Department of Electrical and Electronics Engineering

Objective Exam on Add-on Program for IV year A.Y:2020-2021

Design of Solar System for Homes (EE_DSSH_08)

Exam Date:_________
Name:___________ Hall Ticket No: A

Answer all Questions.All Questions carry Equal Marks.Time:20 min.Marks:10

1.The most reliable estimate is ? [ ]


A) Prelimnary estimate B) Plinth area estimate
C) Detailed estimate D) Cube rate estimate
2. A Three phase 4 wire system is commonly used on ? [ ]
A) Primary transmission B) Primary distribution
C) Secondary transmission D) None of the above

3. The following is also known as overhead costs or on costs? [ ]


A) Indirect expenses B) Direct expenses
C) Cost of indirect labour D) Cost of direct labour

4. The usual spans with R.C.C .poles are……?


[ ]
A) 40-50 meters B) 60-100 meters
C) 80-150 meters D) 200-300 meters

5. The distributors for residential areas are? [ ]


A) Three phase four-wire B) Single phase
C) Three phase three-wire D) None of the above

6. ------costing is a type of job costing?


[ ]
A) Operating B) unit C) Batch D) Multiple

7. What is the prescribed frequency for the supply of house power in India ?
[ ]
A) 100 HZ B) 50 HZ C) 60 HZ D) 30 HZ
8. According to the IS code ,the colour of earth wire is usually?
[ ]
A) Red B) Green C) Yellow D) Black

9. For rewirable fuse, employing copper wire as the fusing element, the fusing factor is
[ ]
A) 0.7 to 0.8 B) 1.0 to 1.2 C) 1.4 to 1.5 D) 1.9 to 2.0

10.Which of the following are the constants of the transmission lines


[ ]
A) Conductance B) Inductance C) Resistance D) All of the above
Department of Electrical and Electronics Engineering

Objective Exam on Add-on Program for II year A.Y:2016-2017


Design of Solar System for Homes (EE_DSSH_08)

Key:
1. C
2. C
3. A
4. D
5. A
6. C
7. B
8. B
9. D
10. D