Design Calculations For Grade Beams and Columns For Auxiliary Piperack CU 1308
Design Calculations For Grade Beams and Columns For Auxiliary Piperack CU 1308
Design Calculations For Grade Beams and Columns For Auxiliary Piperack CU 1308
06-3085
CONTENTS
Page
1. PREFACE 03
4. SUPERSTRUCTURE ELEMENTS 03
6. LOAD DATA
7. STAAD ANALYSIS
1. PREFACE:-
CU 1308
4. SUPERSTRUCTURE ELEMENTS:-
The pipe/cable trays supporting structure for CU 1308 is same as given in Doc. No.
UD-BA-1308-ED-00001 with following changes.
First floor at EL.104250 is removed.
Pipe loads at EL.104250 are transfered to EL.106250 through Structural Steel
hangers.
6. LOAD DATA:-
Node L/C Fx kN Fy kN Fz kN
71 201-DSELF+PO -25.521 17.549 -26.427
72 201-DSELF+PO 0.257 28.641 -59.805
73 201-DSELF+PO 5.245 22.374 -38.873
74 201-DSELF+PO -5.269 22.379 -62.935
75 201-DSELF+PO -24.117 28.324 -62.688
76 201-DSELF+PO 3.217 25.022 -53.084
77 201-DSELF+PO 0 11.563 -18.189
78 201-DSELF+PO -33.72 61.704 28.369
79 201-DSELF+PO 1.034 97.937 31.894
80 201-DSELF+PO 17.342 76.245 35.409
81 201-DSELF+PO -17.645 76.356 34.616
82 201-DSELF+PO -1.123 96.783 34.436
83 201-DSELF+PO 11.724 85.604 31.785
84 201-DSELF+PO -0.09 41.526 21.592
W3 = 692.007 KN Summation of FY
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
Node L/C Fx kN Fy kN Fz kN
57 201-DSELF+PO 7.2 74.223 2.09
58 201-DSELF+PO -0.352 142.62 14.023
59 201-DSELF+PO 2.047 141.77 20.955
60 201-DSELF+PO -22.714 141.78 20.737
61 201-DSELF+PO -0.119 142.62 14.102
62 201-DSELF+PO -3.619 119.49 10.351
63 201-DSELF+PO -0.004 51.093 11.696
64 201-DSELF+PO 30.31 40.833 -29.912
65 201-DSELF+PO -41.231 75.722 -41.103
66 201-DSELF+PO 8.419 83.692 -27.353
67 201-DSELF+PO -30.061 83.696 -28.319
68 201-DSELF+PO -8.677 75.728 -41.978
69 201-DSELF+PO -15.479 64.015 -41.736
70 201-DSELF+PO -1.209 29.123 -19.273
W2 = 1266.398 KN Summation of FY
Note: Above reations are taken from STAAD
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
Node L/C Fx kN Fy kN Fz kN
43 201-DSELF+PO -33.748 179.39 -18.258
44 201-DSELF+PO -4.311 342.27 -9.925
45 201-DSELF+PO 0.986 330.3 -13.177
46 201-DSELF+PO -53.162 336.81 -18.39
47 201-DSELF+PO 1.882 328.67 -13.003
48 201-DSELF+PO 6.737 293.62 -5.618
49 201-DSELF+PO 5.555 127.24 -8.922
50 201-DSELF+PO -44.803 185.89 5.077
51 201-DSELF+PO -27.527 344.04 -9.381
52 201-DSELF+PO 27.561 337.21 6.062
53 201-DSELF+PO -34.73 341.66 7.167
54 201-DSELF+PO 2.577 330.67 9.512
55 201-DSELF+PO 7.469 295.08 13.551
56 201-DSELF+PO 5.468 126.78 12.247
W1 = 3899.612 KN Summation of FY
Note: Above reations are taken from STAAD
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
Seismic analysis for structure CU-1308 is carried out as per Egyptian code ECP No.45
(Refer UD-BA-000-DC-00003 clause No. 3.4.1)
Seismic weight is calculated manually at each floor level & includes only dead weight of
Structure and operating loads.
VB = Base Shear.
W1 = seismic weight of floor at EL.106250 (pipe supporting level)
W2 = seismic weight of floor at EL.109000 (pipe supporting level)
W3 = seismic weight of floor at EL.111000 (cable rack supporting level)
W4 = seimic weight of column between EL.106250 and ground level
Wt = W1+ W2 +W3 +W4(Total seismic weight )
H1 = Height of floor at EL.106250 measured from base.
H2 = Height of floor at EL.109000 measured from base.
H3 = Height of floor at EL.111000 measured from base.
Q1 = Design lateral force at EL.106250.
Q2 = Design lateral force at EL.109000.
Q3 = Design lateral force at EL.111000.
ZICKS = Factors required to calculate base shear.....................( as per CLAUSE No.
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
3
Σ Wi Hi = (3899.612*6.25)+(1266.398 *9.0)+(692.007*11) = 43382.234 KN
i=1
VB= ZIKCS*Wt = 233.663 KN
Q1 = VB*(W1*H1/ Σ Wi Hi) = 131.274 KN.
Lateral force on each node = Q1/(Nos. of column-beam junction nodes at that level)
=Q1/14 = 89.79 /14 = 9.3767 KN
This force applied in X direction as Fx in STAAD (in STAAD file named as
“PIP_1303.std“)
Q2 = VB*(W2*H2/ ΣWi Hi) = 61.389 KN.
Lateral force on each node = Q2/(Nos. of column-beam junction nodes at that l
=Q2/14 = 4.3849 KN.
This force is applied in X direction as Fx in STAAD. (in STAAD file named as “
PIP_1303.std“ )
Q3 = VB*(W3*H3/ ΣWi Hi) = 40.9997 KN.
Lateral force on each node = Q3/ (Nos. of column-beam junction nodes at that level)
=Q3/14 = 2.9285 KN.
This force is applied in X direction as Fx in STAAD (in STAAD file named as
“PIP_1303.std“)
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
T = 0.1 x 3 = 0.3
C = 0.1217, but maximum value of C = 0.12 (refer cl.3.4.3.1, point f)
Therefore, C = 0.12
Soil coefficient,S = 1.3
Total seismic design load, W = 6240.987 kN
ZICKS = 0.03744
Base shear, V = ZICKS*W
= 0.03744*6240.987
= 233.663 kN
seismic force on each node Fi = Wi.Hi/sum(Wi.Hi)xV
where,
Wi = Reaction obtained on ith as given in clause 6.2.2.1 above
Hi = Height of ith node
The calculations for the seismic force on each node are shown in the table
given below.
Fi=
NODE LOAD CASE Fy(Wi) Hi WiHi V*(WiHi/ΣWiHi)
43 201(DSELF+PO) 179.39 6.25 1121.1875 6.0389
44 201(DSELF+PO) 342.27 6.25 2139.1688 11.522
45 201(DSELF+PO) 330.3 6.25 2064.3563 11.119
46 201(DSELF+PO) 336.81 6.25 2105.0313 11.338
47 201(DSELF+PO) 328.67 6.25 2054.1563 11.064
48 201(DSELF+PO) 293.62 6.25 1835.125 9.8842
49 201(DSELF+PO) 127.24 6.25 795.25625 4.2834
50 201(DSELF+PO) 185.89 6.25 1161.8188 6.2577
51 201(DSELF+PO) 344.04 6.25 2150.25 11.582
52 201(DSELF+PO) 337.21 6.25 2107.5375 11.351
53 201(DSELF+PO) 341.66 6.25 2135.3625 11.501
54 201(DSELF+PO) 330.67 6.25 2066.6938 11.131
55 201(DSELF+PO) 295.08 6.25 1844.2438 9.9333
56 201(DSELF+PO) 126.78 6.25 792.3875 4.2679
57 201(DSELF+PO) 74.223 9 668.007 3.598
58 201(DSELF+PO) 142.62 9 1283.607 6.9137
59 201(DSELF+PO) 141.77 9 1275.921 6.8723
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
the section Y-Y, operating load has been taken same as test load. For larger diameter
pipes, the loading are given in running metre. While for small diameter pipes a loading
of 3 kN/m2 is considered.
Pipe friction load has been considered based on the “Engineering Specification –
Loads and General Design UD-BA-000-EC-00005, 2.10“. Friction load is taken as 15%
of the pipe operating load. Total pipe operating load coming on a beam is calculated
and 15% of this total load has been applied on full length of beam as UDL. To account
for the balancing effect of one pipe on other these loads are reduced by 35% to
account for piping load.
The pipe test loads is considered.Wherever, the test loads are specified seprately the,
test load has been taken same as operating load.
Temparature load is applied on structural members as +20 °C. Refer clause 3.2 of UD-
BA-000-DC-00003
Temparature load is applied on structural members as -20 °C. Refer clause 3.2 of UD-
BA-000-DC- 00003
Wind load in X +ve direction (along the length of piperack) is considered on pipe rack
structural elements i.e. on RCC column upto EL.106250 level, on steel columns from
EL.106500 level to EL.111000 level. For column members it is equal to wind pressure
as provided in Annexure-I of UD-BA-000-DC-00003 multiplied with projected width.
On all internal frames, the wind load is considered on horizontal framing beams. This
force is aplied as UDL on beams and is equal to the depth of beam multiplied by the
wind intensity.
