AREA STATEMENT:

PLOT AREA :
GROUND FLOOR AREA: 636.70 SQM
FIRST FLOOR AREA : 581.77 SQM
HEAD ROOM AREA : 22.56 SQM
TOTAL BUILT UP AREA: 1241.03 SQM

NOTES:

1. ALL DIMENSIONS ARE IN MILIMETERS AND LEVELS ARE IN


METERS.DO
NOT SCALE THE DRAWING , BUT FOLLOW THE WRITTEN DIMENSIONS.
2. DO NOT REPRODUCE THE DRAWING BY TRACING.
THROUGH VENTILATOR ABOVE LINTEL THROUGH VENTILATOR ABOVE LINTEL 3. FOLLOW STRUCTURAL DRAWING FOR STRUCTURAL DEATILS AND
UPTO BEAM BOTTOM
UPTO BEAM BOTTOM CORRELATE THE DEATILS GIVEN BELLOW.
4. PROVIDE WATER PROOF COMPOUND FOR BATH ,W/C, AND WASH
WINDOW FROM LANDING CILL LEVEL AREA DURING CONCRETING.
W/V W/V W/V W/V
5. PROVISION SHOULD BE MADE IN THE ESTIMATION FOR ELEVATION
V2 V2 V2 V2 TREATMENT
6. FOLLOW DEATILED DRAWINGS FOR ELECTRICAL AND SANITARY

1200x1200 1200x1200 1200x1200

1200x1200 1200x1200 1200x1200


WORKS

W.C.

W.C.
W3
W/V W/V
7. COLOUR SCHEME FOR THE ENTIRE BUILDINGS AND RESPECTIVE
D3

UR
D3

UR
V2 V2 JOINERIES SHOULD BE STRICTLY FOLLOWED.
8. DO NOT VIOLATE THE SPECIFICATIONS MENTIONED IN THE
W/V

W/V
W/V

W/V
DRAWINGS.
9. THE FOOTING HAS BEEN DESIGNED FOR G+2 STOREY BUILDING

W.C.

W.C.
V2 V2
D3
13 D3
SPECIFICATION:-
12 14
D3 11 15 1.WALL : 230MM THICK BURNT BRICK MASONARY in cm 1:6
D3

W.C.

W.C.
V2 10 16 D2 V2 BBM partition walll -115m thick in 1:4
D2
17 2. PLASTERING : PLASTERED AS PER SPECIFICATION
9
chemistry Laboratory 8 18 Biology EXTERNAL :IN CM 1:4 WITH SPONGE FINISH
INTERNAL :IN CM 1:4 WITH LIME RENDERING
7 19
6000 x 9000 Laboratory-1
W/V

W/V

W/V

W/V
CEILING :12mm THICK IN CM 1:3 WITH LIME RENDERING
6 20
3. STAIRCASE :TREAD300 MM , RISER150MM , MS HAND RAIL,TANDUR
W/V 5 21
22
W/V 6000 x 9000 BLUE STONE FINISH FOR STEPS /LANDING
4 4.DOORS:
3 23 ENTRANCE :TEAK WOOD DOOR FRAME WITH FULLY PANELLED
W/V W/V W/V V2
2 24 TEAK WOOD SHUTTER
1 25 ROOMS :SAL WOOD FRAME WITH FLUSH SHUTTERING
TOILET :ISA -50 X 50 X6 MM THICK FRAME WITH CLADDED
DOOR SHUTTERS.
STORE PRINCIPAL'S TOI. P 5.WINDOWS : THREE TRACK ALUMINUM FRAMES WITH GLAZED
WINDOW (ONE INTERIOR PANEL WITH MOSQUITO MESH)
ROOM
W/V

W/V
ROOM 6. FLOORING : TANDUR BLUE STONE SLAB WITH SKIRTING
7. BATHROOM:
5140 x 3000 5140 x 3000 D3
a) FLOORING: CERAMIC TILES
4.62 b) DADOING: GLAZED TILE UPTO 1500 HEIGHT
8. W/C:
a) FLOORING: CERAMIC TILES
D1 D1 D1 D1 b) DADOING: GLAZED TILE UPTO 900 HEIGHT
W2 W2 W2 W2
SCHEDULE OF SCHOOL BLOCK OPENINGS
2M WIDE CORRIDOR
W1/V1

