STANDARD OPERATING PROCEDURE FORM NO

IR-PRC-SF-002-03
REVISED COMPARISON SHEET Currency USD 3.650 EUR 4.100
Roads and Infrastructure in West Muaither (Al Manaseer) - (DW002-P02) GBP 4.760
PAGE
GRP Fittings for Flow Control Chamber FCC-964

Requestor Name Firdous Project Name: Roads and Infrastructure in West Muaither (Al Manaseer) - (DW002-P02) Date: 11-Apr-21 Comparison Sheet No. PJ012-DZ-10
Request Date 10-Apr-21 Project Reference.: PJ0012 Department: PO Number:
Requisition No. 1824 Material Type: Permanent

Cost Control
BUDGET AMIANTIT
Sr. Cost Code BOQ Ref. Unit Qty. Description

Qty Rate Amount/QR Rate/QR Amount/QR Rate/QR Amount/QR Rate/QR Amount/QR Rate/QR Amount/QR

SW410 / 400 Supply & Delivery of GRP Fittings for SW flow control
RC M190800 7.3.2.5 chamber connection fully comply with QCS2014 Ashghal
LC 5112134 specifications and approved material submittal

1 nos 1 GRP 90 DEG Bend 530.00 530

2 nos 1 GRP Flange spigot pipe with puddle flange L=1.19m 2,540.00 2,540

3 nos 1 GRP Flange spigot pipe with puddle flange L=0.94m 1,260.00 1,260

4 No. 1 Transportation 800.00 800

Comments: Total QAR 5,130.00 5,130.00

Special Discount
Single Source Comparison Since this is an additional quantity Grand Total 5,130.00
which the material was ordered before from Amiantit
AWARD 5,130.00
Cost Control Comments:
Budget considered from SW flow control Payment terms: TBA
chamber Type B, 1.5m ID, invert pipe
depth 6.5 to 7.0m.
Delivery INCOTERM: Site

Delivery Time: As per site schedule

Brand / Origin AQAP-Qatar

Warranty As per Ashghal Requirements


Recommendation: Ashghal PVL Listed in the PVL
AMIANTIT
Approval Status Approved

Remarks
Recommended Award Value QAR 5,130.00

Sr. Procurement Cost Control Project Manager Project Director Procurement Manager Operations Support Director
Engineer

Khalid Eid
Dima Zareefa Santanu Karmakar Nassim Al Omari Radi Shunnar Tarek Turabieh

02/23/202310:01:45 Page 1 of 1