On first frame of pipe rack, at pipe supporting level (i.e EL.106250 and EL.109000
level), the wind load is considered to account for pipe taping. Effective height for a
particular level subjected to wind, includes the maximum pipe diameter at that level
plus the beam depth at that level and an additional height of 0.3m above and below the
supporting level (to account for pipe taping). In addition to this force, on first frame,
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
COLUMN NUMBERS
****************************************************
**********EARTHQUAKE IN X(LONGITUDINAL )DIRECTION***
****************************************************
LOAD 1 EARTHQUAKE LOAD (WEST TO EAST) (VX)
JOINT LOAD
71 TO 84 FX 2.9285
57 TO 70 FX 4.3849
43 TO 56 FX 9.3767
**************************
*LOAD AT EL.106250
MEMBER LOAD
79 CON GX 0.3227 4.65
80 CON GX 1.076 5.4
82 CON GX 1.076 1.5
*LOAD AT EL.109000
112 CON GX 0.2152 3.67
114 CON GX 0.538 4.6
115 CON GX 0.538 4.6
JOINT LOAD
65 FX 0.2152
143 FX 0.2152
*LOAD AT EL.111000
MEMBER LOAD
145 CON GX 0.538 1.1
149 CON GX 0.538 0.33
**************************************************
*******EARTHQUAKE IN Z (TRANSVERSE)DIRECTION*******
*************************************************
LOAD 2 EARTHQUAKE LOAD (NORTH TO SOUTH) (VZ)
JOINT LOAD
71 FZ 1.0397
72 FZ 1.6969
73 FZ 1.3256
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
74 FZ 1.3259
75 FZ 1.6781
76 FZ 1.4825
77 FZ 0.6851
78 FZ 3.6558
79 FZ 5.8025
80 FZ 4.5173
81 FZ 4.5239
82 FZ 5.7342
83 FZ 5.0718
84 FZ 2.4603
57 FZ 3.598
58 FZ 6.9137
59 FZ 6.8723
60 FZ 6.8726
61 FZ 6.9134
62 FZ 5.7923
63 FZ 2.4767
64 FZ 1.9794
65 FZ 3.6706
66 FZ 4.057
67 FZ 4.0572
68 FZ 3.6709
69 FZ 3.1031
70 FZ 1.4117
43 FZ 6.0389
Doc. ID-Code Rev.
Copyright 2007 Uhde GmbH
UD-BA-1308-ED-00002 00
Code
Design Calculations for Grade EPPC
Beams and Columns for UAN Page No.
Auxiliary Piperack CU 1308
06-3085
44 FZ 11.5219
45 FZ 11.1189
46 FZ 11.338
47 FZ 11.064
48 FZ 9.8842
49 FZ 4.2834
50 FZ 6.2577
51 FZ 11.5815
52 FZ 11.3515
53 FZ 11.5014
54 FZ 11.1315
55 FZ 9.9333
56 FZ 4.2679
*************************************
*LOAD AT EL.106250
MEMBER LOAD
79 CON GZ 0.538 4.65
80 CON GZ 0.2152 5.4
82 CON GZ 0.538 1.5
83 CON GZ 0.538 2.3
*LOAD AT EL.109000
112 CON GZ 0.538 3.67
113 CON GZ 0.538 4.6
116 CON GZ 0.2152 4.6
117 CON GZ 0.538 4.6
*LOAD AT EL.111000
146 CON GZ 0.538 1.1
148 CON GZ 0.538 0.33
149 CON GZ 0.538 0.33
150 CON GZ 0.538 0.33
PERFORM ANALYSIS
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
CHANGE
INACTIVE MEMBER 406 TO 413
**************************************
**************DEAD LOAD(SELFWEIGHT)***
**************************************
LOAD 3 SELFWEIGHT (DSELF)
SELFWEIGHT Y -1
*THE WALKAY IS CONSIDRED AT EL.111000*
*DEAD LOAD FOR GRATING IS CONSIDERED = 0.6 kN/M2*
*this walkway is supposed to be supported on the 3m spaced secondry beams .width of walkway is
considred as 1.2m,so applying only the
*point load on walkway beams.(CONTRIBUTARY LENGTH FOR THE LOAD IS 3M)
*1.2M*.6KN/M2*3=2.16KN
*LOAD= 2.16KN/2=1.08KN
MEMBER LOAD
145 TO 151 287 TO 297 CON GY -1.08 1.9
145 TO 151 287 TO 297 CON GY -1.08 3.1
*CABLE TRAY DEAD LOAD = 1.3 KN/M PER CABLE TRAY + 70KG = 1.3*3*4 + 0.7 = 16.3 SAY 16 KN
(TOTAL CABLE TRAYS = 4, SPAN BETWEEN TWO CABLE TRAY = 3.0M)
*MOMENT = 16*0.65/2 = 5.2 SAY 5.3 KNM
MEMBER LOAD
145 TO 151 287 TO 297 CON GY -16 4.5
145 TO 151 287 TO 297 CMOM GX 5.3 4.5
JOINT LOAD
78 TO 84 157 TO 162 168 TO 172 FY -16 MX -5.3
*Additional dead load on tie level beams for the CV support assembly
Doc. ID-Code Rev.
Copyright 2007 Uhde GmbH
UD-BA-1308-ED-00002 00
Code
Design Calculations for Grade EPPC
Beams and Columns for UAN Page No.
Auxiliary Piperack CU 1308
06-3085
(4.5m+3m) IS CONSIDERED.
*PIPE LOAD OF 16" DIA. PIPE 2.1 kN/m
*SO, CONC LOAD = (4.5+4.5)*2.1=18.9 kN AND and
*LOAD ,4.5*2.1=9.45kN
79 CON GY -9.45 6.5
79 CON GY -9.45 5.9
*LOAD ,2.1*(4.5+3)=15.75 KN
84 CON GY -15.75 6.5
84 CON GY -15.75 5.9
*LOAD, 2.1*3=6.3 KN
85 CON GY -6.3 6.5
85 CON GY -6.3 5.9
*LOAD ,(4.5+4.5)*2.1=18.9 kN
80 TO 83 CON GY -18.9 6.5
80 TO 83 CON GY -18.9 5.9
*PIPE OPERATING LOAD OF 20" DIA PIPE GIVEN AS 3 kN/m
*SO, LOAD= 9*3 = 27 kN AND 4.5*3= 13.5kN
*LOAD ,(4.5+4.5)*3=27 kN
80 TO 83 CON GY -27 0.635
*LOAD ,4.5*3=13.5kN
79 CON GY -13.5 0.635
*LOAD, 3*3=9 KN
85 CON GY -9 0.635
*LOAD ,3*(4.5+3)=22.5 KN
84 CON GY -22.5 0.635
**UDL ON BEAMS OF SMALL DIA. PIPES.
Doc. ID-Code Rev.
Copyright 2007 Uhde GmbH
UD-BA-1308-ED-00002 00
Code
Design Calculations for Grade EPPC
Beams and Columns for UAN Page No.
Auxiliary Piperack CU 1308
06-3085
*LOAD 2 kN/m2 GIVEN, CONTRIBUTING LENGTH= 3.0 m AND AT END 1.5 m LENGTH.
*LOAD IS 2*3 = 6 kN/m AND 1.5*2 = 2 kN/m.
80 TO 84 221 TO 231 UNI GY -6 0.94 4.64
79 85 UNI GY -3 0.94 4.64
**THE LEVELS IS EL.109000.
*CONCENTRATED LOAD ON FRAMING BEAMS DUE TO 20" DIA PIPE
*OPERATING LOAD 1 kN/m GIVEN
*CONCENTRATED LOAD ON FRAMING BEAM = 9*1 = 9 kN
*CONCENTRATED LOAD AT END = 4.5 kN
*load= 1*(3+4.5)=7.5 KN*
417 420 423 426 CON GY -9 1.47
429 CON GY -7.5 1.47
*LOAD= 1*4.5=4.5 KN*
414 CON GY -4.5 1.47
441 CON GY -3 1.47
*UNIFORMY DIST. LOAD DUE TO SMALL DIA PIPES @ EL.109000 LVL.
*SMALL DIA PIPES LOAD IS 2 kN/m2 GIVEN
*SO,UDL ON MAIN PIPE = 2*3 = 6 kN/m
113 TO 117 254 TO 264 UNI GY -6 2.92 5
112 118 UNI GY -3 2.92 5
415 417 418 420 421 423 424 426 427 429 430 432 434 437 439 -
445 UNI GY -6 0 0.62
414 441 UNI GY -3 0 0.62
*load= 4.22*(4.5)=18.99 KN*
112 CON GY -18.99 2.33
*load= 4.22*(4.5+4.5)=37.98 KN*
113 TO 116 CON GY -37.98 2.33
*load= 4.22*(4.5+3)=31.65 KN*
117 CON GY -31.65 2.33
*load= 4.22*(3)=12.66 KN*
118 CON GY -12.66 2.33
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
JOINT LOAD
65 FX 25
143 FX 25
*LOAD AT EL.111000 ARE AS FOLLOWS
MEMBER LOAD
*145 CON GY -20 1.1
145 CON GX 20 1.1
*146 CON GY -20 1.1
146 CON GZ 25 1.1
*148 CON GY -25 0.33
148 CON GZ 25 0.33
*149 CON GY -25 0.33
149 CON GZ 25 0.33
149 CON GX 25 0.33
*150 CON GY -25 0.33
150 CON GZ 20 0.33
PERFORM ANALYSIS
CHANGE
*************************************************************************
* FRICTIONAL LOAD BECAUSE OF PIPING LOAD IN LONGITUDINAL DIRECTION *
*************************************************************************
LOAD 6 FRICTIONAL LOAD BECAUSE OF PIPING LOAD IN +VE X DIRECTION (PFX)
*As per "Engineering Specification-Load and General Design UD-BA-000-EC-00005" point 2.10,
*friction load is taken as 15% of the total vertical pipe operating load.
