DWDM Node Acceptance Criteria - Express Layer - v2 T24 Chennai Ekkathangal-1
DWDM Node Acceptance Criteria - Express Layer - v2 T24 Chennai Ekkathangal-1
Doc. Title:
DWDM Node Acceptance Process
Revision
Versi Release
Details and Draft by Validated by Approved by
on Date
Remarks
Nazam
Gaurav Perwar/Mano
02-23-
1.0 Vivek Joshi Pawar/Vaibhav j
2021
M/Kuldeep Pawar Markose/Sanj
ay Nigam
Target Audience
VI Planning Team
VI COG & Circle Ops Team
Circle Planning /Project/Ops/ Team
SNOC CHM/INM/TAC Team
Ciena Planning/Project Team
This document is to provide the checklist for handover of all DWDM Nodes, Links & network from
Projects to Operations. It captures parameters to be validated by Circle Operations & NOC-Tx for all
New/Redeployment DWDM network before integration in thenetwork.
2. Background
In order to meet the capacity requirements in the transmission network, the DWDM network has
been deployed as National, Circle &Metro DWDM . To ensure operational efficiency, it is important
to ensure that the DWDM links deployed are as planned. Since the planning, deployment &
maintenance of the DWDM links involves multiple stake-holders, a standard process for the
integration of newnodes/links in the network is required. This document describes the DWDM
Nodes, Links& Services acceptance criteria in detail.
Test Results
Link Name: TNE-11, TNE-O1, TNE-17, TNE-12, TNE-13, TNE-15 Rack/Sub rack No: _21
Ciena Representative (s) Vodafone India Representative (Field) Vodafone India Representative (NOC)
NOTE: All readings to be recorded against each test in the document. Wherever it is NOT APPLICABLE
Please mention N/A
Sub rack equipped to job specification i.e. rack ID, Sub rack ID, PASS
2.1
sub rack type & its position are as per design/With Photographs
PASS
2.2 Nuts, bolts washers all in place and secure.
Sub rack power cables terminated properly as per PASS
2.3 designmentioning Lugs &Sleves With Photographs& with
Labeling
Other cables i.e. alarm, management and data cables are PASS
2.4 terminated, routed & labeled properly as per designwith
Photographs& with Labeling
All patch cords routed, terminated and labeled properly at PASS
2.5
relevant ODF with Photographs& with Labeling
Fiber excess length is looped properly in the duct or on cable tray PASS
2.6 and secured using Velcro / split spiral for the New rack installed
with Photographs& with Labeling
3 Grounding.
Proper gauge cable used for grounding for the New rack PASS
3.1
installedas per VI Specification
Grounding cable is with lugs on either end, terminated with PASS
3.2 proper hardware for the New rack installed with Photographs&
with Labeling
4 DC Power Cabling.
Acceptance Criteria
Quality of Installation should meet criterions mentioned contents with above table.
CienaRepresentative VI Representative
Any deviation in the acceptance parameters listed in this document needs to be approved along with
timeline for rectification of the deviation by all of the following people before the link is integrated in
the network as part of deviation/risk approval process.
1. Circle CTO
2. CODE-Transport Planning Head
3. COG-Transport Operations Head
The access backhaul links planning & acceptance process involves the following steps and the
ownership of executing the steps have been mentioned in the responsibility matrix as given below.
Node Acceptance Test & Link Acceptance test shall be done prior to service acceptance test.
Key: