281.184.78
30 1m2 pasang dinding keramik uk. 20x20 cm 238.202.70
31 1m2 pasang dinding marmer uk. 60x60 cm 648.564.38
32 1m2 pasang dinding bata pelapis uk. 3x7x24 cm 337.579.66
33 1m2 pasang dinding batu poros 397.400.04
34 1m2 pasang dinding batu tempel hitam 330.987.54
35 1m2 pasang lantai vinyl uk. 30x30cm 176.842.40
36 1m2 pasang wallpaper, lbr 50cm 248.480.50
37 1m2 pasang floor hardener 49.875.50
:ls 1m' pasang plint vinyl uk. 30x30 cm dengan perekat 38.249.92
39 1m' pasang pl int kayu kelas II 2cm,lbr 10 cm 51.391.51
K PEKERJAAN CAT
1 1m2 mengikis/mengerok permukaan cat tembok lama 14.087.50
2 1m2 mencuci bidang permukaan tembok yg pernah di cat 13.816.68
3 1m2 mengerok karat cat lama permukaan baja dengan cara manual 13.215.95
4 1m2 menyabun permukaan tembok lama 13.816.68
5 1m2 mendempul dan memggosok kayu 14.788.08
6 1m2 pengecatan bidang kayu lama 30.039.15
7 1m2 pengecatan bidang kayu baru 1 lps plamir, 1 lps cat dasar,21ps cat minyak 50.614.38
8 1m2 pengecatan bidang kayu baru 1 lps plamir, 1lps cat dasar, 31ps cat minyak 57.962.88
9 1m2 pelaburan kayu dengan residu 12.414.25
186 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI & INTERIOR EDIS/ 33 TAHUN XX 2014
--·- ---·----------- -··--------··--- ---- - - ·--
• JOURNALOFBUILDINGCONSTRUCTION,INTERIOR&MAlERIALPRICE I
1 2 3
10 1m2 peleburan bidang kayu dan venis 45.254.80
11 1m2 pengecatan tembok baru (1Jps plamir,1 Jps cat dasar),2Jps cat penutup) 32.904.49
12 1m2 pengecatan tembok Jama (1 Japis cat dasasr, 21ps cat penutup) 27.039.95
13 1m2 pemasangan wall pap per 133.595.50
14 1m2 pengecetan permukaan baja dengan meni besi 11.943.33
15 1m2 pengecatan permukaan baja dengan meni besi dan perancah 71.067.33
16 1m2 pengecatan permukaan baja lapis seng (gal bani) secara manual sistem 46.057.50
1 lps cat konvensional gdn tbl 200 um
17 1m2 pengecatan permukaan baja la pis seng (galbani) secara manual sistem 3 lps 212.716.77
cat convensional dgn tbl 200 um secara semprot (airless spray) dgn sistem 1 Jps
18 1m2 pengecatan permukaan baja la pis seng (gal bani) secara semprot 176.703.25
(airless spray) dgn sistem .1 Jps cat konvensional dgn tbl 200 um
L PEKERJAAN SANITASI
memasang 1 bh kloset duduk/jongkok 2.505.850.00
2 memasang 1 bh kloset jongkok porselen 502.575.88
3 memasang 1 bh urinoir 1.346.917.38
4 memasang 1 bh wastafel 987.542.38
5 memasang 1 bh bak mandi fiberglass volume 0,30m3 489.233.00
6 memasang 1 bh bak mandi batu bata volume 0,30 m3 1.245.941.50
7 memasang 1 bh bak mandi fiberglass volume 1 m3 1.558.220.56
8 memasang 1 bh bak kontrol pasangan batu bata uk, (30x30)cm tinggi 35 cm 670.562.13
9 memasang 1 bh bak kontroll pasangan batu bata uk. (45x45)cm tinggi 50 cm 640.576.45
10 memasang 1 bh bak kontrol pasangan batu bata uk, (60x60) cm tinggi 65 cm 979.928.52
11 memasang 1 m' pipa galvanis dia. 1/2" 41.888.75
12 memasang 1 m' pipa galvanis dia. 3/4" 49.197.00
13 memasang 1 m' pipa galvanis dia. 1" 56.683.50
14 memasang 1 m' pipa galvanis dia. 1 1/2" 89.061.75
15 memasang 1 m' pipa galvanis dia. 2" 109.649.63
16 memasang 1 m' pipa PVC tipe AW dia. 1/2" 18.956.60
17 memasang 1 m' pipa PVC tipe AW dia. 3/4" 21.202.55
18 memasang 1 m' pi pa PVC tipe AW dia. 1" 26.942.20
19 memasang 1 m' pipa PVC tipe AW dia. 11/2" 29.687.25
20 memasang 1 m' pipa PVC tipe AW dia. 2" 37.418.70
21 memasang 1 m' pipa PVC tipe AW dia. 2 1/2" 35.926.00
22 memasang 1 m' pipa PVC tipe AW dia. 3" 56.882.45
23 memasang 1 m' pipa PVC tipe AW dia. 4" 70.108.60
24 memasang 1 bh bak cuci pring stainles steel 980.490.00
25 memasang 1 bh bak cuci piring teraso 430.436.38
26 memasang 1 bh kran dia 3/4" atau 1/2" 31.452.50
27 memasang 1 bh floor drain 38.559.50
EDIS/ 33 TAHUN XX 2014 JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KoNSTRUKSI & INTERIOR 187
I
JOURNALOFBUILDING,CONSJRUCllON,JNTERIOR&MATERIALPRICE ~
1 2 3
9 1m' pasang kusen pintu aluminium 48.492.20
10 1m2 pasang venations blinds dan vertical blinds 289.685.00
11 1m2 pasang terali besi trip 2x3 mm 508.829.00
12 1m2 pasang kawat nyamuk 91.362.90
13 1m2 pasang jendela nako dan teralis 453.157.50
N PEKERJAAN LANGIT-LANGIT
1 1m2 pasang langit asbes semen, 5mm 37.964.95
2 1m2 pasang langit langit akustik uk. 30x30 cm 145.296.75
3 1m2 pasang langit langit a.kustik uk. 30x60 cm . 136.908.65
4 1m2 pasang langit langit akustik uk. 60x120 cm 140.852.00
5 1m2 pasang langit langit triplek uk, 120x240 cm, tbl 4 mm 52.955.49
6 1m2 pasang langit langit lambriziring kayu tbl 9 mm 293.558.03
7 1m2 pasang langit langit gibsum board 1200x2300x9 mm 54.525.53
8 1m' pasang list plapon gypsum profil 31.222.50
9 1m2 pasang langit langit akustik uk. 60x120 cm+rangka aluminium 231.151.15
10 1m' pasang list langit langit kayu profil 36.614.85
DAFTARHARGASATUANUPAH
1 2 3 4
1 Pekerja oh 75.000
2 Tukang oh 100.000
3 Mander oh 100.000
4 Operator oh 120.000
8 Mekanik oh 120.000
188 JURNAL HARGA SATUAN BAHAN 8ANGUNAN, KONSTRUKSJ &INTERIOR EDIS/ 33 TAHUN XX 2014
<Q> JOURNALOFBUILDINGOONSTRUCllON,INTERIOR&MATERIALPRICE I
DAFTAR HARGA BAHAN
I
1
1
URAIAN I JENIS BAHAN BANGUNAN
158.230
2 batu kali m3 152.230
3 katu koral m3 168.320
4 batu pecah 15/20 cm m3 225.000
5 batu pecah 5-7 cm m3 228.000
6 batu pecah 3-5 cm m3 232.000
7 batu pecah 2-3 cm m3 240.000
8 batu kelapa/belah m3 168.520
9 batu bata cetak mesin bh 875
10 batu terawang roster bh 8.170
11 batako bh 350
12 conblock tbl 6 cm mutu K-125 bh 2.000
13 conblock tbl 8 cm mutu K-175 bh 2.300
14 kirikil beton 2-3 cm m3 210.900
15 material pilihan m3 218.000
16 pasir pasang m3 106.050
17 pasir urug m3 83.380
18 semen portland (PC) kg 1.362
19 semen mortar kg 4.400
20 semen warna 40 kg zak 144.480
21 sirtu/pasir batu m3 119.700
22 tanah limbun m3 83.850
23 urugan humus m3 150.000
24 urugan porus m3 86.100
BAHANKAYU
1 gedek/tepas bambu lbr 31.500
2 gedek/kelapa sawit lbr 31.500
3 ijuk m2 31.500
4 kayu kls 1 m3 9.236.430
5 kayu kls 11 m3 6.818.590
6 kayu kls Ill m3 3.633.730
7 kayu dolken/bulat 3"-4" big 20.000
8 kayu profil (list) big 21.000
9 kayu setara dolken big 21.000
10 triplek 4 mm lbr 70.350
11 triplek 6 mm lbr 105.000
12 triplek 9 mm lbr 129.150
13 triplek sungkai 3mm lbr 100.000
14 plywood 120x240 tbl 4 mm lbr 75.800
15 plywood 120x240 !bl 6 mm lbr 103.600
16 plywood 120x240 tbl 9 mm lbr 142.800
17 plywood 120x240 tbl 12 mm lbr 188.400
18 plywood 120x240 tbl 18 mm lbr 253.700
EDIS/ 33 TAHUN XX 2014 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI & INTERIOR 189
- ---"~- ----~-------- - ----
I
JOURNALOFBUILDINGCONSlRUCTION,li'ITERIOR&MATERIALPRICE ~
1
'
URAIAN I JENIS BAHAN BANGUNAN
m2
Harga (RP)
37.000
2 besi beton polos kg 15.300
3 besi beton ulir kg 17.000.
4 besi profil kg 23.500
5 besi baja IWF kg 23.500
6 besi plat strip kg 20.000
7 frame aluminium hollow m' 55.000
8 jerjak besi m2 353.240
9 jerjak besi bermotif m2 380.000
10 jendela besi m2 353.240
11 jendela nako (rangka+kaca5 mm) m2 192.500
12 kawat licinlbronjong kg 16.940
13 kawat beton kg 23.100
14 kawat las dos -9.450
15 kawat nyamuk m2 19.600
16 kawat jaring galvanis/BRC lbr 320.000
17 kaca jendela naco+rangka m2 126.000
18 kaca block/glas block bh 25.000
19 kaca polos tbl. 3 mm m2 90.000
20 kaca polos tbl. 5 mm m2 120.000
21 kaca polos tbl. 8 mm m2 250.000
22 kaca buram/rayban tbl 5 mm m2 125.000
23 kaca cermin tbl 5 mm m2 160.000
24 kaca cermin tbl 8 mm m2 258.720
25 kaca patri m2 169.400
26 pintu gulung besi m2 525.000
27 pintu besi m2 619.500
28 pintu besi lipat harmonica m2 987.000
29 pagar besi strip m2 315.000
30 pagar BRC 120 polos m2 500.000
31 pintu KM/WC PVC set 391.650
32 pintu alluminium set 875.000
33 profil alluminium m' 28.600
34 plat baja kg .24.670
35 paku biasa kg .
18.900
36 paku ksrup kg 26.250
37 paku skrup bh 500
38 paku beton bh 105
39 paku ramset bh 3.040
40 paku seng kg 42.380
41 paku hak panjang 15 cm kg 30.530
42 rolling door aluminium m2 665.500
43 suncreen aluminium m2 600.000
44 sealant tube 39.300
45 sekrup fixer bh 1.250
46 vertical blinds m2 185.000
47 venention blinds m2 175.000
190 JURNAL HARGA SATUAN 8AHAN BANGUNAN, KONSTRUKSI & INTERIOR EDIS/ 33 TAHUN )()( 2014
-------- ----··--·--- ·--·------ - - -
~ JOURNALOFBUILDINGCONS1RUCTION,INTERIOR&MATERIALPRICE I
I
1
'
URAIAN I JENIS BAHAN BANGUNAN
m2
Harga (RP)
157.500
2 Batu palimanan m2 170.000
3 Batu marmo m2 180.000
4 Batu andhesit polos m2 220.000
5 Batu andhesit motif m2 255.000
6 Batu paras m2 210.000
7 Batu kacang lokal (1zak=40kg) zak 80.000
8 Batu kacang hitam (1zak = 20 kg) zak 120.000
9 Batu kacang warna (1 zak = 20 kg) zak 85.000
10 Batu kacang putih salju, maron (1zak=20kg) zak 165.000
11 Keramik standar 10 x 20 cm bh 1.150
12 Keramik standar 20 x 20 cm bh 2.400
13 Keramik standar 20 x 25 cm bh 3.750
14 Keramik standar 30 x 30 cm bh 6.360
15 Keramik standar 40 x 40 cm bh 12.500
16 Keramik standar 60 x 60 cm bh 50.000
17 Keramik 40 x40 cm setara granite bh 54.070
18 Keramik 60 x60 cm setara granito bh 89.600
19 Keramik 40 x40 cm setara esenza bh 67.200
20 Keramik 30 x30 cm anti slip (KM) bh 7.800
21 Granit 40 x40 cm setara indogress bh 42.500
22 Granit 60 x60 cm setara indogress bh 81.700
23 Geotextile non woven m2 52.500
24 Gebalan rumput m2 21.000
25 Keramik siku (ban ban) m' 9.890
26 Karpel wool m2 65.000
27 Karpel wool nylon m2 50.000
28 Kanstin 15 x 30 x 45 cm bh 26.250
29 Kanstin 15 x 30 x 60 cm bh 66.400
30 Lantai kayu sintetis (gym fioor) m2 210.000
31 Porselin polos 30x30 cm bh 9.450
32 Plint keramik 10 x 30 cm bh 2.120
33 Pl int keramik 10 x 40 cm bh 3.125
34 Plint keramik 10 x 60 cm bh 8.333
.
