Province of Palawan
Municipality of Brooke’s Point
MUNICIPAL DISASTER RIK REDUCTION AND MANAGEMENT OFFICE
FOR: ALL MDRRM COUNCIL MEMBERS, PDRRMO, ROCD, DILG, MIO AND OTHER DRRM STAKE HOLDERSI
FROM: BROOKE’S POINT EOC
SUBJECT: SITUATION REPORT 42 RE: EFFECTS OF LPA and Northeast Monsoon.
DATE: 14 JANUARY 2023, 1415H
SOURCE: BP EOC
I. SITUATION OVERVIEW
SYNOPSIS: At 3:00 AM today, the Low Pressure Area (LPA) was estimated based on all available data over the coastal waters of Lanuza, Surigao del Sur
(9.3ºN, 126.1ºE). Northeast Monsoon affecting Northern and Central Luzon.
II. EFFECT
A. INCIDENT MONITORED
TYPE OF NO. OF
INCIDENT LOCATION DATE & TIME PERSONS DETAILS ACTIONS TAKEN
RESCUE OPERATIONS, REACTIVATION OF THE
FLOODING ALMOST ALL BGYS 04 JAN 2023 - EOC AND IMT, REQUEST RESPONSE
AUGMENTATION FROM OTHER DRRMOs
HOUSE ALONG RODRIGUEZ
ST ON FIRE WAS REPORTED
TO BFP AT 2010H WHILE
FIRE INCIDENT BGY. POBLACION DIST II 04 JAN 2023 - FIRE OUT AS OF 2015H 04 JAN 2023
ATTEMPTS TO PUT OUT FIRE
WAS BEING MADE BY THE
GUARD OF RURAL BANK.
B. AFFECTED POPULATION
1. EVACUATED POPULATION
NO. OF NO. OF
BARANGAY ORIGIN EVAC CENTER REMARKS
FAMILIE S PERSON S
2. STRANDED POPULATION
STRANDED
BARANGAY NO. OF FAMILIES NO. OF PERSONS REMARKS
RESIDENCE
ISOLATED DUE TO SPILLWAY OVERFLOWING AND
UMULNOD
DESTRUCTION OF CABINBIN HANGING BRIDGE
MAINIT ISOLATED DUE TO SPILLWAY OVERFLOWING
MAMBALOT ISOLATED DUE TO INACCESSIBLE ROAD TO RIZAL
IPILAN (CANDIZ,
CURANGA, PINTASAN, ACCESSIBLE AS OF 07 JANUARY 2023 0800H
BAGONG SIKAT)
IPILAN (MANGCAYAP,
ACCESSIBLE AS OF 07 JANUARY 2023 0800H
CALAMIT, LINAO)
TOTAL
C. CASUALTIES
LOCATION DATE&TIME NO. OF PERSONS DETAILS ACTIONS TAKEN
INJURED
TAGUSAO SHORE,
04JAN2023 1700H 1 LACERATED RIGHT LEG FIRST AID TREATMENT
BARONGBARONG
NONE REPORTED
MISSING
NONE REPORTED
DEAD
NONE REPORTED
D. DAMAGE HOUSES
NO. OF NO. OF
BARANGAY ESTIMATED COST HH TOTTALY DAMAGED HH PARTIALLY DAMAGED
AMAS 300,000.00 2 0
ARIBUNGOS 450,000.00 3 0
BARONGBARONG 8,025,000.00 41 5
IMULNOD 750,000.00 5 0
IPILAN 1,275,000.00 5 7
MAASIN 1,725,000.00 7 9
MAINIT 1,800,000.00 11 2
MALIS 75,000.00 0 1
MAMBALOT 1,125,000.00 3 9
ORING-ORING 300,000.00 0 4
PANGOBILIAN 1,275,000.00 8 1
SAMARIÑANA 150,000.00 0 2
SARARAZA 225,000.00 0 3
TUBTUB 300,000.00 2 0
TOTAL 17,775,000.00 87 43
E. DAMAGED PROPERTIES
ESTIMATED COST OF ACTIONS
BARANGAY DATE&TIME NO. AND TYPE DAMAGED PROPERTY ADDRESS TAKEN
(PhP.)