*Total vertical pipe operating load on each beam is calculated and a horizontal UDL of intensity of 15%
*of this total vertical load is applied on beam.
Doc. ID-Code Rev.
Copyright 2007 Uhde GmbH
UD-BA-1308-ED-00002 00
Code
Design Calculations for Grade EPPC
Beams and Columns for UAN Page No.
Auxiliary Piperack CU 1308
06-3085
MEMBER LOAD
*FRICTIONAL LOAD AT EL.104250 LVL.
*Total piping operating load on a beam = 40.5 kN
*15% of this load = 6.075 kN, therefore udl = 0.8678 kN/m over 7m span.
*0.65 REDUCTION FOR FLOOR WITH 3 PIPE TIERS
*0.65*0.8678 kN/m = 0.564 kN/m
*FRICTION LOAD AT EL.106250 LVL.
*Total piping operating load on a beam (Beam No 79) = 62.5 kN
*15% of this load = 9.375 kN, therefore udl = 1.3392 kN/m over 7m span.
*0.65 REDUCTION FOR FLOOR WITH 3 PIPE TIERS
*0.65*1.3392 kN/m = 0.871 kN/m
79 UNI GX 0.606
*Total piping operating load on a beam (Beam No 85) = 47.4 kN
*15% of this load = 7.110 kN, therefore udl = 1.0157 kN/m over 7m span.
*0.65 REDUCTION FOR FLOOR WITH 3 PIPE TIERS
*0.65*1.0157 kN/m = 0.66 kN/m
85 UNI GX 0.455
*Total piping operating load on a beam (Beam No 221 TO 231) = 34.10 kN
*15% of this load = 5.115 kN, therefore udl = 0.7307 kN/m over 7m span.
*0.65 REDUCTION FOR FLOOR WITH 3 PIPE TIERS
*0.65*0.7307 kN/m = 0.475 kN/m
221 TO 231 UNI GX 0.31
*Total piping operating load on a beam (Beam No 80 TO 84) = 124.310 kN
*15% of this load = 18.6465 kN, therefore udl = 2.6637 kN/m over 7m span.
*0.65 REDUCTION FOR FLOOR WITH 3 PIPE TIERS
*0.65*2.66378 kN/m = 1.732.00 kN/m
80 TO 83 UNI GX 1.211
*Total piping operating load on a beam (Beam No 84) = 109.90 kN
*15% of this load = 16.485 kN, therefore udl = 2.355 kN/m over 7m span.
*0.65 REDUCTION FOR FLOOR WITH 3 PIPE TIERS
*0.65*2.355 kN/m = 1.531 kN/m
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
84 UNI GX 1.061
*FRICTION LOAD AT EL.109000 LVL.
*Total piping operating load on a beam (Beam No 112 414) = 40.0 kN
*15% of this load = 6 kN, therefore udl = 0.8571 kN/m over 7m span.
*0.65 REDUCTION FOR FLOOR WITH 3 PIPE TIERS
*0.65*0.8571 kN/m = 0.56 kN/m
112 414 UNI GX 1.067
*Total piping operating load on a beam (Beam No 118 441) = 32.5 kN
*15% of this load = 4.875 kN, therefore udl = 0.6964 kN/m over 7m span.
*0.65 REDUCTION FOR FLOOR WITH 3 PIPE TIERS
*0.65*0.6964 kN/m = 0.453 kN/m
118 441 UNI GX 0.75
*Total piping operating load on a beam (Beam No 254 TO 264 415 432 418 434 421 445 424 437 427 439
430 ) = 35 kN
*15% of this load = 5.25 kN, therefore udl = 0.75 kN/m over 7m span.
*0.65 REDUCTION FOR FLOOR WITH 3 PIPE TIERS
*0.65*0.75 kN/m = 0.49 kN/m
254 TO 264 415 418 421 424 427 430 432 434 437 439 445 UNI GX 0.225
*Total piping operating load on a beam (Beam No 113 TO 116 417 420 423 426) = 62 kN
*15% of this load = 9.30 kN, therefore udl = 1.3285 kN/m over 7m span.
*0.65 REDUCTION FOR FLOOR WITH 3 PIPE TIERS
*0.65*1.3285 kN/m = 0.864 kN/m
113 TO 116 417 420 423 426 UNI GX 2.13
*Total piping operating load on a beam (Beam No 117 429) = 57.60 kN
*15% of this load = 8.64 kN, therefore udl = 1.2342 kN/m over 7m span.
*0.65 REDUCTION FOR FLOOR WITH 3 PIPE TIERS
Doc. ID-Code Rev.
Copyright 2007 Uhde GmbH
UD-BA-1308-ED-00002 00
Code
Design Calculations for Grade EPPC
Beams and Columns for UAN Page No.
Auxiliary Piperack CU 1308
06-3085
*15% of this load = 3 kN, therefore udl = 0.4285 kN/m over 7m span.
*0.65 REDUCTION FOR FLOOR WITH 3 PIPE TIERS
*0.65*0.4285 kN/m = 0.278 kN/m
83 UNI GX 0.278
*LOAD AT EL.109000
*Total piping operating load on a beam = 40 kN
*15% of this load = 6 kN, therefore udl = 0.8571 kN/m over 7m span.
*0.65 REDUCTION FOR FLOOR WITH 3 PIPE TIERS
*0.65*0.8571 kN/m = 0.5571 kN/m
112 414 UNI GX 0.5571
*Total piping operating load on a beam = 30 kN
*15% of this load = 4.5 kN, therefore udl = 0.64285 kN/m over 7m span.
*0.65 REDUCTION FOR FLOOR WITH 3 PIPE TIERS
*0.65*0.64285 kN/m = 0.4178 kN/m
113 417 UNI GX 0.4178
114 420 UNI GX 0.4178
115 423 UNI GX 0.4178
116 426 UNI GX 0.4178
117 429 UNI GX 0.4178
*LOAD AT EL.111000
*Total piping operating load on a beam = 20 kN
*15% of this load = 3 kN, therefore udl = 0.4285 kN/m over 7m span.
*0.65 REDUCTION FOR FLOOR WITH 3 PIPE TIERS
*0.65*0.4285 kN/m = 0.278 kN/m
145 467 UNI GX 0.278
146 468 UNI GX 0.278
Doc. ID-Code Rev.
Copyright 2007 Uhde GmbH
UD-BA-1308-ED-00002 00
Code
Design Calculations for Grade EPPC
Beams and Columns for UAN Page No.
Auxiliary Piperack CU 1308
06-3085
as joint load*
*LOAD=10KN/M*9M(for 9M bay)=90KN*
*90KN/2=45KN*
JOINT LOAD
16 TO 19 23 TO 26 FY -45
*LIVE LOAD OF CABLE TRAY*
JOINT LOAD
78 TO 84 157 TO 162 168 TO 172 209 FY -0.75 MX 0.5
MEMBER LOAD
145 TO 151 287 TO 297 CON GY -0.75 4.5
145 TO 151 287 TO 297 CMOM GX -0.5 4.5
*****************************************
*********************PIPE TEST LOAD******
*****************************************
LOAD 12 PIPING TEST LOAD (PT)
MEMBER LOAD
*THE LEVEL IS EL.104250.
*LOADS FOR SMALL DIA PIPES IS 2 kN/m2 AND 2 kN/m2 RESPECTIVELY.
*CONTRIBUTING LENGTH=3m CONSIDERED.SO, UDL ON PIPE RACK = 2*3 =6kN/m AND 2*1.5 =
3kN/m.
**THE LEVELS IS EL.106250.
*TYPICAL PIPERACK FRAME SPACING IS 9m. FOR PIPE LOADS, CONTRIBUTING LENGTH OF 9m
=(4.5 m+4.5 m) IS CONSIDERED.
*AT ONE LOCATION PIPE RACK FRAMES ARE SPACED AT 6m. SO TO CALCULATE THE LOAD,7.5m =
(4.5m+3m) IS CONSIDERED.
*PIPE LOAD OF 16" DIA. PIPE 2.1 kN/m
Doc. ID-Code Rev.
Copyright 2007 Uhde GmbH
UD-BA-1308-ED-00002 00
Code
Design Calculations for Grade EPPC
Beams and Columns for UAN Page No.
Auxiliary Piperack CU 1308
06-3085
*load=.35*9= 3.15 KN
85 CON GY -3.15 0.635
*LOAD ,3*(4.5+3)=22.5 KN
*load=.35*22.5= 7.87 KN
84 CON GY -7.87 0.635
**UDL ON BEAMS OF SMALL DIA. PIPES.
*LOAD 2 kN/m2 GIVEN, CONTRIBUTING LENGTH= 3.0 m AND AT END 1.5 m LENGTH.
