~ Date Rap
Q@ ALGOTECH (M) SDN BHI
Rev. No.: 00
age: ofS
MECHANICAL, INSTALLATION, PIPING,INSULATION AND
PAINTING ( INCLUSIVE OF CIVIL AND BUILDING FOR OFFICE
| BUILDING AND SUBSTATION )
METHOD STATEMENT
INSTALLATION OFFICE CABIN AT TECHNIP TEMPORARY SITE
FACILITIES
Doc No.: Technip - 00 - CM - MOS ~ 001
Rev |Date | Status ‘ALGOTECH (M) SDN BHD | TECHNIP
Prepared | Checked | Endorsed | Approved By
®y °y 8y
00 | 32/4/2013 | For Approval 35h y |<
Dara ‘Appr a Ca AN
[alMETHOD OF STATEMENT
‘Temporary Sta Facies on Techni ea
CONTENTS
»
2
3
4
5
6
SCOPE
WORK SEQUENCE
MATERIAL
MANPOWER
EQUIPMENT.
HEALTH, SAFETY AND ENVIRONMENT
Page 2 0F6
BrsscsMETHOD OF STATEMENT (Verte
ew “Temporary Ste Facies on Techni ea "
1.0. SCOPE
‘This method statement is applicable for the installation of temporary site facilities and laydown,
area on Technip Area.
“The scope of works include
42) Setting of site facilites as follows:
iL Office cabin 20'x 10"
Portable Toilet
20 WORK SEQUENCE
2) Site Facies Installation
2.1.1 All cabins (storage and office cabin) shall be transported by taller,
2.1.2 Crane inspection and ting gear checking bya ajctesn aud Taclen: p *
2.13 Crane parking and open outrigger.
2.14 Cabin area demarcation
2.1.5 Unload cabins to designated area using 20t crane / Boomtruck.
2.1.6 Cabin to be level.
od,
) Power supply dy reatey “a
2.9.1 Power kt be provided using 2 SOkVA Generator
2.92 Generators tobe inspected ona daily basis
2.93 Ensure that acess o cable outings ae fre rom obstructions.
3.0. MATERIAL
a. Office cabin
b. Gen set
Page 30F6MerWoo oF srareMeNt Bronce
4.0 MANPOWER
- Construction Superintendent x 1 pax
>. Construction Supervisor x 1 pax
Safety Supervisor x 1 pax
General Worker x 2 pax
. Crane Operator x 1 pax
50 PMENT
‘a. 20k crane / Boomtruck
b. Traller
6.0 HEAL AND ENVIi
SA te be approved bafare ame \Gting aalivity communis
'. Tools Box Meeting to be conducted every morning to brief workers of the
dally activites to be carried out and related safety matter.
In accordance with safety regulations, safety induction, toolbox meeting must
be performed on site prior commencement of any work. The risk assessment
‘during activities shall be clearly explained to all personnel who are involved in
forder to avoid any injury and damage to personnel, exéting utlities and
facilities as well as the environment,
Page 4 0F6Uer#00 OF STATEMENT Bocsnsnne
toon Temporary Feces on Techie Wea Temwoomncon,
Page 5 0F6ii