OBJECTIVE:
GENERAL:
Multimeter
Megger
Electrical tool kit
SPARE PARTS:
NA
SAFETY:
BEFORE TEST:
Brief the operator the scope of work and assist him to engage safety
measures i.e. PTW, process reading interruption, vigilance and manning
requirement, risk, and its mitigation. Mutually agree with the operator
that safety measures are in place. Obtain operators signature on the PTW
(Permit to Work).
PROCEDURE:
GENERATOR
Check the Bearing Lube oil for any contamination, discoloration, and sludge
formation.
Measure and record Winding resistance and Insulation resistance of Generator
Rotor winding (after shorting the Diodes).
Inspect and clean Rotating Diodes with soft cloth and check for any signs of
overheating.
Test all Rotating Diodes with Multimeter and replace if defective.
Inspect Exciter, PMG winding and the Rectifier hub, clean if required.
Check gasket and apply sealant compound to the Exciter and PMG terminal box.
Check the termination, IR for Anti-condensation heater of Generator and
Exciter winding.
Check the termination of all Junction boxes and apply grease.
Check the integrity of all power and control cable glands/shrouds.
Ensure Earthing of all terminal boxes and cable glands.
DE-ISOLATION:
Confirm electrical isolation has been removed.
CLOSE-OUT:
S No Activity Comments/Status
1 Inspect all ventilator ducts, passages, cooler
2 Clean the Generator cooling air filter
3 Clean air inlet filter and air inlet meshes of the
ducts
4 Check the Winding resistance and Insulation
resistance of motors
GENERATOR CHECKLIST:
S No Activity Comments/Status
1 Clean the Generator externally
2 Measure and record DC winding resistance
3 Check the integrity of primary/secondary terminations
of CT/PT
4 Measure and record the IR value of the Generator
5 Check the gasket for any damage
6 Clean the Generator CT/PT and inspect for any damages
7 Check the termination connection tightness
S No Activity Comments/Status
1 Check the Bearing Lube oil for any contamination
2 Measure and record Winding resistance and Insulation
resistance
3 Inspect and clean Rotating Diodes with soft cloth
4 Inspect Exciter, PMG winding and the Rectifier hub
5 Check the integrity of all power and control cable
glands
6 Check the termination, IR for Anti-condensation
heater
7 Ensure Earthing of all terminal boxes and cable
glands
S No Activity Comments/Status
1 Clean the interior with vacuum cleaner
2 Check the integrity of the control panel cooling fan
3 Check for any overheated cables, damaged insulation
4 Check the connection tightness of panel selector
switches and Pushbuttons
5 Check all the contactor, control relays, timers
6 Check all panel indicating meters for zero error
7 Check the integrity of control panel earthing
S No Activity Comments/Status
1 Check the integrity by operating the isolating switch
2 Check the fixed and moving contacts of switch for any
signs of wear
3 Check the integrity of motor operating mechanism
4 Check the control terminal connection tightness
5 Clean and check CT’s for any damage, crack
6 Check the CT power and control terminal tightness