PRODUCTION DEPARTMENT
MARCH 2015
S. ARE TIM RESPONSIBILITY Violation category
JOB TITLE DATE PROBLEM
#. A E
19-3- Maint Team Leader name and signature Procedure violation
1. Tiles fixing in operator cabin. 01 15 1135 Urea
missing.
CCR backside debris loading for 5-3-15 Substandard PPEs (damaged helmet and PPE,s non compliance
2. CCR 1500 Ammonia
shifting with tractor trolley. goggles used by contractor).
19-3- Substandard stand (without railing) used for Defective Tools
3. Painting of new operator cabin. 04 1200 Ammonia
painting.
Soil removal upto 3 inch near 30-3- Expired work permit of 28-3-15 found at job Procedure violation
4. 04 0952 Ammonia
MK-212 gravel area. site on 30-3-15.
1. Damaged safety helmet being used. PPE,s non compliance
Pit floor breaking with chisel and
5-3-15 2. Civil job (Plastering) was in progress on Procedure violation
5. hammer near 08 1600 Utilities
the same permit. No separate permit was
MV-802.
issued for the civil job.
Fly wheel side oil leakage 19-3- Procedure violation
6. cleaning with kerosene oil at 07 1517 Permit was not extended. Utilities
MG-702.
MG-702 rocker valve 19-3- Validity time was tempered. (changed from Procedure violation
7. 07 1516 Utilities
adjustment. 1400 hrs to 1800 hrs)
1. Standby person was not present at Procedure violation
To enter in V-920C to perform 19-3- entrance.
8. 09 1552 Utilities
unloading of sand media. 2. Person inside the vessel was not wearing
harness.
1. Work permit for scaffolding adjustment Procedure violation
at T-901 was also handed over
simultaneously.
Cleaning and painting of T-901 28-3- 2. Only upper 2 platforms of scaffolding
9. 09 0950 Utilities
external. were complete and lower platforms were
incomplete. So it was required to mention
in the permit to work on upper 2
platforms only.
/conversion/tmp/activity_task_scratch/646443295.docx
1. Permit was in the pocket of maint. team Procedure violation
28-3- leader.
Scaffolding adjustment around
10. 09 0950 2. Work permit for cleaning and painting of Utilities
T-901.
T-901 external was also handed over
simultaneously.
/conversion/tmp/activity_task_scratch/646443295.docx
MG-702 rocker valve 19-3- Validity time was tempered. (changed from 1400 hrs to Procedure
7. 07 1516 Vehicle Shop violation
adjustment. 1800 hrs)
Scaffolding provision for light 13-3- PPE,s non
8. 06 1030 Safety spectacles not used by scaffolder. Electrical compliance
replacement near TK-602.
PPE,s non
Back filling with PCC ground 31-3-
9. 13 1125 Not used safety spectacles. Electrical compliance
floor near SS-5.