METALSCOPE INDIA PVT. LTD.

PROPOSED MATERIAL WAREHOUSE_B4


[Structural Design Report]

RASHMI BHANDARE
16TH AUGUST 2022
Project Job ref
MATERIAL WAREHOUSE_B4 MS-22-PR-396
Client Sheet No.
M/s CHEYYAR SEZ DEVELOPERS PVT. LTD. 1
Prep. by Date Chkd By Date App’d By Date
RBB 16-08-2022 VKS 17-08-2022 SPS 17-08-2022

1. Building Parameters for SOTAP Building:

SL NO DESCRIPTION DETAILS
1 Building Name MATERIAL WAREHOUSE_B4
2 Width 41.06 m (GL-X1 TO X9)
3 Width Modulus 1@ 41.06 m C/c
4 Width Bay Spacing 1@7.53 m C/c, 4@6.5 m C/c, 1@7.53 m C/c at X1
1@7.53 m C/c, 3@6.5 m C/c, 1@14.03 m C/c at X19
5 Length 135.96 m C/c _ (GL-Y1 TO Y19)
6 Length Bay Spacing 1@7.980 m C/c, 16@7.5m C/c, 1@7.980m C/c
7 Eave Height 7.2 m at GL-X1 & X9 (from FFL)
8 Roof slope 1:07
9 Wall Condition 5.70m Brickwall and Above Metal cladding sheet on
all sides
10 Canopy 3.0m Projected Canopy As per Architect plan
11 Wall Bracing Full Height Portal Bracing
12 Roof Bracing Tube X- Bracing

Fig 1- Frame Elevation

MS-22-PR-396 © METALSCOPE INDIA PVT. LTD. 2021


Project Job ref
MATERIAL WAREHOUSE_B4 MS-22-PR-396
Client Sheet No.
M/s CHEYYAR SEZ DEVELOPERS PVT. LTD. 2
Prep. by Date Chkd By Date App’d By Date
RBB 16-08-2022 VKS 17-08-2022 SPS 17-08-2022

Fig 2- 3d Elevation

MS-22-PR-396 © METALSCOPE INDIA PVT. LTD. 2021


Project Job ref
MATERIAL WAREHOUSE_B4 MS-22-PR-396
Client Sheet No.
M/s CHEYYAR SEZ DEVELOPERS PVT. LTD. 3
Prep. by Date Chkd By Date App’d By Date
RBB 16-08-2022 VKS 17-08-2022 SPS 17-08-2022

2. Design Loads Calculations for Finish Warehouse_B3:

A. Seismic Load: - (As per IS1893 Part-1 -2016)

Parameters Values as Per Code


Zone Factor (Z) 0.16 for Zone-III
Response RF (R) 3 (Steel Frame with OMRF)

Importance Factor (I) 1.50 (for Important Building)


Damping ratio (DM) 5%
Period In X-Direction (PX) 0.650
Period In Z-Direction (PX) 0.650

B. Dead Load (DL): -


1. Self-weight of the Steel Members is considered as per Steel Density = 7.86
g/cm3
2. 0.12kn/m2 Dead load is considered on roof.
3. 0.06kn/m2 Collateral Load is considered on roof.
Note: - 30Kg/Sqm Load Considered In seismic load for Solar Panel load.

Description Calculations
0.12kn/m2 Dead Load on roof. = Roof dead load x bay Spacing
(For 7.50m Bay spacing) =0.12 kn/m2 x 7.50M

= 0.9 kn/m (GL X3 TO X17)

Description Calculations
0.12kn/m2 Dead Load on roof. = Roof dead load x bay Spacing
(For 8.0m Bay spacing) =0.12 kn/m2 x 8.0M

= 0.96 kn/m (GL X2 & X18)

Description Calculations
0.12kn/m2 Dead Load on roof. = Roof dead load x bay Spacing
(For 8.0/2=4m Bay spacing) =0.12 kn/m2 x 8.0/2M

= 0.48 kn/m (GL X1 & X19)

MS-22-PR-396 © METALSCOPE INDIA PVT. LTD. 2021


Project Job ref
MATERIAL WAREHOUSE_B4 MS-22-PR-396
Client Sheet No.
M/s CHEYYAR SEZ DEVELOPERS PVT. LTD. 4
Prep. by Date Chkd By Date App’d By Date
RBB 16-08-2022 VKS 17-08-2022 SPS 17-08-2022

Description Calculations
0.06kn/m2 Collateral load on roof. = Roof Collateral load x bay Spacing
(For 7.50m Bay spacing) =0.06 kn/m2 x 7.50M

= 0.45 kn/m (GL X3 TO X17)

Description Calculations
0.06kn/m2 Collateral load on roof. = Roof Collateral load x bay Spacing
(For 8.0m Bay spacing) =0.06 kn/m2 x 8.0M

= 0.48 kn/m (GL X2 & X18)


Description Calculations
0.06kn/m2 Collateral load on roof. = Roof dead load x bay Spacing
(For 8.0/2=4m Bay spacing) =0.06 kn/m2 x 8.0/2M

= 0.24 kn/m (GL X1 & X19)

C. Live Load (LL): -


Live load on Roof =0.75 kn/m2 as per IS 875 code: -

Description Calculations
0.75kn/m2 is considered on roof. = Roof Live load x bay Spacing
(For 7.50m Bay spacing) =0.75 kn/m2 x 7.50m

= 5.625 kn/m (GL X3 TO X17)

Description Calculations
0.75kn/m2 is considered on roof. = Roof Live load x bay Spacing
(For 8.0m Bay spacing) =0.75 kn/m2 x 8.0m

= 6 kn/m (GL X2 & X18)


Description Calculations

0.75kn/m2 is considered on roof. = Roof Live load x bay Spacing


(For 8.0/2=4m Bay spacing) =0.75 kn/m2 x 8.0/2m
= 3 kn/m (GL X1 & X19)

MS-22-PR-396 © METALSCOPE INDIA PVT. LTD. 2021


Project Job ref
MATERIAL WAREHOUSE_B4 MS-22-PR-396
Client Sheet No.
M/s CHEYYAR SEZ DEVELOPERS PVT. LTD. 5
Prep. by Date Chkd By Date App’d By Date
RBB 16-08-2022 VKS 17-08-2022 SPS 17-08-2022

D. Wind Loads: (IS 875-2015:PART-3)


For 8.0m Bay Spacing: -

MS-22-PR-396 © METALSCOPE INDIA PVT. LTD. 2021


Project Job ref
MATERIAL WAREHOUSE_B4 MS-22-PR-396
Client Sheet No.
M/s CHEYYAR SEZ DEVELOPERS PVT. LTD. 6
Prep. by Date Chkd By Date App’d By Date
RBB 16-08-2022 VKS 17-08-2022 SPS 17-08-2022

MS-22-PR-396 © METALSCOPE INDIA PVT. LTD. 2021


Project Job ref
MATERIAL WAREHOUSE_B4 MS-22-PR-396
Client Sheet No.
M/s CHEYYAR SEZ DEVELOPERS PVT. LTD. 7
Prep. by Date Chkd By Date App’d By Date
RBB 16-08-2022 VKS 17-08-2022 SPS 17-08-2022

MS-22-PR-396 © METALSCOPE INDIA PVT. LTD. 2021


Project Job ref
MATERIAL WAREHOUSE_B4 MS-22-PR-396
Client Sheet No.
M/s CHEYYAR SEZ DEVELOPERS PVT. LTD. 8
Prep. by Date Chkd By Date App’d By Date
RBB 16-08-2022 VKS 17-08-2022 SPS 17-08-2022

For 7.5m Bay Spacing: -

MS-22-PR-396 © METALSCOPE INDIA PVT. LTD. 2021


Project Job ref
MATERIAL WAREHOUSE_B4 MS-22-PR-396
Client Sheet No.
M/s CHEYYAR SEZ DEVELOPERS PVT. LTD. 9
Prep. by Date Chkd By Date App’d By Date
RBB 16-08-2022 VKS 17-08-2022 SPS 17-08-2022

MS-22-PR-396 © METALSCOPE INDIA PVT. LTD. 2021


Project Job ref
MATERIAL WAREHOUSE_B4 MS-22-PR-396
Client Sheet No.
M/s CHEYYAR SEZ DEVELOPERS PVT. LTD. 10
Prep. by Date Chkd By Date App’d By Date
RBB 16-08-2022 VKS 17-08-2022 SPS 17-08-2022

D.1 CANOPY WIND CALCULATION

➢ DESIGN WIND PRESSURE=0.39 KN/M2


➢ SPACING = 7.50M (FOR LENGTH)
➢ PRESSURE COEFFICENT = 1.25 FOR DOWNWARD SLOPE (IS-800-2007, CLAUSE NO: -
7.3.3.5)

THEREFORE, TOTAL WIND =0.39X7.50X1.25=3.75 KN/M2

➢ SPACING = 6.50M (FOR WIDTH)


➢ PRESSURE COEFFICENT = 1.25 FOR DOWNWARD SLOPE (IS-800-2007, CLAUSE NO: -
7.3.3.5)

THEREFORE, TOTAL WIND =0.39X6.50X1.25=3.25 KN/M2

MS-22-PR-396 © METALSCOPE INDIA PVT. LTD. 2021