35 Plint granito 10 x 40 cm bh 18.400
36 Pl int granito 10 x 60 cm bh 22.600
37 Parquet kayu solid m2 315.500
38 Ubin PC abu abu 40 x40 m2 8.600
39 Vynil asbes 30 x30 cm bh 8.230
40 Vynil karet 30 x30 cm KL I bh 9.800
41 Vynil karet 30 x30 cm KL II bh 9.080
42 Vynil motif kembang xex DN 30 X 30 cm bh 9.440
43 Vynil wall covering lebar 50 cm m2 63.250
44 Wallpaper m' 75.000
Eotst 33 TAHUN xx 2014 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI & INTERIOR 191
- - - · ·----------·-·- - - - - -
I
.KlURNALOFBUllDING, CONSTRUCTION, INTCRIOR&MAlERIALPRICE ~
1
2
I
BAHANATAP
URAIAN I JENIS BAHAN BANGUNAN
lbr
Harga (RP)
35.280
kaki 13.650
3 Atap super dex kaki 21.000
4 Atap plastik gelbang fiber lbr 63.000
5 Atap genteng metal tbl. 0,35 mm m2 86.000
6 Atap polycarbonate m2 250.000
7 Atap ganteng aspal bh 11.320
8 Atap aluminium gelombang tbl, 0,55 lbr 98.180
9 Atap sirap bh 1.030
10 Genteng keramik kpg 15.000
11 Genteng beton warna kpg 8.070
12 Rabung gentengg metal tbl 0,35 m' 43.050
13 Rabung zincalum tbl. 0,35 m' 21.000
14 Rabung seng lbr 30 cm lbr 23.940
15 Rabung genteng keramik kpg 16.800
16 Rabung genteng beton kpg 8.400
17 Rabung alluminium standar 40 cm 18 swg 22 m2 47.890
18 Rangka atap zincalum m2 227.010
19 Rangka atap baja ringan atap seng m2 190.000
20 Rangka atap baja ringan atap genteng metal m2 220.000
21 Rangka atap baja ringan genteng keramiklbeton m2 275.000
22 Rangka atap polycarbonate m2 450.000
23 Rabung asbes pjng 0,5m lbr 11.550
24 Roof light fibreglass lbr 46.390
25 Seng gelombang 7 kaki BJLS 20 lbr 56.510
26 Seng gelombang 7 kaki BJLS 35 lbr 76.650
27 Seng plat BJLS 35 lbr 76.650
28 Talang kantong BJLS m' 152.250
29 Lisplank GRC m' 50.000
30 Lisplank gypsum m' 13.450
31 Motif/ornamen lisplank (bunga)14 x 40 cm bh 9.240
BAHAN PLAFON/LANGIT-LANGIT
1 Akustic 30 x30 cm lbr 8.540
2 Akustic 30 x60 cm lbr 17.070
3 Akustic 60 x120 cm lbr 68.290
4 Asbes kpg 17.640
5 Dempul Gypsum kg 8.700
6 Gypsum 120 x 240 tbl, 9 mm lbr 71.500
7 Gypsum 120 x 240 tbl, 6 mm lbr 62.000
8 Gypsum 120 x 240 tbl, 12 mm lbr - 93.000
9 Profil gypsum 6" m' 12.000
10 Profil gypsum 4" m' 10.000
11 Profil gypsum 3" m' 7.000
12 Profil gypsum 2" m' 5.000
13 Panel plafon akustik tbl 9 mm lbr 33.600
14 Rangka luring plafond gypsum m2 79.800
192 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI & INTERIOR EDIS/ 33 TAHUN XX 2014
---···--··---------------------------
----·--· - - - - - - · - - · - - - - - -
~ JOURNALOFBUILDINGCONSTRUcnON, INTERIOR&MATERIALPRICE I
I 1
URAIAN I JENIS BAHAN BANGUNAN
2
• 3
Harga (RP)
•
BAHAN SANITARI
1 Bak air fiberglass 0,3 m3 bh 186.000
2 Bak air fiber glass bh 438.370
3 Bak cuci piring 2 lobang komplet unit 816.900
4 Filter plastik m2 15.750
5 Floor drain bh 21.180
6 Floor hardener kg 4.090
7 lnstalasi air bersih ttk 70.000
8 Klose! duduk + bak air kwalitas biasa bh 1.650.000
9 Klose! duduk + bak air setara TOTO bh 2.500.000
10 Klose! jongkok kwalitas biasa bh 167.790
11 Klose! jongkok setara TOTO bh 250.000
12 Kran air lokal bh 15.000
13 Kran air bebek lokal bh 40.000
14 Kran air setara san ei bh 117.600
15 Kran air bebek setara SAN El bh 147.000
16 Kran shower bh 150.000
17 Pipa PVC Tipe AW 1/2" m' 4.480
18 Pipa PVC Tipe AW 3/4" m' 5.740
19 Pipa PVC Tipe AW 1" m' 8.960
20 Pipa PVC Tipe AW 11/2" m' 10.500
21 Pipa PVC Tipe AW 2" m' 11.760
22 Pipa PVC Tipe AW 21/2" m' 14.000
23 Pipa PVC Tipe AW 3" m' 18.060
24 Pipa PVC Tipe AW 4" m' 25.480
25 Pipa PVC Tipe AW 6" m' 37.240
26 Pipa galvanis 6m 1/2" m' 12.700
27 Pipa g.alvanis 6m 3/4 1" m' 16.800
28 Pipa galvanis 6m 1 1/2" m' 21.000
29 Pipa galvanis 6m 1 1/2" m' 31.500
30 Pipa galvanis 6m 2" m' 43.050
31 Pipa gal vanis 6m 2 1/2" m' 52.500
32 Pipa Porous m' 17.850
33 Riol uk, 1/2 150 mm panjang 1m bh 25.200
34 Riol uk, 1/2 200 mm panjang 1m bh 47.250
35 Riol uk, 1/2 300 mm panjang 1m bh 48.510
36 Riol uk, 150 mm panjang 1m bh 44.100
37 Riol uk, 200 mm panjang 1m bh 49.350
38 Riol uk, 300 mm panjang 1m bh 74.550
39 Riol uk, 400 mm panjang 1m bh 105.000
40 Riol uk, 500 mm panjang 1m bh 141.750
41 Riol uk, 600 mm panjang 1m bh 183.750
42 Riol uk, 800 mm panjang 1m bh 273.000
43 Riol uk, 1000 mm panjang 1m bh 498.750
44 Stop kran 3/4" bh 25.000
45 Septitank kap, 3m3 unit 3.832.500
46 Tempat sabun keramik 1Ox 20 cm bh 38.850
47 Urinoir bh 840.000
48 Wastafel biasa bh 525.000
49 Wastafel setara TOTO bh 1.000.000
EDIS/ 33 TAHUN XX 2014 JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI & INTERIOR 193
---- ----~·· --~-···- ---
I
JOURNALOFBUllDINGCONS1RUGTION,INTERIOR&MA1ERIALPRICE ~
1
'
BAHANCAT
Cat minyak
URAIAN I JENIS BAHAN BANGUNAN
2
• 3
kg
kg
Harga (RP)
'
52.500
2 Cat tembok setra paragon 19.060
3 Cat tembok setara vynilek kg 24.850
4 Cat vernish kg 56.500
5 Cat meni besi kg 35.280
6 Cat meni kayu kg 35.280
7 Cat dasar kg 38.850
8 Filler kg 22.050
9 Ku as bh 15.750
10 plamir kg 8.080
11 Residu /colter ltr 7.700
12 Soda api kg 15.000
BAHAN LISTRIK/ELECTRIKAL
-1 Bok sekering 1 group set 40.000
2 Bok sekering 2 group set 50.000
3 lnstalasi tilik nyala Ilk 108.500
4 lnstalasi stop kontak Ilk 108.500
5 Lampu XL 18 watt komplet set 32.000
6 Lampu XL 10 watt komplet set 29.000
7 Lampu XL 24 watt komplet set 38.000
8 Lampu TL 1 x 20 watt komplet set 80.000
9 Lampu TL 1 x 40 watt komplet set 120.000
10 Lampu TL 2 x 20 watt komplet set 160.000
11 Lampu TL 2 x 40 watt komplet set 240.000
12 Lampu pijar 40 watt +filing set 35.000
13 MCB2A bh 35.000
14 MCB4A bh 42.000
15 MCB6A bh 65.000
16 MCB8A bh 90.000
194 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI & INTERIOR EDIS/ 33 TAHUN )()( 2014
~ JOURNALOFBUILDINGCONSTRUC110N, INTERIOR&IW\lffilALPRICE I
I '
URAIAN I JENIS BAHAN BANGUNAN
2
• 3
Harga (RP)
Tenaga
Tukang kayu 0.200 oh 100.000 20.000
Pekerja 0.400 oh 75.000 30.000
Kepala tukang 0.020 oh 110.000 2.200
Mander 0.020 oh 100.000 2.000
Jumlah (2) 54.200
A.Jumlah (1)+(2) 15% xA 226.945.87
B. Overhead dan profit 15% x A 34.041.88
Harga satuan pekerjaan {A+B) 260.987.75
EDIS/ 33 TAHUN )()( 2014 JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI & INTERIOR 195
--- -·----------~-----'
I
JOURNALOFBUILDING,CONSTRUCTION,INTERIOR&Ml\lERIALPRICE ~
NO. JENIS PEKERJAAN KOEF SAT HARGASATRp. JumlahRp.
196 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI & INTERIOR EDIS/ 33 TAHUN )()( 2014
- ---------------~---------· ---------- - - - - - - - - - - - - - - - -
~JOURNALOFBUILDINGCONsrnucnON, 1NTER10R&MA1ERIALPR1CE I
NO. JENIS PEKERJAAN KOEF SAT HARGASATRp. JumlahRp.
Tenaga
Pekerja 1.000 oh 75.000 75.000.00
Mandor 0.050 oh 100.000 5.000.00
Jumlah (2) 80.000.00
A. Jumlah (1)+(2) 135.330.50
B. Overhead dan profit 15% x A 20.299.58
Haraa satuan pekeriaan (A+Bl 155.630.08
A06 1M3 Bongkaran beton bertulang
Tenaga
Pekerja 6.667 oh 75.000 500.025.00
Mandor 0.333 oh 100.000 33.300.00
A. Jumlah (1) 533.325.00
B.Overheaddanprofit 15%xA 79.998.75
Haraa satuan oekeriaan CA+Bl 613.323.75
A07 1M3 Bongkaran dinding tembok bata merah
Tenaga
Pekerja 5.000 oh 75.000 375.000.00
Mandor 0.250 oh 100.000 25.000.00
A. Jumlah (1) 400.000.00
B. Overhead dan profit 15% x A 60.000.00
Haraa satuan nekeriaan CA+Bl 460.000.00
A08 1M' Pasangan Pagar kawat jaring galvanis, Tinggi 1.00m
Bah an
Kawat jaring qalvanis/BRC 0.434 lbr 320.000 138.880.00
Jumlah (1) 138.880.00
Tenaga
Pekerja 0.042 oh 75.000 3.150.00
Kepala tukang 0.004 oh 110.000 440.00
Tukang 0.042 oh 100.000 4.200.00
Mandor 0.002 oh 100.000 200.00
Jumlah (2) 7.990.00
A. Jumlah C1l+l2\ 146.870.00
B. Overhead dan nrofit 15% x A 22.030.50
Haraa satuan nekeriaan IA+Bl 168.900.50
1m3 Lapisan ijuk tbl 10cm utk bidang resapan
Bahan
ljuk 6.000 m2 31.500 189.000.00
Jumlah (1) 189.000.00
Tenaga
Pekerja 0.150 oh 75.000 11.250.00
Mand or 0.015 oh 100.000 1.500.00
Jumlah (2) 12.750.00
A. Jumlah {1)+{2) 201.750.00
B. Overhead dan profit 15% x A 30.262.50
Haraa satuan Pekeriaan IA+B\ 232.012.50
1M3 Mengurug sirtu padat utk peninggian lantai bangunan
Bahan
Sirtu/Pasir batu 1.200 m3 119.700 143.640.00
Jumlah l1l 143.640.00
Tenaga
Pekerja 0.250 oh 75.000 18.750.00
Mandor 0.025 oh 100.000 2.500.00
Jumlah (2) 21.250.00
A. Jumlah 111+121 164.890.00
B. Overhead dan orofit 15% x A 24.733.50
u .......... .,..,,, .... n neke ..•.. -n 1A+ 0 ' 1-- - - - ....
EDIS/ 33 TAHUN )()( 2014 JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI &INTERIOR 197
I
JOURNALOF BUILDING, CONSTRUCTION, INTERIOR&MAlERIALPRICE ~
NO. JENIS PEKERJAAN KOEF SAT HARGASATRp. JumlahRp.
B PEKERJAAN TANAH
01 1M3 Galian tan ah biasa sedalam 1 meter
Tenaga
Pekerja 0.750 oh 75.000 56.250.00
Mander 0.025 oh 100.000 2.500.00
A. Jumlah (1) 58.750.00
B. Overhead dan orofit 15% x A 8.812.50
Harga satuan pekerjaan (A+B) 67.562.50
B02 1M3 Galian tanah biasa sedalam 2 meter
Tenaga
Pekerja 0.900 oh 75.000 67.500.00
Mander 0.0450 oh 100.000 4.500.00
A Jumlah (1) 72.000.00
B. Overhead dan profit 15%xA 10.800.00
Harga satuan pekerjaan (A+B) 82.800.00
B03 1M3 Galian tanah biasa sedalam 3 meter
Tenaga
Pekerja 0.050 oh 75.000 78.750.00
Mand or 0.0670 oh 100.000 6.700.00
A. Jumlah (1) 85.450.00
B. Overhead dan profit 15% x A 12.817.50
Harga satuan pekerjaan (A+B) 98.267.50
B04 1 M3 Galian tanah keras sedalam 1 meter
Tenaga
Pekerja 1.000 oh 75.000 75.000.00
Mander 0.032 oh 100.000 3.200.00
A. Jumlah (1) 78.200.00
B. Overhead dan profit 15% x A 11.730.00
Harga satuan pekerjaan (A+B) 89.930.00
BOS 1M3 Gali an tanah cadas sedalam 1 meter
Tenaga
Pekerja 1.500 oh 75.000 112.500.00
Mander 0.060 oh 100.000 6.000.00
A. Jumlah (1) 118.500.00
B. Overhead dan profit 15%xA 17.775.00
Harga satuan pekerjaan (A+B) 136.275.00
B06 1 M3 Galian tanah lumpur sedalam 1 meter
Tenaga
Pekerja 1.200 oh 75.000 90.000.00
Mand or 0.045 oh 100.000 4.500.00
A. Jumlah (1) 94.500.00
B. Overhead dan profit 15% x A 14.175.00
• Harga satuan pekerjaan (A+B) 108.675.00
B07 1 M2 Pekerjaan stripping setinggi 1 meter
Tenaga
Pekerja 0.050 oh 75.000 3.750.00
Mander 0.005 oh 100.000 500.00
A. Jumlah (1) 4.250.00
B. Overhead dan profit 15% xA 637.50
Harga satuan pekerjaan (A+B) 4.887.50
198 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI & INTERIOR EDIS/ 33 TAHUNXX 2014
-------------- · · - - - - - - - - - - - - - - - - - - - - - - - - - - -
~ JOURNALOFBUILDINGCONS1RUCTION, INTERIOR&MAlER/ALPRICE I
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp. Jumlah Rp.
EDIS/ 33 TAHUN XX 2014 JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI & INTERIOR 199
IJOURNALOFBUllDING;CONSlRUCTION,INTERIOR&MATERIALPRICE.
NO. JENIS PEKERJAAN KOEF SAT HARGASATRp. Jumlah Rp.
Tenaga
Pekerja 0.800 oh 75.000 60.000.00
Tukang batu - 0.400 oh 100.000 40.000.00
Kepala tukang 0.040 oh 110.000 4.400.00
Mander 0.080 nh 100.000 8.000.00
Juml•h 121 112.400.00
A. Jumlah 111+121 215.791.20
B. Overhead dan profit 15% x A 32.368.68
Harga satuan pekerjaan (A+B) 248.159.88
c PEKERJAAN PONDASI
01 1M3 Pasang Pondasi batu be Iah 1Pc : 3Pp
Bah an
Batu belah 1.200 m3 225.000.00 .270.000.00
Semen potland 202.000 kg 1.362.00 275.124.000
Pasir pasang 0.485 m3 106.050.00 51.424.25
Jumlah(1) 596.558.25
Tenaga
Pekerja 1.500 oh 75.000.00 112.500.00
Tukang batu 0.750 oh 100.000.00 75.000.00
Kepala tukang 0.075 oh 110.000.00 8.250.00
Mander 0.075 oh 100.000.00 7.500.00
Jumlah C2l 203.250.00
A. Jumlah {1)+(21 799.808.25
B. Overhead dan profit 15% x A 119.971.24
Harga satuan pekerjaan (A+B) 919.779.49
C02 1 M3 Pasang pondasi batu be Iah 1pc : 4 Pp
Bahan
Batu belah 1.200 m3 225.000.00 270.000.00
Semen portland 163.000 kg 1.362.00 222.006.00
n--'- n ~?n _, ~-- ---- -- · ''"" 1 Ar.<> nn
200 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI &INTERIOR Eo1s1 33 TAHUN XX 2014
- - - - - - - - - - - - - --·------·
---------------------·---· ------·--------------
~ JOURNALOFBUILDINGCONSlRIJCllON, lmERIOR&Ml\TERW.PRICE I
NO NO. JENIS PEKERJAAN .. KOEF SAT HARGASATRp. JumlahRp.