*LOAD IS 2*3 = 6 kN/m AND 1.5*2 = 2 kN/m.
*load=.35*6= 2.1 KN/M
80 TO 84 221 TO 231 UNI GY -2.1 0.94 4.64
79 85 UNI GY -1.05 0.94 4.64
**THE LEVELS IS EL.109000.
*CONCENTRATED LOAD ON FRAMING BEAMS DUE TO 20" DIA PIPE
*OPERATING LOAD 1 kN/m GIVEN
*CONCENTRATED LOAD ON FRAMING BEAM = 9*1 = 9 kN
*CONCENTRATED LOAD AT END = 4.5 kN
*load= 1*(3+4.5)=7.5 KN*
*load=.35*9= 3.15 KN
417 420 423 426 CON GY -3.15 1.47
*load= 1*(3+4.5)=7.5 KN
*load=.35*7.5= 2.625 KN
429 CON GY -2.625 1.47
*LOAD= 1*(4.5+3)=7.5 KN
*load=.35*7.5= 2.625 KN
117 CON GY -2.625 0.5
*load=.35*9= 3.15 KN
113 TO 116 CON GY -3.15 0.5
*LOAD= 1*4.5=4.5 KN*
*load=.35*5= 1.75 KN
414 CON GY -1.75 1.47
*load=.35*3= 1.05 KN
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
*load=.35*63= 22.05 KN
113 TO 116 CON GY -22.05 1.42
*load= 7*(4.5+3)=52.5 KN*
*load=.35*52.5= 18.4 KN
117 CON GY -18.4 1.42
*load= 7*(3)=21 KN*
*load=.35*21= 7.35 KN
118 CON GY -7.35 1.42
*load= 3*(4.5)=13.5 KN*
*load=.35*13.5= 4.725 KN
112 CON GY -4.725 0.6
*load= 3*(4.5+4.5)=27 KN*
*load=.35*27= 9.45 KN
113 TO 116 CON GY -9.45 0.6
*load= 3*(4.5+3)=22.5 KN*
*load=.35*22.5= 7.875 KN
117 CON GY -7.875 0.6
*load= 3*(3)=9 KN*
*load=.35*9= 3.15 KN
118 CON GY -3.15 0.6
*THESE LOADS ARE TAKEN FROM "CU_1308_EXTERNAL HANGER(GRID1).std"
79 85 CON GY -2.285 6.1
79 85 CON GY -2.285 0.9
79 85 CON GZ -0.607 6.1
79 85 CON GZ 0.607 0.9
*THESE LOADS ARE TAKEN FROM "CU_1308_INTERNAL HANGER( ON SECONDRY BEAMS).std"
80 TO 84 221 TO 231 CON GY -4.57 6.1
80 TO 84 221 TO 231 CON GY -4.57 0.9
80 TO 84 221 TO 231 CON GZ -1.214 6.1
80 TO 84 221 TO 231 CON GZ 1.214 0.9
*LOAD AT EL.106250 ARE AS FOLLOWS
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
*LOAD=0.35*50=17.5 KN
*LOAD=0.35*22=7.7 KN
*LOAD=0.35*20=7 KN
*79 CON GY -17.5 4.65
79 CON GX 7.7 4.65
79 CON GZ 7 4.65
*LOAD=0.35*30=10.5 KN
*LOAD=0.35*35=12.25 KN
*80 CON GY -10.5 5.4
80 CON GX 12.25 5.4
80 CON GZ 10.5 5.4
*LOAD=0.35*30=10.5 KN
*81 CON GY -10.5 5.4
*LOAD=0.35*40=14 KN
*LOAD=0.35*30=10.5 KN
*LOAD=0.35*15=5.25 KN
*82 CON GY -14 1.5
82 CON GX 10.5 1.5
82 CON GZ 5.25 1.5
*LOAD=0.35*20=7 KN
*LOAD=0.35*15=5.25 KN
*83 CON GY -7 2.3
83 CON GZ 5.25 2.3
*LOAD=0.35*20=7 KN
JOINT LOAD
109 FX 7 FZ 7
Doc. ID-Code Rev.
Copyright 2007 Uhde GmbH
UD-BA-1308-ED-00002 00
Code
Design Calculations for Grade EPPC
Beams and Columns for UAN Page No.
Auxiliary Piperack CU 1308
06-3085
*EFFECTIVE HEIGHT FOR WIND PRESSUE = MAXIMUM DIAMETER OF THE PIPE 508MM(20") + 0.3M
ABOVE AND BELOW BEAM(TO ACCOUNT FOR TAPPING FROM PIPING) + BEAM DEPTH(0.9M)
*SO HEIGHT OF OBSTRUCTION= 0.508+(2*0.3)+0.9 = 2.008 M*
*LOAD= 2.008*1.6 = 3.21 KN/M*
79 UNI GX 3.21
*WIND LOAD AT EL.109000 LEVEL*
*WIND LOAD ON FIRST FRAME
*EFFECTIVE HEIGHT FOR WIND PRESSUE = MAXIMUM DIAMETER OF THE PIPE 762MM(30") + 0.3M
ABOVE AND BELOW BEAM(TO ACCOUNT FOR TAPPING FROM PIPING) + BEAM DEPTH(0.9M)
*HEIGHT OF OBSTRUCTION= 0.762+(2*0.3)+0.4 = 1.762 M*
*LOAD= 1.762*1.6 = 2.819 KN/M*
112 414 UNI GX 2.819
*THE LEVEL IS EL.111000*
*STEEL BEAM USED IS 1PE300*
*WIND LOAD= BEAM DEPTH*INTENSITY OF WIND*
*LOAD= 2KN/M2*0.3= .6 KN/M
145 TO 151 467 TO 473 UNI GX 0.6
*RCC COLUMN SIZE IS .6M X.6M SO WIDTH OF OBSTRUCTION IS .6 M*
*LOAD= 1.6*0.6=0.96 KN/M
66 UNI GX 0.96 4.45 6.45
66 UNI GX 0.96 0 4.45
59 UNI GX 0.96 4.45 6.45
59 UNI GX 0.96 0 4.45
65 UNI GX 0.96 4.45 6.45
65 UNI GX 0.96 0 4.45
58 UNI GX 0.96 4.45 6.45
Doc. ID-Code Rev.
Copyright 2007 Uhde GmbH
UD-BA-1308-ED-00002 00
Code
Design Calculations for Grade EPPC
Beams and Columns for UAN Page No.
Auxiliary Piperack CU 1308
06-3085
*******************************************
************TRANSVERSE WIND FORCE**********
*******************************************
LOAD 21 WIND LOAD (NORTH TO SOUTH) (W+VEZ)
**TRANSVERSE WIND FORCE +Z
*Based on the Engineering reference guide,UD-BA-000-DC-00003, following wind pressures are considered.
*Upto height of 10m, wind intensity is taken as 1.6kN/m2
*From 10m to 20m height wind intensity is taken as 2kN/m2.
*Wind UDL on RC Column = column width*wind intensity
*Width of RC column is 0.6M. SO WIND UDL=1.6*0.6 = 0.96KN/M
*As the effective exposed height for wind pressure on pipe supporting tier is taken as 2 m,
*wind on column is applied only upto height of 3.25 m.
MEMBER LOAD
53 TO 66 UNI GZ 0.96 0.2 5.25
*THE EFFECTIVE DEPTH OF THE MEMBER, FOR +Z DIECTION WIND, IS TO BE TAKEN 2M, AS PER
ENGINEERING SPECIFICATION UD-BA-000-DC-00003.
*SO FOR EL.104250, EL.106250 & EL.109000, WIND UDL = 2*1.6 = 3.2 KN/M
67 TO 72 100 TO 105 199 TO 204 211 TO 215 232 TO 237 244 TO 248 405 UNI GZ 3.2
*depth of STEEL BEAM AT EL.111000 IS 0.300M
*SO WIND LOAD= 2*.3=.6 KN/M
133 TO 144 265 TO 286 402 404 UNI GZ 0.6
*WIDTH OF STEEL COLUMN HEB400 IS 0.3M,
*SO WIND LOAD= 2*0.3=.6 KN/M
152 TO 165 UNI GZ 0.6 1 2
119 TO 132 UNI GZ 0.48 1 1.75
*THE VALUES BELOW MENTIONED ARE CALCULATED IN WORD DOCUMENT.
*wind load on cable tray (Wy)=Cf*q*0.5*h*a
*where,
*force coefficient(Cf)=1.3,
*dynamic wind pressure(q)=2 Kn/m2
*height of construction(h)=0.3 x 4=1.2M,where n is no. Of tiers of cable trays = 4
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
**********************************************************
***TRANSVERSE WIND FORCE**********************
********************************************************
LOAD 22 WIND LOAD (SOUTH TO NORTH) (W-VEZ)
*THIS LOAD IS SAME AS LOAD 21, BUT APPLIED IN -Z DIRECTION.
MEMBER LOAD
53 TO 66 UNI GZ -0.96 0.2 5.25
73 TO 78 106 TO 111 205 TO 210 216 TO 220 238 TO 243 249 TO 253 403 UNI GZ -3.2
133 TO 144 265 TO 286 402 404 UNI GZ -0.6
152 TO 165 UNI GZ -0.6 1 2
MEMBER LOAD
119 TO 132 UNI GZ -0.48 1 1.75
JOINT LOAD
79 TO 83 157 TO 162 168 TO 172 FZ -4.68
78 TO 84 157 TO 162 168 TO 172 MX -2.808
78 84 FZ -2.34
MEMBER LOAD
79 CON GY -1.371 6.1
79 CON GY 1.371 0.9
79 CON GZ -2.404 6.1
79 CON GZ -2.396 0.9
********************
146 TO 150 287 TO 297 CON GZ 4.68 4.5
145 TO 151 287 TO 297 CMOM GX 2.808 4.5
145 151 CON GZ 2.34 4.5
79 85 CON GY -1.371 6.1
79 85 CON GY 1.371 0.9
79 85 CON GZ -2.396 6.1
79 85 CON GZ -2.404 0.9
80 TO 84 221 TO 231 CON GZ -4.791 0.9
80 TO 84 221 TO 231 CON GZ -4.809 6.1
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
******************************************************************************
* FOR TEST CONDITION WITHOUT TEMPERATURE EFFECT *
******************************************************************************
* VERTICAL LOAD
LOAD COMB 2001 D(T1) + L
202 1.0 8 0.5
******************************************************************************
* VERTICAL LOAD + WIND IN WEST TO EAST
LOAD COMB 2005 D(T1) + L + (W+VEX)
202 1.0 8 0.5 19 0.6
******************************************************************************
* VERTICAL LOAD + WIND IN EAST TO WEST
LOAD COMB 2009 D(T1) + L + (W-VEX)
202 1.0 8 0.5 20 0.6
*****************************************************************************
* VERTICAL LOAD + WIND IN NORTH TO SOUTH
LOAD COMB 2013 D(T1) + L + (W+VEZ)
202 1.0 8 0.5 21 0.6
******************************************************************************
* VERTICAL LOAD + WIND IN SOUTH TO NORTH
LOAD COMB 2017 D(T1) + L + (W-VEZ)
202 1.0 8 0.5 22 0.6
*****************************************************************************
* FOR ERECTION CONDITION WITHOUT TEMP EFFECT *
******************************************************************************
*VERTICAL LOAD
Doc. ID-Code Rev.
Copyright 2007 Uhde GmbH
UD-BA-1308-ED-00002 00
Code
Design Calculations for Grade EPPC
Beams and Columns for UAN Page No.
Auxiliary Piperack CU 1308
06-3085
******************************************************************************
* VERTICAL LOAD + THERMAL + WIND IN EAST TO WEST
LOAD COMB 6009 D(T1) + L + (T+VE) + (W-VEX)
202 1.0 17 1.0 8 0.5 20 0.6
LOAD COMB 6011 D(T1) + L + (T-VE) + (W-VEX)
202 1.0 18 1.0 8 0.5 20 0.6
*****************************************************************************
* VERTICAL LOAD + THERMAL + WIND IN NORTH TO SOUTH
LOAD COMB 6013 D(T1) + L + (T+VE) + (W+VEZ)
202 1.0 17 1.0 8 0.5 21 0.6
LOAD COMB 6015 D(T1) + L + (T-VE) + (W+VEZ)
202 1.0 18 1.0 8 0.5 21 0.6
******************************************************************************
* VERTICAL LOAD + THERMAL + WIND IN SOUTH TO NORTH
LOAD COMB 6017 D(T1) + L + (T+VE) + (W-VEZ)
202 1.0 17 1.0 8 0.5 22 -0.6
LOAD COMB 6019 D(T1) + L + (T-VE) + (W-VEZ)
202 1.0 18 1.0 8 0.5 22 -0.6
******************************************************************************
* FOR OPERATING CONDITION WITH TEMPERATURE EFFECT
* AND FRICTIONAL LOAD *
******************************************************************************
* VERTICAL LOAD + FRICTIONAL LOAD + THERMAL
LOAD COMB 9001 D(O1) + L + PFX + (T+VE)
201 1.0 6 1.0 17 1.0 8 1.0
LOAD COMB 9003 D(O1) + L + PFX + (T-VE)
Doc. ID-Code Rev.
Copyright 2007 Uhde GmbH
UD-BA-1308-ED-00002 00
Code
Design Calculations for Grade EPPC
Beams and Columns for UAN Page No.
Auxiliary Piperack CU 1308
06-3085
******************************************************************************
* VERTICAL LOAD + THERMAL
LOAD COMB 15001 D(O1) + L + (T+VE)
201 1.4 17 1.4 8 1.7
LOAD COMB 15003 D(O1) + L + (T-VE)
201 1.4 18 1.4 8 1.7
******************************************************************************
* VERTICAL LOAD + THERMAL + WIND IN WEST TO EAST
LOAD COMB 15009 D(O1) + L + (T+VE) + (W+VEZ)
201 1.05 17 1.05 8 1.275 19 1.3
LOAD COMB 15011 D(O1) + L + IL + (T-VE) + (W+VEZ)
201 1.05 18 1.05 8 1.275 19 1.3
******************************************************************************
* VERTICAL LOAD + THERMAL + WIND IN EAST TO WEST
LOAD COMB 15013 D(O1) + L + (T+VE) + (W-VEX)
201 1.05 17 1.05 8 1.275 20 1.3
LOAD COMB 15015 D(O1) + L + (T-VE) + (W-VEX)
201 1.05 18 1.05 8 1.275 20 1.3
******************************************************************************
* VERTICAL LOAD + THERMAL + WIND IN NORTH TO SOUTH
LOAD COMB 15017 D(O1) + L + (T+VE) + (W+VEZ)
201 1.05 17 1.05 8 1.275 21 1.3
LOAD COMB 15019 D(O1) + L + (T-VE) + (W+VEZ)
201 1.05 18 1.05 8 1.275 21 1.3
******************************************************************************
* VERTICAL LOAD + THERMAL + WIND IN SOUTH TO NORTH
Doc. ID-Code Rev.
Copyright 2007 Uhde GmbH
UD-BA-1308-ED-00002 00
Code
Design Calculations for Grade EPPC
Beams and Columns for UAN Page No.
Auxiliary Piperack CU 1308
06-3085
7.3.2 Maximum pile forces are tabulated in following table. From summary of pile
forces it can be seen that the pile forces are less than the capacity of 800mm dia pile
with the reinforcement given in drawing “UD-BA-000-EB-00010 - Reinforcement
drawing R.C Details for 800 dia piles“.
The pile cap size is decided based on pile diameter and considering 200 mm
projection on either side of pile. Centrelines of columns and piles coincides hence
load will be directly transfered to pile from column instead of pile cap. Therefore
minimum steel is provided in pile cap according to ACI 318-2002. At expansion
joint, centreline of column lies within d/2 from the face of pile hence minimum steel
is provided according to ACI 318-2002.
Beams have been designed according to ACI 318-2002 using design software
Staad Pro.
Columns have been designed according to ACI 318-2002 using design software
Staad pro. To consider slenderness effect the moment magnification factors are
worked out for each column and has been applied accordingly in STAAD PRO as
follows.
Since there is minor difference between magnification factor for column moments in
longitudinal and transverse direction applying the higher value in the STAAD for
design of columns.