04JAN23 FARMS,
IMULNOD IMULNOD ISOLATED
LIVESTOCK
1800H
MALIS 05 JAN 2023 RICE FARMS MALIS
F. HEALTH STATUS
1. CASES MONITORED
DATE & TIME LOCATION NUMBER CASE DESCRIPTION ACTIONS TAKEN
04JAN23 TAGUSAO, 1 WOUND ON THE RIGHT LEG FIRST AID TREATMENT
1700H BARONGBARONG
04JAN23 TUBTUB 6 CASES OF SORE EYES CONFIRMED CASE
05JAN23 SARAZA 44 REPORTED GASTRO INTISTINAL PROBLEM UPON CONFIRMATION OF THE RHU, ONLY 3
MANIFESTED S/S OF DIARHOEA
05JAN23 MAINIT 1 REPORTED GASTRO INTISTINAL PROBLEM CONFIRMED DIARHOEAL CASE
06JAN23 BAYOG, 1 REPORTED GASTRO INTISTINAL PROBLEM CONFIRMED DIARHOEAL CASE, ADMITTED TO
ARIBUNGOS SAGRADO HOSPITAL
2. ACTIONS TAKEN
DATE & TIME LOCATION NUMBER DESCRIPTION
05/01/23 BARONGBARONG 90 JERICANS
ARIBUNGOS 1300 AQUATABS
SARAZA
MAINIT
IMULNOD
SALOGON
SAMARINIANA
AMAS
07/01/23 BARONGBARONG WATER RATIONING
BPNHS WATER BLADDER
SARAZA WATER BLADDER
07/01/23 RESPONSE TEAMS VITAMIN C
PROPHYLAXIS FOR LEPTOSPYROSIS
04/01/23 MUN. EVAC RECEIVED MEDICINE AUGMENTATION FROM THE PHO, PDOHO AND HYGEINE KITS FROM UPAA
CENTER
05/01/23 MUN. EVAC WASH TEAM ACTIVATED
CENTER
05/01/23 MUN. EVAC NUTRITION OFFICE, MONITORED NUTRITION STATUS OF EVACUEES
CENTER
G. STATUS OF LIFELINE
1. POWER SUPPLY
BARANGAY DATE&TIME SEVERITY REMARKS ACTIONS TAKEN
04 JAN 2023 ALL BGYS NO
18 LINE ARE DOWN MONITORED BY PALECO
0900H ELECTRICITY
RESUME
BALACAN
RESUME
EDWARDS
RESUME
06 JAN 2023 TAGUSAO
1826H MARKET FISH
RESUME
SECTION
RESUMED 1000H PALECO BROOKE’S POINT RESTORED THE LINES
SABSABAN
14 JAN 2023
2. WATER SUPPLY
SERVICE PROVIDER DATE&TIME SEVERITY REMARKS ACTIONS TAKEN
04 JAN 2023 ALL BGYS NO SHUTDOWN DUE TO TOO MUCH CONDUCTED ASSESSMENT OF THE
BPWSO
0800H WATER SUPPLY SEDIMENTS SINCE 24 DEC 2022 WATER PLANTS
05 JAN 2023 WATER RATIONING
BPRWSA POBLACION AREAS LIMITED SUPPLY
0000H-0400H C/O RHU
3. INTERNET CONNECTIONS
BARANGAY DATE&TIME SEVERITY REMARKS ACTIONS TAKEN
05 JAN 2023 ALL BGYS SMART CONNECTION RETURN
18
06 JAN 2023 UNIDENTIFIED GLOBE CONNECTION RETURN (1418H)
4. ROADS AND BRIDGES
LOCATION DAMAGED INFRASTRUCTURE QUANTITY REMARKS AMOUNT
Sitio Mantalong, Brgy. Amas/Tubtub Concrete Bridge - Approach 3 meters 1 Partially Damaged ₱ 150,000.00
Sitio Bagnao, Brgy. Aribungos Concrete Bridge - Approach - 1.5 meters 1 Partially Damaged ₱ 150,000.00
Along provincial road leading to
Road Shoulder - 100m (PGP) - Partially Damaged ₱ 200,000.00
Sabsaban - Brgy. Aribungos
District I/District II Breakwater/ Seawall - Partially Damaged ₱ 5,000,000.00
Along National Highway, Brgy.