EDIS/ 33 TAHUN XX 2014 JURNALHARGA8ATUAN BAHAN BANGUNAN, KONSTRUKSI & INTERIOR 201
I
JOURN.AJ..OFBUllDING, CONS1RUCTION, INTERJOR&MA1ERL"LPRICE ~
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp. Jumlah Rp. .
. 0 PEKERJAAN OINOING
01 1M2 Pasang bata merah tebal 1 bata, 1 pc:2Pp
Bahan
Batu bata cetak mesin 140.000 bh 875 122.500.00
Semen portland 43.500 kg 1.362 59.247.00
Pasir oasana 0.080 m3 106.050 8.484.00
Jumlah (1) 190.231.00
Tenaga
Pekerja 0.600 oh 75.000 45.000.00
Tukang batu 0.200 oh 100.000 20.000.00
Kepala tukang 0.020 oh 110.000 2.200.00
Mandor 0.030 oh ·100.000 3.000.00
.
Jumlah 121 70.200.00
.
A. Jumlah (1 )+(2) 260.431.00
. B. Overhead dan orofit 15% x A 39.064.65
Haraa satuan nekeriaan fA+Bl 299.495.65
002 1M2 Pasang bata merah tbl 1 bata 1pc:3Pp
Bah an
Batu bata cetak mesi 140.000 bh 875 122.500.00
Semen portland 32.950 kg 1.362 44.877.90
Pasir pasana 0.091 m3 106.050 9.650.55
.
Jumlah(1) 177.028.45
Tenaga
Pekerja 0.600 oh 75.000 45.000.00
Tukang batu 0.200 oh 100.000 20.000.00
Kepala tukang 0.020 oh 110.000 2.200.00
Mandor 0.030 oh 100.000 3.000.00
Jumlah (2\ 70.200.00
A. Jumlah (1)+(2) 247.228.45
B. Overhead dan profit 15% x A 37.048.27
Harga satuan pekeriaan (A+B) 284.312.72
003 1M2 Pasang bata merah tbl 1bata,1Pc: 4 Pp
I
Bahan
Batu bata cetak mesin 140.000 bh 875 122.500.00
Semen portland 26.550 kg 1.362 36.161.10
Pasir oasana 0.093 m3 106.050 9.862.65
Jumlah (1) 168.523.75
Tenaga
Pekerja 0.600 oh 75.000 45.000.00
Tukang batu 0.200 oh 100.000 20.000.00
Kepala tukang 0.020 oh 110.000 2.200.00
Mander . 0.030 oh 100.00 3.000.00
Jumlahf2l 70.200.00
A. Jumlah (1)+(2) 238.723.75
B. Overhead dan orofit 15% x A 35.808.56
Haraa satuan oekeriaan (A+B\ 274.532.31
004 1M2 Pasang bata merah tbl 1 bata,1pc:3 Kp:10 Pp
Bahan
Batu bata cetak mesin 140.000 bh 875 122.500.00
Semen portland 10.080 kg 1.362 13.728.96
Pasir pasang 0.093 m3 106.050 9.809.63
Jumlah (1) 146.038.59
202 JURNAL HARGA SATUAN 8AHAN 8ANGUNAN, KONSTRUKSI & INTERIOR Eo1s1 33 TAHUN XX 2014
-·-- - - - - - - - - - - -
-----· ·---·----
~JOURNALOFBUllDINGCQNSffiUGTION,INTERIOR&MATERIALPRICE I
NO NO. JENISPEKERJAAN KOEF SAT HARGASATRp. Jumlah Rp.
Tenaga
Pekerja 0.600 oh 75.000 45.000.00
Tukang batu 0.200 oh 100.000 20.000.00
Kepala tukang batu 0.020 oh 110.000 2.200.00
Mander 0.030 oh 100.000 3.000.00
Jumlah (2) 70.200.00
A. Jumlah (1)+(21 216.238.59
B. Overhead dan orofit 15% x A . 32.435.79
Haraa satuan oekeriaan IA+B\ 248.674.37
DOS 1M2 Pasang bata merah tbl 112 bata, 1pc:2Pp
Bah an
Batu bata cetak mesin 70.000 bh 875 61.250.00
Semen porltland 18.950 kg 1.362 25.809.90
Pasir pasang 0.038 m3 106.050 4.029.90
Jumlah (1) 91.089.80
Tenaga
Pekerja 0.300 oh 75.000 22.500.00.
Tukang batu 0.100 oh 100.000 10.000.00
Kepala tukang 0.010 oh 110.000 1.100.00
Mandor 0.015 oh 100.000 . 1.500.00
Jumlah(2) 35.100.00
A. Jumlah (1 )+(2) 126.189.80
B.Overheaddanprofit 15%xA 18.928.47
Harga satuan pekerjaan (A+B) 145.118.27
006 1 M2 Pasang bata merah tbl 112 bata, 1pc : 3Pp
Bahan
Batu bata cetak mesin 70.000 bh 875 61.250.00
Semen portland 14.370 kg 1.362 19.571.94
Pasir pasang 0.040 m3 106.050 4.242.00
.
Jumlah (1) 85.063.94
Tenaga
Pekerja 0.300 oh 75.000 22.500.00
Tukang batu 0.100 oh 100.000 10.000.00
Kepala tukang 0.010 oh 110.000 1.100.00
Mandor 0.015 oh 100.000 1.500.00
Jumlah (2) 35.100.00
A. Jumlah 111+12\ 120.163.94
B. Overhead dan profit 15% x A 18.024.59
Harga satuan pekerjaan (A+B) 138.188.53
007 1 M2 Pasang bata merah tbl 112 bata, 1PC : 4Pp
Bahan
Batu bata cetak mesin 70.000 bh 875 61.250.00
Semen portland 11.500 kg 1.362 15.663.00
Pasir pasang 0.043 m3 106.050 4.560.15
Jumlah (1) . 81.473.15
Tenaga
Pekerja 0.300 oh 75.000 22.500.00
Tukang batu 0.100 oh 100.000 10.000.00
Kepala tukang 0.010 oh 110.000 1.100.00
Mandor 0.015 oh 100.000 1.500.00
Jumlah (2) 35.100.00
Eo1s1 33 TAHUN XX 2014 JURNAL HARGA SATUAN BAHAN 8ANGUNAN, KONSTRUKSI &INTERIOR 203
•
--- ··---·-----
IJOLIRNALOFBUlllllNGCONSlRUCTION,INTERJOR&Ml\lERIAl..PRICE ~
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp. JumlahRp.
204 JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI & INTERIOR EDIS/ 33 TAHUN )()( 2014
--------------- -·------·---
~ JOURNALOFBUILDINGCONSffiUCTJON,INTERIOR&MATERIALPRICE I
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp. JumlahRp.
011 1M2 Pasang bata merah !bl 1/2 bata, 1Kp : 1 Sm : 2Pp
Bahan
Batu bata cetak mesin 70.000 bh 875 61.250.00
Semen porltland 0.014 m3 1.362 19.07
Pasir pasang 0.028 m3 106.050 2.969.40
Jumlah (1) 64.238.47
Tenaga
Pekerja 0.300 oh 75.000 22.500.00
Tukang batu 0.100 oh 100.000 10.000.00
Kepala tukang 0.010 oh 110.000 1.100.00
, Mandor 0.015 oh 100.000 1.500.00
Jumlah(2) 35.100.00
A. Jumlah 111+121 99.338.47
D 1..1 .. - ........ fit 1~0/_ .... 4 1• ann 77
EDIS/ 33 TAHUN XX 2014 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNsTRUKs1 &INTERIOR 205
-------- ----~-· ·---~---.------ ----- __________ - ,, ----·- - --------·----·-----
E PEKERJAAN PLESTERAN
01 1M2 Plesteran 1 Pc : 1 Pp, tbl 15 mm
Bah an
Semen porltland 15.504 kg 1.362.00 21.116.45
Pasir oasana 0.016 m2 106.050.00 1.696.80
Jumlah (1) 22.813.25
Tenaga
Pekerja 0.300 oh 75.000.00 22.500.00
Tukang batu 0.150 oh 100.000.00 15.000.00
Kepala tukang 0.015 oh 110.000.00 1.650.000
Mand or 0.015 oh 100.000.00 1.500.00
Jumlah(2) 40.650.00 .
A. Jumlah (1)+(2) 63.463.25
B. Overhead dan orofit 15% x A 9.519.49
·-. Har!:la satuan pekeriaan (A+B) 72.982.74
E02 1M2Plesteran1 Pc: 2 Pp, tbl 15 mm
Bahan
Semen portland 10.224 kg 1.362.00 13.925.09
Pasir oasana 0.020 m3 106.050.00 2.121.00
Jumlah C1l 16.046.09
Tenaga
Pekerja 0.300 oh 75.000.00 22.500.00
Tukang batu 0.150 oh 100.000.00 15.000.00
Kepala tukang 0.015 oh 110.000.00 1.650.00
Mandor 0.015 oh 100.000.00 1.500.00
Jumlah (2) 40.650.00
A. Jumlah (1)+(2) 56.696.09
B. Overhead dan orofit 15% x A 8.504.41
Harga satuan pekerjaan (A+B) 65.200.50
E03 1M2 Plesteran 1 Pc: 3 Pp, tbl 15 mm
Bahan
Semen portland 7.776 kg 1.362.00 10.590.91
Pasir oasana 0.023 m3 106.050.00 2.439.15
Jumlah (1) 13.030.06
Tenaga
Pekerja 0.300 oh 75.000.00 22.500.00
Tukang batu 0.150 oh 100.000.00 15.000.00
Kepala tukang 0.015 oh 110.000.00 1.650.00
Mand or 0.015 oh 100.000.00 1.500.00
Jumlah 121 40.650.00
A. Jumlah (1)+(2) 53.680.06
B. Overhead dan profit 15% x A 8.052 .. 01
Harga satuan pekerjaan (A+B) 61.732.07
E04 1 M2 Plesteran 1 Pc : 4 Pp, tbl 15 mm
Bahan
Semen portland 6.240 kg 1.362.00 8.498.88
Pasir· pasang 0.024 m3 106.050.00 2.545.20
Jumlah (1) .
11.044.08
Tenaga ·
Peke~a 0.300 oh 75.000.00 22.500.00
Tukang batu 0.150 oh 100.000.00 15.000.00
Kepala tukang 0.015 oh 110.000.00 1.650.00
Mander 0.015 oh 100.000.00 1.500.00
Jumlah (2) 40.650.00
206 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI & INTERIOR Eo1s1 33 TAHUN xx 2014
- - - - - - · - - - - - - - - - - - - - - -- - - - - - - - - - - - - - . --
~ JOURNALOFBUILDINGCONSTRUCllON, INTERIOR&MA1ERIALPRICE I
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp. Jumlah Rp.
Eo1s133 TAHUNXX 2014 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI & INTERIOR 207
-----··· .~--·----------------------
I
JOURNALOFBUILDINC> CONSlRUCTION, INlERIOR&MAlERIALPRICE ~
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp. Jumlah Rp.
Tenaga
Pekerja 0.400 oh 75.000.00 30.000.00
Tukang batu 0.200 oh 100.000.00 20.000.00
Kepala tukang 0.020 oh 110.000.00 2.200.00
Mander 0.022 oh 100.000.00 2.200.00
Jumlah (2) 54.400.00
A. Jumlah (1)+(2) 75.830.13
B. Overhead dan profit 15% x A 11.374.52
Harga satuan pekerjaan (A+B) 87.204.65
E08 1M2 Plesteran 1 Pc: 3 Pp, tbl 20 mm
Bahan
Semen portland 10.368 kg 1.362.00 14.121.22
Pasir pasang 0.031 m2 106.050.00 3.287.55
Jumlah 11l 17.408.77
Tenaga
Pekerja 0.260 oh 75.000.00 19.500.00
Tukang batu 0.200 oh 100.000.00 20.000.00
Kepala tukang 0.020 oh 110.000.00 2.200.00
Mander O.Q13 oh 100.000.00 1.300.00
Jumlah (2) 43.000.00
A. Jumlah (1)+(2) 60.408.77
B. nvorhead dan ornfit 15% x A 9.061.31
Harna s•tuan oekeriaan CA+Bl 69.470.08
E09 1 M2 Plesteran 1 Pc : 4 Pp, tbl 20 mm
Bahan
Semen portland 8.320 kg 1.362.00 11.331.84
Pasir pasang 0.032 m3 106.050.00 3.393.60
Jumlah 11) 14.725.44
Tenaga
Pekerja 0.400 oh 75.000.00 30.000.00
Tukang batu 0.200 oh 100.000.00 20.000.00
Kepala tukang 0.020 oh 110.000.00 2.200.00
Mander 0.022 oh 100.000.00 2.200.00
Jumlah (2) 54.400.00
A. Jumlah (1)+(2) 69.125.11
c nv,::i,r...... ad ... ,,, ... .........rrt 15°1.. x A •n OQD DO
Haraa satuan neker;aan IA+Bl 79.494.26
E10 1M2 Plesteran 1 Pc: 5 Pp, tbl 20 mm
Bah an
Semen portland 6.912 kg 1.362.00 9.414.14
Pasir oasana 0.035 m3 106.050.00 3.711.75
Jumlah r11 13.125.89
Tenaga
Pekerja 0.400 oh 75.000.00 30.000.00
Tukang batu 0.200 oh 100.000.00 20.000.00
Kepala tukang 0.020 oh 110.000.00 2.200.00
Mand or 0.022 oh 100.000.00 2.200.00
Jumlah (2) 54.400.00
A. Jumlah (1)+121 67.525.89
B. Overhead dan profit 15% x A 10.128.88
Harga satuan pekerjaan (A+B) 77.654.78
208 JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI & INTERIOR EDIS/ 33 TAHUN XX 2014
~ JOURNALOFBUILDINGCONSlRUCTION,INTERIOR&MATERIALPRICE I
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp. JumlahRp.
Eorsr 33 TAHUN xx 2014 JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI &INTERIOR 209
--------------,
--- ----------·---- --- -----
I
JOURNl'LOFBUILDING, CONSlRUCTION, INTERIOR&MA1ERIALPRICE ~
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp. JumlahRp.
-
A. Jumlah 11 l+/2) 24.663.10
B. nuorhooA Aon n•nfit 15% x A ~.RQQ 46
E17 1M2Acian
Bahan
Semen oortland 3.250 ka 1.362.00 4.426.50
Jumlah (1) 4.426.50
Tenaga
Pekerja 0.200 oh 75.000.00 15.000.00
Tukang batu 0.100 oh 100.000.00 10.000.00
Kepala tukang 0.010 oh 110.000.00 1.100.00
Mander - 0.010 oh 100.000.00 1.000.00
Jumlah 121 27.100.00
A. Jumlah 11\+121 31.526.50
B. Overhead dan profit 15% x A 4.728.98
Harga satuan pekerjaan (A+B) 36.255.48
210 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI &INTERIOR EDIS/ 33 TAHUN XX 2014
----------------
··----------- - - - --------·--------- ---
~JOURNALOFBUILDINGCONSlRUCllON, INTERIOR&MATERIALPRICE I
F PEKERJAAN KAYU
01 1M3 Pasang kusen pintu dan jendela kayu kls 1
Bah an
Balok (kayu kls 1) 1.100 m3 9.236.430.00 10.160.073.00
Paku biasa 1.250 kg 18.900.00 23.625.00
Lem kayu 1.000 kg 15.750.00 15.750.00
. Jumlah (1) 10.199.448.00
Tenaga
Pekerja 7.000 oh 75.000.00 525.000.00
Tukang kayu 21.000 oh 100.000.00 2.100.000.00
Kepala tukang 2.100 oh 110.000.00 231.000.00
Mandor 0.350 oh 100.000.00 35.000.00
Jumlah (2) 2.891.000.00
A. Jumlah 111+12\ 13.090.448.00
R -• ..i-- nrnfi+ 1Jii.O/A v A 1 ao~.567. ?n
Bahan
Papan {kayu kls Ill) 0.040 m3 3.633. 730.00 145.349.20
Paku biasa 0.050 kg 18.900.00 945.00
Jumlah (1) 146.294.20
Eorsr 33 TAHUN XX 2014 JURNAL HARGA SATUAN BAHAN 8ANGUNAN, KoNSTRUKSI &INTERIOR 211
------- -------- ------- ------·---- - - - - -
I
JOURNALOFBUILDINC'\CONSlRUGTION,INIERIOR&MATERll'J..PRICE ~·
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp. JumlahRp.
