PROPOSED HDD PROFILE DRAWING FOR VADAVALLI NALA CROSSING AT CH:04+950 KM TO CH:05+230 KM

NOTES:-

PLAN VIEW
Vadavalli Edayarpalayam
LEGEND :-

CH:04+950 KM MES EX SRI ESR CH:05+230 KM BENTONITE SLURRY

MEDICAL ANNANY'S APARTMENT


ENTRY APARTMENT EXIT
PALAGYAM
POINT POINT 4" Conduit Pipe

WATER LINE
WALL THK. 6.4 API 5L X 52
GR.PSL-2
MDR 982

NALA
CL OF ROAD
PROFILE DATA

ENTRY
EXIT
POINT POINT
UTILITY :-
447.026

446.950

446.875

446.802

446.778

446.672

446.556

446.484

446.479

446.541

446.704

436.826

436.826

436.826

446.594

446.615

446.636

446.656

446.677

446.698

446.719

446.740

446.761

446.781
10.00

10.00

10.00

10.00

10.00

10.00

10.00

10.00

10.00

15.00

10.00

10.00

10.00

10.00

10.00

10.00

10.00

10.00

10.00

10.00

10.00

10.00

10.00
REV DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY
TRIJE TRIJE IOCL/TEPL
105.000

115.000

125.000

135.000

145.000

155.000

165.000

175.000

185.000

195.000

205.000

215.000

225.000

235.000
CLIENT
10.000

20.000

30.000

40.000

50.000

60.000

70.000

80.000

90.000
0.000

INDIAN OIL CORPORATION LIMITED


CONSULTANT
TRACTEBEL ENGINEERING PVT. LTD.
01.50

03.19

04.88

06.57

08.31

09.86

04.00

04.00

04.00

03.26

01.50
11.12

12.13

12.92

13.49

13.96

13.64

13.13

12.39

11.35

10.07

08.48

06.72

04.96
CONTRACTOR
TRIJE ENGINEERS
MAX. HEIGHT OF SOIL ABOVE PIPE=13.96M

PROJECT
CGD NETWORK IN COIMBATORE

TITLE PROPOSED HDD PROFILE DRAWING FOR VADAVALLI NALA

CROSS SECTION SIZE: A3


CROSSING AT CH:04+950 KM TO CH:05+230 KM

DRAWING NUMBER: REV.


SCALE: 1:1
00
SHEET: 01 OF 01