Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

KEY PLAN

SD1 RD1

TRANSFORMER YARD

STORAGE

(±0.000) SHOWER
(-0.030)

CAFETARIA LOCKER
(±0.000) LOBBY ROOM
(±0.000) MALE
(-0.030) TOILET
(-0.030)
PANTRY
(±0.000)

UP

ACCESS
UP

CABLE
LEGEND & ABBREVIATION
1. ALL DIMENSION ARE IN MILLIMETERS, AND ELEVATION ARE IN METER,
UNLESS NOTED OTHERWISE
2. GRADE LEVEL ELEVATION GL.±0.000 = +8.100 OR OTHERWISE NOTICE
AS PER SITE CONDITION.
3. OPENING FOR PIPE, CABLE, AUX TO BE VERIFIED AT SITE
AS PER OTHER DISCIPLINES INFO.
4. FOUNDATION FOR PUMP & DIESEL TANK REFER TO CIVIL FOUNDATION.
5. INDOOR PIPING, STEEL BRIDGE & PUMP FOUNDATION BY OTHER.

ABBREVIATION :
-HP : HIGH POINT
-LP : LOWEST POINT
-EL : ELEVATION
-FFL : FLOOR FINISH LEVEL

REFERENCE DRAWINGS

PERTAMINA (PERSERO)

Code Description

REVISIONS

PT PERTAMINA (PERSERO)
RELIABILITY & PROJECT DEVELOPMENT
DIREKTORAT LOGISTIK , SUPPLY CHAIN DAN INFRASTRUKTUR
A3
D-100-1340-011

TITLE :

COMP.DRAWING NO.

CONT. DRAWING NO.

A3

You might also like