Tenaga
Pekerja 0.350 oh 75.000.00 26.250.00
Tukang kayu 1.050 oh 100.000.00 105.000.00
Kepala tukang 0.105 oh 110.000.00 11.550.00
Mandor 0.018 oh 100.000.00 1.800.00
Jumlah 121 144.600.00
A. Jumlah 111+121 290.894.20
B. Overhead dan profit 15% x A ' 43.634.13
Harga satuan pekerjaan (A+B) 334.528.33
F05 1 M2 Pasang daun pintu panel, kayu kls I
Bah an
Papan (kayu kls I) 0.040 m3 9.236.430.00 369.457.20
Lem kavu 0.500 ka 15.750.00 7.875.00
Jumlah (1) 377.332.20
Tenaga
Pekerja 1.000 oh 75.000.00 75.000.00
Tukang kayu 3.000 oh 100.000.00 300.000.00
Kepala tukang 0.300 oh 110.000.00 33.000.00
Mandor 0.050 oh 100.000.00 5.000.00
Jumlah (2) 413.000.00
A. Jumlah (1)+(2) 790.332.20
B. Overhead dan orofit 15% x A 118.549.83
Harga satuan pekerjaan {A+B) 908.882,03
FOG 1M2 Pasang daun pintu panel, kayu kls II
Bahan
Papan {kayu kls II) 0.040 m3 6.818.590.00 272.743.60
Lem kavu 0.500 ka 15.750.00 7.875.00
Jumlah (1) 280.618.60
Tenaga
Pekerja 1.000 oh 75.000.00 75.000.00
Tukang kayu 3.000 oh 100.000.00 300.000.00
Kepala tukang 0.300 oh 110.000.00 33.000.00
Mandor 0.050 oh 100.000.00 5.000.00
Jumlah 121 412.000.00
A. Jumlah 111+121 693.618.60
B. Overhead dan orofit 15% x A 104.042.79
Haraa satuan pekeriaan (A+Bl 797.661.39
F07 1 M2 Pasang pintu dan jendela kaca, kayu kls I
Bah an
Papan (kayu kls I) 0.024 m3 9.236.430.00 221.674.32
Lem kayu 0.300 kg 15.750.00 4.725.00
Jumlah (1) 226.399.32
Tenaga
Pekerja 0.800 oh 75.000.00 60.000.00
Tukang kayu 2.400 oh 100.000.00 240.000.00
Kepala tukang 0.240 oh 110.000.00 26.400.00
Mandor 0.040 oh 100.000.00 4.000.00
Jumlah 121 ~~•.400.0R
212 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI & INTERIOR EDIS/ 33 TAHUN XX 2014
...... - - -----·· · · · - - - - - - - - -··--·-------- .--'
~ JOURNALOFBUILDINGCONSTRUCTION,INTERIOR&MAlERIALPRJCE I
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp. JumlahRp.
Eo1s133 TAHUNXX 2014 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI &INTERIOR 213
------·---------------·------- ----- -----,
- - ------ - --- ----
IJOURNALOFBUILDIN<;\CONSTRUGflON,INlERIOR&MATERIALPRICE ~
214 JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KoNSTRUKSI & INTERIOR EDIS/ 33 TAHUN )()( 2014
---·· -,-------~-------------- ----,,-·-------~
~ JOURNALOFBUILDINGCONS1RUCTION,INTERIOR&MATERIALPRICE I
NO NO. JENISPEKERJAAN KOEF SAT HARGASATRp. Jumlah Rp.
Tenaga
Pekerja 0.670 oh 75.000.00 50.250.00
Tukang kayu 2.000 oh 100.000.00 200.000.00
Kepala tukang 0.200 oh 110.000.00 22.000.00
Mandor 0.335 oh 100.000.00 33.500.00
Jumlah 12\ 305.750.00
A. Jumlah (1)+(2) 717.700.40
B. Overhead dan profit 15% x A 107.655.06
Harga satuan pekerjaan (A+B) 825.355.46
F16 1M3 Pasang kontruksi kuda2 konvensional bentang Gm" kayu Ids II
Bahan .
Eotst33 TAHUNXX 2014 JuRNAL HARGA SAruAN BAHAN BANGUNAN, KoNsTRuKs1 & INTERIOR 215
1·JOURNALOFBUILDING,CONSTRL/CllON, INIERIOR&MAlERIALPRICE.
216 JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI &INTERIOR EDIS/ 33 TAHUN )()( 2014
--------------- ----- ----- --- ---------·-----·-- -------··-------'
~ JOURNALOFBUILDINGCONSTRUCTION,INTERIOR&MATERIALPRICE I
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp. JumlahRp.
EDIS/ 33 TAHUN XX 2014 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKs1 & INTERIOR 217
------------
----·--- - - - -------·-·-------
I
JOURNALOFBUILDING,CONSTRUGTION, INTERIOR&MAlERJALPRICE ~
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp. Jumlah Rp.
218 JURNAL HARGA 8ATUAN BAHAN 8ANGUNAN, KoNSTRUKSI & INTERIOR EDIS/ 33 TAHUN XX 2014
~
JOURNAl..OFBUllDINGCONSTRUGTION,INTERIOR&MAlERIALPRICE I
-
·-· --- --
Dr ..i-- 1 ll!.0/
u---- __.. ___ I ---&:4.
•A+D'
"' A
F32 1M2 Pasang dinding pemisah triple ks rangkap, rangka kayu Ids Ill
Bah an
Balok kayu kls 111 0.028 m3 3.633.730.00 101.744.44
Paku biasa 0.150 kg 18.900.00 2.835.00
Tripleks !bl 4mm 0.860 lbr 70.350.00 60.501.00
Lem kayu 0.560 kg 15.750.00 .8.820.00
Jumlah 111 173.900.44
Tenaga
Pekerja 0.150 oh 75.000.0 11.250.00
Tukang kayu 0.450 oh 100.000.00 45.000.00
Kepala tukang 0.045 oh 110.000.00 4.950.00
Mandor 0.008 oh 100.000.00 800.00
Jumlah (2) 62.000.00
A. Jumlah 11\+12\ 235.900.44
B.Overheaddanorofit 15%xA 35.385.07
Haraa satuan oekeriaan IA+BI 271.285.51
F33 1M2 Pasang dinding pemisah triplek rangkap, rangka kayu kls Ill
Bah an
Balok (kayu kls II) 0.028 m3 6.818.590.00 190.920.52
Paku biasa 0.150 kg 18.900.00 2.835.00
Triplek tbl 4mm 0.860 lbr
,__ 70.350.00 60.501.00
I om ''°"" n ""° .. ,,. -,c::r. ()(\ o nMnn
Jumlah 111 263.076.52
Tenaga
Pekerja 0.200 oh 75.000.00 15.000.00
Tukang kayu 0.600 oh 100.000.00 60.000.00
Kepala tukang 0.060 oh 110.000.00 6.600.00
Mandor 0.010 oh 100.000.00 1.000.00
Jumlah 121 82.600.00
-
A 11\+l•'U. -.. •r r.~r. .,_,..
EDIS/ 33 TAHUN xx 2014 JURNAL HARGA8ATUAN BAHAN BANGUNAN, KoNSTRUKSI & INTERIOR 219
---- --- ------~
Tenaga
Pekerja 0.600 oh 75.000.00 45.000.00
Tukang kayu 1.800 oh 100.000.00 180.000.00
Kepala tukang 0.180 oh 110.000.00 19.800.00
Mander 0.030 oh 100.000.00 3.000.00
Jumlah 12\ 247.800.00
A. Jumlah (1)+(2) 318.282.51
B. Overhead dan profit 15% x A 47.742.38
Haraa satuan nekeriaan IA+BI 366.024.89
F35 1M2 Pasang dinding lambrizing dari triplek uk, 120x140 cm
Bah an
triplek tbl 4 mm 0.400 lbr 70.350.00 28.140.00
Paku biasa 0.050 k~ 18.900.00 945.00
Jumlah (1) 29.085.00
Tenaga
Pekerja 0.025 oh 75.000.00 1.875.00
Tukang kayu 0.075 oh 100.000.00 7.500.00
Kepala tukang 0.008 oh 110.000.00 880.00
Mander 0.001 oh 100.000.00 100.00
Jumlah 121 10.355.00
A. Jumlah 111+121 39.440.00
B. Overhead dan profit 15% x A 5.916.00
Haraa satuan nekeriaan IA+BI 43.356.00
F36 1M2 Pasang dinding bilik,rangka kayu kls Ill
Bah an
Tepas bambu 1.500 lbr 31.500.00 47.250.00
Kayu kls Ill 0.014 m3 3.633.730.00 50.872.22
Paku 0.012 kg 18.900.00 226.80
List kavu 2./4 lkavu kls 1111 0.003 m3 3.633.730.00 10.901.19
111 A7
Tenaga
Pekerja 0.100 oh 75.000.00 7.500.00
Tukang kayu 0.050 oh 100.000.00 5.000.00
Kepala tukang 0.005 oh 110.000.00 550.00
Mander 0.005 oh 100.000.00 500.00
Jumlah 12) 13.550.00
A. Jumlah 11 l+l2l 60.800.00
B. Overhead dan orofit 15% x A 9.120.00
Harga satuan pekerjaan (A+B) 69.920.00
G PEKERJAAN BETON
01 1M3 Membuat beton mutu fc=7.4 Mpa (K 100),slump
(12±2)cm,w/c=0.87
Bahan
Semen portland 247.000 kg 1.362 336.414.00
Pasir beton 869.000 kg 71.14 62.689.66
...
Kerikil beton 999.000
~1~ nn' ...
kg 140.74
1 17
140.599.26
~ . . <<
220 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI &INTERIOR Eo1s1 33 TAHUN XX 2014
-------------------·-·--,
---- --------------------------------- -- ----------- --- - -----------
~
.Kll.JRNALOFBUILDINGCONSTRUCllON,Ji'<TERIOR&MAlERIALPRICE I
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp JumlahRp.
et nv............ -..1 ..1 ... n nrnfit 1'" 0L" " "n.c:. ~a7 t::.'7
--- __ .. ""'
~c• cc
Tenaga
Pekerja 1.650 oh 75.000 123.750.00
Tukang batu 0.275 oh 100.000 27.500.00
Kepala tukang 0.028 oh 110.000 3.080.00
Mander 0.083 oh 100.000 8.300.00
•• <7•
EDIS/ 33 TAHUN xx 2014 JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI & INTERIOR 221
IJOURNALOFBUILDING.CONSTRUCTION,INTERIOR&MAlffiJALPRICE.
Jumlahl1l 677.512.83
Tenaga
Pekerja 1.650 oh 75.000 123.750.00
Tukang batu 0.275 oh 100.000 27.500.00
Kepala tukang 0.028 oh 110.000 3.080.00
Mandor 0.083 oh 100.000 8.300.00
Jumlah (2) 162.630.00
A. Jumlah (1)+(2) 840.412.83
B. Overhead dan orofit 15% x A 126.021.42
Harga satuan pekerjaan (A+B) 966.164.25
G07 1M3 Membuat lantai kerja beton mutu fc=19.3 Mpa (K
225),slump (12±2)cm,w/c='0.58 (1PC:2PB:3KR)
Bahan
Semen portland 371.000 kg 1.362 505.302.00
Pasir beton 698.000 kg 72.14 50.353.72
Kerikil beton 1047.000 kg 140.74 147.354.78
Air ?1fi nno ltr 1.17 2n1 .5~
. . . 11 I 7no •~•.n~
Tenaga
Pekerja 1.650 oh 75.000 123.750.00
Tukang batu 0.275 oh 100.000 27.500.00
Kepala tukang 0.028 oh 110.000 3.080.00
Mandor 0.083 oh 100.000 8.300.00
Jumlah (2) 162.630.00
A. Jumlah (1)+(2) 865.892.05
B. Overhead dan nrofit 15% x A 129.883.81
Harga satuan pekerjaan (A+B) 995.775.86
222 JURNAL HARGA SATUAN BAHAN 8ANGUNAN, KoNSTRUKSI &INTERIOR Eo1s133 TAHuNXX2014
-·-~---------- .. - - - - - - - - - · - -
~ JOURNALOFBUILDINGCONSTRUCTION,INTERIOR&MATERIALPRICE I
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp. JumlahRp.
Eo1s133 TAHUNXX 2014 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI & INTERIOR 223
- - - - - - - · ·-------····-- -----
Jumlahm 799.284.93
Tenaga
Pekerja 2.100 oh 75.000 157.500.00
Tukang batu 0.350 oh 100.000 35.000.00
Kepala tukang 0.035 oh 110.000 3.850.00
Mander 0.105 oh 100.000 10.500.00
Jumlah (2) 206.850.00
A. Jumlah (1)+(2) 1.006.134.93
B. Overhead dan orofit 15% x A 150.920.24
Harga satuan pekerjaan (A+B) 1.157.055.17
G13 Pembesian 10 kg besi polos/besi ulir
Bah an
Besi beton (polos/ulir) 10.500 kg 15.300 160.650.00
kawat beton 0.150 kg 23.100 3.465.00
Jumlahl1\ 164.115.00
Tenaga
Pekerja 0.070 oh 7_5.000 5.250.00
Tukang batu 0.070 oh 100.000 7.000.00
Kepala tukang 0.007 oh 110.000 770.00
Mand or 0.004 oh 100.000 400.00
Jumlah 121 13.420.00
A. Jumlah (1)+12) 177.535.00
B. Overhead dan profit 15% x A 26.630.25
Haraa satuan oekeriaan IA+Bl 204.165.25
224 JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI & INTERIOR EDIS/ 33 TAHUN XX 2014
-----------------------·------------
--- --- ··--· ---······-·-----
<$>
JOURNALOFBUILDINGCONSTRUCTION,INTERIOR&MAlERIALPRICE I
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp. Jumlah Rp.
Tenaga
Pekerja 0.050 oh 75.000 3.750.00
Tukang besi 0.050 oh 100.000 5.000.00
Kepala tukang 0.005 oh 110.000 550.00
Mandor 0.003 oh 100.000 300.00
Jumlah (2) 9.600.00
A. Jumlah 111+121 173.715.00
B. Overhead dan orofit 15% x A 26.057.00
Haraa satuan pekeriaan CA+Bl 199.772.25
G15 Pasang 1 m2 bekisting untuk pondasi
Bahan
Kayu kls Ill 0.040 m3 3.633.730 145.349.20
Paku biasa 0.300 kg 18.900 5.670.00
Minvak bekistina 0.100 kn 26.250 2.625.00
Jumlah 111 153.644.20
Tenaga
Pekerja 0.520 oh 75.000 39.000.00
Tukang kayu 0.260 oh 100.000 26.000.00
Kepala tukang 0.026 oh 110.000 2.860.00
Mandor
.
'"'
0.026 oh 100.000
...
2.600.00
~- ""
.
A. Jumlah 111+121
• ...;i _ _ -M-.r.~
257.719.83
.. i:;: ,....,
Eq1s133 TAHUNXX 2014 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKs1 & INTERIOR 225
\'
----- --- ----
.
Kepala tukang 0.033
n noo
oh
oh
110.000
100.000
3.630.00
0 ftftft ftft
523.855.27
ftftft ""
""
Jumlah (2) 89.430.00
A. Jumlah 111+121 452.825.20
B. Overhead dan nrofit 15% x A 67.923.93
Harga satuan pekerjaan (A+B) 520.750.13
226 JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI &INTERIOR EDIS/ 33 TAHUNxX2014
-----------·
--·-·----------------------------- ------- ·--- - - - · - - -...- - - - - - · - - - · - - - - - - '
~
JOURNALOFBUILDINGCONSlRUCTION,INTERJOR&Ml\lERIALPRICE I
NO NO. JENIS PEKERJAAN
~
Kepala tukang. 0.033 oh 110.000 3.630.00
Mandor 0.033 oh 100.000 3.300.00
.
Jumlah 121 89.430.00
A. Jumlah (11+(21
R 11:i:OL v A
397.420.75
~
Haraa satuan oekerlaan IA+BI
G22 Pasang 1m2 jembatan untuk pengecaran beton
457.033.86
c:
Bahan
Kayu kls lll(papan)
Paku biasa
0.026 m3
kg
3.633.730 95.930.47 i!
~
0.600 18.900 11.340.00
Kayu dolken.bulat 3"-4" 0.500 btg 20.000 10.000.00
.
Jumlah l1l 117.270.47
Tenaga
Pekerja 0.150 oh 75.000 11.250.00
Tukang kayu 0.050 oh 100.000 5.000.00
Kepala tukang 0.005 oh 110.000 550.00
Mandor 0.008 oh 100.000 800.00
Jumlah 121 17.600.00
A. Jumlah (1}+(2) 134.870.47
Dr ...................,• .... ot..YA
u ••_. ~·'"""
. fA+D\ "'i:.c -1n1 nA
EDIS/33 TAHUNXX 2014 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNsTRUKs1 & INTERIOR 227
- - - - - ----.-------- ------ - ------ ---~---------~
228 JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI & INTERIOR EDIS! 33 TAHUN XX 2014
------- -----·------
~
JOURNALOFBUILDINGCONSlRUCTION, INTERIOR&MATERIALPRICE I
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp. JumlahRp.
Tenaga
Pekerja 6.350 oh 75.000 476.250.00
Tukang batu 0.275 oh 100.000 27.500.00
Tukang kayu 1.650 oh 100.000 165.000.00
Tukang besi 1.400 oh 100.000 140.000.00
Kepala lukang 0.333 oh 110.000 36.630.00
Mander 0.318 oh 100.000 31.800.00
Jumlah 12\ 877.'80.00
A. Jumlah 111+121 7.746.704.20
"'r ..,..,._ ---~"' "I cO/~ y .4 ••
Haraa satuan nekerlaan IA+Bl 8.908.709.83
G27 Membuat 1m3 plat beton bertulang (150kg besi+bekisting)
Bahan
Kayu kls Ill 0.320 m3 3.633.730 1.162.793.60
Paku biasa 3.200 kg 18.900 60.480.00
Minyak bekisting 1.600 kg 26.250 42.000.00
Besi beton polos 157.500 kg 15.300 2.409.750.00
Kawai belon 2.250 kg 23.100 51.975.00
Semen portland 336.000 kg 1.362 457.632.00
Pasir belon 0.540 m3 106.050 57.267.00
Kerikil belon 2-3 cm 0.810 m3 210.900 170.829.00
Kayu kls II (BALOK) 0.120 m3 6.818.590 818.230.80
Triplek 9mm 2.800 lbr 129.150 361.620.00
Kavu dolken.bulot 3"-4" 32.000 bin 20.000 640.000.00
h·- 1 - ' - 11\ Q ...... ~ ..........
Tenaga
Pekerja 5.300 oh 75.000 397.500.00
Tukang balu 0.275 oh 100.000 27.500.00
Tukang kayu 1.300 oh 100.000 130.000.00
Tukang besi 1.050 oh 100.000 105.000.00
Kepala lukang 0.265 oh 110.000 29.150.00
Mander 0.265 oh 100.000 26.500.00
Jumlah 121 715.650.0
.4 l11ml!1h 11\+I?\ it.948 "'"'7 .....
B. Overhead dan nrofit 15% x A 1.042.234.11
Haraa satuan nekeriaan IA+Bl 7 .990.461.51
G28 Pasang 1m3 dinding beton bertulang (150kg besi+bekisting)
Bah an
Kayu kls Ill - 0.240 m3 3.633.730 872.095.20
Paku biasa 3.200 kg 18.900 60.480.00
Minyak bekisting 1.600 kg 26.250 42.000.00
Besi beton polos 157.500 kg 15.300 2.409.750.00
kawal beton 2.250 kg 23.100 51.975.00
Semen portland 336.000 kg 1.362 457.632.00
Pasir beton 0.540 m3 106.050 57.267.00
Kerikil belon 2-3 cm 0.810 m3 210.900 170.829.00
Kayu kls II (BALOK) 0.160 m3 6.818.590 1.090.974.40
Triplek 9 mm 2.800 lbr 129.150 361.620.00
Kayu dolken/bulat 3"-4" 24.000 big 20.000 480.000.00
Jumlah l1l 6.054.622.60
Tenaga
Pekerja 5.300 oh 75.000 397.500.00
Tukang balu 0.275 oh 100.000 27.500.00
Tukang kayu 1.300 oh 100.000 130.000.00
Tukang besi 1.050 oh 100.000 105.000.00
Kepala tukang 0.262 oh 110.000 28.820.00
Mandnr 0 oac oh 1 oo.oon 26 5"0.00
Jumlah 121 715.320.00
A. Jumlah 111+121 6. 769.942.60
B. Overhead dan nrofit 15% x A 1.015.491.39
Haraa satuan nekerl•an IA+B\ 7.785.433.99
EDIS/ 33 TAHUN XX 2014 JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KoNSTRUKSI _& INTERIOR 229
IJOURNALOFBUILDINC>CONSTRUCTION,INTERIOR&MAlERIALPRICE ~
230 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI &INTERIOR EDIS/ 33 TAHUN xx 2014
~----·------------------
·------------·--------·--- --------------
~ JOURNALOFBUILDINGCONSlRUCTION,INTERIOR&MATERIALPRICE I
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp. JumlahRp.
Tenaga
Pekerja 0.297 oh 75.000 22.275.00
Tukang batu 0.033 oh 100.000 3.300.00
Tukang kayu 0.033 oh 100.000 3.300.00
Tukang besi 0.033 oh 100.000 3.300.00
Kepala tukang 0.010 oh 110.000 1.100.00
Mandor 0.015 oh 100.000 1.500.00
Jumlah 121 34.775.00
A. Jumlah (1)+{2) 113.898.14
B. Overhead dan profit 15% x A 17.084.72
Harga satuan pekerjaan (A+B) ..
130.982.86
H PEKERJAAN PENUlUPATAP
01 1M2 Pasang roof light fiberglass (180x90)cm
Bahan
Roof light fiberglass 0.600 lbr 46.390 27.834.00
Paku biasa 1/2 - 1 0.050 kg 18.900 945.00
Jumlah (1) 28.779.00
Tenaga
Pekerja 0.140 oh 75.000 10.500.00
Tukang kayu 0.067 oh 100.000 6.700.00
Kepala tukang 0.007 oh 110.000 770.00
Mandor 0.007 oh 100.000 • 700.00
Jumlah (2) 18.680.00
A. Jumlah (1)+(2) 47.449.00
B. Overhead dan profit 15% x A 7.117.35
Harga satuan pekerjaan (A+B) 54.566.35
H02 1M2 Pasang atap asbes gelombang
Bahan
Atap asbes gelombang 0.750 lbr 35.280 26.460.00
Paku sena 0.120 ka 42.380 5.085.60
Jumlah 111 31.545.60
.
Tenaga
Pekerja· 0.140 oh 75.000 10.500.00
Tukang kayu 0.070 oh 100.000 7.000.00
Kepala tukang 0.007 oh 110.000 770.00
Mandor 0.007 oh 100.000 700.00
Jumlah (2) 18.970.00
A. Jumlah (1l+l2l 50.515.00
.
B.Overheaddanorofit 15%xA 7.577.34
Harga satuan oekerjaan (A+B) 58.092.94
H03 1M2 Pasang nok as bes
Bahan
Nok asbes 1.20 lbr 11.550 • 13.860.00
Paku seng 0.050 bh 42.380 2.119.00
Jumlah (1) . 15.979.00
Tenaga
Pekerja 0.084 oh 75.000 6.300.00
Tukang kayu 0.125 oh 100.000 12.500.00
Kepala tukang 0.013 oh 110.000 1.430.00
M"" .. dor n on4 oh 100.000 4nn nn ·
.
Jumlah 121 .. .
20.630.00
.
. · A. Jumlah 111+121 36.609.00
B. Overhead dan orofit 15% x A 5.491.35
Harga satuan pekerjaan (A+B) 42.100.35
Eo1s133 TAHUNXX 2014 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNsTRuKs1 & INTERIOR 231
-------,
IJOURNALOFBUILDING,CONSTRUCTlON,INTERJOR&MATERIALPRICE ~
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp JumlahRp.
H04 1M2 Pasang atap genteng beton
Bah an
Atap genteng beton 11.00 bh 8.070 88.770.00
c.,,i,, a..; ..... ,.. ?"-fi" nM 10 ann nn
Jumlah (1)
"" ~R7
89.337.00
Tenaga
Pekerja 0.200 oh 75.000 15.000.00
Tukang kayu 0.100 oh 100.000 10.000.00
Kepala tukang 0.010 oh 110.000 1.100.00
Mandor 0.010 oh 100.000 1.000.00
•
D
Jumlah 121
111+'~'
: ..a. .... ....,..,:;.. 1 ~Of_ v 6.
...
27.100.00
.
A. Jumlah 111+121
1 r1..,,.,. .,. ..,.r.t 1 J::O/_ v A
Harga satuan pekerjaan (A+B)
106.580.00
1~ ao7 nn
122.567.00
232 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKs1 & INTERIOR EDIS/ 33 TAHUN XX 2014
------~-------------- --- --·----
• JOURNALOFBUILDINGCONSlRUCTKJN,INTERIOR&MAlERIALPRICE I
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp Jumlah Rp.
HOS 1M2 Pasang nok genteng beton
Bah an
Nok Atap genteng beton 3.50 bh 8.400 29.400.00
Paku biasa 2"-5" 0.050 kg 18.900 945.00
Semen pc 10.800 kg 1.362 14.709.60
pasir pasang 0.032 m3 106.050 3.393.60
Semen warna 1.000 kg 3.612 3.612.00
Jumlah (1) 52.060.20
Tenaga
Pekerja 0.400 oh 75.000 30.000.00
Tukang kayu 0.200 oh 100.000 20.000.00
Kepala tukang 0.020 oh 110.000 2.200.00
Mandor 0.020 oh 100.000 2.000.00
Jumlah (2) 54.200.00
.
A. Jumlah 11l+l2l 106.260.20
B. Overhead dan orofit 15% x A 15.939.03
Haraa satuan nekeriaan IA+Bl 122.199.23
H09 1M2 Pasang nok genteng aspal
Bahan
Genteng Aspal 2.00 bh 29.350 58.700.00
Paku biasa 1/2" -1" 0.050 kg 18.900 945.00
Kayu papan kls II 0.0035 m3 6.818.590 23.865.07
Jumlah 111 . 83.510.07
Tenaga
Pekerja 0.125 oh 15.000 9.375.00
Tukang kayu 0.250 oh 100.00 25.000.00
Kepala tukang 0.025 oh 110.000 2.750.00
Mandor 0.006 oh 100.000 600.00
Jumlah 121 37.725.00
A. Jumlah (1)+(2) 121.235.07
B. Overhead dan profit 15% x A 18.185.26
+
H11 1M2 Pasang nok genteng metal
Bah an
nok genteng metal 1.10 bh 41.140 45.254.00
f:},..(,~· 1..: ......... 1/?"-1" n n~n kn < o,9nn n<c on
6.
Jumlah 121
_h·-'-'"' '"\+t~\ .......
<h.700.00
EDIS/ 33 TAHUN XX 2014 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI & INTERIOR 233
I
JOURNALOFBUILDIN<:> CONSTRUCllON, INTERIOR&MATERIALPRICE <$>
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp JumlahRp.
Jumlah 121 37.725.00
A. Jumlah (1)+(2) 97.738.36
B. Overhead dan orofit 15% x A 14.660.75
Hara a satuan ·oekeriaan IA+BI 112.399.11
H12 1M2 Pasang atap seng gelombang
Bahan
Seng gelombang 3"x6" BJLS 35 0.700 lbr 76.650 53.655.00
c ••• """" fl f\A fl kn 42.380 .1 """'~ ,.,....
Jumlah 111 55.350.20
Tenaga
Pekerja 0.120 oh 75.000 9.000.00
Tukang kayu 0.060 oh 100.000 6.000.00
Kepala tukang 0.006 oh 110.000 660.00
Mander 0.006 oh 100.000 600.00
234 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI &INTERIOR EDIS/ 33 TAHUN )()( 2014
<$>
JOURNALOFBUILDINGCONSTRUCTION,INTERIOR&MATERIALPRICE I
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp JumlahRp.
A. Jumlah (1)+(2) 78.600.00
B. Overhead dan Drofil 15% x A 11.743.38
' Harna satuan nekeriaan tA+B\ 90.032.58
H16 1 M2 Pasang aluminium foil
Bahan .,
u---- __...__
B. Overhead dan orofit 15% x A
n tA+D\
'
42.885.00
<:t?R.7R" nn
EDIS/ 33 TAHUN )()( 2014 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI &INTERIOR 235
IJOURW>J..OFBUllDING,CONSTRUCTION,lr-m:RJOR&MATERIALPRICE ~
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp JumlahRp.
104 1 Buah pasang kunci silinder
Bahan
Kunci silinder 1.000 bh 36.000 36.000.00
"
Jumlah 11) 36.000.00
Tenaga
Pekerja 0.005 oh 75.000 375.00
Tukang kayu 0.500 oh 100.000 50.000.00
Kepala tukang 0.005 oh 110.000 550.00
Mander 0.00025 oh 100.000 25.00
Jumlah 12\ 50.950.00
A. Jumlah 111+121 86.950.00
B. Overhead dan orofit 15% x A 13.052.50
"··-· __,..__ .
"+'"
_.AAA •A
236 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSJ & INTERIOR EDISI 33 TAHUN xx 2014
----- - ---·---·- ··-- ------------- -
<$> JOURNALOFBUILDINGCONSTRUCTION,INTERIOR&MAlERIALPRICE I
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp JumlahRp.
108 1 Buah pasang kait angin
Bahan
Kait angin 1.000 bh 19.120 19.120.00
Jumlah (1) 19.120.00
Tenaga
Pekerja 0.015 oh 75.000 1.125.00
Tukang kayu 0.150 oh 100.000 15.000.00
Kepala tukang 0.015 oh 110.000 1.650.00
Mandor .
