The following report reflects the activity of ground operations department from 01 to 29 of
August 2022.
Manpower Reduction
Number of Staff reduced 0% In progress
Table 2.7 Cost Savings
NOTE: Some of our contracts are in Kwanzas. We used the rate of 430 AOA per 01 USD to convert the amounts.
B. LEAVE BALANCES
C. ABSENTEEISM
0
0
Director's Office 0
0
0
4
Station Coordination 0
0
0
3
Administrative Support Division 0
0
0
0
Regulatory and Quality Control Division 0
0
0
17
Ramp Services Division 14
10
0
58
Passenger Assistance Division 7
3
For the month of August, we had a increase in absenteeism, for reasons of illness.
D. TRAINING
Employees per Trainning
22
20
15
8
6
2
0 0 0 0
s) ) o) o) o II) ) ) )
do aI nt nt rg tem rio ão as
h a al c m
e
m
e C a y s
lac a
n tá iaç
g os
c P i tS ve v i
I( ga lh in
g (P aA Pe
r
s eA p arre co n dl m
en II o
In n s
m A p a a
id
o
Ra C t( H
a ge m sd nç or
i
rd de os ana Ra ink u ra ad
e lo H c
( P ro M (L eg er
nd nt ty ks (S (M
u o a fe in on s
Fo C L d
l( -S ry ati oo
nd tro S to vi G
st
A
Co
n
SM ve rA us
In Fo ro
Lo ad y g e
Lo rit an
ecu - D
-S G
R
E C D
S
V
A
Based on the data presented, it can be concluded that there was a 100% approved in the training carried out
during the month of August.
Uíge - UGO 6
Menongue - SPP 37
Soyo - SZA 3
Huambo - NOV 5
Catumbela - CBT 10
Namibe - MSZ 6
The Ground Operations Department, through management and control of the Training and Resource Planning
Section, planned and carried out in August, training actions for the stations on the graphs.
The Training Section continues with the online training project, thus combined with the face-to-face training that
the trainers have taught in the National and International stations.
The Board of Directors has approved the Internal Communications of DOT, for the travel of trainers in order to
provide training to all employees.
90
80
70
60
50
40
30
20
10
0
CAB DUE VHC LUO SVP NOV CBT MSZ SDD SPP UGO VPE LAD GRU HAV LIS LOS TMS FIH WDH MPM JNB MAD CPT
PETC
STRCH
UM
WCH
No Show
Transfer Pax
Boarded Pax
Flight
Domestic International
TOTAL
NOTE (1): AHL = missing baggage processes created - CFI = Closed/completed processes
J. COMPENSATION
The figures below indicate processes that have been sent to the Directorate of Planning and Finance,
after completion of investigations of missing or damaged baggage, which required compensation to
their passengers. This data is from Luanda only.
TVI TVD
Details
Costs
TOTAL
NOTE: We used the rate of 430 AOA per 01 USD to convert the amounts.
10
9 This is the
8 monitoring
7
of the
ground
operations
1 process´s.
AUDITS
AUDITOR AREA/STATION FINDING OBSERVATIO STATUS NOTE
S NS S
ENI DOT 0 0 In progress Follow
Up
This is the result of the External Audits to check compliance.
INOPERATIONALS Qty
TRACTORS 07
GENERATORES/GPU 12
AIR CONDITIONING 04
AIR STARTER 05
CONVEYOR BELTS 03
PAX STAIRS 09
AMBULIFT 01
MINI BUS 03
SCALES - GATE 03
SUB-TOTAL 142
The process of purchasing parts for repair of the GSEs is already in DAS
Analyzing the received proposals for further negotiation and contract and SLA signing.
LAD: Delay in the process of purchasing GHASSIST by interested companies. TAAG contacted GHASSIST
directly for an offer of services and is delayed a week in the response.
LIS: Provider Portway begins new services on 1 August. The contract will be signed in September for reasons
within Portway.
GRU: The new Orbital provider will begin on 1 September. Delay in the revision of the contract and SLA due to
lack of information. New date to have signed the contract 15 July.
Updating of the manual and its Setbacks for Finance 10% 20 Jun 01 Oct In Progress
processes by an external company. and Human Resources 2022 2022
for not agreeing with
the contract. Pending
to solve this problem
in the first week of
August.
Root Causes
All of those issues were already address with DAS and DIT but there is no action plan from those
departments to solve them.
Recommendations
We need direct intervention from the COO with the Board of Directors to quickly address these
problems
There is an increasing need to resolve the rosters issues so we can increase the operational efficiency