BILL NR1
ELEMENT
CONCRETE WORKS (Mixing ratio1:3:6)
This section covers the following:
BEAMS 13 M3
SLAB 30 M3
STAIRS 3 M3
1 CARPENTRY
2 IRON BENDING
4 BRICKLAYING
Total 4,428,510.00
SUPERVISION
0.1% of Grand total sum 0.1 % 4,428,510 442,851.00 442,851.00
BILL NR1
ELEMENT
CONCRETE WORKS (Mixing ratio1:3:6)
GRAND TOTAL CARRIED TO SUMMARY Grand Total 4,871,361.00