0.00075 oh 100.000 75.00
Jumlah 121 17.850.00
A. Jumlah (1)+(21 36.970.00
B. Overhead dan profit 15% x A 5.545.50
Harga satuan pekerjaan (A+B) 42.515.50
109 1 Buah pasang door closer
Bahan
Door closer 1.000 bh 210.000 210.000.00
Jumlah (1) 210.000.00
Tenaga
Pekerja 0.050 oh 75.000 3.750.00
Tukang kayu 0.500 oh 100.000 50.000.00
Kepala Tukang 0.050 oh 110.000 5.500.00
Mandor 0.0025 oh 100.000 250.00
Jumlah (2) . 59.500.00
A. Jumlah (1)+(2) 269.500.00
B. Overhead dan orofit 15% x A 40.425.00
Haroa satuan nekeriaan !A+BI 309.925.00
110 1 Buah pasang kunci selot
Bah an
Kunci selot 1.000 bh 27.230 27.230.00
Jumlah (1) 27.230.00
Tenaga
Pekerja 0.020 oh 75.000 1.500.00
Tukang kayu 0.200 oh 100.000 20.000.00
Kepala Tukang 0.020 oh 110.000 2.200.00
Mandor 0.001 oh 100.000 100.00
Jumlah (2) 23.800.00
A. Jumlah (1)+(2) 51.030.00
B. Overhead dan profit 15% x A 7.654.50
Haraa satuan oekeriaan IA+Bl 58.684.50
111 1 Buah pasang pegangan pintu/door holder
Bahan
Pegangan pintu/door holder 1.000 bh 105.000 105.000.00
Jumlah {1) 105.000.00
Tenaga
Pekerja 0.050 oh 75.000 3.750.00
Tukang kayu 0.500 oh 100.000 50.000.00
Kepala Tukang 0.050 oh 110.000 5.500.00
Mandor 0.0025 oh 100.000 250.00
Jumlah (2) 59.500.00
A. Jumlah (1)+{2) 164.500.00
0 ..1-- ---or.a 1J;;OJ' ~A
......... _.......
Haraa satuan oekeriaan CA+BI 189.175.00
Eo1s133 TAHUNXX 2014 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI & INTERIOR 237
------- ----------...,
------------- --- ..
IJOURNi'LOFBUILDING,CONSTRUCllON,INTERKJR&MATERIM.PRICE ~
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp Jumlah Rp ..
112 1 Buah pasang door stop
Bahan
Door stoo 1.000 bh 38.120 38.120.00
Jumlah (1) 38.120.00
Tenaga
Pekerja 0.010 oh 75.000 750.00
Tukang kayu 0.100 oh 100.000 10.000.00
Kepala tukang 0.010 oh 110.000 1.100.00
.
'
A. Jumlah f11+f21
.. '"' .
o.nnn~ oh 1nn.ooo
.. en nn
""" ""
50.020.00
B. Overhead dan profit 15% x A 7.503.00
Harga satuan pekerjaan (A+B) 57.523.00
113 1 Buah pasang rel pintu dorong
Bah an
Rel ointu dorong 1.000 bh 160.330 160.330.00
Jumlah 111 160.330.00
Tenaga
Pekerja 0.060 oh 75.000 4.500.00
Tukang kayu 0.600 oh 100.000 . 60.000.00
Kepala Tukang 0.060 oh 110.000 6.600.00
Mander 0.003 oh 100.000 300.00
Jumlah 121 71.400.00
.
238 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI & INTERIOR EDIS/ 33 TAHUN XX 2014
~JOURNAl..OFBUILDINGCONSTRUCTION,INlERIOR&MAlERIALPRICE I
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp. Jumlah Rp.
116 1 m2 pasang kaca, tbl 5mm
Bah an
Kaea oolos !bl. 5mm 1.100 bh 120.000 132.000.00
Jumlah (1) 132.000.00
Tenaga
Pekerja 0.0155 oh 75.000 1.162.50
Tukang kayu 0.1550 oh 100.000 15.500.00
Kepala tukang 0.0155 oh 110.000 1.705.00
Mander 0.00075 oh 100.000 75.00
Jumlah (2) 18.442.50
A. Jumlah 111+121 150.442.50
B. Overhead dan profit 15% x A 22.566.38
Haraa satuan oekeriaan IA+Bl . 173.008.88
117 1m2 pasang kaca, !bl 8mm
Bah an
Kaea nolos !bl 8mm 1.100 m2 258.720 284.592.00
Jumlah 111 284.592.00
Tenaga
Pekerja 0.0165 oh 75.000 1.237.50
Tukang kayu 0.165 oh 100.000 16.500.00
Kepala Tukang 0.0165 oh 110.000 1.815.00
Mander 0.0008 oh 100.000 80.00
Jumlah (2) 19.632.50
A. Jumlah 11l+C2l 304.224.50
B. Overhead dan profit 15% x A 45.633.68
Har'""" ..........,." . tA+<2' 349.858.18
118 1 m2 pasang kaca buram, tbl 5 mm
Bahan
Kaea buram/rayban tbl 5mm 1.100 m2 125.000 137.500.00
Sealant 0.050 ka 39.330 1.966.50
Jumlah (1) 139.466.50
Tenaga
Pekerja 0.0155 oh 75.000 1.162.50
Tukang kayu 0.1550 oh 100.000 15.500.00
Kepala Tukang 0.0155 oh 110.000 1.705.00
Mander .
0.00075 oh 100.000 75.00
Jumlah (2) 18.442.50
A. Jumlah 111+121 157.909.00
B. Overhead dan orofit 15% x A 23.686.35
Haraa satuan pekeriaan IA+Bl 181.595.35
119 1m2 pasang kaca cermin, !bl 5mm
Bahan
Kaea aolos !bl 3mm .
1.100 m2 160.000 176.000.00
Jumlah (1) 176.000.00
Tenaga
Pekerja 0.0155 oh 75.000 1.162.50
Tukang kayu 0.1550 oh 100.000 15.500.00
Kepala Tukang 0.0155 oh 110.000 1.705.00
Mander 0.00075 oh 100.000 75.00
Jumlah (2) 18.442.50
A. Jumlah (1)+(2) 194.442.50
B. Overhead dan profit 15% x A 29.166.38
Harga satuan pekerjaan (A+B) 223.608.88
EDIS/ 33 TAHUN )()( 2014 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI &INTERIOR 239
... --------- ---- ··---·-----
I
JOURNAf.OFBUllDING, CONSlRUCTlON,INTERJOR&IW\TERIALPRICE <Q>
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp JumlahRp.
120 1 m2 pasang kaca cermin, tbl 8mm
Bahan
Kaea cermin tbl 8mm 1.100 m2 258.720 284.592.00
Jumlah (1) 284.592.00
Tenaga
Pekerja 0.0165 oh 75.000 1.237.50
Tukang kayu 0.165 oh 100.000 16.500.00
Kepala tukang . 0.0165 oh 110.000 1.815.00
Mander 0.0008 oh 100.000 80.00
Jumlah 121 19.632.50
• .................. _
.. ..
.
• -• -• {1\+l'I\
. ..
B. , ~-~<:+ 1"0/. v A ~ ~"
. .
Harna sa•uan oekeriaan IA+Bl "4Q.•• .1A 0
240 JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI &INTERIOR EDIS/ 33 TAHUN )()( 2014
---------~
~ JOURNALOFBUILDINGCONS1RUCTION,INTERKJR&MATERIALPRICE I
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp. Jumlah Rp.
J PEKERJAAN PENUTUP LANTAI DAN DINDING
01 1m2 Pasang lantai ubin PC.abu-abu uk, 40 x 40 cm
· Bahan
Ubin PC abu·abu 6.630 bh 8.600 57.018.00
Semen portland 9.800 kg 1.362 13.347.60
Pasir pasano 0.0450 m3 106.050 4.772.25
Jumlah 11l 75.137.85
Tenaga
Pekerja 0.250 oh 75.000 18.750.00
Tukang kayu 0.125 oh 100.000 12.500.00
Kepala tukang 0.013 oh 110.000 1.430.00
.Mandor 0.0130 oh 100.000 1.300.00
Jumlah f2l 33.980.00
A. Jumlah 111+12\ 109.117.85
B. Overhead dan profit 15% x A 16.367.68
Haraa satuan nekeriaan IA+Bl 125.485.53
J02 1m2 pasang lantai ubin granit uk, 40 x 40 cm
Bah an
Granite 40 x 40 6.630 bh 42.500 281.775.00
Semen portland 9.800 kg 1.362 13.347.60
Pasir pasang 0.0450 m3 106.050 4.772.25
Semen wama 40kg 1.300 kg 3.612 4.695.60
Jumlah 11) 304.590.45
Tenaga
Pekerja 0.250 oh 75.000 18.750.00
Tukang kayu 0.125 oh 100.000 12.500.00
Kepala Tukang 0.013 oh 110.000 1.430.00
Mandor 0.0130 oh 100.000 1.300.00
Jumlah 12) 33.980.00
A. Jumlah (1)+(2) 338.570.45
B. Overhead dan profit 15%xA .
50.785.57
. Haraa satuan nekeriaan IA+Bl 389.356.02
J03 1 m2 pasang LANTAI UBIN GRAN IT UK. 30 x 30 cm
Bahan
Granite 30 x 30 11.870 bh 26.260 311.706.20
Semen portland 10.000 kg 1.362 13.620.00
Pasir pasang 0.04500 m3 106.050 4.772.25
Semen warna 1.500 kg 3.612 5.418.00
Jumlah (1l 335.516.45
Tenaga
Pekerja 0.260 oh 75.000 19.500.00
Tukang kayu 0.130 oh 100.000 13.000.00
Kepala Tukang 0.013 oh 110.000 1.430.00
Mandor ' 0.0130 oh 100.000 1.300.00
Jumlah 12l 35.230.00
A. Jumlah (1)+{2) 370.746.45
B. Overhead dan profit 15% xA 55.611.97
Haraa satuan nekeriaan IA+B\ 426.358.42
EDIS/ 33 TAHUN xx 2014 JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI & INTERIOR 241
· · - - · · - - - - - - - - · - - - - - ·-·-· ---·
I
JOURNALOF BUILDING, CONSTRUCTION, INTERIOR&MA1ERIALPRICE ~
Bah an
~....
Teraluk marmer 60 x 60 3.100 bh 112.000 347.200.00
Semen portland 9.600 kg 1.362 13.075.20
Pasir pasang 0.045 m3 106.050 4.772.25
Semen warna 1.500 ka 3.612 5.418.00
Jumlah (1) 370.465.45
fl) Tenaga
•~
Tukang batu 0.120 oh 100.000 12.000.00
Kepala tukang 0.012 oh 110.000 1.320.00
Mander 0.012 oh 100.000 1.200.00
Jumlah (2) 32.520.00
A. Jumlah 111+121 402.985.45
~ Teraluk marmer 40 x 40
Semen portland
6.630
9.800
bh
kg
49.200
1.362
326.196.00
13.347.60
~ Pasir pasang
Semen warna
0.0450
1.300
m3
kg
106.050
3.612
4.772.25
4.695.60
Jumlah (1) 349.011.45
Tenaga
Pekerja 0.250 oh 75.000 18.750.00
Tukang batu 0.125 oh 100.000 12.500.00
Kepala Tukang 0.013 oh 110.000 1.430.00
Mander 0.0130 oh 100.000 1.300.00
Jumlah (2) 33.980.00
A. Jumlah 111+121 382.991.45
B. Overhead dan nrofit 15% x A 57.448.72
Haraa satuan nekeriaan IA+BI 440.440.17
JOG 1 m2 pasang lantai ubin teralux marmer uk, 30 x 30 cm
Bah an
Teraluk marmer 30 x 30 11.870 bh 27.700 352.539.00
Semen portland 10.000 kg 1.362 13.620.00
Pasir pasang 0.0450 m3 106.050 4.772.25
Semen warna 1.500 kg 3.612 5.418.00
Jumlah (1) 376.349.25
Tenaga
Pekerja 0.260 oh 75.000 19.500.00
Tukang batu 0.130 oh 100.000 13.000.00
Kepala Tukang 0.013 oh 110.000 1.430.00
Mander 0.0130 oh 100.000 1.300.00
Jumlah (2) 35.230.00
A. Jumlah 111+121 411.579.25
B. Overhead dan nrofit 15% x A 61.736.89
Harga satuan pekerjaan {A+B) 473.316.14
J42 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI &INTERIOR EDIS/ 33 TAHUN )()( 2014
--·-· ---
----·-···--··--"-------- - · - - - - - - - - - - - - - - ------
~
• I
JOURNALOFBUli'.olNGCONS1Rf110N,INTERl,OR&MAlERIAl,PRICE I
I
NO NO. JENIS PEKERJAAN KOEF I SAT HA~GASATRp Jumlah Rp.
'
J07 1m2 Pasang plint ubin granit uk. 10 x 40 cm '
I
I
!
Bahan
i '
Pl int granite 1O x 40 cm 2.650 bh 18.400 48.160.00
Semen portland 1.140 kg 1.362 1.5?2.68
Pasir pasang 0.003 m3 106.050 318.15
c- ............................... n 1nn; kn I 3.612 -:ia~ ?n
I
Jumlah 111 '
50.992.03
Tenaga
Pekerja 0.0901 oh 75.000 6.750.00
Tukang batu 0.090 oh 100.000 9.000.00
Kepala tukang 0.009 oh 110.000 990.00
Mander 0.005 oh 100.000 500.00
Jumlah (2) .
17.240.00
A. Jumlah (1)+(2) 68.232.03
B. Overhead dan orofit 15% x A 10.234.80
Harga satuan pekeriaan (A+B) 78.466.83
JOB 1m2 pasang plint ubin granlt uk, 10 x30 cm
Bahan
Plint granite 1O x 30 cm 3.530 bh 17.500 61.775.00
Semen! portland 1.140 kg 1.362 1.552.68
Pasir pasang 0.003 m3 106.050 318.15
Semen warna 0.100 kq 3.612 361.20
Jumlah (1) 64.007.03
Tenaga
Pekerja 0.090 oh 75.000 6.750.00
Tukang batu 0.090 oh 100.000 9.000.00
Kepala Tukang 0.009 oh 110.000 990.00
Mander 0.005 oh 100.000 500.00
Jumlah 121 17.240.00
A. Jumlah 111+12! 81.247.03
B. Overhead dan orofit 15% x A 12.187.05
Haraa satuan oekeriaan {A+Bl 93.434.08
J09 1 m2 pasang plint ubin teralux marmer uk. 10x60cm
Bahan
Plint Teraluk marmer 30 x 60 1.700 bh 66.800 113.560.00
Semen portland 1.140 kg 1.362 1.552.68
Pasir pasang · 0.003 m3 106.050 318.15
Semen warna 0.100 ka 3.612 361.20
Jumlah (1) 115.792.03
Tenaga
Pekerja 0.090 oh 75.000 6.750.00
Tukang batu 0.090 oh 100.000 9.000.00
Kepala Tukang 0.009 oh 110.000 990.00
Mander 0.005 oh 100.000 500.00
Jumlah (2) 17.240.00
A. Jumlah (1)+(2) 133.032.03
B. Overhead dan profit 15% x A 19.954.80
Harga satuan pekerjaan (A+B) 152.986.83
EDIS/ 33 TAHUN XX 2014 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSJ & INTERIOR 243
---------------- ------------ --- - ------- ------------- -----
IJOURNALOFBUILDl~CONSTRUCTION,11'11ERJOR&MATERIALPRICE <$>
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp JumlahRp.
J10 1m2 Pasang plint ubin teralux manner uk, 10 x 40 cm
Bahan
Plint teralux marmer 10x40cm 2.650 bh 30.500 80.825.00
Semen portland 1.140 kg 1.362 1.552.68
Pasir pasang 0.003 m3 106.050 318.15
Semen warna 0.100 ko 3.612 361.20
Jumlah (1l 83.057.03
Tenaga
Pekerja 0.090 oh 75.000 6.750.00
Tukang batu 0.090 oh 100.000 9.000.00
Kepala tukang 0.009 oh 110.000 990.00
. n nn• nn •nn nnn cnnnn
.
u---- --···-- 'A+<»
J12 1 m2 pasang lantai keramik artistik uk. 10x20cm
.......... " ft.ft
Bah an
keramik artistik 1O x 20 53.000 bh 1.850 98.050.00
Semen portland 8.190 kg 1.362 11.154.78
Pasir pasang 0.045 m3 106.050 4.772.25
Semen warna 2;750 ka 3.612 9.933.00
•umlah 11l .1.d..7" ... ~ ..
Tenaga
Pekerja 0.700 oh 75.000 52.500.00
Tukang batu 0.350 oh 100.000 35.000.00
Kepala Tukang 0.035 oh 110.000 3.850.00
Mander 0.0350 oh 100.000 3.500.00
Jumlah 121 94.850.00
A m+
B. Overhead dan profit 15% x A 16.433.29
Haraa satuan oekeriaan IA+Bl 125.988.54
J13 1 m2 pasang lantai keramik artistik uk. 5x20cm
Bahan
keramik artistik 1O x 20 106.000 bh 1.100 116.600.00
Semen portland 8.190 kg 1.362 11.154.78
Pasir pasang 0.045 m3 106.050 4.772.25
Semen warna
... 3.200 ka 3.612 11.558.40
.. -
Tenaga '
244 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI &INTERIOR EDIS/ 33 TAHUN )()( 2014
----------------------·---·----
- _,
~ JOURNALOFBUILDINGCONSTRUCTION,IN"IERIOR&Mt\TERIALPRICE I
.
EDIS/ 33 TAHUN )()( 2014 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI &INTERIOR 245
----- ----'- ---·~-----
IJOURNALOFBUILDING,CONSTRUCllON,INTERJOR&MAlERIALPRICE ~
246 JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI &INTERIOR EDIS/ 33 TAHUN XX 2014
-----,------· .. ---
~
JOURNALOFBUILDINGCONSlRUCTION,INIERIOR&Ml\TERIALPRJCE I
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp JumlahRp.
J21 1 m2 pasanglantai karpet
Bah an
karpet wool 1.050 m3 65.000 68.250.00
lem 0.350 kg 21.000 7.350.00
Jumlah (1) 75.600.00
Tenaga
Pekerja 0.170 oh 75.000 12.750.00
Tukang batu 0.170 oh 100.000 17.000.00
Kepala Tukang 0.017 oh 110.000 1.870.00
Mander 0.009 oh 100.000 900.00
Jumlah (2) 32.520.00
A. Jumlah 111+121 108.120.00
B. Overhead dan orofit 15% x A 16.218.00
Uo•n• ~••uon ll>+A\ 1~A "J"JD ftft
Eo1s133 TAHUNXX 2014 JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI &INTERIOR 247
I
JOURNALOFBUllDING,CONSlRUCTION,MERIOR&MAlERW.PRICE ~
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp Jumlah Rp.
J25 1 m2 pasang DINDING PORSELIN UK. 11 x 11 CM
Bahan
Porcelin 11 x 11 86.000 bh 1.100 94.600.00
Semen portland 9.300 kg 1.362 12.666.60
Pasir pasang 0.018 m3 106.050 1.908.90
Semen warna 1.500 kg 3.612 5.418.00
Jumlah f1I 114.593.50
Tenaga
Pekerja 1.000 oh 75.000 75.000.00
Tukang batu 0.500 oh 100.000 50.000.00
Kepala Tukang 0.050 oh 110.000 5.500.00
Mander 0.050 oh 100.000 5.000.00
Jumlah (21 135.500.00
A. Jumlah 111+121 250.093.50
B. Overhead d~n -·-fit 1••'- x A 37.514.03
Haraa satuan pekerjaan fA+B) 287.607.53
J26 1 m' pasang dlnding porselin uk. 15 x 15 cm
Bah an
Porcelin 15 x15 45.000 bh 2.250 101.250.00
Semen port land 9.300 kg 1.362 12.666.60
Pasir pasang 0.018 m3 106.050 1.908.90
Semen warna 2.750 kg 3.612 9.933.00
'
Jumlah (1) 125.758.50
Tenaga
Pekerja 0.900 oh 75.000 67.500.00
Tukang batu 0.450 oh 100.000 45.000.00
Kepala Tukang 0.045 oh 110.000 4.950.00
Mander 0.045 oh 100.000 4.500.00
Jumlah (2) 121.950.00
A. Jumlah (1)+(2) 247.708.50
B. Overhead dan orofit 15% x A 37.156.28
Harga satuan pekerjaan (A+B) 284.864.78
J27 1 m2 pasang dinding keramik artistik uk. ,10 x20 cm
Bah an
Porcelin 1O x 20 53.000 bh 1.850 98.050.00
Semen portland 9.300 kg 1.362 12.666.60
Pasir pasang 0.018 m3 106.050 1.908.90
Semen warna 2.750 kg 3.612 9.933.00
Jumlah 111 122.558.50
Tenaga
Pekerja 0.900 oh 75.000 67.500.00
Tukang batu 0.450 oh 100.000 45.000.00
Kepala Tukang 0.045 oh 110.000 4.950.00 '
Mand or 0.045 oh 100.000 4.500.00
,.,,
• • 11\+/')\ -...........
1,1 R•n.nn
,..
-- --- ......
-' -' L
248 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNS1RUKs1 & INTERIOR EDIS/ 33 TAHUN XX 2014
------·------------------
--- --··. ----~------·------------------
~ JOURNALOFBUILDINGCONSlRUCTlON,INlCRKJR&MATERIALPRICE I
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp JumlahRp.
.
Tenaga
Pekerja 0.900 oh 75.000 67.500.00
Tukang batu 0.450 oh 100.000 45.000.00
Kepala Tukang 0.045 oh 110.000 4.950.00
Mandor 0.045 oh 100.000 4.500.00
Jumlah 121 121.950.00
A. Jumlah (1)+(2) 263.600.30
B. Overhead dan nrolit 15% x A 39.540.05
u-·-·-·..··- IA+u' •
J29 1 m' pasang dinding keramik uk. 10 x 20 cm
Bahan
Keramik artistik 1O x 20 53.000 bh 1.850 98.050.00
Semen portland 9.300 kg 1.362 12.666.!30
Pasir pasang O.D18 m3 106.050 1.908.90
Semen warna 2.750 kg 3.612 9.933.00
Jumlah 111 122.558.50
Tenaga
Pekerja 0.900 oh 75.000 67.500.00
Tukang batu 0.450 oh 100.000 45.000.00
Kepala Tukang 0.045 oh 110.000 4.950.00
Mandor 0.045 oh 100.000 4.500.00
Jumlah 121 . 121.950.00
A. Jumlah 111+121 244.508.50
B. Overhead dan nrolit 15% x A 36.676.28
u-·-- __... __ l&+O'\ nnA ·- • --
.-
A. Jumlah 111+121
· ...1-- _ ......~.
Harna satuan nekeriaan IA+BI
1~01 v- A
_.
207...
__ ".78
,,... ,,... ....
238.202.70
;
..
A. Jumlah r11+r21
. 1...1.,, ...... .-...-F1• 1C.0Lv-A
ED1s133 TAHUNXX 2014 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI &INTERIOR 249
n•
<nn nn
O•ft ftft
250 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNsTRuKs1 &INTERIOR EDIS/ 33 TAHUN xx 2014
------·---------·-·--·· . ·---- ··----- ------ ______ ___
,, ··-------·· ·-------··- - - - - ... - -- ---- ------ -
~ JOURNALOFBUILDINGCONSTRUCTION,INTffilOR&MAlERIALPRICE I
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp Jumlah Rp.
J36 1 m2 pasang Wall paper, lbr 50 cm
Bah an
Wall paper 2.200 m' 75.000 165.000.00
Lem 0.250 kg 21.000 5.250.00
Jumlah (1) 170.250.00
Tenaga
Pekerja 0.350 oh 75.000 26.250.00
Tukang batu 0.175 oh 100.000 17.500.00
Kepala Tukang 0.017 oh 110.000 1.870.00
Mander 0.002 oh 100.000 200.00
Jumlah (2) 45.820.00
A. Jumlah 111+121 216.070.00
B. Overhead dan profit 15% x A 32.410.50
Harga satuan pekerjaan (A+B) 248.480.50
J37 1 m2 pasang floor hardener
Bah an
Floor hardener 5.000 kg 4.090 20.450.00
Jumlah 111 20.450.00
Tenaga
Pekerja 0.120 oh 75.000 9.000.00
Tukang batu 0.120 oh 100.000 12.000.00
Kepala Tukang 0.012 oh 110.000 1.320.00
Mander 0.006 oh 100.000 600.00
Jumlah 121 22.920.00
A. Jumlah 111+121 43.370.00
R ..1-- ---&:" 15°/0 v A 6.l<iRI;, 1;,n
Haraa satuan oekeriaan IA+BI 49.875.50
Jumlah (1)+(2) 43.370.00
J38 1 m' pasang plint vinyl uk. 30 x 30cm dgn perekat
Bahan
Vinyl karet 30 x 30 cm KL II 1.760 bh 9.080 15.980.80
Lem vinvl 0.080 ka 25.000 2.000.00
Jumlah 111 17.980.80
Tenaga
Pekerja 0.080 oh 75.000 6.000.00
Tukang batu 0.080 oh 100.000 8.000.00
Kepala Tukang 0.008 oh 110.000 880.00
.. n MA nh <nn nnn Ann nn
Eo1s133 TAHUNXX 2014 JURNAL HAAGA 8ATUAN BAHAN BANGUNAN, KoNSTRUKSI &INTERIOR 251
--·-----·-------------------···
."
A. Jumlah 111+121
1 _. _ _
Tenaga
.h ... 0.050 kg 10.290 514.50
••
Pekerja 0.150 oh 75.000 11.250.00
.. . n nno~ nh 1nn nnn o•n nn
Jumlah 121 11.500.00
A. Jumlah (1)+(2) 12.014.50
B. Overhead dan orofit 15% x A 1.802.18
Harga satuan pekerjaan (A+B) 13.816.68
K03 1 m2 Mengerok karat cat lama permukaan baja dgn cara manual
Bahan
Sabun 0.050 kc 10.290 514.50
Jumlah 111 514.50
Tenaga
Pekerja 0.150 oh 75.000 11.250.00
Mandor 0.0025 oh 100.000 250.00
Jumlah (2) 11.500.00
A. Jumlah 111+121 12.014.50
B. Overhead dan oroflt 15% x A 1.201.45
Harna satuan oekerlaan (A+Bl 13.215.95
K04 1 m2 Menyabun permukaan tembok lama
Bah an
n n•n 1n oan «A <n
"'"""'"
'"mlah 111
"" 514.~fl
Tenaga
Pekerja 0.150 oh 75.000 11.250.00
Mandor 0.0025 oh 100.000 250.00
'"'
A. Jumlah (1)+(2) 12.014.50
"r _. ...... - ..-•1+ 1 ..:0L "' A
•
Harga satuan oekeriaan (A+Bl 13.816.68
KOS 1 m2 Mendempul dan mengosok kayu
Bahan
Dempul 0.080 kg 8.190 655.20
Minyakcat 0.020 kg 12.700 254.00
Amolas 0.100 lbr 3.000 300.00
Jumlah l1l 1.209.20
Tenaga
Pekerja 0.040 oh 75.000 3.000.00
Tukang cat 0.040 oh 100.000 4.000.00
Kepala Tukang 0.040 oh 110.000 4.400.00
Mandor 0.0025 oh 100.000 250.00
.
. . 11\+l~\
l?\ 11.~.cn nn
• ft M R ft ft
252 JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KoNSTRUKSI & INTERIOR Eo1s133 TAHUNXX2014
------------··-----------------·---
~
JOURNl'J..OFBUILDINGCONSTRUCTION,INTERIOR&MATERIALPRICE I
.
A _hnnJ~h
,....
u---- ......_
.
f1\+f?\
_...,,.._ .t~OL..,.
,.+"'
A
.
.t.t .........
• •n< ••
l:ft J:O,f ..
~
">0
....
Tenaga
.. ' 0.350 ka 52.500 18.375.00
EDtSt33 TAHUNXX 2014 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI &INTERIOR 253
--- ---- ----- -------.----·~-----·----------
I
JOURNALOFBUILDINC>Ca.ISTRUCTION,INTERIOR&MATERJALPRICE ~
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp JumlahRp.
K10 1M2 Peleburan bidang kayu dan vernis
Bah an
Cat varnish 0.150 kg 56.500 8.475.00
Dempul 0.050 kg 8.190 409.50
Amp las 0.100 lbr 3.000 300.00
Ku as 0.010 bh 15.750 157.50
Jumlah 111 9.342.00
Tenaga
Pekerja 0.160 oh 75.000 12.000.00
Tukang cat 0.160 oh 100.000 16.000.00
Kepala tukang 0.016 oh 110.000 1.760.00
Mandor 0.0025 oh 100.000 250.00
Jumlah 12\ 30.010.00
A. Jumlah 11 l+l2l 39.352.00
B. Overhead dan orofit 15% x A 5.902.80
Har!la satuan pekeriaan IA+Bl 45.254.80
K11 1 m2 Pengecatan tembok baru(lapis plamir, 1 lapis cat
dasar, 2 lapis cat penutup)
Bahan
Plamir 0.120 kg 8.080 969.60
Cat dasar 0.120 kg 38.850 4.662.00
rat tembok setara vinilex 0.260 kn 24.850 6.4~1.""
- li--l-L 11\
Tenaga
Pekerja 0.040 oh 75.000 3.000.00
Tukang cat 0.120 oh 100.000 12.000.00
Kepala tukang 0.0120 oh 110.000 1.320.00
Mandor 0.002 oh 100.000 200.00
Jumlah (2) 16.520.00
A. Jumlah 111+121 28.612.60
B. Overhead dan orofit 15% x A 4.291.89
Harga satuan pekerjaan (A+B) 32.904.49
254 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI & INTERIOR ED/SI 33 TAHUN xx 2014
---------------·------------------ ---
---- --- ------------ ------------ __________ __,
~ JOURNALOFBUILDINGCONSTRUCTION, INTERIOR&MATERIALPRICE 1.
15.750.00
Tenaga
Pekerja 0.060 oh 75.000 4.500.00
Tukang cat 0.060 oh 100.000 6.000.00
Kepala tukang 0.1200 oh 110.000 13.200.00
Mandor 0.006 oh 100.000 600.00
Jumlah 12\ 24.300.00
A. Jumlah (1)+(21 40.050.00
· B. Overhead dan orolit 15% x A 6.007.50
Haraa satuan pekeriaan IA+Bl 46.057.50
K17 1 m2 Pengecatan permukaan baja lapis seng (galbanl)
secara manual sistem 3 lapis cat konvensional dgn !bl 200um
Bahan
Cat dasar 0.110 kg 38.850 4.273.50
Cat menie besi 0.170 kg 35.280 5.997.60
Cat minvak besi 0.080 ko 52.500 4.200.00
.
Jumlah 111 14.471.10
Tenaga
Pekerja 0.500 oh 75.000 37.500.00
Tukang cat 0.800 oh 100.000 80.000.00
Kepala tukang 0.300 oh 110.000 33.000.00
Mander 0.200 oh 100.000 20.000.00
.
Jumlah (2)
(•
170.500.00
1
"
• ....... _ ............. "tr•/.. y .6. ?7 '7A~ e7
Harga aatuan pekerj1an (A+B) 212.716.77
EDIS/ 33 TAHUN xx 2014 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI & INTERIOR 255
----------- - - - --,
I JbURNALOFBUILDINt> CONSlRl.JCllON,INTERIOR&MATERll'J.PRICE ~
I NO NO. JENIS PEKERJAAN KOEF SAT. HARGASATRp JumlahRp.
K18 1M2 Pengecatan permukaan baja lapis seng (gal bani)
secara sempre! (airless spray)dgn sistem 1 lapis cat
konvensional dgn !bl 200um
Bah an
Cat dasar 0.300 ko 38.850 11.655.00
Jumlah (11 11.655.00
Tenaga
Pekerja 0.400 oh 75.000 30.000.00
Tukang cat 0.700 oh 100.000 70.000.00
Kepala tukang 0.200 oh 110.000 22.000.00
Mandor 0.200 oh 100.000 20.000.00
Jumlah (2l 142.000.00
A. Jumlah (1)+(2) 153.655.00
B. Overhead dan orofit 15% x A 23.048.25
Harga satuan pekerjaan (A+B) . .. 176.703.25
L PEKERJAAN SANITASI
01 Memasang 1 bh kloset duduk
Bah an
Klose! duduk+bak air kwalitas biasa 1.000 bh 1.650.000 1.650.000.00
Perlenakaoan harga closet 1.650.000 99.000.00
.
Jumlah 11\ 1.749.000.00
Tenaga
Pekerja 3.300 oh 75.000 24.7.500.00
Tukang batu 1.500 oh 100.000 150.000.00
Kepala tukang 0.150 oh 110.000 16.500.00
. . n 1an oh 1nn.ooo 1a "°" nn
Jumlah 12l 430.000.00
.
A. Jumlah {1l+l2l 2.179.000.00
B. Overhead dan profit 15% x A 326.850.00
Harga satuan pekeriaan {A+B) 2.505.850.00
256 JURNAL HARGA SATUAN BAHAN 8ANGUNAN, KoNSTRUKSI &INTERIOR EDIS/ 33 TAHUN )()( 2014
---- -.---------·" --- ----·----·--··--··--·. ·--------~-----------~
~ JOURNALOFBUllDINGCONSTRUCllON,INTERIOR&MAlERIALPRICE I
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp Jumlah Rp.
A ·,1-t\+t ... \ .. _171 ......... ll'!'ft
E01s133 TAHUNXX 2014 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNsTRUKSI &INTERIOR 257
I
JOURNAL OF BUILDING\ CONSTRUCllON, INTERIOR&MATERIALPRICE ~
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp JumlahRp.
Tenaga
Pekerja 3.000 oh 75.000 225.000.00
Tukang batu 4.500 oh 100.000 450.000.00
Kepala tukang 0.900 oh 110.000 99.000.00
Mander 0.900 oh 100.000 90.000.00
Jumlah (2) 864.000.00
A. Jumlah 11l+l2l 1.354.974.40
B. Overhead dan orofit 15% x A 203.246.16
Haraa satuan oekeriaan IA+Bl 1.558.220.56
Tenaga
Pekerja 1.420 oh 75.000 106.500.00
Tukang batu 0.473 oh 100.000 47.300.00
Kepala tukang 0.047 oh 110.000 5.170.00
Mander 0.074 oh 100.000 7.100.00
. I?\
258 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI &INTERIOR EDISI 33 TAHUN )()( 2014
~ JOURNALOFBUILDINGCONSJRUCTION,INIERIOR&MATERIALPRICE I
.. • • 111 32 550.00
Tenaga
Pekerja 0.054 oh 75.000 4.050.00
Tukang batu 0.090 oh 100.000 9.000.00
Kepala tukang 0.009 oh 110.000 990.00
Mander
. .... '" n.027 oh 100.000
..,,. __._ --
2.700.00
EDISJ33 TAHUNXX 2014 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI &INTERIOR 259
---- ··---· ____________ ,, ---- --~----
IJOU~OFBUILDING,CONSTRUCTION,INTERJOR&MATERIALPRICE ~
NO, NO. JENIS PEKERJAAN KOEF SAT HARGASATRp JumlahRp.
i
Tenaga
' Pekerja 0.108 oh 75.000 8.100.00
Tukang batu 0.180 oh 100.000 18.000.00
Kepala tukang 0.018 oh 110.000 1.980.00
!
' . . n nn•A nh 1nn 000 •An nn
Jumlah 121 28.620.00
A. Jumlah !1l+!2l 77.445.00
R • ...!-- ---=" ""r.o/_ v lJ. ••••• u
Tenaga
Pekerja 0.036 oh 75.000 2.700.00
Tukang batu 0.060 oh 100.000 6.000.00
Kepa\a tukang 0.006 oh 110.000 660.00
Mandor 0.0018 oh 100.000 180.00
Jumlah (2) 9.540.00
A. Jumlah 11\+12\ 16.484.00
B. Overhead dan profit 15% x A 2.472.00
............... '""""•uan nekAri ......... IA+B\
L17 Memasang 1 m' pipa PVC tipe AW dia 3/4"
Bahan
Pipa PVC Tipe AW 3/4 1.200 m' 5.740 6.888.00
Per\enakaoan haraa oioa 5.740 2.009.00
Jumlah 111 8.897.00
Tenaga
Pekerja 0.036 oh 75.000 2.700.00
Tukang batu 0.060 oh 100.000 6.000.00
Kepa\a tukang 0.006 oh 110.000 660.00
Mandor 0.0018 oh 100.000 180.00
Jumlah 121 9.540.00
A. Jumlah (1)+(2) 18.437.00
B. Overhead dan profit 15% x A 2.765.55
Harga satuan pekerjaan (A+B) 21.202.55
L18 Memasang 1 m' pipa PVC tipe AW dia. 1
Bahan
Pipa galvanis 6 M 1 1/2" 1.200 m' 8.960 10.752.00
Per\enok~nan ha ....... nj .... ~ 8.960 ~.136.nn
260 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI &INTERIOR EDIS/ 33 TAHUN )()( 2014
~
JOURNALOFBUILDINGCONSTRLICTION,INTERIOR&MATERLl\LPRICE I
NO NO. JENIS PEKERJAAN KOEF SAT HARGASAT Rp. JumlahRp.
Tenaga
Pekerja 0.036 oh 75.000 2.700.00
Tukang batu 0.060 oh 100.000 6.000.00
Kepala tukang 0.006 oh 110.000 660.00
Mander 0.0018 oh 100.000 180.00
Jumlah 121 9,540.00
A f1l+f"ll\ " " AOO nn
Harnasatuanneker•aanlA+B\ 26.942.20
L19 Memasang 1 m' plpa PVC tipe AW dla. 1 1/2"
Bahan
Pipa PVC tipe AW 11/2" 1.200 m' 10.500. 12.600.00
-
Jumlah 11\
. "··-- -·-- 1n.fiOO ~
16.275.00
R7fi nn
Tenaga
Pekerja 0.036 oh 75.000 2.700.00
Tukang batu 0.060 oh 100.000 6.000.00
Kepala tukang 0.003 oh 110.000 660.00
Mand or 0.0018 oh 100.000 180.00
'"' 0 P l . f t ftft
Eo1s133 TAHUNXX 2014 JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI &INTERIOR 261
--------------------· --· ·--··--- --- -------.
IJOURNALOFBUILDING,CONSTRUGnON,INTERJOR&MATERIALPRICE.
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp JumlahRp.
Tenaga
Pekerja 0.081 oh 75.000 6.075.00
Tukang batu 0.135 oh 100.000 13.500.00
Kepala tukang 0.0135 oh 110.000 1.485.00
Mandor 0.0041 oh 100.000 410.00
Jumlah 121 21.470.00
A. Jumlah 111+12\ 49.463.00
B. Overhead dan orofit 15% x A 7.419.45
Harga satuan pekerjaan (A+BI 56.882.45
L23 Memasang 1 m' pi pa PVC tipe AW dia. 4"
Bahan
Pipa PVC tipeAW 11/2" 1.200 m' 25.480 30.576.00
Perlengkapan harga pipa 25.480 8.918.00
Jumlah (1) 39.494.00
Tenaga
Pekerja 0.081 oh 75.000 6.075.00
Tukang batu 0.135 oh 100.000 13.500.00
Kepala tukang 0.0135 oh 110.000 1.485.00
Mandor 0.0041 oh 100.000 410.00
262 JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI &INTERIOR EDIS/ 33 TAHUN XX 2014
······-·-··· - - · - - - - - - - - - · - - · - · - - - - - · · · -------
-- --------~- ..- - - - - -
~JOURNALOFBUILDINGOONSTRUCll~,INIERIOR&MATERIALPRICE I
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp JumlahRp.
Tenaga
Pekerja 0.010 oh 75.000 750.00
Tukang batu 0.100 oh 100.000 10.000.00
Kepala tukang . 0.010 oh 110.000 1.100.00
Mandor 0.005 oh 100.000 500.00
Jumlah f2l 12.350.00
A. Jumlah f1l+l2\ 27.350.00
B. Overhead dan orofit 1~·1. v A .
d.,102.50
Haraa satuan oekeriaan fA+Bl 31.452.00
L27 Memasang 1 bh floor drain
Bahan
floor drain 1.000 bh 21.180 21.180.00
Jumlah f1l 21.180.00
Tenaga
Pekerja 0.010 oh 75.000 750.00
Tukang batu - 0.100 oh 100.000 10.000.00
Kepala tukang 0.010 oh 110.000 1.100.00
Mander 0.005 oh 100.000 500.00
Jumlah 12\ 12.350.00
A. Jumlah (1 \+{2\ 33.530.00
B. Overhead dan orofit 15% x A 5.029.50
Haraa satuan pekeriaan IA+B) 38.559.50
Eo1s133 TAHUNXX 2014 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI &INTERIOR 263
------- ---
I~OFBUIUJINC>CONSTRUCT10N,INTERIOR&MA1ERW.PRICE •
.
. , .. \+l?\+1'2\
~4.""" nn
ftft ~ftft ftn
A -• -• '"'-+'~'
0.170 iam 67.500
..
11.475.00
...... ...... ~ n
Dr
.· ..a-- ......-..n.. 4 1:.0f.. v A '2 ""~ ...... ~
....
D
Jumlah 121
.
111+1::t1
-~ ..1-- - ..-.r.• 1 r:.oL y 6.
223.800.00
74R.onn nn
11? nnn n
264 JURNAL HARGA 8ATUAN BAHAN 8ANGUNAN, KONSTRUKSI &INTERIOR EDIS/ 33 TAHUN XX 2014
---·.,-~-------.- - - - - - .... - - - · - - - - - - , - - - -----------------"
~ JOURNALOFBUIL.DINGCONSTRUCTION,INTERIOR&MATERIALPRICE I
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp Jumlah Rp.
MO 1m2 Pasang pintu lipat (folding door)bahan plastik/PVC
Bahan
Pintu lipat plastik 1.000 m2 68.000 68,000.00
Jumlah (1) 68.000.00
Tenaga
Pekerja 0.440 oh 75.000 33.000.00
Tukang las biasa 0.440 oh 100.000 44.000.00
Kepala tukang 0.044 oh 110.000 4.840.00
Mandor 0.022 oh 100.00 2.200.00
Jumlah 12\ 84.040.00
A. Jumlah (1)+(2) 152.04.00
B. Overhead dan nrofit 15% x A 22.806.00
.
LI---- --&··-- a+g' 174 ...... ~ ......
MOI 1m2 pasang rolling door alluminium
Bahan
Rollinn door alluminium 1.000 m2 665.000 665.500.00
Jumlah 11\ 665.500.00
Tenaga
Pekerja 1.ooo oh 75.000 75.000.00
Tukang khusus alumunium 1.000 oh 100.000 100.000.00
Kepala tukang 0.100 oh 110.000 11.000.00
Mandor 0.050 oh 100.000 5.000.00
Jumlah 121 191.000.00
A. Jumlah !1l+!2l 856.500.00
u---- __.,,__
B. Overhead dan orofit 15% x A
fA+g'
128.475.00
...._......._
B. Overhead dan nrofit 15% x A
I A+l:l\
6.325.20
....................
M1 1m2' pasang venetion blinds dan vertical blinds
Bahan
Venetion/vertical blinds 1.000 m2 185.000 185.000.00
Jumlah (1) 185.000.00
Tenaga
Pekerja 0.350 oh 75.000 26.250.00
Tukang 0.350 oh 100.000 35.000.00
Kepala tukang 0.035 oh 110.000 3.8.50.00
Mandor 0.018 oh 100.000 1.800.00
Jumlah (21 66.900.00
.
A. Jumlah (1)+(2) 251.900.00
B. Overhead dan profit 15% x A 37.785.00
Harga satuan pekerjaan (A+B) 289.685.00
EDIS/ 33 TAHUN XX 2014 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI & INTERIOR 265
----··- -----· -----·---- ··-·----· ---·----·
I
JOURNALOFBUILDIN<> CONSTRUCTION, INTERKlR&MAlt'RIALPRICE ~
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp JumlahRp.
M11 1m2 Pasang Terali besi strip 2x3 mm
Bahan
Besi plat strip 6.177 kg 20.000 123.540.00
Jumlah (1) 123.540.00
Tenaga
Pekerja 1.670 oh 75.000 125.250.00
Tukang las biasa 1.670 oh 100.000 167.000.00
Kepala tukang 0.167 oh 110.000 18.370.00
Mandor 0.083 oh 100.000 8.300.00
.
Jumlah 121 318.920.00
A. Jumlah 111+121 442.460.00
B. Overhead dan nrofit 15% x A 66.369.00
Harga satuan pekerjaan (A+B) 508.829.00
M1: 1m2 pasang kawat nyamuk
Bahan
kawat nyamuk 1.100 m2 18.200 20.020.00
besi plat strip 1.716 kg 23.500 40.326.00
Jum1ah I'll uu . .:J . .u.uu
·Tenaga
Pekerja 0.100 oh . 75.000 7.500.00
Tukang khusus alumunium 0.100 oh· 100.000 10.000.00
Kepala tukang 0.010 oh 110.000 1.100.00
· Mandor 0.005 oh 100.000 500.00
Jumlah (2) < 19.100.00
A. Jumlah 111+12\ 79.466.00
B.Overheaddanprofit 15%xA 11.916.00
Haraa satuan oekeriaan IA+Bl 91.362.90
M1< 1m2 pasang jendela nako dan teralis
Bah an
Jendela nako 1.100 m2 192.500 211.750.00
paku skrup 1-2,5cm 10.000 bh 500 5.000.00
bei strip 7.000 kg 20.000 140.000.00
Jumlah l1l 356.750.00
Tenaga
Pekerja 0.200 oh 75.000 15.000.00
Tukang 0.200 oh 100.000 20.000.00
Kepala tukang 0.020 oh 110.000 2.200.000
Mandor 0.001 oh 100.000 100.00
Jumlah 121 37.300.00
A. Jumlah {1l+12l 394.050.00
B. Overhead dan profit 15% x A 59.107.50
Harna satuan oekeriaan IA+Bl 453.157.50
L PEKERJAAN LANGIT-lANGIT
01 1m2' pasang langit-langit asbes semen, tbl 5mm
Bah an
asbes 1.100 kpg 17.640 19.404.00
paku biasa 0.010 kg 18.900 189.00
Jumlah (1) 19.593.00
Tenaga
Pekerja 0.070 oh 75.000 5.250.00
Tukang 0.070 oh 100.000 7.000.00
Kepala tukang 0.007 oh 110.000 770.00
Mandor 0.0040 oh 100.000 400.00
Jumlah (2) 13.420.00
266 JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI &INTERIOR EDIS/ 33 TAHUN XX 2014
--------~-·------ --- - -------~--- ·---------'
~
JOURNALOFBUILDINGCONS1RUCTJON,INTERJOR&MATERIALPRICE I
EDIS/ 33 TAHUN XX 2014 JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI & INTERIOR 267
---··-----~·--··-···-·-----
I
JOURNALOFBUILDINC>CON51R\JCTION,INTERIOR&MATERIALPRICE <Q>·
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp JumlahRp.
Jumlah (2) 19.100.00
A. Jumlah (11+(21 46.048.25
g , 0/,.y.4 c
268 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNs1RuKs1 & INTERIOR EDIS/ 33 TAHUN XX 2014
~~OFBUl.DINGCONSTRUCTION,INTERIOR&W\lERIAL.PRICE I
NO NO. JENIS PEKERJAAN KOEF SAT HARGASATRp JumlahRp.
EDIS/ 33 TAHUN XX 2014 JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI &INTERIOR 269