W1/V1
2M WIDE CORRIDOR SR
W/V W/V W/V W/V W/V W/V NO SYMBOL SIZES NO CILL LEVEL LINTEL HT
D1 D1 W2 W2 W2 D1 W2 D1 W2 D1

ENTRANCE DOORS
A LOBBY A 1 MD 3.15 X 2.40 1 ---- 2.40
6000 x 6000 2 D1 1.20 X 2.40 9 ---- 2.40
3 D2 1.00 X 2.40 2 ---- 2.40
CLASSROOM CLASSROOM
CLASSROOM 4 D3 7 ---- 2.10
7TH SCHOOL 8TH 0.75 X 2.10
6TH STAFF ROOM WINDOWS
STANDARD OFFICE STANDARD
STANDARD 5330 x6000
9000 x 6000 3435x6000 9000 x 6000 1 W 1.20 X 1.50 42 0.90 2.40
9000 x 6000 1.15 3.15 1.15
2 W1 2.00 X 1.50 2 0.90 2.40
3 W2 1.20 X 0.90 9 1.50 2.40
2.00

4 W3 1.80 X 2.00 1 ---- 2.40


VENTILATOR
W/V W/V W/V W/V
W/V W/V W/V W/V W/V W/V W/V W/V W/V W/V W/V W/V
1 V2 0.75 X 0.60 11 ---- ----
R A M P

1.50
SLOPE - 1:12 42 ----
2 V 1.20 X 0.60 ----
UP
UP

PORCH DO NOT SCALE


7660x6860
OFFICE OF ORIGIN

DATE

DRAWN

CLIENT:- PRE-CHECKED
KARNATAKA RESIDENTIAL EDUCATIONAL
INSTITUTIONS SOCIETY

FINAL-CHECKED
PROJECT:-

ACADEMIC BLOCK
APPROVED
TITLE:-

GROUND FLOOR PLAN


THIS DRAWING IS THE PROPERTY OF M/S PREMIER TECHNICAL CONSULTANTS. IT SCALE
SHOULD NOT BE USED COPIED OR REPORDUCED WITHOUT THEIR WRITTEN Not to Scale
PERMISSION

AREA STATEMENT:

PLOT AREA :
GROUND FLOOR AREA: 636.70 SQM
FIRST FLOOR AREA : 581.77 SQM
HEAD ROOM AREA : 22.56 SQM
TOTAL BUILT UP AREA: 1241.03 SQM

ventilator
are fixed NOTES:

(no air 1. ALL DIMENSIONS ARE IN MILIMETERS AND LEVELS ARE IN


METERS.DO
Passing) THROUGH VENTILATOR ABOVE LINTEL THROUGH VENTILATOR ABOVE LINTEL
UPTO BEAM BOTTOM
NOT SCALE THE DRAWING , BUT FOLLOW THE WRITTEN DIMENSIONS.
UPTO BEAM BOTTOM
A/C 2.
3.
DO NOT REPRODUCE THE DRAWING BY TRACING.
FOLLOW STRUCTURAL DRAWING FOR STRUCTURAL DEATILS AND
room W/V W/V
WINDOW FROM LANDING CILL LEVEL
W/V W/V CORRELATE THE DEATILS GIVEN BELLOW.
4. PROVIDE WATER PROOF COMPOUND FOR BATH ,W/C, AND WASH
V2 V2 V2 V2
AREA DURING CONCRETING.
1200x1200 1200x1200 1200x1200

1200x1200 1200x1200 1200x1200

5. PROVISION SHOULD BE MADE IN THE ESTIMATION FOR ELEVATION


W.C.

W.C.

W3
W/V W/V TREATMENT
D3
UR

D3
UR

V2 V2 6. FOLLOW DEATILED DRAWINGS FOR ELECTRICAL AND SANITARY


WORKS
W/V

W/V
W/V

W/V

7. COLOUR SCHEME FOR THE ENTIRE BUILDINGS AND RESPECTIVE


W.C.

W.C.

V2 JOINERIES SHOULD BE STRICTLY FOLLOWED.