=====================================================================
B E A M N O. 15 D E S I G N R E S U L T S - SHEAR
AT START SUPPORT - Vu= 118.06 KNS Vc= 309.70 KNS Vs= 0.00 KNS
Tu= 0.37 KN-MET Tc= 20.4 KN-MET Ts= 0.0 KN-MET LOAD 11001
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 365. MM C/C FOR 3690. MM
AT END SUPPORT - Vu= 171.19 KNS Vc= 309.70 KNS Vs= 0.00 KNS
Tu= 0.37 KN-MET Tc= 20.4 KN-MET Ts= 0.0 KN-MET LOAD 11001
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 365. MM C/C FOR 3690. MM
=====================================================================
|----------------------------------------------------------------|
| CRITICAL POS MOMENT= 279.95 KN-MET AT 2400.MM, LOAD19003|
| REQD STEEL= 1400.MM2, ROW=0.0034, ROWMX=0.0168 ROWMN=0.0034 |
| MAX/MIN/ACTUAL BAR SPACING= 194./ 41./ 54. MMS |
| REQD. DEVELOPMENT LENGTH = 754. MMS |
|----------------------------------------------------------------|
B E A M N O. 17 D E S I G N R E S U L T S - SHEAR
AT START SUPPORT - Vu= 122.09 KNS Vc= 320.48 KNS Vs= 0.00 KNS
Tu= 0.14 KN-MET Tc= 20.6 KN-MET Ts= 0.0 KN-MET LOAD 11013
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 365. MM C/C FOR 3690. MM
AT END SUPPORT - Vu= 175.92 KNS Vc= 314.79 KNS Vs= 0.00 KNS
Tu= 0.01 KN-MET Tc= 20.6 KN-MET Ts= 0.0 KN-MET LOAD 11001
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 365. MM C/C FOR 3690. MM
| |
|___________________________________________________________________________|
_______ _______ _______ _______ _______ _______ _______
| | | | | | | | | | | | | |
|ooooooo| |ooooooo| |ooooooo| | | |oooooo | |oooooo | |oooooo |
| 7#16 | | 7#16 | | 7#16 | | | | 6#20 | | 6#20 | | 6#20 |
| | | | | | | | | | | | | |
| 7#16 | | 7#16 | | 7#16 | | 7#16 | | 7#16 | | 7#16 | | 7#16 |
|ooooooo| |ooooooo| |ooooooo| |ooooooo| |ooooooo| |ooooooo| |ooooooo|
| | | | | | | | | | | | | |
|_______| |_______| |_______| |_______| |_______| |_______| |_______|
=====================================================================
|----------------------------------------------------------------|
| CRITICAL NEG MOMENT= 222.85 KN-MET AT 0.MM, LOAD15015|
| REQD STEEL= 1400.MM2, ROW=0.0034, ROWMX=0.0168 ROWMN=0.0034 |
| MAX/MIN/ACTUAL BAR SPACING= 194./ 41./ 54. MMS |
| REQD. DEVELOPMENT LENGTH = 754. MMS |
|----------------------------------------------------------------|
B E A M N O. 19 D E S I G N R E S U L T S - SHEAR
AT START SUPPORT - Vu= 119.59 KNS Vc= 315.98 KNS Vs= 0.00 KNS
Tu= 1.53 KN-MET Tc= 20.7 KN-MET Ts= 0.0 KN-MET LOAD 15015
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 365. MM C/C FOR 3690. MM
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
AT END SUPPORT - Vu= 181.17 KNS Vc= 312.12 KNS Vs= 0.00 KNS
Tu= 2.06 KN-MET Tc= 20.6 KN-MET Ts= 0.0 KN-MET LOAD 11001
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 365. MM C/C FOR 3690. MM
| | | | | | | | | | | | | |
|_______| |_______| |_______| |_______| |_______| |_______| |_______|
=====================================================================
|----------------------------------------------------------------|
B E A M N O. 20 D E S I G N R E S U L T S - SHEAR
AT START SUPPORT - Vu= 127.28 KNS Vc= 312.26 KNS Vs= 0.00 KNS
Tu= 0.87 KN-MET Tc= 20.7 KN-MET Ts= 0.0 KN-MET LOAD 15015
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 365. MM C/C FOR 2190. MM
AT END SUPPORT - Vu= 134.29 KNS Vc= 307.08 KNS Vs= 0.00 KNS
Tu= 1.41 KN-MET Tc= 20.5 KN-MET Ts= 0.0 KN-MET LOAD 11009
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 365. MM C/C FOR 2190. MM
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
=====================================================================
B E A M N O. 21 D E S I G N R E S U L T S - SHEAR
AT START SUPPORT - Vu= 125.47 KNS Vc= 316.63 KNS Vs= 0.00 KNS
Tu= 0.24 KN-MET Tc= 20.5 KN-MET Ts= 0.0 KN-MET LOAD 11013
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 365. MM C/C FOR 3690. MM
AT END SUPPORT - Vu= 173.74 KNS Vc= 309.70 KNS Vs= 0.00 KNS
Tu= 0.04 KN-MET Tc= 20.4 KN-MET Ts= 0.0 KN-MET LOAD 11001
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 365. MM C/C FOR 3690. MM
=====================================================================
B E A M N O. 23 D E S I G N R E S U L T S - SHEAR
AT START SUPPORT - Vu= 122.44 KNS Vc= 320.19 KNS Vs= 0.00 KNS
Tu= 0.14 KN-MET Tc= 20.6 KN-MET Ts= 0.0 KN-MET LOAD 11013
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 365. MM C/C FOR 3690. MM
AT END SUPPORT - Vu= 178.21 KNS Vc= 314.10 KNS Vs= 0.00 KNS
Tu= 0.01 KN-MET Tc= 20.6 KN-MET Ts= 0.0 KN-MET LOAD 11001
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 365. MM C/C FOR 3690. MM
=====================================================================
|----------------------------------------------------------------|
| CRITICAL NEG MOMENT= 223.07 KN-MET AT 0.MM, LOAD15015|
| REQD STEEL= 1400.MM2, ROW=0.0034, ROWMX=0.0168 ROWMN=0.0034 |
| MAX/MIN/ACTUAL BAR SPACING= 194./ 41./ 54. MMS |
| REQD. DEVELOPMENT LENGTH = 754. MMS |
|----------------------------------------------------------------|
B E A M N O. 25 D E S I G N R E S U L T S - SHEAR
AT START SUPPORT - Vu= 119.62 KNS Vc= 315.93 KNS Vs= 0.00 KNS
Tu= 1.65 KN-MET Tc= 20.7 KN-MET Ts= 0.0 KN-MET LOAD 15015
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 365. MM C/C FOR 3690. MM
AT END SUPPORT - Vu= 183.47 KNS Vc= 311.75 KNS Vs= 0.00 KNS
Tu= 2.20 KN-MET Tc= 20.6 KN-MET Ts= 0.0 KN-MET LOAD 11001
NO STIRRUPS ARE REQUIRED FOR TORSION.
=====================================================================
B E A M N O. 26 D E S I G N R E S U L T S - SHEAR
AT START SUPPORT - Vu= 127.14 KNS Vc= 312.29 KNS Vs= 0.00 KNS
Tu= 1.36 KN-MET Tc= 20.7 KN-MET Ts= 0.0 KN-MET LOAD 15015
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 365. MM C/C FOR 2190. MM
AT END SUPPORT - Vu= 140.70 KNS Vc= 306.77 KNS Vs= 0.00 KNS
Tu= 1.89 KN-MET Tc= 20.5 KN-MET Ts= 0.0 KN-MET LOAD 11009
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 365. MM C/C FOR 2190. MM
| 8*10c/c365 | | | | | | | | | 8*10c/c365| |
| 7No16|H 88. 0.TO 6000 | | | | | | | | | | |
||=========================================================================||
| |
|___________________________________________________________________________|
_______ _______ _______ _______ _______ _______ _______
| | | | | | | | | | | | | |
|ooooooo| |ooooooo| |ooooooo| |ooooooo| |ooooooo| |ooooooo| |ooooooo|
| 7#16 | | 7#16 | | 7#16 | | 7#20 | | 7#20 | | 7#20 | | 7#20 |
| | | | | | | | | | | | | |
| 7#16 | | 7#16 | | 7#16 | | 7#16 | | 7#16 | | 7#16 | | 7#16 |
|ooooooo| |ooooooo| |ooooooo| |ooooooo| |ooooooo| |ooooooo| |ooooooo|
| | | | | | | | | | | | | |
|_______| |_______| |_______| |_______| |_______| |_______| |_______|
=====================================================================
B E A M N O. 27 D E S I G N R E S U L T S - SHEAR
AT START SUPPORT - Vu= 4.46 KNS Vc= 307.98 KNS Vs= 0.00 KNS
Tu= 0.85 KN-MET Tc= 20.4 KN-MET Ts= 0.0 KN-MET LOAD 11001
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
| | | | | | | | | | | | | |
|_______| |_______| |_______| |_______| |_______| |_______| |_______|
=====================================================================
|----------------------------------------------------------------|
B E A M N O. 28 D E S I G N R E S U L T S - SHEAR
AT START SUPPORT - Vu= 116.61 KNS Vc= 307.95 KNS Vs= 0.00 KNS
Tu= 0.84 KN-MET Tc= 20.4 KN-MET Ts= 0.0 KN-MET LOAD 11017
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 365. MM C/C FOR 2690. MM
AT END SUPPORT - Vu= 197.51 KNS Vc= 307.95 KNS Vs= 0.00 KNS
Tu= 0.84 KN-MET Tc= 20.4 KN-MET Ts= 0.0 KN-MET LOAD 11017
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 365. MM C/C FOR 2690. MM
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
=====================================================================
B E A M N O. 29 D E S I G N R E S U L T S - SHEAR
AT START SUPPORT - Vu= 124.35 KNS Vc= 307.94 KNS Vs= 0.00 KNS
Tu= 0.98 KN-MET Tc= 20.4 KN-MET Ts= 0.0 KN-MET LOAD 11017
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 365. MM C/C FOR 2690. MM
AT END SUPPORT - Vu= 205.24 KNS Vc= 307.94 KNS Vs= 0.00 KNS
Tu= 0.98 KN-MET Tc= 20.4 KN-MET Ts= 0.0 KN-MET LOAD 11017
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 365. MM C/C FOR 2690. MM
=====================================================================
B E A M N O. 30 D E S I G N R E S U L T S - SHEAR
AT START SUPPORT - Vu= 124.88 KNS Vc= 307.93 KNS Vs= 0.00 KNS
Tu= 1.09 KN-MET Tc= 20.4 KN-MET Ts= 0.0 KN-MET LOAD 11017
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 365. MM C/C FOR 2690. MM
AT END SUPPORT - Vu= 205.78 KNS Vc= 307.93 KNS Vs= 0.00 KNS
Tu= 1.09 KN-MET Tc= 20.4 KN-MET Ts= 0.0 KN-MET LOAD 11017
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 365. MM C/C FOR 2690. MM
=====================================================================
|----------------------------------------------------------------|
| CRITICAL NEG MOMENT= 363.38 KN-MET AT 0.MM, LOAD14008|
| REQD STEEL= 1348.MM2, ROW=0.0034, ROWMX=0.0168 ROWMN=0.0034 |
| MAX/MIN/ACTUAL BAR SPACING= 194./ 41./ 54. MMS |
| REQD. DEVELOPMENT LENGTH = 754. MMS |
|----------------------------------------------------------------|
B E A M N O. 31 D E S I G N R E S U L T S - SHEAR
AT START SUPPORT - Vu= 131.24 KNS Vc= 308.60 KNS Vs= 0.00 KNS
Tu= 0.51 KN-MET Tc= 20.4 KN-MET Ts= 0.0 KN-MET LOAD 14008
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 365. MM C/C FOR 2690. MM
AT END SUPPORT - Vu= 192.58 KNS Vc= 307.94 KNS Vs= 0.00 KNS
Tu= 1.48 KN-MET Tc= 20.4 KN-MET Ts= 0.0 KN-MET LOAD 11017
NO STIRRUPS ARE REQUIRED FOR TORSION.
