Professional Documents
Culture Documents
Form Tech-2 Full
Form Tech-2 Full
1
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry of Urban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
Site Management
Quality Management
Budget Management
Contract Management
Claim Management
Cost Management
Value Engineering
Business Schedule Management
Documentation Management
Risk Management
LEED
We, as OPTİMAL PMO, is keen on to work in Afghanistan and have taken our
management board decision to establish a local office in Afghanistan incase awarded and
enclosed please find the related official documents and preparation to establish our office.
OPTIMAL is a project management and consultancy firm providing specialist services to clients
in the Residential, Commercial, Hospitality, Infrastructure, Public Buildings, Health, Education,
Industrial and Medical and Logistic sectors. Founded in 2010 the company has grown quickly and
established a reputation for providing high quality, professional services to its clients. The
Practice has so far delivered many prestigious projects successfully operating with its young,
dynamic, up-to-date and experienced staff and developed an extensive network of clients and
variety of precious experience in Private and Public Sectors.
OPTIMAL do much more than simply delivering projects. We focus on being a strategic partner
with our clients – delivering a comprehensive service across their portfolio and optimizing the
benefits of continuous improvement in efficiency, cost reduction and knowledge retention. We
support them at all stages of a project or program, and our understanding of the key risks and
challenges means that we direct effort where it is most needed. Today OPTIMAL with its up to
two hundred technical staff and 4 offices manages various projects in more than 20 locations
across the region.
Specifically, expertise in the superstructures; Optimal has supervised more than 400 hundred
public buildings (mostly schools, dormitories, etc), more than 10.000 residential units, and
university campus and health facilities (pharmacy & production plants) with a total closed area
of more than 4.000.0000 m2 and most of them being in the high seismic risk zone of Turkey.
2
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry of Urban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
Revised
# Client Name of the Project Contract Date Contract
Amount (EURO)
CATHAY İNŞAAT SAN. VE GAYRİMENKUL ARTERİUM RESİDENCE AND SHOPPİNG STREET PROJECT AND
2 15.06.2010 143.783,06 €
TİC. LTD CONSTRUCTION MANAGEMENT
3 TORUNLAR GYO AŞ. KORUPARK 3rd Phase Real Estate Project 1.12.2011 95.737,36 €
ŞENER GIDA MAĞAZACILIK İNŞ. VE TURİZM ISPARTA CENTRUM GARDEN PROJESİ PROJECT MANAGEMENT
5 9.07.2012 430.551,20 €
SAN. TİC. AŞ AND CONSULTANCY SERVICES
6 DERİ MAMULLERİ YAPI KOOPERATİFİ PROJECT MANAGEMENT AND CONSULTANCY SERVICES 15.10.2012 154.228,43 €
14 DKY-MES JOINT VENTURE DKY ADA PROJESİ PROJECT MANAGEMENT SERVICES 10.03.2016 1.010.419,96 €
17 ÖZGÜN GIDA SAN. TİC. LTD. ŞTİ. MARINCITY PROJECT - CONSTRUCTION MANAGEMENT 1.12.2014 1.081.232,46 €
3
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry of Urban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
7 DESTEK PATENT HER AN ISTANBULPROJECT CONSTRUCTION MANAGEMENT 20.03.2018 80.240.050,00 ₺ 16.538.884,08 € € 372.137,32
13 KUYAŞ GAYRİMENKUL VE YATIRIM A.Ş. GOLDEN STOCK MARKET BUİLDİNG - PROJECT MANAGEMENT 25.07.2018 2.222.500,00 ₺ 390.762,36 € € 0,00
14 TÜRKİYE YEŞİLAY CEMİYETİ YEŞİLAY SEPETÇİLER PALACE RENOVATİON PROJECT 9.07.2018 2.125.000,00 ₺ 397.716,64 € € 0,00
4
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry of Urban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
HEALTH SECTOR
Optimal PMO has invested its energy in health sector and increasing its capacity and
experience recently. Optimal has completed the project management, construction
management and the supervision of the Centurion Pharmacy and Production Plant and
Compound in Ankara.
The projects include 26.000 m2 closed area of Pharmacy Facility Compound including Production
Building with
• High-tech Plant, Production Bands and equipment’s,
• Manufacturing Area (Filling Line, Dryers and Packaging)
• CNC and Green Area
• Solution Preparation Tanks, Vial Washing Tunnel Filling, Water Treatment Plant
• Bioassay Lab, Microbiology Lab,
• Research-Development Centre, Hygiene Divisions, Warehouses and Depots, Energy
Building, Admin buildings and Offices and its special infrastructure; such as pumping
stations, HVAC systems, etc.
With this experience and successful completion of the project; has recently awarded with
the Supervision consultancy of the Pharmacy compound of Abdi İbrahim, one of the most
famous pharmacy brand of Turkey,
The projects Sterile-administrative building and expansion buildings in Abdi İbrahim Field in
Hadımköy, Istanbul. There are approximately 50.000 m2 closed area in 3 different blocks.
Within the scope of the project the following units are being constructed;
• sterile pharmaceutical production areas,
• laboratories,
• technical units,
• warehouse and service areas and
• administrative office areas.
Optimal PMO has more than 20 staff currently working who have health sector and
especially hospital construction and pharmacy compound construction experience
5
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry of Urban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
EDUCATION SECTOR
The following map shows the geographic distribution of some of the schools in Turkey.
The recent contracts for the school buildings and the funding institutions are given below;
• Design and Supervision of Public Building in Istanbul under Istanbul Seismic Risk Mitigation
and Emergency Preparedness Project (ISMEP)
41 school campus (some of the campus has more than one or two school buildings, primary-
secondary-high, sports hall, conference buildings and dormitories and ateliers) + 112 Command
control centre + 2 nursing home + 1 orphanage which were decided to be demolished and
reconstructed against earthquake with a total closed area of approx. 320.000 m2.
• Design and Supervision Consultancy of 3th Group Cities – Educational Buildings in Bursa,
Balıkesir, Eskişehir, Kocaeli, Manisa, Sakarya Cities of Turkey
Funded by STATE BUDGET
150 school campus (some of them with sports hall, swimming pools, conference buildings and
dormitories and ateliers) with a total closed area of 740.000 m2
• Design and Supervision Consultancy of 5th Group Cities – Educational Buildings in Ankara,
Konya, Kayseri Cities of Turkey
Funded by STATE BUDGET
96 school campus (some of them with sports hall, swimming pools, conference buildings and
dormitories and ateliers) with a total closed area of 551.000 m2
• Design and Supervision Consultancy of Schools in İzmir and Bursa for Syrian Refugees
6
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry of Urban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
INVEST IN EXPERIENCE
MISSION
Our mission to serve integrated professional services to our valuable clients ensuring optimal
management standards and environmental sustainability.
7
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry of Urban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
VISION
Our vision is to serve sustainable projects to our clients showing optimal sensitivity on
environmental aspects and ensuring the high quality, safety within the estimated cost and targeted
scope.
INVESTMENT FEASIBILTY
Making the legal/legislation infrastructure, when the project is at the idea stage yet, project
identification, pre-investment studies, project appraisal creation of assumption-based estimated
costs and estimated revenue and determination of commercial value and functional structure of
the project.
8
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry of Urban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
DESIGN MANAGEMENT
Management of the process from Concept Project to the completion of Implementation Projects
by assigning them to multiple project disciplines in line with Client expectations and project
requirements.
CONSTRUCTION MANAGEMENT
Contractor Model (Main Contractor / Subcontractors) is created in line with the expectations of
Client and the entire Construction Process is managed on behalf of the Client
Fields of Activity
Name of firm: Optimal Proje Yönetimi ve İnşaat San. Tic. Ltd. Şti
(Optimal Project Management Ltd.)
The Commercial Register, İstanbul Chamber of Commerce. Registry no: 726434
Registered office address: Barbaros M. Nuh Kuyusu Cad. No:6 Üsküdar-İSTANBUL
Tel: 0 090 216 5457148
Fax: 0 090 216 5457149
E-mail: info@optimalpmo.com
9
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry of Urban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
Annual
Manpower (2015) (2016) (2017) (2018)
Relevant Relevant Relevant Relevant
Overall Overall Overall Overall
fields fields fields fields
Permanent
staff 12 18 16 110 101 131 122 101 91
Other staff 13 5 3 27 20 45 38 40 36
7
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry of Urban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
8
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
Address: Approx. value of the services provided by your firm under the
contract (in current US$ or Euro):
Milli Eğitim Bakanlığı İnşaat ve Emlak Dairesi Başkanlığı Beşevler
Kampüsü B Block İncitaş Sitesi USD 2.74 Million
Ankara On-going ((%98,50 – 2.7 Million USD))
Mr. Özcan DUMAN (Head of the Construction Department); Revised Contract Amount: (%20 Increase)
oduman@meb.gov.tr
USD 3,28 Million
Name of associated Consultants, if any: Name of senior professional staff of your firm involved and functions
performed (indicate most significant profiles such as Project
None Director/Coordinator, Team Leader):
Project Director – Burhan Ozdemir
Project Manager – Yasemin Kaya
Project Coordinator – Hüseyin Han
Structrual Engineer – Mehmet Uzun
Electrical Engineer – Banu Gümüş
Mechanical Engineer – Fettah Karağaç
1 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
• Preparation of conceptional architectural drawings to meet site conditions and beneficiary needs for the selected buildings.
• Requirement of geo-technical surveys and data collection studies for the site to examine the soil conditions for the buildings to be
constructed.
• Preparation of all related construction drawings considering technical requirements and applicable standards (structural,
architectural, mechanical, electrical, electronics and communication, infrastructural and landscaping drawings, etc.) in
compliance with new local building codes in disaster prone areas.
• Preparation of all necessary technical specifications, Bill of Quantities and tender documents with respect to final construction
drawings.
• On-site construction supervision throughout the construction period.
• Onsite and Off-site infrastructure design and supervision
• Supervising the Works including defects liability period.
• Acting as the Engineer under the contracts
2 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
Address: Approx. value of the services provided by your firm under the
contract (in current US$ or Euro):
Milli Eğitim Bakanlığı İnşaat ve Emlak Dairesi Başkanlığı Beşevler
Kampüsü B Block İncitaş Sitesi USD 3,51 Million
Ankara On-going ((%116 – 3,4 Million USD))
Mr. Özcan DUMAN (Head of the Construction Department);
oduman@meb.gov.tr
Name of associated Consultants, if any: Name of senior professional staff of your firm involved and functions
performed (indicate most significant profiles such as Project
None Director/Coordinator, Team Leader):
Project Director – Burhan Ozdemir
Project Manager – Avni Toksoy
3 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
• Preparation of conceptional architectural drawings to meet site conditions and beneficiary needs for the selected buildings.
• Requirement of geo-technical surveys and data collection studies for the site to examine the soil conditions for the buildings to be
constructed.
• Preparation of all related construction drawings considering technical requirements and applicable standards (structural,
architectural, mechanical, electrical, electronics and communication, infrastructural and landscaping drawings, etc.) in
compliance with new local building codes in disaster prone areas.
• Preparation of all necessary technical specifications, Bill of Quantities and tender documents with respect to final construction
drawings.
• On-site construction supervision throughout the construction period.
• Onsite and Off-site infrastructure design and supervision
• Supervising the Works including defects liability period.
• Acting as the Engineer under the contracts
4 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
Name of associated Consultants, if any: Name of senior professional staff of your firm involved and functions
performed (indicate most significant profiles such as Project
Projacs International (Qatar), Director/Coordinator, Team Leader):
Dome Doğal Mekan Mimarlık İnş. Dan. Tur. İth. San. Ltd. Şti. Project Director – Yasemin Kaya
(Turkey)
Project Manager – Veysi Coşkun
Chief Architect –Ebru Odabasi
Cost & Planning – Erhan Kaplan
Electrical Engineer – Halil İbrahim Ünal
Mechanical Engineer – Mete Kılıç
QA & QC – Füsun Acar
Health and Safety Engineer – Ali Çeliker
Seismic Engineer - Ömer Ülker
Leed Expert – Berkay Somalı
Façade Expert – Behlül Tetik
5 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
6 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
Address: Approx. value of the services provided by your firm under the contract (in current
US$ or Euro):
Başakşehir Mah. Olimpia Residans No:8/10,
US$ 1,38 (on –going 0,58 USD Million - %42)
Başakşehir-ISTANBUL-TURKEY
Name of associated Consultants, if any: Name of senior professional staff of your firm involved and functions performed
(indicate most significant profiles such as Project Director/Coordinator, Team
None Leader):
Project Manager – Gokay Rodoplu
Deputy Manager – Halil İbrahim Yılmaz
Cost&Planning – Mehmet Emre Işıkyıldız
QA&QC – Ömer Faruk Altınsoy
The project covers campus including but not limited to the construction of the buildings having 1.252 housing units & residences + 229
commercial units in total having an approximately 346.000 m² built-up area and all related civil, mechanical, electrical, landscape and
infrastructural works as well as the landscaping works. The Project will be multi-storied comprising in-situ reinforced concrete construction and
equipped with sophisticated electrical and mechanical services, including lifts, heating, ventilation/air-conditioning systems.
• Design Review
7 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
8 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
Address: Approx. value of the services provided by your firm under the contract (in current
US$ or Euro):
Burhaniye Mh. Kısıklı Cd. No:65
US$ 0,27 Million
Üsküdar – Istanbul
Name of associated Consultants, if any: Name of senior professional staff of your firm involved and functions performed
(indicate most significant profiles such as Project Director/Coordinator, Team
Dome Leader):
Project Director – Burhan Ozdemir
Project Manager – Engin Kabil
Deputy Manager - Irem Ozden
Trump Towers Mall containing 185 stores and covering an area of 65,000 sqm.
9 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
10 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
Address: MEB Beşevler Kampüsü B Blok Beşevler /Ankara Approx. value of the services provided by your firm under the contract
06500 (in current US$ or Euro):
Tel: 00(90)3124133132 Fax: 00(90)3122138346 On-going
E-mail: iedb_frit@meb.gov.tr Web: www.iedb.meb.gov.tr
Name of associated Consultants, if any: Name of senior professional staff of your firm involved and functions
performed (indicate most significant profiles such as Project
Director/Coordinator, Team Leader):
Project Manager – Avni Toksoy
11 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
12 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
Address: Approx. value of the services provided by your firm under the
contract (in current US$ or Euro):
Milli Eğitim Bakanlığı İnşaat ve Emlak Dairesi Başkanlığı Beşevler
Kampüsü B Block İncitaş Sitesi USD 1,1 Million
Ankara
Mr. Özcan DUMAN (Head of the Construction Department);
oduman@meb.gov.tr
Name of associated Consultants, if any: Name of senior professional staff of your firm involved and functions
performed (indicate most significant profiles such as Project
None Director/Coordinator, Team Leader):
Project Director – Burhan Ozdemir
Project Manager – Avni Toksoy
13 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
• Preparation of conceptional architectural drawings to meet site conditions and beneficiary needs for the selected buildings.
• Requirement of geo-technical surveys and data collection studies for the site to examine the soil conditions for the buildings to be
constructed.
• Preparation of all related construction drawings considering technical requirements and applicable standards (structural,
architectural, mechanical, electrical, electronics and communication, infrastructural and landscaping drawings, etc.) in compliance
with new local building codes in disaster prone areas.
• Preparation of all necessary technical specifications, Bill of Quantities and tender documents with respect to final construction
drawings.
• On-site construction supervision throughout the construction period.
• Onsite and Off-site infrastructure design and supervision
• Supervising the Works including defects liability period.
• Acting as the Engineer under the contracts
14 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
Address: Approx. value of the services provided by your firm under the
contract (in current US$ or Euro):
Milli Eğitim Bakanlığı İnşaat ve Emlak Dairesi Başkanlığı Beşevler
Kampüsü B Block İncitaş Sitesi USD 0,7 Million
Ankara
Mr. Özcan DUMAN (Head of the Construction Department);
oduman@meb.gov.tr
Start date (month/year): Contract Awarded No of professional staff-months provided by associated Consultants:
Completion date (month/year): NA
Name of associated Consultants, if any: Name of senior professional staff of your firm involved and functions
performed (indicate most significant profiles such as Project
None Director/Coordinator, Team Leader):
Project Director – Burhan Ozdemir
Project Manager – Avni Toksoy
15 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
• Preparation of conceptional architectural drawings to meet site conditions and beneficiary needs for the selected buildings.
• Requirement of geo-technical surveys and data collection studies for the site to examine the soil conditions for the buildings to be
constructed.
• Preparation of all related construction drawings considering technical requirements and applicable standards (structural,
architectural, mechanical, electrical, electronics and communication, infrastructural and landscaping drawings, etc.) in compliance
with new local building codes in disaster prone areas.
• Preparation of all necessary technical specifications, Bill of Quantities and tender documents with respect to final construction
drawings.
• On-site construction supervision throughout the construction period.
• Onsite and Off-site infrastructure design and supervision
• Supervising the Works including defects liability period.
• Acting as the Engineer under the contracts
16 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
Address: Approx. value of the services provided by your firm under the
contract (in current US$ or Euro):
Tekel cad. Orhantepe mah . Eski tekel sigara fabrikası 2-8 Kartal /
İSTANBUL USD 1,71 Million
İŞÜ - ZAFER NALBANTOĞLU (zafernalbantoglu@sehir.edu.tr) Completed (DLP on-going)
Name of associated Consultants, if any: Name of senior professional staff of your firm involved and functions
performed (indicate most significant profiles such as Project
None Director/Coordinator, Team Leader):
Project Manager – Ahmet Behçet Baran
Deputy Project Manager – Halil İbrahim Yılmaz
Cost&Plan – Erhan Kaplan
Mech. Eng. – Orçun Çiçekoğlu
Elec. Eng. – Eser Çoban
Narrative description of Project:
The projects include the project management, construction management and site supervision of İstanbul Şehir University Dragos Campus;
Superstructure; 113,000 m2 in a 450.000 m2 site
• Faculty Buildings
• Admin Buildings
• Library
• Energy Buildings
• Conference Hall Social Facility Buildings
• Data Centers
Infrastructure (On-site and Off-site)
• On-site Roads
• Sewerage System 3,5 km
• Stormwater System 4,5 km
• Potable Water & Fire Hydrant Lines12,6 km
17 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
• Preparation of all necessary technical specifications, Bill of Quantities and tender documents with respect to final
construction drawings.
• Procurement Management (Market-surveys, inviting the potential qualified companies, collecting the bids from bidders,
evaluating the Tender and recommendation of award to the Client)
• Preparation of contracts with the sub-contractors
• Construction Management
• On-site construction supervision throughout the construction period.
• Onsite and Off-site infrastructure design and supervision
• Making all the design revisions and the issuing of the variation orders, change management, value engineering, claim
management
• Monitoring & Evaluation
• Risk Management
• Supervising the Works including defects liability period.
• Acting as the Engineer under the contracts.
18 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
Address: Approx. value of the services provided by your firm under the contract (in
current US$ or Euro):
İstanbul Vizyon Park Merkez Plaza Kuyumcular Sk.
No: 4 C-1 Blok Kat: 11 34197 Bahçelievler – İstanbul USD 1,06 Million (The first phase completed; the second phase is
T. (0850) 640 0 400 F. (0212) 603 32 04 waiting the notice to commence)
E. info@kuyas.com.tr
Name of associated Consultants, if any: Name of senior professional staff of your firm involved and functions
performed (indicate most significant profiles such as Project
None Director/Coordinator, Team Leader):
Project Manager – Bülent Unal
Design Coordinator – Özlem Kayserilioğlu
MEP Coordinator – Cemal Özünalan
Technical Office Coordinator – Önder Şenol
19 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
20 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
Address: Approx. value of the services provided by your firm under the contract
(in current US$ or Euro):
Hoşsohbet Sokak No: 6 Balmumcu/Beşiktaş/İstanbul
Tel : 00902122750708 (Pbx) Euro 4.436.789,23
Fax : 00902122746149
E- Mail : info@centurion.com.tr
Name of associated Consultants, if any: Name of senior professional staff of your firm involved and functions
performed (indicate most significant profiles such as Project
None Director/Coordinator, Team Leader):
Project Director – Burhan Özdemir
Project Manager – Nurettin Mutlu
Chief Architect- Zerin Ergun
Cost & Planning – Önder Şenol
MEP Coordinator – Cemalettin Özünalan
Electrical Coordinator – Gökhan Akbaşoğlu
21 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
22 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
23 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
24 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
25 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
Address:Reşitpaşa Mahallesi, Eski Büyükdere Caddesi No: 4 Maslak - Approx. value of the services provided by your firm under the
Sarıyer 34467 İstanbul contract (in current US$ or Euro):
Tel : 00902123668400 (Pbx)
Fax : 00902122762020 2.300.000 TL (Euro 300.394,43 due to fluctuation in currency)
E- Mail : info@abdiibrahim.com.tr
Name of associated Consultants, if any: Name of senior professional staff of your firm involved and functions
performed (indicate most significant profiles such as Project
None Director/Coordinator, Team Leader):
Project Director – Yasemin Kaya
Project Manager – Gürsel Çankaya
Chief Architect- Zerin ERGUN
Cost & Planning – Önder Şenol
Mechanical Coordinator – Cemal Özünalan
Electrical Coordinator – Halil İbrahim Unal
26 of 27
ISLAMIC REPUBLIC of AFGHANISTAN
Ministry ofUrban Development Housing (MUDH)
Ref: MUDH/1397/S-023
Construction Management and Construction Supervision for Phase 1
Infrastructure and Building of Dar-ul Aman Administrative Complex
27 of 27