V2 D3
13 D3 8. DO NOT VIOLATE THE SPECIFICATIONS MENTIONED IN THE
DRAWINGS.
12 14 9. THE FOOTING HAS BEEN DESIGNED FOR G+2 STOREY BUILDING
D3 11 15 D3
W.C.

W.C.

V2 D2 10 16 D2 V2
9 17 SPECIFICATION:-
8 18
Computer 7 19 Physics 1.WALL : 230MM THICK BURNT BRICK MASONARY in cm 1:6
W/V

W/V

W/V

W/V

BBM partition walll -115m thick in 1:4


Laboratory-3 6
5
20
21 Laboratory-4 2. PLASTERING : PLASTERED AS PER SPECIFICATION
W/V W/V
6000 x 9000 4 22
6000 x 9000 EXTERNAL :IN CM 1:4 WITH SPONGE FINISH
3 23 INTERNAL :IN CM 1:4 WITH LIME RENDERING
W/V W/V W/V W/V
2 24 CEILING :12mm THICK IN CM 1:3 WITH LIME RENDERING
1 25 3. STAIRCASE :TREAD300 MM , RISER150MM , MS HAND RAIL,TANDUR
BLUE STONE FINISH FOR STEPS /LANDING
4.DOORS:
SPORTS
STORE ROOM
P ENTRANCE :TEAK WOOD DOOR FRAME WITH FULLY PANELLED
TEAK WOOD SHUTTER
W/V

W/V

ROOM 5140 x 3000


ROOMS :SAL WOOD FRAME WITH FLUSH SHUTTERING
TOILET :ISA -50 X 50 X6 MM THICK FRAME WITH CLADDED
Smart Board 5140 x 3000 DOOR SHUTTERS.
5.WINDOWS : THREE TRACK ALUMINUM FRAMES WITH GLAZED
WINDOW (ONE INTERIOR PANEL WITH MOSQUITO MESH)
6. FLOORING : TANDUR BLUE STONE SLAB WITH SKIRTING
D1 D1 D1 D1 7. BATHROOM:
W2 W2 W2 W2
a) FLOORING: CERAMIC TILES
b) DADOING: GLAZED TILE UPTO 1500 HEIGHT
2M WIDE CORRIDOR
W1/V1

W1/V1

2M WIDE CORRIDOR 8. W/C:


a) FLOORING: CERAMIC TILES
W/V W/V W/V W/V W/V W/V b) DADOING: GLAZED TILE UPTO 900 HEIGHT
D1 D1 W2 W2 W2 D1 W2 W2 D1
SCHEDULE OF SCHOOL BLOCK OPENINGS
0.60
A A SYMBOL SIZES NO CILL HT LINTEL HT

DOORS
D1 1.20 X 2.40 8 ---- 2.40
CLASSROOM CLASSROOM D2 1.00 X 2.40 2 ---- 2.40
MULTIPURPOSE 6TH Library -4 10TH D3 0.75 X 2.10 6 ---- 2.10
ROOM STANDARD 9000 x 6000 STANDARD WINDOWS
9000 x 6000 9000 x 6000 9000 x 6000 1 W 1.20X 1.50 41 0.90 2.40

2 W1 2.00X 1.50 2 0.90 2.40

3 W2 1.20X 0.90 9 1.50 2.40


2.00

W3 1.80X 2.00 1 ---- 2.40


Please VENTILATOR
Show W/V W/V
1 V2 0.75 X 0.60 11
W/V W/V W/V W/V W/V W/V W/V W/V W/V W/V W/V W/V W/V ---- ----
Shelf's 2 ---- ----
V 1.20 X 0.60 41
And 3 V1 2.00X 0.60 2 ---- ----
chairs

DO NOT SCALE

OFFICE OF ORIGIN

DATE

DRAWN

CLIENT:- PRE-CHECKED
KARNATAKA RESIDENTIAL EDUCATIONAL
INSTITUTIONS SOCIETY

FINAL-CHECKED
PROJECT:-

ACADEMIC BLOCK
APPROVED
TITLE:-

FIRST FLOOR PLAN


THIS DRAWING IS THE PROPERTY OF M/S PREMIER TECHNICAL CONSULTANTS. SCALE
IT SHOULD NOT BE USED COPIED OR REPORDUCED WITHOUT THEIR WRITTEN Not to Scale
PERMISSION

You might also like