Execution Module
Execution Module
What ever work we are executing at site as per our BOQ, tender Terms and conditions i.e. as per our
Planning Module we have created activities and Sub activities.
Master: Execution Approval Master
Execution Approval Master: This form shows the rights at different locations for work orders,
instructions etc.
Work Awards:
Work Orders:
There first WO of the job is a system created WO. No Accounting entry will be generated on the R.A
Bill of such first WO.
Apart from this there are 3 types of WO.
1) Item Rate
2) Lump sum
3) Departmental Labour.
Item Rate WO
Create W.O from Location Site
This is activity based W.O. We choose the sub activities and link in respective work order (awards).
Insert W.O
Name of Work
Type of Work Order
Mobilization Advance if any and Recovery detail
Retention: % or amount based
Account No.
Etc and Post the record.
Awards: Click awards Tab.
We can link the number of sub activities as per our requirement. Then Post
We can see the total amount of Work Order in unapproved amount for all the activities.
M.B Entry: The M.B entry of work orders in hard copy (Measurement Book) same we are doing in ERP system
in Execution Module in form Progress: Progress Validation.
Item Rate Work Order
Progress: Progress Validation:
We can do Progress validation for unapproved work orders also but we can not create Sub Contractor bill of
unapproved work order. Some tips for progress validation
Lump Sum Work Order: The lump sum type W.O can be created in ERP system, this may be IDC
based (Indirect cost) or Direct cost based
IDC validation
If the W.O is Labour hire then we use form Periodic Consumption: Project Labour consumption:
Enter the utilization of labour activity wise for required hours.
Amendment of Work Order is possible: We can amend the W.O by directly Edit the W.O and the increased
value of W.O at unapproved value and Post the record. The work order will be pending till approval from the
authorties.
Important Reports:
1. Work Awards: EXEC 1.5 Sub Contractor Register
2. Progress: EXEC 2.2 Work order wise Progress validation
3. Progress: EXEC 2.4 Measurement Book
4. General: EXEC 6.1 Approved status for unapproved Documents
Closure of Work Order :
Once the Final Bill is prepared for any WO, the status of such WO becomes "Ready for closure". Project
in charge needs to approve the same from Approval of documents form and once the same is approved
the status of such WO becomes closed.
Important Information:
While preparing WO engineer should ensure that expenses. Account is linked with WO. (Except
Department WO which are auto linked). If the same is not linked, no accounting entry will be generated
on RA Bill preparation. In case wrong account is linked or no account is linked, the same can be linked
by Accountant form Accounts Module as shown in Account Manual. ( Ref page 185 – 194 of Accounts
Manual)
Only after the bill is approved from both levels RA Bill will show Accounted Status. Accounting entry will
be generated on next day of approval on timer Basis. e.g., Bill is approved on 9.10.08 than accounting
entry (PJV / SCB) will be generated on 10.10.08.
Engineer needs to send following closure confirmation for Jan 09 to be sent by 10th Feb 09.
1) MB closure
2) SC Bill closure
3) Sundry Payment/deduction closure.
The closure confirmation to be sent to d.bedi@gammonindia.com by an email.
Approvals: