Akaki W2 3 by 1 (1st Payment)
Akaki W2 3 by 1 (1st Payment)
Item Unit
Description Unit QTY QTY/Sub total Sub summary Amount(ETH Birr)
No Price
Total
Previous Current Contract Previous Current Total
quantity
1. Excavation and Earth work
Back fill with selected quality fine red ash
in layers not exceeding 20cm thick and
1.1 m3 292.23 822 315 315 240,213.06 0 258930 258930
compact with 16 ton rolo compactor &
well showering water
1.2 25cm thick basaltic stone hard core m2 5 433 94.5 94.5 2,165.00 0 40918.5 40918.5
1.3 Maintain the existing stone masonry wall ls 1 20,000 0 20,000.00 0 0 0
Construct 50cm thick stone masonry with
1.4 m3 10 3700 0 37,000.00 0 0 0
cement mortar of mix ratio 1:3
Maintain the existing cement screed with
1.5 m2 10 4450 0 44,500.00 0 0 0
1:2 cement mortar ratio
Sum 343,878.06 0 299848.5 299848.5
2. Concrete work
Reinforced concrete in C-25, with
minimum cement content of 378kg/m3,
2.1 filled and vibrated into formwork. Price
includes formwork & all the necessary
works to fulfill the jobs.
a) In 15cm thick Slab m2 1500 1200 1324.9 1324.9 1,800,000.00 0 1589880 1589880
a) 8mm def bar c/c 30cm kg 3811.5 150 3524.309 3524.309 571,725.00 0 528646.275 528646.275
a) RHS 60*60*2.5mm post kg 1219.89 280 531.6 531.6 341,569.20 0 148848 148848
b) RHS 40*40*2.5mm diagonal kg 1626.52 280 0 455,425.60 0 0 0
c) RHS 30*30*2.5mm purlin kg 1031.49 280 0 288,817.20 0 0 0
Wire mesh for fence with chain link
3.5 m2 840 350 0 294,000.00 0 0 0
galvanized 68 kg/25*2
Supply and fix cover for the half ditch
around the sport field made of 30*30*1.5
3.5 (2angle iron as a frame and dia 16 deformed ml 163.8 1850 154 154 303,030.00 0 284900 284900
bar as a mesh c/c 5cm as shown on the
drawing.
Supply and construct football field
3.6 precoated EGA 500 with 0.4mm roof m2 291.06 1400 276 276 407,484.00 0 386400 386400
cover
Supply and fix 1mm thick corrugated iron
sheet for stage for protection starting from
3.7 the last seat up to 2m height. The price m2 168 1300 0 218,400.00 0 0 0
includes one coat of antirust and 2 coat of
synthetic paint.
3.8 Supply & fix RHS 0 - 0 0 0
a) RHS 40*40*2.5 mm post kg 1686.61 280 1047.79 1047.79 472,250.80 0 293381.088 293381.088
b) RHS 30*30*2.5 mm purlin kg 937.53 280 1703.362 1703.362 262,508.40 0 476941.248 476941.248
c) RHS 30*20*2 mm purlin for wire mesh kg 395.64 280 0 110,779.20 0 0 0
4.3 3 coats of synthetic paint for masonry seat m2 268 120 0 32,160.00 0 0 0
Sum 64,728.00 0 0 0
Grand Total 8,209,015.86 0 4265871.11 4265871.11
15% VAT 1,231,352.38 0 639880.6667 639880.6667
Grand Total with VAT 9,440,368.24 0 4905751.778 4905751.778
TAKE OFF SHEET
measurement Sheet No -1
Project: Wereda 02 Youth Centre 3 by 1 Sport Field
Location: Akaki Kality Sub-city, Wereda 02
Client: Akaki Kality Sub City Design and Construction Works Office
Contractor: SIFHAN CONSTRUCTION PLC
Consultant:
1. previous payments
-
2. Rebate
3. Retention 5%
245,287.59
4. Penality
Total deduction
1,717,013.12
Total - - TOTAL EXCUTED WORK 4,265,871.11
VAT 15% 639,880.67
TOTAL WITH VAT 4,905,751.78
3,188,738.66
We certify that the contractor is now entitled to the sum of birr 3,188,738.66 (Three Million One Hundred Eighty Eight Thousand Seven Hundred Thirty Eight
birr and 66/100)
1.1 bulk excavate for pavement around the sport filed m3 63.60
Cart away the excess excavated material 10 km far from
1.2 site m3 1,277.10
3.3 Two coats of synthtic enamel paint to store CIS wall m2 50.00
3.4 apply quartz paint to mnin entrance column m2 10.80
3.5 3 coats of synthetic paint for masonry seat m2 405.00
Total carried to Summary
4.site works
supply and fix dia 30cm external half ditch 4.1 around
4.1 sport filed pavement ml 171.00