=====================================================================
B E A M N O. 32 D E S I G N R E S U L T S - SHEAR
AT START SUPPORT - Vu= 116.44 KNS Vc= 309.40 KNS Vs= 0.00 KNS
Tu= 0.21 KN-MET Tc= 20.4 KN-MET Ts= 0.0 KN-MET LOAD 14008
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 365. MM C/C FOR 2690. MM
AT END SUPPORT - Vu= 162.76 KNS Vc= 308.81 KNS Vs= 0.00 KNS
Tu= 0.53 KN-MET Tc= 20.4 KN-MET Ts= 0.0 KN-MET LOAD 11017
NO STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 365. MM C/C FOR 2690. MM
| 9*10c/c365 | | | | | | | | | | | 9*10c/c365 | |
| 7No16 H |88.| 0.TO 7000| | | | | | | | | | | | |
||=========================================================================||
| |
|___________________________________________________________________________|
_______ _______ _______ _______ _______ _______ _______
| | | | | | | | | | | | | |
|ooooooo| |ooooooo| |ooooooo| |oooooo | |oooooo | |oooooo | |oooooo |
| 7#16 | | 7#16 | | 7#16 | | 6#20 | | 6#20 | | 6#20 | | 6#20 |
| | | | | | | | | | | | | |
| 7#16 | | 7#16 | | 7#16 | | 7#16 | | 7#16 | | 7#16 | | 7#16 |
|ooooooo| |ooooooo| |ooooooo| |ooooooo| |ooooooo| |ooooooo| |ooooooo|
| | | | | | | | | | | | | |
|_______| |_______| |_______| |_______| |_______| |_______| |_______|
=====================================================================
B E A M N O. 33 D E S I G N R E S U L T S - SHEAR
AT START SUPPORT - Vu= 25.54 KNS Vc= 308.86 KNS Vs= 0.00 KNS
Tu= 0.79 KN-MET Tc= 20.4 KN-MET Ts= 0.0 KN-MET LOAD 11001
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
| | | | | | | | | | | | | |
|_______| |_______| |_______| |_______| |_______| |_______| |_______|
365mm 250mm
Left Support (T) 715 6#20
(TB4) Left Support (B) 523 4#16+2#20
4 20 500*900 Right Support (T) 1490 6#20
Right Support (B) 432 4#16+2#20
Mid span (B) 376 4#16+2#20
Stirrups 2 legged, 10mm, 4 legged, 12mm,
365mm 250mm
Left Support (T) 813 6#20
(TB5) Left Support (B) 963 4#16+2#20
5 21 500*900 Right Support (T) 1654 6#20
Right Support (B) 291 4#16+2#20
Mid span (B) 1072 4#16+2#20
Stirrups 2 legged, 10mm, 4 legged, 12mm,
365mm 250mm
Left Support (T) 548 6#20
(TB6) Left Support (B) 755 4#16+2#20
6 23 500*900 Right Support (T) 1355 6#20
Right Support (B) 272 4#16+2#20
Mid span (B) 1015 4#16+2#20
Stirrups 2 legged, 10mm, 4 legged, 12mm,
365mm 250mm
Left Support (T) 498 6#20
(TB7) Left Support (B) 807 4#16+2#20
7 25 500*900 Right Support (T) 1409 6#20
Right Support (B) 22 4#16+2#20
Mid span (B) 1036 4#16+2#20
Stirrups 2 legged, 10mm, 4 legged, 12mm,
365mm 250mm
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
====================================================================
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
8167.43 6533.95 2959.67 784.27 265.0
M0 P-tens. Des.Pn Des.Mn e/h
473.03 -1930.22 248.02 89.77 0.05611
--------------------------------------------------------
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
====================================================================
----------------------------------------------------------
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
8724.91 6979.92 2957.84 876.41 296.3
M0 P-tens. Des.Pn Des.Mn e/h
598.86 -2513.29 689.59 275.07 0.06184
--------------------------------------------------------
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
8724.91 6979.92 2957.84 876.41 296.3
M0 P-tens. Des.Pn Des.Mn e/h
598.86 -2513.29 689.59 521.91 0.11734
--------------------------------------------------------
Pn Mn Pn Mn (@ Z )
| 6443.01 498.98 3221.50 857.63
====================================================================
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
8475.01 6780.01 2974.80 835.65 280.9
M0 P-tens. Des.Pn Des.Mn e/h
545.20 -2251.92 588.80 144.91 0.03816
--------------------------------------------------------
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
8475.01 6780.01 2974.80 835.65 280.9
M0 P-tens. Des.Pn Des.Mn e/h
545.20 -2251.92 588.80 536.54 0.14128
--------------------------------------------------------
Pn Mn Pn Mn (@ Z )
| 6258.47 487.12 3129.24 825.45
P0 |* 5736.93 568.12 2607.70 832.72
| * 5215.39 638.12 2086.16 814.45
Pn,max|__* 4693.85 696.62 1564.62 777.10
| * 4172.31 746.47 1043.08 721.54
Pn | * 3650.77 788.67 521.54 641.91
NOMINAL| * Pn Mn Pn Mn (@ Y )
AXIAL| * 6258.47 487.12 3129.24 825.45
COMPRESSION| * 5736.93 568.12 2607.70 832.72
Pb|-------*Mb 5215.39 638.12 2086.16 814.45
| * 4693.85 696.62 1564.62 777.10
___________|____*_______ 4172.31 746.47 1043.08 721.54
| * M0 Mn, 3650.77 788.67 521.54 641.91
| * BENDING
P-tens|* MOMENT
|
====================================================================
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
8475.01 6780.01 2974.80 835.65 280.9
M0 P-tens. Des.Pn Des.Mn e/h
545.20 -2251.92 669.99 518.63 0.12001
--------------------------------------------------------
Pn Mn Pn Mn (@ Z )
| 6258.47 487.12 3129.24 825.45
P0 |* 5736.93 568.12 2607.70 832.72
| * 5215.39 638.12 2086.16 814.45
Pn,max|__* 4693.85 696.62 1564.62 777.10
| * 4172.31 746.47 1043.08 721.54
Pn | * 3650.77 788.67 521.54 641.91
NOMINAL| * Pn Mn Pn Mn (@ Y )
AXIAL| * 6258.47 487.12 3129.24 825.45
COMPRESSION| * 5736.93 568.12 2607.70 832.72
Pb|-------*Mb 5215.39 638.12 2086.16 814.45
| * 4693.85 696.62 1564.62 777.10
====================================================================
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
8167.43 6533.95 2959.67 784.27 265.0
M0 P-tens. Des.Pn Des.Mn e/h
473.03 -1930.22 648.82 66.65 0.01593
--------------------------------------------------------
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
8167.43 6533.95 2959.67 784.27 265.0
M0 P-tens. Des.Pn Des.Mn e/h
473.03 -1930.22 648.82 485.77 0.11608
--------------------------------------------------------
Pn Mn Pn Mn (@ Z )
| 6031.34 470.34 3015.67 780.96
P0 |* 5528.72 548.09 2513.06 777.89
| * 5026.11 613.56 2010.45 754.89
Pn,max|__* 4523.50 667.97 1507.83 714.77
| * 4020.89 712.53 1005.22 655.51
Pn | * 3518.28 749.22 502.61 572.67
NOMINAL| * Pn Mn Pn Mn (@ Y )
AXIAL| * 6031.34 470.34 3015.67 780.96
COMPRESSION| * 5528.72 548.09 2513.06 777.89
Pb|-------*Mb 5026.11 613.56 2010.45 754.89
| * 4523.50 667.97 1507.83 714.77
___________|____*_______ 4020.89 712.53 1005.22 655.51
| * M0 Mn, 3518.28 749.22 502.61 572.67
| * BENDING
P-tens|* MOMENT
|
====================================================================
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
8167.43 6533.95 2959.67 784.27 265.0
M0 P-tens. Des.Pn Des.Mn e/h
473.03 -1930.22 518.43 296.13 0.08856
--------------------------------------------------------
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
8167.43 6533.95 2959.67 784.27 265.0
M0 P-tens. Des.Pn Des.Mn e/h
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
Pn Mn Pn Mn (@ Z )
| 6031.34 470.34 3015.67 780.96
P0 |* 5528.72 548.09 2513.06 777.89
| * 5026.11 613.56 2010.45 754.89
Pn,max|__* 4523.50 667.97 1507.83 714.77
| * 4020.89 712.53 1005.22 655.51
Pn | * 3518.28 749.22 502.61 572.67
NOMINAL| * Pn Mn Pn Mn (@ Y )
AXIAL| * 6031.34 470.34 3015.67 780.96
COMPRESSION| * 5528.72 548.09 2513.06 777.89
Pb|-------*Mb 5026.11 613.56 2010.45 754.89
| * 4523.50 667.97 1507.83 714.77
___________|____*_______ 4020.89 712.53 1005.22 655.51
| * M0 Mn, 3518.28 749.22 502.61 572.67
| * BENDING
P-tens|* MOMENT
|
