Jacking System Repairs - Action Plan
Jacking System Repairs - Action Plan
24 February 2023
Investigate use of existing rod material in stock in Hidroservice that may be suitable for Stock material identified which is suitable for
9 fabricating new nuts and fittings fabrication 10 new nuts. Sabuhi J 19 Oct 22 20 Oct 22 Closed
To be delivered to BOS Shelf - 20 October
10 Identify and approve single preferred modification Modification #2 Rev 2 decided upon Ilya K 20 Oct 22 20 Oct 22 Closed
11 Set up equipment for modifying 8 no. cylinders Jhun A 19 Oct 22 20 Oct 22 Closed
12 Upon approval of final modification option, modify cylinders Jhun A TBA TBA Open
13 Set up equipment for machining new nuts Jhun A 20 Oct 22 TBA Closed
Completed successfully using BOS Shelf in-stock
Trial machining of new nut material Jhun A 20 Oct 22 20 Oct 22 Closed
Upon approval of final modification option, machine new nuts with smooth external
14 surface Jhun A 21 Oct 22 TBA Open
Match each new nut with a single cylinder and ensure there is a good fit Jhun A 22 Oct 22 TBA Open
Transport repaired cylinders and nut to Hidroservice to Temp-1 as soon as work at BOS Each nut and cylinder to be transported as soon as
15 Shelf is finished each assembly is complete. Do NOT wait to Damir G TBA TBA Open
complete the full set.
24 February 2023
Planned
Item Description Actions / Outcomes Actioner Planned Start Finish Status
Drill holes in external surface of each nut to accommodate bolts for later tightening up
when in place Sabuhi J TBA TBA Open
COMPLETED COMPLETED
COMPLETED COMPLETED
COMPLETED COMPLETED
COMPLETED COMPLETED
COMPLETED COMPLETED
COMPLETED COMPLETED
COMPLETED COMPLETED
COMPLETED COMPLETED
COMPLETED COMPLETED
COMPLETED 23:59 on 22nd
transfer onbaord Installed onbaord
Temp1 Temp1 Ready for test