The Singareni Collieries Company Limited Annexure - III

BRIEF SUMMARY OF GODAVARIKHANI 11 INCLINE ( GDK 11)


UNDERGROUND COAL MINING PROJECT

The Singareni Collieries Company Limited (SCCL) is operating 5 no’s of coal mines
namely Godavarikhani-1&3 incline coal mining project, Godavarikhani-2&2A incline coal
mining project, Godavarikhani-5 incline coal mining project , Medapalli opencast coal
mining project, and Godavarikhani 11 incline (GDK 11 ) underground coal mining project in
Ramagundem-1 area of Peddapalli District in Telangana State.

GDK-11 incline mine consists of three inclines and two shafts. The three inclines are
connected to No.1 seam. Out of two shafts, one shaft i.e. return air shaft is connected up to
No. 3 seam where main mechanical ventilator is installed and the other i.e. intake shaft is
connected to No. 1 seam only.

GDK 11 Incline is an operating mine in Ramagundam area with a mine take area of
901.13 ha which falls in Pandulapalli Mining Lease and South Godavari Mining Lease.

The Mining Plan of “Deep mining area Ramagundam", was approved earlier vide
Lr.No.13011/1/89-CA, dated 8th August, 1989 by Ministry of Coal, GoI for an extent of
4877 ha. Accordingly, Environmental Clearance for Godavarikhani-11A incline (GDK 11A )
was accorded from MoEF vide letter no J-11015/38/89-IA-II, dated 10th August, 1990 with
a mine take area of 197.00 ha with Road headers and Long wall technology.

In, 2006, the Mining Plan of “Deep mining area Ramagundam", was revised with the
change in reserves, technology & production and named as 1st revision of Mining Plan for
part of Deep mining area of Ramagundam (GDK-11A & Peddampeta shaft Project)”, and
obtained approval vide Lr.No.13016/9/2006-CA-II, dated 12th October, 2006, Ministry of
Coal, GoI.

GDK-11A Incline and Peddampeta Shaft Project are vertically below one another and
planned to share by the same entries. The Mining Plan was prepared for a mine take area
of 725.00 ha with total of No.1 seam and part of No.3 seam (upto 300m depth line) by
existing GDK 11A Incline working with LHD, Blasting Gallery and Continuous Miner
technology for a life of 20 years @ 0.825 Mtpa from 2006-07 and total area of No. 2
seam, No. 3 seam (beyond 300m depth line) & No. 4 seam by the proposed Peddampeta
Shaft Project with Longwall, Road Header and Continuous Miner for life of 32 years @ 1.46
(peak-1.76) MTPA from 2006-07.

Environmental Clearance for Peddampeta Shaft Project was accorded from MoEF vide
letter no J-11015/307/2006-IA-II (M), dated 11th June, 2007 with the rated capacity of
1.459 MTPA with an extent of 725.00 ha with Road header, long wall and continuous miner
technology.

Brief Summaryof Vakilpalli Mine


The Singareni Collieries Company Limited

Subsequently With the changed scenario of technology, production schedule mining


Plan (2nd Revision) & Mine Closure Plan of part of Deep mining of Ramagundam was
prepared by combining both GDK 11A Incline and Peddampeta shaft Project by enhancing
the mine take area by 176.13 ha from 725 ha to 901.13 ha. (The enhanced area of 176.13
ha falls partly (i.e, 41.86 ha) in Pandulapalli Mining Lease and remaining (i.e, 134.27 ha)
falls in South Godavari Mining Lease) and renamed as GDK-11 Incline the same was
approved by MoC, GoI vide letter No: 34011-10-2016, dated 17th August, 2016 for the
production capacity of 1.0 MTPA (peak 1.30MTPA).

The reserves up to 310 m depth line of No. 4 seam are identified for future Opencast
Projects and reserves beyond 310 m depth line of No.1, 3, & 4 seam are considered for the
existing GDK 11 Incline underground mine with Continuous Miner technology in No.1
seam, Blasting gallery technology in No.3 seam, LHDs in No. 4 seam

The present proposal for GDK-11 incline is being submitted for obtaining prior
Environmental clearance in accordance with the MoEF&CC, EIA & EMP notification S.O.
1533, dated 14thSep,2006 and and S.O 1530 dated 6th April, 2018 for grant of Terms of
Reference/ Environmental Clearance for expansion of the project. Hence balance
extractable reserves of 38.22 MT( as on 01.04.2015) are estimated for the present
proposal at the rate of 1.00 MPTA (peak-1.3 MPTA) in the mine take area of 901.13 ha
with Continuous miner, Blasting gallery and LHD technology.

Salient features of the project:

1. Name of the project GDK 11 Incline


2. Geological Block GDK-11 Incline block (Shaft Block-I (Ramagundam
area) & part of Dubbapalli Block)
3. Name of the Coal Field Ramagundam coal belt,
Godavari Valley Coal Field.
4. Name of the Organization The Singareni Collieries Company Limited
5. Type of project Underground coal mine
6. Location
• Village(s) Jallaram village
• Mandal Ramagiri
• District Peddapalli
• State Telangana
• Name of the Coalfield Godavari Valley Coalfield
• Nearest Rly Station Ramagundam Road railway station
• Nearest Air Port Gandhi International Airport, Shamshabad of
Hyderabad
Brief Summaryof Vakilpalli Mine
The Singareni Collieries Company Limited

Latitude North 180 41’ 30” - 180 44’ 10”


Longitude East 790 32’ 58” - 790 34’ 54"
Survey of India Topo sheet 56 N/10

7. Project area /Mine take 901.13


Area(ha)
8. Forest Land(ha) Nill
9. land details (ha) Sl. Particulars Area
A. Acquired land:
1 Forest land Nil
2 Non forest land
a Mine pithead structure/ 19.5
establishment area
sand stowing 6.60
b
plant/sand stock area
c Coal dump area 0.50
d Villages 53.00
e Nallah (Jallaram vagu) & Tank 55.5
f Area reclaimed by Plantation 479.49
(as on 31 03 2015)
Vacant land (proposed 123.609
g
plantation area)
Sub Total 738.199
B. Non Acquired land:
1 Private land 39.088
2 Government 123.843
Sub Total 162.931
Grand Total (A+B) 901.13
10. Borehole Density 14.09 Bore holes per km2
11. Seams present 1A, 1, 2, 3B, 3A 3 and 4 seams are present
12. Seams considered for Three workable seams namely No 1 seam, 3 seam
extraction and 4 seam.
13. Gradient 1 in 8 to 10
14. Thickness of seams Thickness (m)
Seam
Min Max
I 3.97 6.5
III 6.10 11.37
IV 1.95 4.27
15. Depth range Depth (m)
Seam
Min Max
I 63.85 345.07
III 137.20 419.85
IV 158.20 443.00

Brief Summaryof Vakilpalli Mine


The Singareni Collieries Company Limited

16. Quality
Seam/ GCV (K.cal/kg) Grade
sections From To From To
I 3967 5113 G12 G8
III 4789 5737 G9 G6
IV 5751 6516 G6 G4

17. Average Grade G4 to G10. Mean G 7


18. Technology No.1seam with Continuous Miner technology, No.3
seam with Blasting Gallery Technology and No.4
seam with LHDs respectively,
19. Method of Mining Board and Pillar, Under ground
20. Manpower 1310
21. Geological Reserves (Balance The estimated geological reserves of GDK 11 incline
as on 01-04-2015) are 298.01 Mt. Out of total geological reserves,
geological reserves considered for underground
mining (beyond 310m depth line of IV seam) are
161.61 Mt and the balance extractable reserves are
38.22 Mt as on 01.04.2015.
22. Balance extractable reserves 38.22 Mt as on 01.04.2015.
23. Production Capacity (Mtpa) 1.0 and 1.3 peak

24. Life of the Mine 45 years from 2015-16


25. R&R involved Nil
26. Additional land required Nil
27. Project cost 156.00 Crores
28. Additional capital required Nil

Brief Summaryof Vakilpalli Mine