Road Shoulder - 300m (DPWH) - Partially Damaged ₱ 400,000.00
Barong-barong
Cable Suspension Bridge/ Hanging Bridge -
Brgy. Imulnod 1 Totally Damaged ₱ 1,800,000.00
total damaged
Cable Suspension Bridge/ Hanging Bridge -
Brgy. Imulnod - Partially Damaged ₱ 1,000,000.00
total damaged (DPWH)
Ipilan Proper 2, Brgy. Ipilan Concrete Bridge- total damaged 1 Totally Damaged ₱ 1,700,000.00
Box Culvert - 5 meters approach with
Sitio Mangcayap, Brgy. Ipilan 1 Partially Damaged ₱ 800,000.00
wingwall at one side (PGP)
RCPC with wingwall - approach and rcpc
Mainit Proper, Brgy. Mainit 1 Partially Damaged ₱ 300,000.00
(PGP)
Sitio Raang, Brgy. Mainit Box Culvert - Approach 3 meters 3 Partially Damaged ₱ 600,000.00
Suring 2, Brgy. Pangobilian/Mainit PCCP with Culvert(RCPC & BOX) - approach
1 Partially Damaged ₱ 1,500,000.00
(Mainit Spillway) and wingwall and pccp at one end (DPWH)
Along National Highway,Sitio Lada,
Road Shoulder - 200m (DPWH) - Partially Damaged ₱ 300,000.00
Brgy. Pangobilian
Sitio Lada, Brgy. Pangobilian Tigaplan Riverbank Protection (DPWH) - Partially Damaged ₱ 1,000,000.00
Along National Highway,Purok 1,
Road Shoulder - 100m (DPWH) - Partially Damaged ₱ 200,000.00
Brgy. Mambalot
Along National Highway, Mambalot
Gate & Perimeter Fence - 50m - Partially Damaged ₱ 300,000.00
Elem. School ,Brgy. Mambalot
Sitio Rizal, Mambalot RCPC with headwall - Totally Damaged ₱ 200,000.00
Sitio Tabud, Brgy. Saraza RCPC with riprap - riprap and approach 3 Partially Damaged ₱ 750,000.00
Concrete Bridge - 2 meter approach & wing
Sitio Tabud, Brgy. Saraza 1 Partially Damaged ₱ 200,000.00
wall protection at one end
Sitio Tabud, Brgy. Saraza Gravel Road - 200m - Partially Damaged ₱ 200,000.00
Concrete Bridge - 25 m Approach and Wing
Sitio Tamlang, Brgy. Saraza 1 Partially Damaged ₱ 2,000,000.00
wall Protection both ends (PGP)
Salogon Proper, Brgy. Salogon Concrete Bridge - Approach 1 Partially Damaged ₱ 500,000.00
Along National Highway,Brgy.
Road Shoulder - 100m (DPWH) - Partially Damaged ₱ 200,000.00
Tubtub
Sitio Tabud Brgy. Saraza Water Treatment Plant Macagua 1 Partially Damaged ₱ 960,000.00
Brgy. Mainit Water Treatment Plant Cabinbin 1 Partially Damaged ₱ 1,990,000.00
Brgy. Maasin Water Treatment Plant Filantropea 1 Partially Damaged ₱ 1,156,000.00
18 Barangays - Municipal Wide Barangay Roads Partially Damaged ₱ 5,000,000.00
TOTAL AMOUNT ₱ 28,556,000.00
5. AIR TRAVEL
STRANDED
AIRPORTS REMARKS PASSENGER ROUTE VESSEL DATE &TIME
NONE REPORTED
6. SEA TRAVEL
STRANDED
SEA PORTS REMARKS
PASSENGER ROUTE VESSEL DATE &TIME
H. DECLARATION OF STATE OF CALAMITY
MUNICIPALITY DATE&TIME REMARKS
DAMAGED DUE TO EFFECTS OF FLOODING
BROOKE’S POINT DEC 28 2022
BROUGHT BY HEAVY RAINFALL.
I. SUSPENSION OF CLASSES
MUNICIPALITY BARANGAY SCHOOL DATE&TIME REMARKS
04 JAN 2023
BROOKE’S POINT ALL BGY ALL RESUME 10 JAN 2023
0800H
J. SUSPENSION OF WORK
MUNICIPALITY BARANGAY OFFICE DATE&TIME REMARKS
04 JAN 2023
BROOKES POINT ALL ALL RESUME 1/5/2023
0800H
NOTE:
YELLOW= NEW UPDATES/CHANGES
PREPARED BY: