PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 27.03.22


Producion(in nos) Despatch (in nos) REJECTION & MF
Balance to be Under
Factory weekly rest Per day max production Balance to be IC under Stock as on date
on
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on
producted as on date
curing(in Under testing
issue (in nos)
01.04.2021 During the During the During the nos)
As on date During the year Cumulative As on date Cumulative MF REJ
month month year

BG(ZONAL RLY)P.O
SUNDAY No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 0 0 42213 75500 0 0 8380 50772 74772 0 0 0 698 30 51

CS-172,WIDER BASE/950000 NOS 440 34536 430958 826138 1818 33459 379139 752979 15590 3865 2061 50830 334 479
30.06.2022 554540 120102
CS-172,(T-8746) 128 3760 3760 3760 0 0 0 0 2970 682 108 0 0 0
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E dt-14.01.2019

R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 1 4


CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 276 2884 2884 0 0 0 254 3
T.OUT 1IN12=88 SETS 123 0 33 58 58 65 0 0 0 0 18 19 0 21 5 11
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 1321 3253 3253 0 0 0 480 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 42 42 0 0 0 6 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 414 1253 1253 0 0 0 1386 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 76 351 0 0 0 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 10 10 0 2 0 10
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
OTHERS PVT.

BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4


T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 0 2 2 0 0 0 2
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 9 9 9 0 0 0 0
BG/PICASONA 10622 0 4174 5916 5916 4706 0 330 1201 1201 2042 284 352 2037 1 2
BG/MOONHOUSE 8400 0 0 960 960 7440 0 740 740 740 0 0 0 219 0 1
TRACK & TOWERS/WB B.A 22 SETS 0 0 22 SETS 22 SETS 0 0 0 0 0 0 22 SETS 0 0 0
TRACK & TOWERS/WB GR 1200 0 816 1200 1200 0 0 0 0 0 480 720 0 0 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH /CSP/ANARA 27.03.22
ORGANISATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY
DESPATCH ON DATE
IN NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

SSE/P-WAY/BLS AT BLS - - 0 8380 0


1 BG ………… 0 0 0 50772 74772 698

SER
TOTAL DESPATCH 0 8380 0
…….. 0 9900 0 155802
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 0 484 0
2)TC/CON/BI/21-22/Con/437 DT-
10.03.2022
SSE/P-WAY/CON/BKSC 29417 31.03.22 110 200 11823
3)TC/CON/BI/333 DT-16.12.2021 SSE/P-WAY/CON/RNC 10000 31.03.22 110 4203 5797
4)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 522 3823 7727
2 WB
5)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 350 575 14769 223337 752979 50830
6)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 0 1018 0
7)TC/CON/BI/431 DT-04.03.2022 SSE/P-WAY/CON/BLS 10000 31.03.22 232 938 9062
8)TC/CON/BI/430 DT-04.03.2022 SSE/P-WAY/CON/KGP 10000 31.02.22 0 0 10000
9)TC/CON/BI/RVNL/357 DT-13.01.2022 DGM(P)/RVNL/TATA 18000 31.03.22 494 12318 1541
TOTAL DESPATCH 1818 33459 379139
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 77.740 2)CEMENT(RLY)= 2232.495 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 29987 NOS. 27038 NOS
381) =
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 04.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 288 576 25500 58787 16713 0 0 17102 41102 2412 121 150 14945 22 35

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1886 5280 188014 583194 366806 1730 2456 168979 542819 22312 599 1993 14922 231 318
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 480 480 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 2664 2664 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 64 160 1748 1748 1390 0 0 0 0 512 132 0 1104
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 23 0 40
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 72 200 2232 2232 408 0 0 0 0 776 616 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 13 13 0 0 0 4
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 - - 0 0 0
BG 0 0 0 17102 41102 14945
TOTAL DESPATCH 0 0 0
_ 0 0 82257
2

TC/CON/BI/21-22/Con/261 DT-28.09.2021 SSE/P-WAY/CON/KGP 6000 30.11.21 0 0 2242 86722 542819 14922


WB
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 1730 2456 1925
TOTAL DESPATCH 1730 2456 168979
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 125.340 2)CEMENT(RLY)= 2936.820 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 195291 NOS. 92321 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
p PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 01.04.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under IC under Stock as on date (in
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
producted as on During the producted as on During the During the curing(in nos)
Under testing
issue nos)
rest on 01.04.2020 As on date
month
During the year Cumulative date As on date
month year
Cumulative MF REJ

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 280 280 280 395460 554540 0 0 0 373840 12624 844 5116 2665 158 213 11980
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 0 0 0 24000 0 0 0 9227 12 20 561244
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93 #VALUE!
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0 0
LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120 0
L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 0 0 708 128 190 2532 1 3 314
CR WIDER-15134NOS 15134 48 48 48 8696 6438 0 0 0 0 1836 213 575 6063 2 7 7338

1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2


7
ECR/ CON T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0 0
ECR/ OL T.OUT1in12(ECR/OL) 351SETS 0 0 0 329 22 0 0 0 274 6 4 6 39 #VALUE!
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26 6635
L.C/RVNL(KEC)
TC/CON/PRIL/CS-169/I/294 dt- 01.10.19
950 0 0 0 950 0 0 0 0 580 0 0 370 0 0
P
V
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0 0
T
G. R. /RVNL (KEC)
-
K
1550 0 0 0 1550 0 0 0 0 938 0 0 128 484 0
E
C B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0 0
1 IN 8.5 (KEC) 38 0 0 0 38 0 2 2 2 11 11 8 0 8 1
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 514 514 514 33150 11750 0 0 0 13875 4962 602 2602 11078 11 20 14188
P
WB /RITES. TC/CONC/PRIL/CS-
V
T 172/298 DT 18.09.20 5750 0 0 0 2088 3662 0 0 0 0 0 0 0 2085 1 2 3662
-
L.C /RITES. TC/CONC/PRIL/CS-
R
I 172/298 DT 18.09.20 140 0 0 0 140 0 0 0 0 0 0 0 140 0 0
T
E T.O 1 in 8.5 22 1 1 1 4 18 0 0 0 0 4 0 0 0 18
S

T.O 1 in 12 28 0 0 0 10 18 0 0 0 0 0 0 0 10 1096
CR(RITES) 1800 32 32 32 872 928 0 0 0 0 304 568 0 0 4400
Others PVT BG/TRIVENI 13520 0 0 0 9120 4216 0 0 0 7756 0 0 0 1353 4 7 1032
BG/MALHOTRA 6000 0 0 0 4968 1032 0 0 0 2494 0 0 0 2469 1 4
T.O. (1/12)/MALHOTRA 10 0 0 0 5 5 0 0 0 0 0 0 0 5
ORGANIS
ATION
Srl.No DETAILS OF DESPATCH

DESPATCH ON MONTHLY BALANCE TO BE CUMULATIVE QTY STOCK IN


1 BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY DATE IN NOS DESPATCH DESPATCH During the year DESPATCH HAND
ORGANISATION REMARKS

SER 0 24000 9227 7956


_
2 _ _ 0 0 0 OPEN LINE

SSE/P-WAY/
TC/CON/BI/20-21/Con/112 DT-31.03.21 WIDER BASE
CON/KGP
6403 _ 0 0 6403 0 373840 2665 CONSTRUCTION

3 0 0 0
SER/ O.L
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/ CON 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 _ _ _ _ _ 0 93 SETS 10 SETS
ECR/OL _ _ 0 0 0
8 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 _ _ 0 0 0 0 1255 16
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 119.18 MT 2)CEMENT(RLY)= 551.40 MT 3)CEMENT(PVT)= 57.420 MT 4)INSERTS(T-6901)= 283004 NOS. 381) = 28714 NOS
.
p PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 02.04.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
Under IC under Stock as on
weekly ORGANISATION Agreement (Ordered Qty) production producted as on During the producted as on As on During the During the curing(in
testing issue date (in nos)
rest on capacity/DP up to 01.04.2020 As on date
month
During the year Cumulative date Cumulative nos) MF REJ
date month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 896 1176 1176 396356 553644 411 411 411 374251 12592 1016 5872 2254 158 213
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 0 0 0 24000 0 0 0 9227 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 0 0 708 128 190 2532 1 3
CR WIDER-15134NOS 15134 72 120 120 8768 6366 0 0 0 0 1788 52 856 6063 2 7
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ OL T.OUT1in12(ECR/OL) 351SETS 2 2 2 331 20 0 0 0 274 6 4 8 39
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P
TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
-
K
1550 0 0 0 1550 0 0 0 0 938 0 0 128 484
E
C
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
1 IN 8.5 (KEC) 38 0 0 0 38 0 1 3 3 12 10 9 0 7
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 200 714 714 33350 11550 0 0 0 13875 4666 564 3136 11078 11 20
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 2088 3662 0 0 0 0 0 0 0 2085 1 2
-
R
I
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 0 0 0 0 0 140 0
T
E T.O 1 in 8.5 22 2 3 3 6 16 0 0 0 0 6 0 0 0
S
T.O 1 in 12 28 0 0 0 10 18 0 0 0 0 0 0 0 10
CR(RITES) 1800 16 48 48 888 912 0 0 0 0 296 592 0 0
Others PVT BG/TRIVENI 13520 0 0 0 9120 4216 0 0 0 7756 0 0 0 1353 4 7
BG/MALHOTRA 6000 0 0 0 4968 1032 90 90 90 2584 0 0 0 2379 1 4
T.O. (1/12)/MALHOTRA 10 0 0 0 5 5 0 0 0 0 0 0 0 5
ORGANIS
ATION
Srl.No DETAILS OF DESPATCH

DESPATCH ON MONTHLY BALANCE TO BE CUMULATIVE QTY STOCK IN


1 BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY DATE IN NOS DESPATCH DESPATCH During the year DESPATCH HAND
ORGANISATION REMARKS

SER 0 24000 9227 7956


_
2 _ _ 0 0 0 OPEN LINE

SSE/P-WAY/CON/
TC/CON/BI/20-21/Con/112 DT-31.03.21 WIDER BASE
KGP
6403 30.05.21 411 411 5992 411 374251 2254 CONSTRUCTION

3 411 411 411


SER/ O.L
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/ CON 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 _ _ _ _ _ 0 93 SETS 10 SETS
ECR/OL _ _ 0 0 0
8 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 _ _ 0 0 0 0 1255 16
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 104.08 MT 2)CEMENT(RLY)= 453.65 MT 3)CEMENT(PVT)= 34.440 MT 4)INSERTS(T-6901)= 279004 NOS. 381) = 55236 NOS
.
p PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 03.04.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
Under IC under Stock as on
weekly ORGANISATION Agreement (Ordered Qty) production producted as on During the producted as on As on During the During the curing(in
testing issue date (in nos)
rest on capacity/DP up to 01.04.2020 As on date
month
During the year Cumulative date Cumulative nos) MF REJ
date month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 936 2112 2112 397292 552708 246 657 657 374497 12672 1392 480 7873 161 217
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 0 0 0 24000 0 0 0 9227 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 0 0 708 128 190 2532 1 3
CR WIDER-15134NOS 15134 80 200 200 8848 6556 0 0 0 0 1740 90 90 6918 2 8
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ OL T.OUT1in12(ECR/OL) 351SETS 1 3 3 332 19 0 0 0 274 5 6 8 39
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P
TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
-
K
1550 0 0 0 1550 0 0 0 0 938 0 0 128 484
E
C
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
1 IN 8.5 (KEC) 38 0 0 0 38 0 1 4 4 13 10 9 0 6
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 328 1042 1042 33678 11222 8815 8815 8815 22690 4482 754 396 5321 13 22
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 2088 3662 0 0 0 0 0 0 0 2085 1 2
-
R
I
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 0 0 0 0 0 140 0
T
E T.O 1 in 8.5 22 1 4 4 7 15 0 0 0 0 5 2 0 0
S
T.O 1 in 12 28 0 0 0 10 18 0 0 0 0 0 0 0 10
CR(RITES) 1800 16 64 64 904 896 0 0 0 0 288 616 0 0
Others PVT BG/TRIVENI 13520 0 0 0 9120 4216 0 0 0 7756 0 0 0 1353 4 7
BG/MALHOTRA 6000 0 0 0 4968 1032 0 90 90 2584 0 0 0 2379 1 4
T.O. (1/12)/MALHOTRA 10 0 0 0 5 5 0 0 0 0 0 0 0 5
ORGANIS
ATION
Srl.No DETAILS OF DESPATCH

DESPATCH ON MONTHLY BALANCE TO BE CUMULATIVE QTY STOCK IN


1 BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY DATE IN NOS DESPATCH DESPATCH During the year DESPATCH HAND
ORGANISATION REMARKS

SER 0 24000 9227 7956


_
2 _ _ 0 0 0 OPEN LINE

SSE/P-WAY/CON/
TC/CON/BI/20-21/Con/112 DT-31.03.21 WIDER BASE
KGP
6403 30.05.21 246 657 5746 657 374497 7873 CONSTRUCTION

3 246 657 657


SER/ O.L
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/ CON 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 _ _ _ _ _ 0 93 SETS 10 SETS
ECR/OL _ _ 0 0 0
8 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 _ _ 0 0 0 0 1255 16
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 90.10 MT 2)CEMENT(RLY)= 849.91 MT 3)CEMENT(PVT)= 11.340 MT 4)INSERTS(T-6901)= 274812 NOS. 381) = 53085 NOS
.
p PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 05.04.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
Under IC under Stock as on
weekly ORGANISATION Agreement (Ordered Qty) production producted as on During the producted as on As on During the During the curing(in
testing issue date (in nos)
rest on capacity/DP up to 01.04.2020 As on date
month
During the year Cumulative date Cumulative nos) MF REJ
date month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 880 2992 2992 398172 551828 1030 1687 1687 375527 12568 1826 1030 6843 161 217
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 0 0 0 24000 0 0 0 9227 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
LC , P.O No.-CE/TP/SER/2018/006/B/10031
S dt-14.01.2019 25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
E
R L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 0 0 532 194 300 2532 1 3
CR WIDER-15134NOS 15134 176 376 376 9024 6110 0 0 0 0 1756 202 138 6918 2 8
BA WIDER-124 SET 124 2 2 2 2 122 2
GR WIDER-3138 3138 8 8 8 8 3130 8
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ OL T.OUT1in12(ECR/OL) 351SETS 2 5 5 334 17 0 0 0 274 6 7 8 39
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P
TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
-
K
1550 0 0 0 1550 0 0 0 0 938 0 0 128 484
E
C
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
1 IN 8.5 (KEC) 38 0 0 0 38 0 2 6 6 15 10 9 0 4
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 608 1650 1650 34286 10614 0 8815 8815 22690 4546 1008 686 5321 13 22
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 2088 3662 0 0 0 0 0 0 0 2085 1 2
-
R
I
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 0 0 0 0 0 140 0
T
E T.O 1 in 8.5 22 3 7 7 10 12 0 0 0 0 8 2 0 0
S
T.O 1 in 12 28 0 0 0 10 18 2 2 2 2 0 0 0 8
CR(RITES) 1800 32 96 96 936 864 0 0 0 0 296 640 0 0
Others PVT BG/TRIVENI 13520 0 0 0 9120 4216 0 0 0 7756 0 0 0 1353 4 7
BG/MALHOTRA 6000 0 0 0 4968 1032 265 355 355 2849 0 0 0 2114 1 4
T.O. (1/12)/MALHOTRA 10 0 0 0 5 5 0 0 0 0 0 0 0 5
ORGANIS
ATION
Srl.No DETAILS OF DESPATCH

DESPATCH ON MONTHLY BALANCE TO BE CUMULATIVE QTY STOCK IN


1 BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY DATE IN NOS DESPATCH DESPATCH During the year DESPATCH HAND
ORGANISATION REMARKS

SER 0 24000 9227 7956


_
2 _ _ 0 0 0 OPEN LINE

SSE/P-WAY/CON/
TC/CON/BI/20-21/Con/112 DT-31.03.21 WIDER BASE
KGP
6403 30.05.21 1030 1687 4716 1687 375527 6843 CONSTRUCTION

3 1030 1687 1687


SER/ O.L
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/ CON 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 _ _ _ _ _ 0 93 SETS 10 SETS
ECR/OL _ _ 0 0 0
8 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 _ _ 0 0 0 0 1255 16
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 68.85 MT 2)CEMENT(RLY)= 569.04 MT 3)CEMENT(PVT)= 161.353 MT 4)INSERTS(T-6901)= 270160 NOS. 381) = 48625 NOS
.

NOTE- 200 MT CEMENT HAS BEEN TRANSFERD FROM RLY TO PVT STOCK
p PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 06.04.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
Under IC under Stock as on
weekly ORGANISATION Agreement (Ordered Qty) production producted as on During the producted as on As on During the During the curing(in
testing issue date (in nos)
rest on capacity/DP up to 01.04.2020 As on date
month
During the year Cumulative date Cumulative nos) MF REJ
date month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 936 3928 3928 399108 550892 268 1955 1955 375795 12008 2012 2340 6575 161 217
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 0 0 0 24000 0 0 0 9227 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
LC , P.O No.-CE/TP/SER/2018/006/B/10031
S dt-14.01.2019 25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
E
R L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 0 0 468 158 400 2532 1 3
CR WIDER-15134NOS 15134 184 560 560 9208 5926 0 0 0 0 1740 197 343 6918 2 8
BA WIDER-124 SET 124 2 4 4 4 120 4
GR WIDER-3138 3138 8 16 16 16 3122 16
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ OL T.OUT1in12(ECR/OL) 351SETS 1 6 6 335 16 0 0 0 274 4 10 8 39
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P
TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
-
K
1550 0 0 0 1550 0 0 0 0 938 0 0 128 484
E
C
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
1 IN 8.5 (KEC) 38 0 0 0 38 2 4 8 8 17 10 9 0 2
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 536 2186 2186 34822 10078 0 8815 8815 22690 4514 964 1298 5321 13 22
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 2088 3662 0 0 0 0 0 0 0 2085 1 2
-
R
I
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 0 0 0 0 0 140 0
T
E T.O 1 in 8.5 22 1 8 8 11 11 0 0 0 0 7 4 0 0
S
T.O 1 in 12 28 0 0 0 10 18 0 2 2 2 0 0 0 8
CR(RITES) 1800 24 120 120 960 840 0 0 0 0 285 672 0 0
Others PVT BG/TRIVENI 13520 0 0 0 9120 4216 0 0 0 7756 0 0 0 1353 4 7
BG/MALHOTRA 6000 0 0 0 4968 1032 96 451 451 2945 0 0 0 2018 1 4
T.O. (1/12)/MALHOTRA 10 0 0 0 5 5 0 0 0 0 0 0 0 5
ORGANIS
ATION
Srl.No DETAILS OF DESPATCH

DESPATCH ON MONTHLY BALANCE TO BE CUMULATIVE QTY STOCK IN


1 BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY DATE IN NOS DESPATCH DESPATCH During the year DESPATCH HAND
ORGANISATION REMARKS

SER 0 24000 9227 7956


_
2 _ _ 0 0 0 OPEN LINE

SSE/P-WAY/CON/
TC/CON/BI/20-21/Con/112 DT-31.03.21 WIDER BASE
KGP
6403 30.05.21 268 1955 4448 1955 375795 6575 CONSTRUCTION

3 268 1955 1955


SER/ O.L
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/ CON 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 _ _ _ _ _ 0 93 SETS 10 SETS
ECR/OL _ _ 0 0 0
8 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 _ _ 0 0 0 0 1255 16
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 68.85 MT 2)CEMENT(RLY)= 569.04 MT 3)CEMENT(PVT)= 161.353 MT 4)INSERTS(T-6901)= 270160 NOS. 381) = 48625 NOS
.
p PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 07.04.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
Under IC under Stock as on
weekly ORGANISATION Agreement (Ordered Qty) production producted as on During the producted as on As on During the During the curing(in
testing issue date (in nos)
rest on capacity/DP up to 01.04.2020 As on date
month
During the year Cumulative date Cumulative nos) MF REJ
date month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 880 4808 4808 399988 550012 556 2511 2511 376351 11592 1000 4648 6019 161 217
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 0 0 0 24000 0 0 0 9227 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
LC , P.O No.-CE/TP/SER/2018/006/B/10031
S dt-14.01.2019 25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
E
R L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 0 0 388 188 450 2532 1 3
CR WIDER-15134NOS 15134 104 664 664 9312 5822 0 0 0 0 1700 221 463 6918 2 8
BA WIDER-124 SET 124 4 8 8 8 116 8
GR WIDER-3138 3138 16 32 32 32 3106 32
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ OL T.OUT1in12(ECR/OL) 351SETS 2 8 8 337 14 0 0 0 274 5 11 8 39
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P
TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
-
K
1550 0 0 0 1550 0 0 0 0 938 0 0 128 484
E
C
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
1 IN 8.5 (KEC) 38 0 0 0 38 0 2 6 10 19 10 9 0 0
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 504 2690 2690 35326 9574 0 8815 8815 22690 4602 1030 1648 5321 13 22
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 2088 3662 0 0 0 0 0 0 0 2085 1 2
-
R
I
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 0 0 0 0 0 140 0
T
E T.O 1 in 8.5 22 2 10 10 13 9 0 0 0 0 8 5 0 0
S
T.O 1 in 12 28 0 0 0 10 18 0 2 2 2 0 0 0 8
CR(RITES) 1800 24 144 144 984 816 0 0 0 0 296 696 0 0
Others PVT BG/TRIVENI 13520 0 0 0 9120 4216 0 0 0 7756 0 0 0 1353 4 7
BG/MALHOTRA 6000 0 0 0 4968 1032 265 716 716 3210 0 0 0 1753 1 4
T.O. (1/12)/MALHOTRA 10 0 0 0 5 5 0 0 0 0 0 0 0 5
ORGANIS
ATION
Srl.No DETAILS OF DESPATCH

DESPATCH ON MONTHLY BALANCE TO BE CUMULATIVE QTY STOCK IN


1 BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY DATE IN NOS DESPATCH DESPATCH During the year DESPATCH HAND
ORGANISATION REMARKS

SER 0 24000 9227 7956


_
2 _ _ 0 0 0 OPEN LINE

SSE/P-WAY/CON/
TC/CON/BI/20-21/Con/112 DT-31.03.21 WIDER BASE
KGP
6403 30.05.21 556 2511 3892 2511 376351 6019 CONSTRUCTION

3 556 2511 2511


SER/ O.L
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/ CON 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 _ _ _ _ _ 0 93 SETS 10 SETS
ECR/OL _ _ 0 0 0
8 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 _ _ 0 0 0 0 1255 16
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 81.71 MT 2)CEMENT(RLY)= 416.89 MT 3)CEMENT(PVT)= 89.320 MT 4)INSERTS(T-6901)= 260880 NOS. 381) = 41948 NOS
.
p PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 08.04.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
Under IC under Stock as on
weekly ORGANISATION Agreement (Ordered Qty) production producted as on During the producted as on As on During the During the curing(in
testing issue date (in nos)
rest on capacity/DP up to 01.04.2020 As on date
month
During the year Cumulative date Cumulative nos) MF REJ
date month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 880 5688 5688 400868 549132 6108 8619 8619 382459 11416 826 1230 4554 163 220
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 360 360 360 24360 0 0 0 8867 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
LC , P.O No.-CE/TP/SER/2018/006/B/10031
S dt-14.01.2019 25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
E
R L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 0 0 388 188 450 2532 1 3
CR WIDER-15134NOS 15134 192 856 856 9504 5630 0 0 0 0 1756 202 618 6918 2 8
BA WIDER-124 SET 124 4 12 12 12 112 12
GR WIDER-3138 3138 16 48 48 48 3090 48
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ OL T.OUT1in12(ECR/OL) 351SETS 2 10 10 339 12 0 0 0 274 5 13 8 39
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P
TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
-
K
1550 0 0 0 1550 0 0 0 0 938 0 0 128 484
E
C
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
1 IN 8.5 (KEC) 38 0 0 0 38 0 0 6 10 19 10 9 0 0
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 536 3226 3226 35862 9038 0 8815 8815 22690 4770 578 2468 5321 13 22
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 2088 3662 0 0 0 0 0 0 0 2085 1 2
-
R
I
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 0 0 0 0 0 140 0
T
E T.O 1 in 8.5 22 1 11 11 14 8 0 0 0 0 7 7 0 0
S
T.O 1 in 12 28 0 0 0 10 18 0 2 2 2 0 0 0 8
CR(RITES) 1800 16 160 160 1000 800 0 0 0 0 296 712 0 0
Others PVT BG/TRIVENI 13520 0 0 0 9120 4216 0 0 0 7756 0 0 0 1353 4 7
BG/MALHOTRA 6000 0 0 0 4968 1032 90 806 806 3300 0 0 0 1663 1 4
T.O. (1/12)/MALHOTRA 10 0 0 0 5 5 0 0 0 0 0 0 0 5
ORGANIS
ATION
Srl.No DETAILS OF DESPATCH

DESPATCH ON MONTHLY BALANCE TO BE CUMULATIVE QTY STOCK IN


1 BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY DATE IN NOS DESPATCH DESPATCH During the year DESPATCH HAND
ORGANISATION REMARKS

SER SSE/P-WAY/MURI 5768 5768 5768 24000 9227 7956


_
2 _ _ 0 0 0 OPEN LINE

SSE/P-WAY/CON/
TC/CON/BI/20-21/Con/112 DT-31.03.21 WIDER BASE
KGP
6403 30.05.21 340 2851 3552 2851 382459 4554 CONSTRUCTION

3 6108 8619 8619


SER/ O.L
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/ CON 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 _ _ _ _ _ 0 93 SETS 10 SETS
ECR/OL _ _ 0 0 0
8 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 _ _ 0 0 0 0 1255 16
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 113.83 MT 2)CEMENT(RLY)= 335.74 MT 3)CEMENT(PVT)= 56.028 MT 4)INSERTS(T-6901)= 256080 NOS. 381) = 38476 NOS
.
p PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 09.04.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
Under IC under Stock as on
weekly ORGANISATION Agreement (Ordered Qty) production producted as on During the producted as on As on During the During the curing(in
testing issue date (in nos)
rest on capacity/DP up to 01.04.2020 As on date
month
During the year Cumulative date Cumulative nos) MF REJ
date month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 936 6624 6624 401804 548196 0 8619 8619 382459 11384 1000 2024 4554 163 220
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 110 470 470 24470 0 0 0 8757 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
LC , P.O No.-CE/TP/SER/2018/006/B/10031
S dt-14.01.2019 25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
E
R L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 0 0 268 46 712 2532 1 3
CR WIDER-15134NOS 15134 128 984 984 9632 5502 0 0 0 0 1732 52 920 6918 2 8
BA WIDER-124 SET 124 2 14 14 14 110 14
GR WIDER-3138 3138 8 56 56 56 3082 56
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ OL T.OUT1in12(ECR/OL) 351SETS 2 12 12 341 10 0 0 0 274 6 14 8 39
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P
TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
-
K
1550 0 0 0 1550 0 0 0 0 938 0 0 128 484
E
C
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
1 IN 8.5 (KEC) 38 0 0 0 38 0 0 6 10 19 10 9 0 0
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 480 3706 3706 36342 8558 0 8815 8815 22690 4874 614 2808 5321 13 22
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 2088 3662 0 0 0 0 0 0 0 2085 1 2
-
R
I
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 0 0 0 0 0 140 0
T
E T.O 1 in 8.5 22 2 13 13 16 6 0 0 0 0 8 8 0 0
S
T.O 1 in 12 28 0 0 0 10 18 3 5 5 5 0 0 0 5
CR(RITES) 1800 32 192 192 1032 768 0 0 0 0 296 16 728 0
Others PVT BG/TRIVENI 13520 0 0 0 9120 4216 0 0 0 7756 0 0 0 1353 4 7
BG/MALHOTRA 6000 0 0 0 4968 1032 180 986 986 3480 0 0 0 1483 1 4
T.O. (1/12)/MALHOTRA 10 0 0 0 5 5 0 0 0 0 0 0 0 5
ORGANIS
ATION
Srl.No DETAILS OF DESPATCH

DESPATCH ON MONTHLY BALANCE TO BE CUMULATIVE QTY STOCK IN


1 BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY DATE IN NOS DESPATCH DESPATCH During the year DESPATCH HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.19 0 0 850

TC/CONC/20-21-/97 BG SSE/PWAY/MHQ 731 30.04.20 0 0 731 470 24470


SER TC/CONC/20-21-/98 SSE/PWAY//CNI 2112 30.04.21 110 470 1642 8757
SSE/P-WAY/MURI 0 5768 5768 24000 9227 7956
_
2 _ _ 0 0 0 OPEN LINE

SSE/P-WAY/CON/
TC/CON/BI/20-21/Con/112 DT-31.03.21 WIDER BASE
KGP
6403 30.05.21 0 2851 3552 2851 382459 4554 CONSTRUCTION

3 0 8619 8619
SER/ O.L
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/ CON 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 _ _ _ _ _ 0 93 SETS 10 SETS
ECR/OL _ _ 0 0 0
8 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 _ _ 0 0 0 0 1255 16
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 94.83 MT 2)CEMENT(RLY)= 255.08 MT 3)CEMENT(PVT)= 318.460 MT 4)INSERTS(T-6901)= 34878 NOS. 381) = 251440 NOS
.
p PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 10.04.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
Under IC under Stock as on
weekly ORGANISATION Agreement (Ordered Qty) production producted as on During the producted as on As on During the During the curing(in
testing issue date (in nos)
rest on capacity/DP up to 01.04.2020 As on date
month
During the year Cumulative date Cumulative nos) MF REJ
date month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 824 7448 7448 400604 549396 528 9147 9147 382987 11184 1064 960 4026 163 220
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 0 470 470 24470 0 0 0 8757 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
LC , P.O No.-CE/TP/SER/2018/006/B/10031
S dt-14.01.2019 25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
E
R L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 0 0 228 86 0 3243 1 4
CR WIDER-15134NOS 15134 136 1120 1120 9768 5366 0 0 0 0 1740 145 35 7837 2 9
BA WIDER-124 SET 124 2 16 16 16 108 0 0 0 0 16 0 0 0
GR WIDER-3138 3138 8 64 64 64 3074 0 0 0 0 64 0 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ OL T.OUT1in12(ECR/OL) 351SETS 2 14 14 343 8 0 0 0 274 8 12 0 49
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P
TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
-
K
1550 0 0 0 1550 0 0 0 0 938 0 0 128 484
E
C
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
1 IN 8.5 (KEC) 38 0 0 0 38 0 0 6 10 19 10 9 0 0
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 520 4226 4226 36862 8038 0 8815 8815 22690 5042 656 310 8126 14 24
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 2088 3662 0 0 0 0 0 0 0 2085 1 2
-
R
I
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 0 0 0 0 0 0 140
T
E T.O 1 in 8.5 22 1 14 14 17 5 0 0 0 0 7 0 0 10
S
T.O 1 in 12 28 0 0 0 10 18 3 5 5 5 0 0 0 5
CR(RITES) 1800 16 112 112 536 1264 0 0 0 0 168 8 0 360
Others PVT
BG/TRIVENI 13520 0 0 0 9120 4216 0 0 0 7756 0 0 0 1353 4 7
BG/MALHOTRA(T-4183) 800 16 112 112 544 256 0 0 0 0 140 36 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 986 986 3480 0 0 0 1483 1 4
T.O. (1/12)/MALHOTRA 10 0 0 0 5 5 0 0 0 0 0 0 0 5
ORGANIS
ATION
Srl.No DETAILS OF DESPATCH

DESPATCH ON MONTHLY BALANCE TO BE CUMULATIVE QTY STOCK IN


1 BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY DATE IN NOS DESPATCH DESPATCH During the year DESPATCH HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.19 0 0 850

TC/CONC/20-21-/97 BG SSE/PWAY/MHQ 731 30.04.20 0 0 731 470 24470


SER TC/CONC/20-21-/98 SSE/PWAY//CNI 2112 30.04.21 0 470 1642 8757
SSE/P-WAY/MURI 0 5768 5768 24000 9227 7956
_
2 _ _ 0 0 0 OPEN LINE

SSE/P-WAY/CON/
TC/CON/BI/20-21/Con/112 DT-31.03.21 WIDER BASE
KGP
6403 30.05.21 528 3379 3024 3379 382987 4026 CONSTRUCTION

3 528 9147 9147


SER/ O.L
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/ CON 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 _ _ _ _ _ 0 93 SETS 10 SETS
ECR/OL _ _ 0 0 0
8 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 _ _ 0 0 0 0 1255 16
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 131.50 MT 2)CEMENT(RLY)= 188.51 MT 3)CEMENT(PVT)= 285.080 MT 4)INSERTS(T-6901)= 272216 NOS. 381) = 31959 NOS
.

NOTE- 2024 NOS OF SLEEPERS HAS BEEN TRANSFERD FROM SER(CS-172) TO RITES
p PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 12.04.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
Under IC under Stock as on
weekly ORGANISATION Agreement (Ordered Qty) production producted as on During the producted as on As on During the During the curing(in
testing issue date (in nos)
rest on capacity/DP up to 01.04.2020 As on date
month
During the year Cumulative date Cumulative nos) MF REJ
date month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 1200 8648 8648 401804 548196 1263 10410 10410 384250 11128 1288 1992 2763 163 220
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 0 470 470 24470 0 0 0 8757 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
LC , P.O No.-CE/TP/SER/2018/006/B/10031
S dt-14.01.2019 25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
E
R L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 0 0 228 86 0 3243 1 4
CR WIDER-15134NOS 15134 208 1328 1328 9976 5158 0 0 0 0 1772 155 201 7837 2 9
BA WIDER-124 SET 124 4 20 20 20 104 0 0 0 0 20 0 0 0
GR WIDER-3138 3138 16 80 80 80 3058 0 0 0 0 80 0 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ OL T.OUT1in12(ECR/OL) 351SETS 2 16 16 351 0 0 0 0 274 12 8 8 49
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P
TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
-
K
1550 0 0 0 1550 0 0 0 0 938 0 0 128 484
E
C
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
1 IN 8.5 (KEC) 38 0 0 0 38 0 0 6 10 19 10 9 0 0
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 672 4898 4898 37534 7366 0 8815 8815 22690 5438 622 620 8126 14 24
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 0 0 0 0 0 0 0 4106 2 4
-
R
I
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 110 110 110 110 0 0 0 30
T
E T.O 1 in 8.5 22 2 16 16 19 3 0 0 0 0 7 2 0 10
S
T.O 1 in 12 28 0 0 0 10 18 1 6 6 6 0 0 0 4
CR(RITES) 1800 8 120 120 544 1256 0 0 0 0 160 24 0 360
Others PVT
BG/TRIVENI 13520 0 0 0 9120 4216 0 0 0 7756 0 0 0 1353 4 7
C.R/MALHOTRA(T-4183) 800 8 120 120 552 248 0 0 0 0 132 52 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 986 986 3480 0 0 0 1483 1 4
T.O. (1/12)/MALHOTRA 10 0 0 0 5 5 0 0 0 0 0 0 0 5
ORGANIS
ATION
Srl.No DETAILS OF DESPATCH

DESPATCH ON MONTHLY BALANCE TO BE CUMULATIVE QTY STOCK IN


1 BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY DATE IN NOS DESPATCH DESPATCH During the year DESPATCH HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.19 0 0 850


TC/CONC/20-21-/97 BG SSE/PWAY/MHQ 731 30.04.20 0 0 731 470 24470 8757
SER TC/CONC/20-21-/98 SSE/PWAY//CNI 2112 30.04.21 0 470 1642
SSE/P-WAY/MURI 0 5768 5768 7956
_
2 _ _ 0 0 0 OPEN LINE

SSE/P-WAY/CON/ 384250 2763


TC/CON/BI/20-21/Con/112 DT-31.03.21 WIDER BASE
KGP
6403 30.05.21 1263 4642 1761 4642 CONSTRUCTION

3 1263 10410 10410


SER/ O.L
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/ CON 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 _ _ _ _ _ 0 93 SETS 10 SETS
ECR/OL _ _ 0 0 0
8 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 _ _ 0 0 0 0 1255 16
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 183.39 MT 2)CEMENT(RLY)= 1462.86 MT 3)CEMENT(PVT)= 238.970 MT 4)INSERTS(T-6901)= 286600 NOS. 381) = 52603 NOS
.
p PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 13.04.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
IC under Stock as on
weekly ORGANISATION Agreement (Ordered Qty) production producted as on During the producted as on As on During the During the curing(in Under testing
issue date (in nos)
rest on capacity/DP up to 01.04.2020 As on date
month
During the year Cumulative date Cumulative nos) MF REJ
date month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 1232 9880 9880 403036 546964 965 11375 11375 385215 12360 840 2440 1798 163 220
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 110 580 580 24580 0 0 0 8647 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
LC , P.O No.-CE/TP/SER/2018/006/B/10031
S dt-14.01.2019 25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
E
R L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 0 0 172 56 86 3243 1 4
CR WIDER-15134NOS 15134 128 1456 1456 10104 5030 0 0 0 0 1900 99 257 7837 2 9
BA WIDER-124 SET 124 4 24 24 24 100 0 0 0 0 24 0 0 0
GR WIDER-3138 3138 16 96 96 96 3042 0 0 0 0 96 0 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ OL T.OUT1in12(ECR/OL) 351SETS 0 16 16 351 0 0 0 0 274 12 8 8 49
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P
TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
-
K
1550 0 0 0 1550 0 0 0 0 938 0 0 128 484
E
C
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
1 IN 8.5 (KEC) 38 0 0 0 38 0 0 6 10 19 10 9 0 0
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 496 5394 5394 38030 6870 0 8815 8815 22690 5934 198 1044 8126 14 24
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 0 0 0 0 0 0 0 4106 2 4
-
R
I
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 110 110 110 0 0 0 30
T
E T.O 1 in 8.5 22 2 18 18 21 1 0 0 0 0 9 2 0 10
S
T.O 1 in 12 28 1 1 1 11 17 1 7 7 7 0 0 0 4
CR(RITES) 1800 32 152 152 576 1224 0 0 0 0 192 24 0 360
Others PVT
BG/TRIVENI 13520 0 0 0 9120 4216 120 120 120 7876 0 0 0 1233 4 7
C.R/MALHOTRA(T-4183) 800 0 120 120 552 248 0 0 0 0 132 52 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 986 986 3480 0 0 0 1483 1 4
T.O. (1/12)/MALHOTRA 10 0 0 0 5 5 0 0 0 0 0 0 0 5
ORGANIS
ATION
Srl.No DETAILS OF DESPATCH

DESPATCH ON MONTHLY BALANCE TO BE CUMULATIVE QTY STOCK IN


1 BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY DATE IN NOS DESPATCH DESPATCH During the year DESPATCH HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.19 0 0 850


TC/CONC/20-21-/97 BG SSE/PWAY/MHQ 731 30.04.20 0 0 731 580 24580 8647
SER TC/CONC/20-21-/98 SSE/PWAY//CNI 2112 30.04.21 110 580 1532
SSE/P-WAY/MURI 0 5768 5768 7956
_
2 _ _ 0 0 0 OPEN LINE

SSE/P-WAY/CON/ 385215 1798


TC/CON/BI/20-21/Con/112 DT-31.03.21 WIDER BASE
KGP
6403 30.05.21 965 5607 796 5607 CONSTRUCTION

3 965 11375 11375


SER/ O.L
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/ CON 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 _ _ _ _ _ 0 93 SETS 10 SETS
ECR/OL _ _ 0 0 0
8 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 _ _ 0 0 0 0 1255 16
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 163.327 MT 2)CEMENT(RLY)= 1379.472 MT 3)CEMENT(PVT)= 192.909 MT 4)INSERTS(T-6901)= 280712 NOS. 381) = 49430 NOS
.
p PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 14.04.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
IC under Stock as on
weekly ORGANISATION Agreement (Ordered Qty) production producted as on During the producted as on As on During the During the curing(in Under testing
issue date (in nos)
rest on capacity/DP up to 01.04.2020 As on date
month
During the year Cumulative date Cumulative nos) MF REJ
date month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 632 10512 10512 403668 546332 0 11375 11375 385215 11520 0 0 6546 164 223
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 0 580 580 24580 0 0 0 8647 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
LC , P.O No.-CE/TP/SER/2018/006/B/10031
S dt-14.01.2019 25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
E
R L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 0 0 68 120 126 3243 1 4
CR WIDER-15134NOS 15134 112 1568 1568 10216 4918 0 0 0 0 1796 213 359 7837 2 9
BA WIDER-124 SET 124 2 26 26 26 98 0 0 0 0 26 0 0 0
GR WIDER-3138 3138 8 104 104 104 3034 0 0 0 0 104 0 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ OL T.OUT1in12(ECR/OL) 351SETS 0 16 16 351 0 0 0 0 274 10 10 8 49
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P
TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
-
K
1550 0 0 0 1550 0 0 0 0 938 0 0 128 484
E
C
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
1 IN 8.5 (KEC) 38 0 0 0 38 0 0 6 10 19 9 10 0 0
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 408 5802 5802 38438 6462 0 8815 8815 22690 5742 488 1354 8126 14 24
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 0 0 0 0 0 0 0 4106 2 4
-
R
I
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 110 110 110 0 0 0 30
T
E T.O 1 in 8.5 22 0 18 18 21 1 0 0 0 0 9 2 0 10
S
T.O 1 in 12 28 1 2 2 12 16 1 8 8 8 2 0 0 2
CR(RITES) 1800 0 152 152 576 1224 0 0 0 0 168 48 0 360
Others PVT
BG/TRIVENI 13520 0 0 0 9120 4216 0 120 120 7876 0 0 0 1233 4 7
C.R/MALHOTRA(T-4183) 800 0 120 120 552 248 0 0 0 0 108 76 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 986 986 3480 0 0 0 1483 1 4
T.O. (1/12)/MALHOTRA 10 0 0 0 5 5 0 0 0 0 0 0 0 5
ORGANIS
ATION
Srl.No DETAILS OF DESPATCH

DESPATCH ON MONTHLY BALANCE TO BE CUMULATIVE QTY STOCK IN


1 BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY DATE IN NOS DESPATCH DESPATCH During the year DESPATCH HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.19 0 0 850


TC/CONC/20-21-/97 BG SSE/PWAY/MHQ 731 30.04.20 0 0 731 580 24580 8647
SER TC/CONC/20-21-/98 SSE/PWAY//CNI 2112 30.04.21 0 580 1532
SSE/P-WAY/MURI 0 5768 5768 7956
_
2 _ _ 0 0 0 OPEN LINE

SSE/P-WAY/CON/ 385215 6546


TC/CON/BI/20-21/Con/112 DT-31.03.21 WIDER BASE
KGP
6403 30.05.21 0 5607 796 5607 CONSTRUCTION

3 0 11375 11375
SER/ O.L
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/ CON 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 _ _ _ _ _ 0 93 SETS 10 SETS
ECR/OL _ _ 0 0 0
8 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 _ _ 0 0 0 0 1255 16
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 182.670 MT 2)CEMENT(RLY)= 1333.850 MT 3)CEMENT(PVT)= 165.200 MT 4)INSERTS(T-6901)= 277352 NOS. 381) = 72299 NOS
.
REVISED

p PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 16.04.21


Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
IC under Stock as on
weekly ORGANISATION Agreement (Ordered Qty) production producted as on During the producted as on As on During the During the curing(in Under testing
issue date (in nos)
rest on capacity/DP up to 01.04.2020 As on date
month
During the year Cumulative date Cumulative nos) MF REJ
date month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 832 11344 11344 404500 545500 2270 13645 13645 387485 11072 676 604 4276 164 223
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 110 690 690 24690 0 0 0 8537 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
LC , P.O No.-CE/TP/SER/2018/006/B/10031
S dt-14.01.2019 25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
E
R L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 0 0 0 0 314 3243 1 4
CR WIDER-15134NOS 15134 136 1704 1704 10352 4782 0 0 0 0 1764 289 451 7837 2 9
BA WIDER-124 SET 124 2 28 28 28 96 0 0 0 0 28 0 0 0
GR WIDER-3138 3138 8 112 112 112 3026 0 0 0 0 112 0 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ OL T.OUT1in12(ECR/OL) 351SETS 0 16 16 351 0 0 0 0 274 8 12 8 49
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P
TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
-
K
1550 0 0 0 1550 0 110 110 110 1048 0 0 128 374
E
C
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
1 IN 8.5 (KEC) 38 0 0 0 38 0 0 6 10 19 9 10 0 0
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 472 6274 6274 38910 5990 7380 16195 16195 30070 5380 612 2064 746 14 24
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 1050 1050 1050 1050 0 0 0 3056 2 4
T
-
R
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 110 110 110 0 0 0 30
I
T
T.O 1 in 8.5 22 1 19 19 22 0 0 0 0 0 10 2 0 10
E
S T.O 1 in 12 28 1 3 3 13 15 0 8 8 8 3 0 0 2
CR(RITES) 1800 0 152 152 576 1224 190 190 190 190 44 72 0 170
BG/TRIVENI 13520 0 0 0 9120 4216 0 120 120 7876 0 0 0 1233 4 7
Others PVT C.R/MALHOTRA(T-4183) 800 0 120 120 552 248 0 0 0 0 84 100 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 986 986 3480 0 0 0 1483 1 4
T.O. (1/12)/MALHOTRA 10 0 0 0 5 5 0 0 0 0 0 0 0 5
ORGANIS
ATION
Srl.No DETAILS OF DESPATCH

DESPATCH ON MONTHLY BALANCE TO BE CUMULATIVE QTY STOCK IN


1 BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY DATE IN NOS DESPATCH DESPATCH During the year DESPATCH HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.19 0 0 850


TC/CONC/20-21-/97 BG SSE/PWAY/MHQ 731 30.04.20 0 0 731 690 24580 8532
SER TC/CONC/20-21-/98 SSE/PWAY//CNI 2112 30.04.21 110 690 1422
SSE/P-WAY/GBA AT CDGR _ _ 2270 8038 8038 7956
_
2 _ _ 0 0 0 OPEN LINE

SSE/P-WAY/CON/ 387485 4276


TC/CON/BI/20-21/Con/112 DT-31.03.21 WIDER BASE
KGP
6403 30.05.21 0 5607 796 5607 CONSTRUCTION

3 2270 13645 13645


SER/ O.L
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/ CON 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 _ _ _ _ _ 0 93 SETS 10 SETS
ECR/OL _ _ 0 0 0
8 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 _ _ 0 0 0 0 1255 16
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 167.490 MT 2)CEMENT(RLY)= 1268.350 MT 3)CEMENT(PVT)= 134.360 MT 4)INSERTS(T-6901)= 273128 NOS. 381) = 69572 NOS
.
REVISED

p PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 17.04.21


Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
IC under Stock as on
weekly ORGANISATION Agreement (Ordered Qty) production producted as on During the producted as on As on During the During the curing(in Under testing
issue date (in nos)
rest on capacity/DP up to 01.04.2020 As on date
month
During the year Cumulative date Cumulative nos) MF REJ
date month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 1000 12344 12344 405500 544500 0 13645 13645 387485 11176 852 1324 4276 164 223
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 0 690 690 24690 0 0 0 8537 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
LC , P.O No.-CE/TP/SER/2018/006/B/10031
S dt-14.01.2019 25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
E
R L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 0 0 0 0 314 3243 1 4
CR WIDER-15134NOS 15134 120 1824 1824 10472 4662 0 0 0 0 1812 0 812 7837 2 9
BA WIDER-124 SET 124 4 32 32 32 92 0 0 0 0 32 0 0 0
GR WIDER-3138 3138 16 128 128 128 3010 0 0 0 0 128 0 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ OL T.OUT1in12(ECR/OL) 351SETS 0 16 16 351 0 0 0 0 274 8 10 10 49
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P
TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
-
K
1550 0 0 0 1550 0 0 110 110 1048 0 0 128 374
E
C
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
1 IN 8.5 (KEC) 38 0 0 0 38 0 0 6 10 19 9 10 0 0
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 472 6274 6274 38910 5990 0 16195 16195 30070 5380 612 2064 746 14 24
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 0 1050 1050 1050 0 0 0 3056 2 4
T
-
R
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 110 110 110 0 0 0 30
I
T
T.O 1 in 8.5 22 1 20 20 23 0 0 0 0 0 11 3 0 10
E
S T.O 1 in 12 28 1 4 4 14 14 0 8 8 8 4 0 0 2
CR(RITES) 1800 48 200 200 624 1176 0 190 190 190 76 88 0 170
BG/TRIVENI 13520 0 0 0 9120 4216 120 240 240 7996 0 0 0 1113 4 7
Others PVT C.R/MALHOTRA(T-4183) 800 0 120 120 552 248 0 0 0 0 84 100 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 986 986 3480 0 0 0 1483 1 4
T.O. (1/12)/MALHOTRA 10 0 0 0 5 5 0 0 0 0 0 0 0 5
ORGANIS
ATION
Srl.No DETAILS OF DESPATCH

DESPATCH ON MONTHLY BALANCE TO BE CUMULATIVE QTY STOCK IN


1 BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY DATE IN NOS DESPATCH DESPATCH During the year DESPATCH HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.19 0 0 850

TC/CONC/20-21-/97 BG SSE/PWAY/MHQ 731 30.04.20 0 0 731 690 24580 8532


SER
TC/CONC/20-21-/98 SSE/PWAY//CNI 2112 30.04.21 0 690 1422
SSE/P-WAY/GBA AT CDGR _ _ 0 8038 8038 7956
_
2 _ _ 0 0 0 OPEN LINE

SSE/P-WAY/CON/ 387485 4276


TC/CON/BI/20-21/Con/112 DT-31.03.21 WIDER BASE
KGP
6403 30.05.21 0 5607 796 5607 CONSTRUCTION

3 0 13645 13645
SER/ O.L
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/ CON 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 _ _ _ _ _ 0 93 SETS 10 SETS
ECR/OL _ _ 0 0 0
8 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 _ _ 0 0 0 0 1255 16
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 149.800 MT 2)CEMENT(RLY)= 1199.670 MT 3)CEMENT(PVT)= 92.000 MT 4)INSERTS(T-6901)= 268104 NOS. 381) = 66621 NOS
.
p PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 18.04.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be
Under IC under Stock as on
weekly ORGANISATION Agreement (Ordered Qty) production producted as on During the producted as on As on During the During the curing(in nos)
Under testing
issue date (in nos)
rest on capacity/DP up to 01.04.2020 As on date During the year Cumulative date Cumulative MF REJ
month date month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 960 13304 13304 406460 543540 0 13645 13645 387485 11200 884 2228 4276 164 223
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 0 690 690 24690 0 0 0 8537 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
LC , P.O No.-CE/TP/SER/2018/006/B/10031
S dt-14.01.2019 25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
E
R L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 0 0 0 0 0 3561 1 4
CR WIDER-15134NOS 15134 120 1944 1944 10592 4542 0 0 0 0 1808 32 140 8598 2 9
BA WIDER-124 SET 124 2 34 34 34 90 0 0 0 0 34 0 0 0
GR WIDER-3138 3138 8 136 136 136 3002 0 0 0 0 136 0 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ OL T.OUT1in12(ECR/OL) 351SETS 0 16 16 351 0 0 0 0 274 7 11 10 49
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P
TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
-
K
1550 0 0 0 1550 0 90 200 200 1138 0 0 128 284
E
C
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
1 IN 8.5 (KEC) 38 0 0 0 38 0 0 6 10 19 9 10 0 0
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 512 7314 7314 39950 4950 0 16195 16195 30070 5892 708 136 3103 15 26
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 0 1050 1050 1050 0 0 0 3056 2 4
T
-
R
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 110 110 110 0 0 0 30
I
T
T.O 1 in 8.5 22 0 20 20 22 0 0 0 0 0 11 3 0 10
E
S T.O 1 in 12 28 0 4 4 14 14 1 9 9 9 4 0 0 1
CR(RITES) 1800 24 224 224 648 1152 0 190 190 190 192 96 0 170
BG/TRIVENI 13520 0 0 0 9120 4216 120 360 360 8116 0 0 0 993 4 7
Others PVT C.R/MALHOTRA(T-4183) 800 0 120 120 552 248 0 0 0 0 76 108 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 100 1086 1086 3580 0 0 0 1383 1 4
T.O. (1/12)/MALHOTRA 10 0 0 0 5 5 0 0 0 0 0 0 0 5
ORGANIS
ATION
Srl.No DETAILS OF DESPATCH

DESPATCH ON MONTHLY BALANCE TO BE CUMULATIVE QTY STOCK IN


1 BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY DATE IN NOS DESPATCH DESPATCH During the year DESPATCH HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.19 0 0 850

TC/CONC/20-21-/97 BG SSE/PWAY/MHQ 731 30.04.20 0 0 731 690 24580 8532


SER
TC/CONC/20-21-/98 SSE/PWAY//CNI 2112 30.04.21 0 690 1422
SSE/P-WAY/GBA AT CDGR _ _ 0 8038 8038 7956
_
2 _ _ 0 0 0 OPEN LINE

SSE/P-WAY/CON/ 387485 4276


TC/CON/BI/20-21/Con/112 DT-31.03.21 WIDER BASE
KGP
6403 30.05.21 0 5607 796 5607 CONSTRUCTION

3 0 13645 13645
SER/ O.L
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/ CON 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 _ _ _ _ _ 0 93 SETS 10 SETS
ECR/OL _ _ 0 0 0
8 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 _ _ 0 0 0 0 1255 16
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 134.700 MT 2)CEMENT(RLY)= 1133.450 MT 3)CEMENT(PVT)= 59.460 MT 4)INSERTS(T-6901)= 263432 NOS. 381) = 64223 NOS
.
p PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 19.04.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be
Under IC under Stock as on
weekly ORGANISATION Agreement (Ordered Qty) production producted as on As on During the During the producted as As on During the During the curing(in nos)
Under testing
issue date (in nos)
rest on capacity/DP up to 01.04.2020 Cumulative on date month year
Cumulative MF REJ
date month year date

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 656 13960 13960 407116 542884 1500 15145 15145 388985 10976 1055 2937 2776 164 223
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 0 690 690 24690 0 0 0 8537 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
dt-14.01.2019
E L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 0 0 0 0 0 3561 1 4
R CR WIDER-15134NOS 15134 104 2048 2048 10696 4438 0 0 0 0 1736 156 192 8598 2 9
BA WIDER-124 SET 124 2 36 36 36 88 0 0 0 0 36 0 0 0
GR WIDER-3138 3138 8 144 144 144 2994 0 0 0 0 144 0 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 16 16 351 0 0 0 0 274 7 11 10 49
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
. 1550 0 0 0 1550 0 0 200 200 1138 0 0 128 284
K
E
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
C 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 6 10 19 9 10 0 0
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 320 7634 7634 40270 4630 0 16195 16195 30070 5604 784 668 3103 15 26
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 0 1050 1050 1050 0 0 0 3056 2 4
.
R
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 110 110 110 0 0 0 30
I T.O 1 in 8.5 22 0 20 20 22 0 0 0 0 0 11 3 0 10
T
E T.O 1 in 12 28 0 4 4 14 14 0 9 9 9 4 0 0 1
S CR(RITES) 1800 24 248 248 672 1128 0 190 190 190 184 128 0 170
BG/TRIVENI 13520 0 0 0 9120 4216 0 360 360 8116 0 0 0 993 4 7
T.O. (1 IN 8.5)/TRIVENI 27 1 3 3 3 24 0 0 0 0 3 0 0 0
OTHERS PVT. C.R/MALHOTRA(T-4183) 800 0 120 120 552 248 0 0 0 0 76 108 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 1086 1086 3580 0 0 0 1383 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 5 5 0 0 0 0 0 0 0 5
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF
SLEEPER
CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE
DESPATCH During the year
CUMULATIVE
DESPATCH
QTY STOCK
IN HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.19 0 0 850

1 TC/CONC/20-21-/97 BG SSE/PWAY/MHQ 731 30.04.20 0 0 731 690 24580 8532


TC/CONC/20-21-/98 SSE/PWAY//CNI 2112 30.04.21 0 690 1422
SER
ADRA DIV SSE/P-WAY/GBA AT CDGR _ _ 1500 9538 9538 7956
_
2 _ _ 0 0 0 OPEN LINE

SSE/P-WAY/CON/ 388985 2776


TC/CON/BI/20-21/Con/112 DT-31.03.21 WIDER BASE
KGP
6403 30.05.21 0 5607 796 5607 CONSTRUCTION

3 1500 15145 15145


SER/
O.L. 4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 124.200 MT 2)CEMENT(RLY)= 1086.850 MT 3)CEMENT(PVT)= 36.310 MT 4)INSERTS(T-6901)= 260224 NOS. 381) = 62593 NOS
.
p PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 20.04.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be
Under IC under Stock as on
weekly ORGANISATION Agreement (Ordered Qty) production producted as on As on During the During the producted as As on During the During the curing(in nos)
Under testing
issue date (in nos)
rest on capacity/DP up to 01.04.2020 Cumulative on date Cumulative MF REJ
date month year date month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 920 14880 14880 408036 541964 0 15145 15145 388985 11896 543 3449 2776 164 223
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 0 810 810 24810 0 0 0 8417 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
E
dt-14.01.2019
L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 0 0 0 0 0 3561 1 4
R CR WIDER-15134NOS 15134 136 2184 2184 10832 4302 0 0 0 0 1872 76 272 8598 2 9
BA WIDER-124 SET 124 2 38 38 38 86 0 0 0 0 36 2 0 0
GR WIDER-3138 3138 8 152 152 152 2986 0 0 0 0 144 8 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 16 16 351 0 0 0 0 274 7 11 10 49
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
. 1550 0 0 0 1550 0 174 374 374 1312 0 0 128 110
K
E
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
C 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 6 10 19 9 10 0 0
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 544 8178 8178 40814 4086 0 16195 16195 30070 6148 464 988 3103 15 26
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 0 1050 1050 1050 0 0 0 3056 2 4
.
R
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 110 110 110 0 0 0 30
I T.O 1 in 8.5 22 0 20 20 22 0 0 0 0 0 11 3 0 10
T
E T.O 1 in 12 28 0 4 4 14 14 1 10 10 10 4 0 0 0
S CR(RITES) 1800 48 296 296 720 1080 0 190 190 190 232 128 0 170
BG/TRIVENI 13520 0 0 0 9120 4216 0 360 360 8116 0 0 0 993 4 7
T.O. (1 IN 8.5)/TRIVENI 27 1 4 4 4 23 0 0 0 0 4 0 0 0
OTHERS PVT. C.R/MALHOTRA(T-4183) 800 0 120 120 552 248 0 0 0 0 76 108 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 1086 1086 3580 0 0 0 1383 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 5 5 0 0 0 0 0 0 0 5
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF
SLEEPER
CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE
DESPATCH During the year
CUMULATIVE
DESPATCH
QTY STOCK
IN HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.19 0 0 850

1 TC/CONC/20-21-/97 BG SSE/PWAY/MHQ 731 30.04.20 0 0 731 810 24810 8417


TC/CONC/20-21-/98 SSE/PWAY//CNI 2112 30.04.21 0 690 1422
SER
ADRA DIV SSE/P-WAY/GBA AT CDGR _ _ 0 9538 9538 7956
_
2 _ _ 0 0 0 OPEN LINE

SSE/P-WAY/CON/
TC/CON/BI/20-21/Con/112 DT-31.03.21
KGP
6403 30.05.21 0 5607 796 5607 388985 2776 CONSTRUCTION
WIDER BASE
TC/CON/BI/21-22/Con/116 DT- SSE/P-WAY/CON/
3 08.04.2021 KGP
10000 15.06.21 0 0 0 0
0 15145 15145
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 108.640 MT 2)CEMENT(RLY)= 1022.100 MT 3)CEMENT(PVT)= 0.890 MT 4)INSERTS(T-6901)= 255552 NOS. 381) = 60067 NOS
.