====================================================================
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
8167.43 6533.95 2959.67 784.27 265.0
M0 P-tens. Des.Pn Des.Mn e/h
473.03 -1930.22 500.63 508.42 0.15745
--------------------------------------------------------
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
8167.43 6533.95 2959.67 784.27 265.0
M0 P-tens. Des.Pn Des.Mn e/h
473.03 -1930.22 500.63 13.86 0.00429
--------------------------------------------------------
Pn Mn Pn Mn (@ Z )
| 6031.34 470.34 3015.67 780.96
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
====================================================================
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
8475.01 6780.01 2974.80 835.65 280.9
M0 P-tens. Des.Pn Des.Mn e/h
545.20 -2251.92 644.01 126.69 0.03050
--------------------------------------------------------
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
8475.01 6780.01 2974.80 835.65 280.9
M0 P-tens. Des.Pn Des.Mn e/h
545.20 -2251.92 644.01 538.99 0.12976
--------------------------------------------------------
Pn Mn Pn Mn (@ Z )
| 6258.47 487.12 3129.24 825.45
P0 |* 5736.93 568.12 2607.70 832.72
| * 5215.39 638.12 2086.16 814.45
Pn,max|__* 4693.85 696.62 1564.62 777.10
| * 4172.31 746.47 1043.08 721.54
Pn | * 3650.77 788.67 521.54 641.91
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
NOMINAL| * Pn Mn Pn Mn (@ Y )
AXIAL| * 6258.47 487.12 3129.24 825.45
COMPRESSION| * 5736.93 568.12 2607.70 832.72
Pb|-------*Mb 5215.39 638.12 2086.16 814.45
| * 4693.85 696.62 1564.62 777.10
___________|____*_______ 4172.31 746.47 1043.08 721.54
| * M0 Mn, 3650.77 788.67 521.54 641.91
| * BENDING
P-tens|* MOMENT
|
====================================================================
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
9205.50 7364.40 2969.17 955.72 321.9
M0 P-tens. Des.Pn Des.Mn e/h
707.05 -3015.94 1087.99 301.93 0.04302
--------------------------------------------------------
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
9205.50 7364.40 2969.17 955.72 321.9
M0 P-tens. Des.Pn Des.Mn e/h
707.05 -3015.94 1087.99 635.00 0.09049
--------------------------------------------------------
Pn Mn Pn Mn (@ Z )
| 6797.90 523.39 3398.95 921.91
P0 |* 6231.41 614.49 2832.46 955.54
| * 5664.92 694.91 2265.97 949.61
Pn,max|__* 5098.43 763.71 1699.48 920.63
| * 4531.94 823.41 1132.98 872.52
Pn | * 3965.44 874.90 566.49 800.83
NOMINAL| * Pn Mn Pn Mn (@ Y )
AXIAL| * 6797.90 523.39 3398.95 921.91
COMPRESSION| * 6231.41 614.49 2832.46 955.54
Pb|-------*Mb 5664.92 694.91 2265.97 949.61
| * 5098.43 763.71 1699.48 920.63
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
====================================================================
--------------------------------------------------------
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
8724.91 6979.92 2957.84 876.41 296.3
M0 P-tens. Des.Pn Des.Mn e/h
598.86 -2513.29 1004.81 651.71 0.10056
--------------------------------------------------------
Pn Mn Pn Mn (@ Z )
| 6443.01 498.98 3221.50 857.63
P0 |* 5906.09 584.42 2684.59 873.97
| * 5369.17 658.92 2147.67 862.84
Pn,max|__* 4832.26 719.84 1610.75 826.47
| * 4295.34 771.64 1073.83 774.43
Pn | * 3758.42 816.81 536.92 698.49
NOMINAL| * Pn Mn Pn Mn (@ Y )
AXIAL| * 6443.01 498.98 3221.50 857.63
COMPRESSION| * 5906.09 584.42 2684.59 873.97
Pb|-------*Mb 5369.17 658.92 2147.67 862.84
| * 4832.26 719.84 1610.75 826.47
___________|____*_______ 4295.34 771.64 1073.83 774.43
| * M0 Mn, 3758.42 816.81 536.92 698.49
| * BENDING
P-tens|* MOMENT
|
H:\STAAD\1308 FINAL ON 6 DEC\UD-BA-1308-ED-00002.doc
====================================================================
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
9205.50 7364.40 2969.17 955.72 321.9
M0 P-tens. Des.Pn Des.Mn e/h
707.05 -3015.94 1102.11 190.53 0.02680
--------------------------------------------------------
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
9205.50 7364.40 2969.17 955.72 321.9
M0 P-tens. Des.Pn Des.Mn e/h
707.05 -3015.94 1102.11 706.08 0.09933
--------------------------------------------------------
Pn Mn Pn Mn (@ Z )
| 6797.90 523.39 3398.95 921.91
P0 |* 6231.41 614.49 2832.46 955.54
| * 5664.92 694.91 2265.97 949.61
Pn,max|__* 5098.43 763.71 1699.48 920.63
| * 4531.94 823.41 1132.98 872.52
Pn | * 3965.44 874.90 566.49 800.83
NOMINAL| * Pn Mn Pn Mn (@ Y )
AXIAL| * 6797.90 523.39 3398.95 921.91
COMPRESSION| * 6231.41 614.49 2832.46 955.54
Pb|-------*Mb 5664.92 694.91 2265.97 949.61
| * 5098.43 763.71 1699.48 920.63
___________|____*_______ 4531.94 823.41 1132.98 872.52
| * M0 Mn, 3965.44 874.90 566.49 800.83
| * BENDING
P-tens|* MOMENT
|
====================================================================
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
8475.01 6780.01 2974.80 835.65 280.9
M0 P-tens. Des.Pn Des.Mn e/h
545.20 -2251.92 1060.41 97.30 0.01423
--------------------------------------------------------
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
Pn Mn Pn Mn (@ Z )
| 6258.47 487.12 3129.24 825.45
P0 |* 5736.93 568.12 2607.70 832.72
| * 5215.39 638.12 2086.16 814.45
Pn,max|__* 4693.85 696.62 1564.62 777.10
| * 4172.31 746.47 1043.08 721.54
Pn | * 3650.77 788.67 521.54 641.91
NOMINAL| * Pn Mn Pn Mn (@ Y )
AXIAL| * 6258.47 487.12 3129.24 825.45
COMPRESSION| * 5736.93 568.12 2607.70 832.72
Pb|-------*Mb 5215.39 638.12 2086.16 814.45
| * 4693.85 696.62 1564.62 777.10
___________|____*_______ 4172.31 746.47 1043.08 721.54
| * M0 Mn, 3650.77 788.67 521.54 641.91
| * BENDING
P-tens|* MOMENT
|
====================================================================
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
9205.50 7364.40 2969.17 955.72 321.9
M0 P-tens. Des.Pn Des.Mn e/h
707.05 -3015.94 948.54 619.57 0.10127
--------------------------------------------------------
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
9205.50 7364.40 2969.17 955.72 321.9
M0 P-tens. Des.Pn Des.Mn e/h
707.05 -3015.94 948.54 263.16 0.04301
--------------------------------------------------------
Pn Mn Pn Mn (@ Z )
| 6797.90 523.39 3398.95 921.91
P0 |* 6231.41 614.49 2832.46 955.54
| * 5664.92 694.91 2265.97 949.61
Pn,max|__* 5098.43 763.71 1699.48 920.63
| * 4531.94 823.41 1132.98 872.52
Pn | * 3965.44 874.90 566.49 800.83
NOMINAL| * Pn Mn Pn Mn (@ Y )
AXIAL| * 6797.90 523.39 3398.95 921.91
COMPRESSION| * 6231.41 614.49 2832.46 955.54
Pb|-------*Mb 5664.92 694.91 2265.97 949.61
| * 5098.43 763.71 1699.48 920.63
___________|____*_______ 4531.94 823.41 1132.98 872.52
| * M0 Mn, 3965.44 874.90 566.49 800.83
| * BENDING
P-tens|* MOMENT
|
====================================================================
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
8475.01 6780.01 2974.80 835.65 280.9
M0 P-tens. Des.Pn Des.Mn e/h
545.20 -2251.92 603.52 533.89 0.13715
--------------------------------------------------------
--------------------------------------------------------
P0 Pn max P-bal. M-bal. e-bal. (MM)
8475.01 6780.01 2974.80 835.65 280.9
M0 P-tens. Des.Pn Des.Mn e/h
545.20 -2251.92 603.52 197.07 0.05063
--------------------------------------------------------
Pn Mn Pn Mn (@ Z )
| 6258.47 487.12 3129.24 825.45
P0 |* 5736.93 568.12 2607.70 832.72
| * 5215.39 638.12 2086.16 814.45
Pn,max|__* 4693.85 696.62 1564.62 777.10
ANNEXURE- I
ANNEXURE- II