Design Calculation for Bandhara :-

Data:
1.High Flood Level (RL) = 99.00 RL
2. Deepest bed Level ( RL)= 91.50 RL
3. Catchment Area of River = 285.00 SqKm
4. Bligh Creep Coef. C= 12.00
5. Height of the Pier of Bandhara= 4.00 mts
6. Free Board adopted = 0.30 mts
7. Height of the Abutment= 4.30 mts
8. SBC of the Soil= 200.00 Kg/Sqmt
9. Soil Unit weight= 1750.00 Kg/Cum
10. Bulk Unit weight= 2000.00 Kg/Cum
11. Angle of Repose of Soil= 30 Degrees
12. Unit weight of Concrete= 2400.00 Kg/Cum

Calculation for Maximum Flood Discharge of the River


The Design Flood of the River is Calculated by Ingli Formula
Q= 123x A/ SQRT(A+10.4)
Q=123x 117/SQRT(117+10.4) = 2039.599 Cumec
Total width of the flow in the river= 72.80 mts
Number of Pier proposed 20 of 0.9 mt width
Number of foot bridge piers proposed 6 of 1.2 mts width
Width of the flow of the river after restriction due to pier= 50.00 mts
The intensity of the flow in the river per meter width= 40.79 Cumec/mts
35055

17.187204542915
27.281943016134

mts width
I) Calculations for the length of the Apron
Data
1. Bligh creep coef., C= 12
2. Head of water , H= 4 mts

H= 4.00 mts

L1 L2

3 L

The Total creep length required as per Bligh's Creep Theory is given by
L=CxH = 48 mts

Length of the Down stream apron is given by


L2= 2.21x Cx (V H/10) = 16.77 mts

Provide 22.5 mts long downstream apron


Length of the Pier is 2.5 mts
Thus, Length of the upstream apron will be 11.00 mts

Provide 8.00 mts long upstream apron


3
Details of the Bandhara showing cutoff, Pier and thickness of the Apron

u/s= 8.00

0.6
4.5 1.0
3.00 2.0
2.0
2.40
1.0 1.0

0.5

Head = 4.00 mts Value of C= 12


Total creep length as per drawing at A: 19.30 mts
Total length L 48 mts
Calculations of apron thickness:
1. Un balanced head at A = 2.39 mts
thickness of apron at A= 1.93 mts
Adopt thickness of the Apron at = 2.00 mts

2. Total length upto B= 24.80


Un balanced head at B = 1.93 mts
thickness of apron at A= 1.56 mts
Adopt thickness of the Apron at = 1.60 mts

3. Total length upto C= 29.30


Un balanced head at B = 1.56 mts
thickness of apron at A= 1.26 mts
Adopt thickness of the Apron at = 1.50 mts

3. Total length upto C= 29.30


Un balanced head at B = #DIV/0! mts
thickness of apron at A= #DIV/0! mts
Adopt thickness of the Apron at = 1.50 mts
2.50

d/s= 22.5
H= 4.00

2.00 1.60 1.50 D


C 8.5
B 4.5
A 4.5 1.9
4.5
1.0
0.5 0.5
3.00
Design of Pier:
1. Unit Weight of Concrete = 2.40 tonnes/Sqmt
2. Velocity of flow during High flood= 2.62 m/sec
3. Pier Height = 3.50 m
4. square portion= 1.60 m
5. Curved portion= 0.45 m
6. Width of pier = 0.90 m

For calculating stresses only the straight portion of the pier will be considered.
1. Stress at base due to self weight:
self weight of the pier = ((1.60x0.9) + (3.14/4 x 0.90)) x3.50x2.40 = 18.03
Compressive stress at base = 18.03/( 0.9 x 1.60)( 3.14/4 x 0.9) = 8.40

2. Effect of Buoyancy:
During High flood and when bandhara is closed, submerged volume of the
pier= 0.9x1.60x3.50= 5.04 cum
Stress at base due to buoyancy = 5.04x1.0/(0.9x1.6)= 3.5

3. Stress due to Hydrostatic force:


Hydrostatic force when bandhara is close and no water on
downstream side = 1.0x3.52 x2.90 = 17.76 tonnes
2
Moment due to hydrostatic pressure = 17.76 x (3.50/3) =
Stress = M/Z= (30.93/(0.9X1.62 )/6 = 53.97 T/Sqm

4. Stress due to water current:


Intensity of pressure = 52KV2
Where = K= Constant depending upon shape of the pier (0.66 for Semi- Circular cut water)
V= Velocity of flow = 2.62 m/sec.
Therfore, Intensity of pressure = 235.586 Kg/Sqm
Force due to water when flow is parallel to the pier = 0.74
This force acts at a distance of (2/3) from the base.
Moment= 0.74x (2/3)x 3.5 = 1.73 T-m
strees= M/Z = (1.73/(0.9x 1.62 )/6 4.51 t/sqm
If the current varies direction varies by 20 degrees
Then Pressure parallel to the pier = 235.59xCos 20 = 221.3786
Pressure perpendicular to the pier = 235.59x sin 20= 80.58
Force Parallel to the pier = 0.9 x3.50x (221.4/1000)= 0.70
acting at ( 2/3) height above the base.

stress at base = M/Z =


M = 0.7x(2/3) x 3.5 = 1.63
Z= ( 0.9X 1.62 )/6 = 0.38

Stress at Base = 4.24 T/Sqm

Force perpendicular to pier = ( 80.58/1000)x1.6x3.5 = 0.45

stress at the base = M/Z


M= 0.45x(2/3)x 3.5= 1.05
Z= (1.6 x 0.92 )/6 = 0.22

Stress at Base = 4.87 t/Sqm

Thus, Maximum stress due to water current = (4.24+4.87)=

Summary of Stresses :-
Sr No Loads Bandhara ( Dry) Bandhara ( Closed )
1 Self Weight 8.40 8.40
2 Buoyancy 3.5
3 Hydrostatic
Forces 53.97
4 Water Current
Max. Stress 8.40 86.14
Min. Stress 8.40 74.94

Maximum Compressive stress = 86.14 t/sqm 0.86 N/sqmm


Allowable Compressive Stress for M20 grade concrete 5.00
Since Max Compressive Stress < Allowable Compressive stress, Hence Safe.

Max. Tensile Stress = 74.94 t/Sqm 0.74 N/Sqmm


Allowable Tensile Stress = 10% Compressive Stress = 10% of 5.00 N/Sqmm

Since Max Tensile Stress > Allowable Tensile Stress.

Therefore, Provide Nominal Reiforcement of 12 Tor @ 200mm c/c.


Tonnes
t/sqm

t/sqm (Negative)

20.72 T-m
rcular cut water)

tonnes

Kg/sqm
Kg/sqm
tonnes

tonnes

9.11 T/Sqm

During Floods
8.40
3.5
9.11
13.35
4.87

N/Sqmm

0.5 N/Sqmm
Check for Stability of Pier :

Summation of Vertical forces, V= W= 1.60X 0.90X3.50X2.40 + (∏/4) X (0.90)2 X 3.50 X 2.40 =


)2 X 3.50 X 2.40 =