Job Description: The JSA covering all the hazard & preventive measures for manual/Equipment removal of sand around fence post foundation, fence removing
from designated area to TRD approved area. Equipment’s involved in activity will be Hand tools, backhoe loader, skid loader and Tipper/Dump truck.
Prepared By Subcontractor:
Name: Syed Hassan Raza Position: HSE Manager Signature: Date:
Reviewed and Approved By Subcontractor:
Name: Kapil Dev Position: Project Manager Signature: Date:
Reviewed and Approved By TRD:
Name: Renato Sousa Position: TRD-HSE Superintendent Signature: Date:
Page 1 / 15
Duqm Refinery Project EPC Package One
JSA for Removal of Fencing Rev.00
Permanent damage
Damage to an
within project Permanent
1 week to entire facility or loss
boundary or partial 4 L M H H H
2 weeks of multiple systems
reportable release disability
in a facility
beyond boundary
Reportable release Damage to an entire
facility or multiple
> 1 day to within project
systems in a facility Days away 3 L L M H H
< 1 week boundary with no requiring repair or
permanent damage replacement
High Operation not permitted; must implement Operation permitted with a time Operation permitted with
Risk Mitigation Medium Low
controls to reduce risk to an acceptable or limited waiver endorsed by implementation of core HSE program
Controls (H) (M) (L)
manageable level. management. elements.
Page 2 / 15
Duqm Refinery Project EPC Package One
JSA for Removal of Fencing Rev.00
Please mark (■) appropriate boxes - (A new JSA is required if the job scope or work conditions changes)
Confined Space Safe Work Permit
1.0 Permit(s) Required:
Hot Work Others
Hard Hat Clear Safety Glasses Dark Safety Glasses Chemical Goggles Cutting Goggles
Dust Mask Face Shield Welding Hood Welding Aprons Welding Leggings
Ear Plugs Earmuffs Cartridge Respirator Escape Respirator SCBA
2.0 PPE Required: Cotton Gloves Leather Gloves (rigging) Leather Gloves (welding) Rubber Gloves Rubberized Cotton
Coverall Disposable Coverall Full Body Harness Hi-vis Vest / jacket
Safety Shoes
Cut resistant gloves Nitrile gloves Elect Insulated gloves Arm Sleeves
Dielectric footwear
Air supplied respirator Fire resistant coverall Rain Suit
Gas Badge Multi-Gas Monitor Gas Detective Light Meter Anemometer
Special Tools and Dosimeter Thermometer Ventilation Fans Air Blower Fire Extinguisher
3.0 Lifeline Retrieval Line Padlock, Hasp, Tags Lighting (low voltage)
Equipment Required: Lighting (high lux)
Air Horn Whistle Traffic Flags Traffic Cones Spill Kits
Potential Noise Air Pollution (dust) Air Pollution (smoke) Air Pollution (vapor)
4.0 Environmental Hazards Soil erosion Spills (to ground) Spills (Water) Hazards to Flora & Fauna
Hazardous Materials
5.0 Carcinogen Irritant Highly Flammable Toxic Explosive
(attach MSDS)
Other Potential Electrical Pressure (air, water, gas) Mechanical (crush points) Ergonomics Temperature (±)
6.0 Hazards Light / Dark Ignition Sources Dust / Vapor Suffocation Other Trades
Drink water and take rest breaks in hot weather conditions/Wear warm/suitable clothes in cold weather conditions.
Emergency: TRD HOT LINE: 97864422 and follow the emergency response plan: First aid facilities shall be available.
Covid-19: Respect the protocol wear facemask, maintain social distance, use of sanitizers and soap liquids, avoid touching eyes, mouth or nose before washing hands. Follow with MOH instructions, in case of
covid-19 symptoms, report to your supervisor immediately.
HEAT STRESS: Drink water and take rest breaks, do not work in open area for too long.
Additional
7.0 CONFINED SPACES: if confined space entry is applicable, a separated PTW and JSA are required.
Instructions
HOT WORK: if you use grinder machine, torch, cutting machine, etc. another JSA is required.
ENVIRONMENT: Respect the environment HSE plan in all aspects.
Page 3 / 15
Duqm Refinery Project EPC Package One
JSA for Removal of Fencing Rev.00
Acceptable
S RISK RESIDUAL
JOB STEPS POTENTIAL HAZARDS PREVENTIVE AND CONTROL MEASURES RESPONSIBLE (Y/N)
N RATING RISK
Page 4 / 15
Duqm Refinery Project EPC Package One
JSA for Removal of Fencing Rev.00
Acceptable
S RISK RESIDUAL
JOB STEPS POTENTIAL HAZARDS PREVENTIVE AND CONTROL MEASURES RESPONSIBLE (Y/N)
N RATING RISK
Page 5 / 15
Duqm Refinery Project EPC Package One
JSA for Removal of Fencing Rev.00
Acceptable
S RISK RESIDUAL
JOB STEPS POTENTIAL HAZARDS PREVENTIVE AND CONTROL MEASURES RESPONSIBLE (Y/N)
N RATING RISK
Page 6 / 15
Duqm Refinery Project EPC Package One
JSA for Removal of Fencing Rev.00
Acceptable
S RISK RESIDUAL
JOB STEPS POTENTIAL HAZARDS PREVENTIVE AND CONTROL MEASURES RESPONSIBLE (Y/N)
N RATING RISK
Page 7 / 15
Duqm Refinery Project EPC Package One
JSA for Removal of Fencing Rev.00
Acceptable
S RISK RESIDUAL
JOB STEPS POTENTIAL HAZARDS PREVENTIVE AND CONTROL MEASURES RESPONSIBLE (Y/N)
N RATING RISK
Page 8 / 15
Duqm Refinery Project EPC Package One
JSA for Removal of Fencing Rev.00
Acceptable
S RISK RESIDUAL
JOB STEPS POTENTIAL HAZARDS PREVENTIVE AND CONTROL MEASURES RESPONSIBLE (Y/N)
N RATING RISK
Face the stepladder.
Keep your body centered between
side rails.
Must follow ladder placement
ratio of 75 degrees.
Maintain three-point contact by
keeping two hands and one foot,
Ladder collapse Site l
H or two feet and one hand on a L
and slip. Supervisor
ladder always
Make sure that footwear is in good
condition.
Only allow one person on a ladder
at a time.
Have a second person hold the
bottom of a long ladder,
Never play with tools and use
tools for what it made for.
Site Y
Misuse of tools H Use hand protection to avoid L
Supervisor
injury from sharp edges.
Use appropriate PPE.
Competent employees must be
deployed in the work.
Site Y
Sharp edges H Use hand protection to avoid L
Supervisor
injury from sharp edges.
(Safety Gloves)
Page 9 / 15
Duqm Refinery Project EPC Package One
JSA for Removal of Fencing Rev.00
Acceptable
S RISK RESIDUAL
JOB STEPS POTENTIAL HAZARDS PREVENTIVE AND CONTROL MEASURES RESPONSIBLE (Y/N)
N RATING RISK
Use hand protection to avoid
injury from sharp edges.
Rolling of steel net/ Site Y
5 Sharp edges H (Safety gloves) L
metal sheet Supervisor
Competent employees must be
deployed in the work.
Competent employees with
appropriate PPE must be
Manual Handling deployed in the work. Site Y
H L
Injuries Supervisor
Use proper safety hand gloves
to avoid any hand cuts.
Removing
sand/soil around Full supervision during activity on
Fence Post site.
Man Improve alert/awareness of mobile
foundation with Site Y
6 machine equipment Warning signs, lights, L
machinery/equi H Supervisor
interface alarms, etc.
pment: backhoe Competent Flagman shall be
loader, skid available with the equipment.
loader
Page 10 / 15
Duqm Refinery Project EPC Package One
JSA for Removal of Fencing Rev.00
Acceptable
S RISK RESIDUAL
JOB STEPS POTENTIAL HAZARDS PREVENTIVE AND CONTROL MEASURES RESPONSIBLE (Y/N)
N RATING RISK
Ensure equipment/machine
inspection done by TRD inspector.
Daily checklist is available and filled
oil/fuel leakage by driver.
Site
from Ensure dip trays are used while y
H L Supervisor
equipment/vehic refueling.
Drivers
le Ensure no leakage from
equipment/vehicle.
Do not overfill fuel.
Page 11 / 15
Duqm Refinery Project EPC Package One
JSA for Removal of Fencing Rev.00
Acceptable
S RISK RESIDUAL
JOB STEPS POTENTIAL HAZARDS PREVENTIVE AND CONTROL MEASURES RESPONSIBLE (Y/N)
N RATING RISK
Page 12 / 15
Duqm Refinery Project EPC Package One
JSA for Removal of Fencing Rev.00
Acceptable
S RISK RESIDUAL
JOB STEPS POTENTIAL HAZARDS PREVENTIVE AND CONTROL MEASURES RESPONSIBLE (Y/N)
N RATING RISK
Page 13 / 15
Duqm Refinery Project EPC Package One
JSA for Removal of Fencing Rev.00
Acceptable
S RISK RESIDUAL
JOB STEPS POTENTIAL HAZARDS PREVENTIVE AND CONTROL MEASURES RESPONSIBLE (Y/N)
N RATING RISK
Page 14 / 15
Duqm Refinery Project EPC Package One
JSA for Removal of Fencing Rev.00