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L.
8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
p PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 21.04.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
producted as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2020 As on date Cumulative on date As on date During the year Cumulative MF REJ
month year month

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 352 15232 15232 406745 543255 0 15145 15145 388985 11312 827 2458 2776 164 223
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 110 920 920 24920 0 0 0 8417 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
E
dt-14.01.2019
L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 1340 1340 1340 1340 0 0 0 2221 1 4
R CR WIDER-15134NOS 15134 72 2256 2256 10904 4230 3694 3694 3694 3694 1760 260 272 4904 3 11
BA WIDER-124 SET 124 2 40 40 40 84 0 0 0 0 36 4 0 0
GR WIDER-3138 3138 8 160 160 160 2978 0 0 0 0 144 16 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 16 16 351 0 0 0 0 274 5 13 0 49
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
. 1550 0 0 0 1550 0 0 374 374 1312 0 0 128 110
K
E
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
C 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 6 10 19 9 10 0 0
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 224 8402 8402 41038 3862 0 16195 16195 30070 5836 608 1380 3103 15 26
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 0 1050 1050 1050 0 0 0 3056 2 4
.
R
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 110 110 110 0 0 0 30
I T.O 1 in 8.5 22 0 20 20 22 0 0 0 0 0 0 0 0 22
T
E T.O 1 in 12 28 0 4 4 14 14 0 10 10 10 4 0 0 10
S CR(RITES) 1800 0 296 296 720 1080 0 190 190 190 224 136 0 170
BG/TRIVENI 13520 0 0 0 9120 4216 0 360 360 8116 0 0 0 993 4 7
T.O. (1 IN 8.5)/TRIVENI 27 1 5 5 5 22 0 0 0 0 4 0 0 0
OTHERS PVT. C.R/MALHOTRA(T-4183) 800 0 120 120 552 248 0 0 0 0 60 124 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 1086 1086 3580 0 0 0 1383 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 5 5 0 0 0 0 0 0 0 5
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.19 0 0 850

1 TC/CONC/20-21-/97 BG SSE/PWAY/MHQ 731 30.04.20 0 0 731 920 24920 8307


TC/CONC/20-21-/98 SSE/PWAY//CNI 2112 30.04.21 110 920 1192
SER
ADRA DIV SSE/P-WAY/GBA AT CDGR _ _ 0 9538 9538 7956
_
2 _ _ 0 0 0 OPEN LINE

TC/CON/BI/20-21/Con/112 DT-31.03.21 SSE/P-WAY/CON/KGP 6403 30.05.21 0 5607 796 5607 388985 2776 CONSTRUCTION
WIDER BASE
TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021
SSE/P-WAY/CON/KGP 10000 15.06.21 0 0 0 0
0 15145 15145
STOCK OF RAW MATERIALS
5)INSERTS(T-381)
1)HTS WIRE = 101.700 MT 2)CEMENT(RLY)= 696.100 MT 3)CEMENT(PVT)= 283.760 MT 4)INSERTS(T-6901)= 253600 NOS. = 58821 NOS

Dated 20.04.2021 Unit -1, 3rd shift and U-2,2nd&3rd not run due to Local Festival

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L.
8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
p PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 22.04.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
producted as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2020 As on date Cumulative on date As on date month
During the year Cumulative MF REJ
month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 968 16200 16200 407713 542287 1365 16510 16510 390350 11400 1007 3158 1411 164 223
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 0 920 920 24920 0 0 0 8307 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
dt-14.01.2019
E L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 1340 1340 1340 0 0 0 2221 1 4
R CR WIDER-15134NOS 15134 128 2384 2384 11032 4102 0 3694 3694 3694 1784 269 367 4904 3 11
BA WIDER-124 SET 124 2 42 42 42 82 0 0 0 0 34 8 0 0
GR WIDER-3138 3138 8 168 168 168 2970 0 0 0 0 144 16 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 16 16 351 0 0 0 0 274 5 13 0 49
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
. 1550 0 0 0 1550 0 110 484 484 1422 0 0 128 0
K
E
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
C 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 6 10 19 9 10 0 0
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 528 8930 8930 41566 3334 0 16195 16195 30070 5860 600 1892 3103 15 26
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 0 1050 1050 1050 0 0 0 3056 2 4
.
R
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 110 110 110 0 0 0 30
I T.O 1 in 8.5 22 0 20 20 22 0 0 0 0 0 0 0 0 22
T
E T.O 1 in 12 28 0 4 4 14 14 0 10 10 10 4 0 0 10
S CR(RITES) 1800 48 344 344 768 1032 0 190 190 190 264 144 0 170
BG/TRIVENI 13520 0 0 0 9120 4216 0 360 360 8116 0 0 0 993 4 7
T.O. (1 IN 8.5)/TRIVENI 27 1 6 6 6 21 0 0 0 0 6 0 0 0
OTHERS PVT. C.R/MALHOTRA(T-4183) 800 0 120 120 552 248 0 0 0 0 44 140 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 100 1286 1286 3780 0 0 0 1183 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 5 5 0 0 0 0 0 0 0 5
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.19 0 0 850

1 TC/CONC/20-21-/97 BG SSE/PWAY/MHQ 731 30.04.20 0 0 731 920 24920 8307


TC/CONC/20-21-/98 SSE/PWAY//CNI 2112 30.04.21 0 920 1192
SER
ADRA DIV SSE/P-WAY/GBA AT CDGR _ _ 0 9538 9538
_
2 _ _ 0 0 0 OPEN LINE

TC/CON/BI/20-21/Con/112 DT-31.03.21 SSE/P-WAY/CON/KGP 6403 30.05.21 0 5607 796 CONSTRUCTION


390350 1411
WIDER BASE 6972
TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021
SSE/P-WAY/CON/KGP 10000 15.06.21 1365 1365 8635

1365 16510 16510


STOCK OF RAW MATERIALS
5)INSERTS(T-381)
1)HTS WIRE = 91.580 MT 2)CEMENT(RLY)= 628.900 MT 3)CEMENT(PVT)= 241.410 MT 4)INSERTS(T-6901)= 248864 NOS. = 105870 NOS

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 23.04.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
producted as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2020 As on date Cumulative on date As on date month
During the year Cumulative MF REJ
month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 920 17120 17120 408633 541367 442 16952 16952 390792 11440 272 4773 969 164 223
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 0 920 920 24920 0 0 0 8307 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
dt-14.01.2019
E L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 1340 1340 1340 0 0 0 2221 1 4
R CR WIDER-15134NOS 15134 144 2528 2528 11176 3958 0 3694 3694 3694 1736 156 672 4904 3 11
BA WIDER-124 SET 124 4 46 46 46 78 0 0 0 0 34 12 0 0
GR WIDER-3138 3138 8 176 176 176 2962 0 0 0 0 128 48 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 16 16 351 0 0 0 0 274 5 13 0 49
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
. 1550 0 0 0 1550 0 0 484 484 1422 0 0 128 0
K
E
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
C 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 6 10 19 0 0 0 0
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 536 9466 9466 42102 2798 0 16195 16195 30070 5860 572 2456 3103 15 26
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 0 1050 1050 1050 0 0 0 3056 2 4
.
R
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 110 110 110 0 0 0 30
I T.O 1 in 8.5 22 0 20 20 22 0 3 3 3 3 0 0 0 19
T
E T.O 1 in 12 28 0 4 4 14 14 0 10 10 10 4 0 0 10
S CR(RITES) 1800 24 368 368 792 1008 0 190 190 190 272 160 0 170
BG/TRIVENI 13520 0 0 0 9120 4216 120 600 600 8356 0 0 0 753 4 7
T.O. (1 IN 8.5)/TRIVENI 27 2 8 8 27 0 0 0 0 0 17 10 0 0
OTHERS PVT. C.R/MALHOTRA(T-4183) 800 0 120 120 552 248 0 0 0 0 44 140 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 1286 1286 3780 0 0 0 1183 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 5 5 0 0 0 0 0 0 0 5
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.19 0 0 850

1 TC/CONC/20-21-/97 BG SSE/PWAY/MHQ 731 30.04.20 0 0 731 920 24920 8307


TC/CONC/20-21-/98 SSE/PWAY//CNI 2112 30.04.21 0 920 1192
SER ADRA DIV SSE/P-WAY/GBA AT CDGR _ _ 0 9538 9538
_
2 _ _ 0 0 0 OPEN LINE

TC/CON/BI/20-21/Con/112 DT-31.03.21 SSE/P-WAY/CON/KGP 6403 30.05.21 0 5607 796 390792 969 CONSTRUCTION

WIDER BASE 7414


TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021 SSE/P-WAY/CON/KGP 10000 15.06.21 442 1807 8193

442 16952 16952


STOCK OF RAW MATERIALS
5)INSERTS(T-381)
1)HTS WIRE = 74.980 MT 2)CEMENT(RLY)= 563.660 MT 3)CEMENT(PVT)= 201.530 MT 4)INSERTS(T-6901)= 244096 NOS. = 103026 NOS

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 24.04.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
producted as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2020 As on date Cumulative on date As on date During the year Cumulative MF REJ
month year month

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 1080 18200 18200 409713 540287 0 16952 16952 390792 11584 304 5677 969 164 223
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 0 920 920 24920 0 0 0 8307 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
E
dt-14.01.2019
L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 1340 1340 1340 0 0 0 2221 1 4
R CR WIDER-15134NOS 15134 144 2672 2672 11320 3814 0 3694 3694 3694 1752 100 856 4904 3 11
BA WIDER-124 SET 124 2 48 48 48 76 0 0 0 0 34 14 0 0
GR WIDER-3138 3138 8 184 184 184 2954 0 0 0 0 128 56 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 16 16 351 0 0 0 0 274 5 13 0 49
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
. 1550 0 0 0 1550 0 0 484 484 1422 0 0 128 0
K
E
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
C 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 6 10 19 0 0 0 0
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 520 9986 9986 42622 2278 0 16195 16195 30070 5900 532 2976 3103 15 26
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 0 1050 1050 1050 0 0 0 3056 2 4
.
R
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 110 110 110 0 0 0 30
I T.O 1 in 8.5 22 0 20 20 22 0 1 4 4 4 0 0 0 18
T
E T.O 1 in 12 28 0 4 4 14 14 1 11 11 11 4 0 0 9
S CR(RITES) 1800 48 416 416 840 960 0 190 190 190 304 176 0 170
BG/TRIVENI 13520 0 0 0 9120 4216 120 720 720 8476 0 0 0 633 4 7
T.O. (1 IN 8.5)/TRIVENI 27 0 8 8 27 0 0 0 0 0 17 10 0 0
OTHERS PVT. C.R/MALHOTRA(T-4183) 800 0 120 120 552 248 0 0 0 0 28 156 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 1286 1286 3780 0 0 0 1183 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 5 5 0 0 0 0 0 0 0 5
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.19 0 0 850

1 TC/CONC/20-21-/97 BG SSE/PWAY/MHQ 731 30.04.20 0 0 731 920 24920 8307


TC/CONC/20-21-/98 SSE/PWAY//CNI 2112 30.04.21 0 920 1192
SER
ADRA DIV SSE/P-WAY/GBA AT CDGR _ _ 0 9538 9538
_
2 _ _ 0 0 0 OPEN LINE

TC/CON/BI/20-21/Con/112 DT-31.03.21 SSE/P-WAY/CON/KGP 6403 30.05.21 0 5607 796 390792 969 CONSTRUCTION

WIDER BASE 7414


TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021
SSE/P-WAY/CON/KGP 10000 15.06.21 0 1807 8193

0 16952 16952
STOCK OF RAW MATERIALS
5)INSERTS(T-381)
1)HTS WIRE = 92.640 MT 2)CEMENT(RLY)= 488.610 MT 3)CEMENT(PVT)= 159.570 MT 4)INSERTS(T-6901)= 238880 NOS. = 103026 NOS

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 26.04.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
producted as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2020 As on date Cumulative on date As on date During the year Cumulative MF REJ
month year month

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 1248 19448 19448 410961 539039 1034 17986 17986 391826 12008 1128 0 5607 166 226
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 354 1274 1274 25274 0 0 0 7953 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
E
dt-14.01.2019
L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 1340 1340 1340 0 0 0 2221 1 4
R CR WIDER-15134NOS 15134 208 2880 2880 11528 3606 0 3694 3694 3694 1824 181 55 5759 3 12
BA WIDER-124 SET 124 6 54 54 54 70 0 0 0 0 38 16 0 0
GR WIDER-3138 3138 24 208 208 208 2930 0 0 0 0 144 64 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 16 16 351 0 0 0 0 274 5 13 0 49
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
. 1550 0 0 0 1550 0 0 484 484 1422 0 0 0 128
K
E
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
C 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 6 10 19 0 0 0 0
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 744 10730 10730 43366 1534 0 16195 16195 30070 6124 752 300 6076 16 28
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 0 1050 1050 1050 0 0 0 3056 2 4
.
R
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 110 110 110 0 0 0 30
I T.O 1 in 8.5 22 0 20 20 22 0 1 4 4 4 0 0 0 18
T
E T.O 1 in 12 28 0 4 4 14 14 1 11 11 11 4 0 0 9
S CR(RITES) 1800 72 488 488 912 888 0 190 190 190 360 192 0 170
BG/TRIVENI 13520 0 0 0 9120 4216 120 720 720 8476 0 0 0 633 4 7
T.O. (1 IN 8.5)/TRIVENI 27 0 8 8 27 0 0 0 0 0 17 10 0 0
OTHERS PVT. C.R/MALHOTRA(T-4183) 800 0 120 120 552 248 0 0 0 0 12 172 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 1286 1286 3780 0 0 0 1183 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 5 5 0 0 0 0 0 0 0 5
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.19 0 0 850

1 TC/CONC/20-21-/97 BG SSE/PWAY/MHQ 731 30.04.20 0 0 731 1274 25274 7953


TC/CONC/20-21-/98 SSE/PWAY//CNI 2112 30.04.21 354 1274 838
SER
ADRA DIV SSE/P-WAY/GBA AT CDGR _ _ 0 9538 9538
_
2 _ _ 0 0 0 OPEN LINE

TC/CON/BI/20-21/Con/112 DT-31.03.21 SSE/P-WAY/CON/KGP 6403 30.05.21 0 5607 796 391826 5607 CONSTRUCTION

WIDER BASE 8448


TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021
SSE/P-WAY/CON/KGP 10000 15.06.21 1034 2841 7159

1034 17986 17986


STOCK OF RAW MATERIALS
5)INSERTS(T-381)
1)HTS WIRE = 97.340 MT 2)CEMENT(RLY)= 399.330 MT 3)CEMENT(PVT)= 106.880 MT 4)INSERTS(T-6901)= 232384 NOS. = 96431 NOS

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 27.04.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
producted as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2020 As on date Cumulative on date As on date During the year Cumulative MF REJ
month year month

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 1206 20654 20654 412167 537833 630 18616 18616 392456 11094 0 3248 4977 166 226
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 390 1664 1664 25664 0 0 0 7563 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
E
dt-14.01.2019
L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 1340 1340 1340 0 0 0 2221 1 4
R CR WIDER-15134NOS 15134 112 2992 2992 11640 3494 0 3694 3694 3694 1728 287 157 5759 3 12
BA WIDER-124 SET 124 2 56 56 56 68 0 0 0 0 36 20 0 0
GR WIDER-3138 3138 8 216 216 216 2922 0 0 0 0 136 80 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 16 16 351 0 0 0 0 274 5 13 0 49
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
. 1550 0 0 0 1550 0 0 484 484 1422 0 0 0 128
K
E
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
C 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 6 10 19 0 0 0 0
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 400 11130 11130 43766 1134 0 16195 16195 30070 5852 1074 650 6076 16 28
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 0 1050 1050 1050 0 0 0 3056 2 4
.
R
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 110 110 110 0 0 0 30
I T.O 1 in 8.5 22 0 20 20 22 0 0 4 4 4 0 0 0 18
T
E T.O 1 in 12 28 0 4 4 14 14 0 11 11 11 4 0 0 9
S CR(RITES) 1800 24 512 512 936 864 0 190 190 190 376 200 0 170
BG/TRIVENI 13520 0 0 0 9120 4216 0 720 720 8476 0 0 0 633 4 7
T.O. (1 IN 8.5)/TRIVENI 27 0 8 8 27 0 0 0 0 0 17 10 0 0
OTHERS PVT. C.R/MALHOTRA(T-4183) 800 0 120 120 552 248 0 0 0 0 12 172 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 1286 1286 3780 0 0 0 1183 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 5 5 1 1 1 1 0 0 0 4
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.19 240 240 610

1 TC/CONC/20-21-/97 BG SSE/PWAY/MHQ 731 30.04.20 0 0 731 1664 25664 7563


TC/CONC/20-21-/98 SSE/PWAY//CNI 2112 30.04.21 150 1424 688
SER
ADRA DIV SSE/P-WAY/GBA AT CDGR _ _ 0 9538 9538
_
2 _ _ 0 0 0 OPEN LINE

TC/CON/BI/20-21/Con/112 DT-31.03.21 SSE/P-WAY/CON/KGP 6403 30.05.21 0 5607 796 392456 4977 CONSTRUCTION

WIDER BASE 9078


TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021
SSE/P-WAY/CON/KGP 10000 15.06.21 630 3471 6529

630 18616 18616


STOCK OF RAW MATERIALS
5)INSERTS(T-381)
1)HTS WIRE = 82.440 MT 2)CEMENT(RLY)= 318.520 MT 3)CEMENT(PVT)= 85.960 MT 4)INSERTS(T-6901)= 226760 NOS. = 94831 NOS

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 28.04.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
producted as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2020 As on date Cumulative on date As on date During the year Cumulative MF REJ
month year month

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 1196 21850 21850 413363 536637 406 19022 19022 392862 11058 812 3668 4571 166 226
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 554 2218 2218 26218 0 0 0 1009 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
E
dt-14.01.2019
L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 1340 1340 1340 0 0 0 2221 1 4
R CR WIDER-15134NOS 15134 152 3144 3144 11792 3344 0 3694 3694 3694 1752 415 157 5759 3 12
BA WIDER-124 SET 124 4 60 60 60 64 0 0 0 0 36 24 0 0
GR WIDER-3138 3138 16 232 232 232 2906 0 0 0 0 136 96 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 16 16 351 0 0 0 0 274 5 13 0 49
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
. 1550 0 0 0 1550 0 0 484 484 1422 0 0 0 128
K
E
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
C 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 6 10 19 0 0 0 0
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 536 11666 11666 44302 598 0 16195 16195 30070 5892 760 1460 6076 16 28
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 0 1050 1050 1050 0 0 0 3056 2 4
.
R
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 110 110 110 0 0 0 30
I T.O 1 in 8.5 22 0 20 20 22 0 0 4 4 4 0 0 0 18
T
E T.O 1 in 12 28 0 4 4 24 4 2 13 13 13 4 0 0 7
S CR(RITES) 1800 24 536 536 960 840 0 190 190 190 368 232 0 170
BG/TRIVENI 13520 0 0 0 9120 4216 0 720 720 8476 0 0 0 633 4 7
T.O. (1 IN 8.5)/TRIVENI 27 0 8 8 27 0 0 0 0 0 17 10 0 0
OTHERS PVT. C.R/MALHOTRA(T-4183) 800 0 120 120 552 248 0 0 0 0 12 172 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 1286 1286 3780 0 0 0 1183 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 5 5 0 1 1 1 0 0 0 4
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.19 240 480 370

1 TC/CONC/20-21-/97 BG SSE/PWAY/MHQ 731 30.04.20 0 0 731 2218 26218 7009


TC/CONC/20-21-/98 SSE/PWAY//CNI 2112 30.04.21 314 1738 374
SER
ADRA DIV SSE/P-WAY/GBA AT CDGR _ _ 0 9538 9538
_
2 _ _ 0 0 0 OPEN LINE

TC/CON/BI/20-21/Con/112 DT-31.03.21 SSE/P-WAY/CON/KGP 6403 30.05.21 0 5607 796 392862 4571 CONSTRUCTION

WIDER BASE 9484


TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021
SSE/P-WAY/CON/KGP 10000 15.06.21 406 3877 6123

406 19022 19022


STOCK OF RAW MATERIALS
5)INSERTS(T-381)
1)HTS WIRE = 65.970 MT 2)CEMENT(RLY)= 1669.150 MT 3)CEMENT(PVT)= 59.690 MT 4)INSERTS(T-6901)= 220952 NOS. = 92687 NOS

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 29.04.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
producted as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2020 As on date Cumulative on date As on date During the year Cumulative MF REJ
month year month

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 1118 22968 22968 414481 535519 2860 21882 21882 395722 11968 430 4258 1711 166 226
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 0 2218 2218 26218 0 0 0 7009 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
E
dt-14.01.2019
L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 1340 1340 1340 0 0 0 2221 1 4
R CR WIDER-15134NOS 15134 96 3240 3240 11888 3246 0 3694 3694 3694 1696 265 459 5759 3 12
BA WIDER-124 SET 124 2 62 62 62 62 0 0 0 0 36 26 0 0
GR WIDER-3138 3138 8 240 240 240 2898 0 0 0 0 136 104 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 16 16 351 0 0 0 0 274 5 13 0 49
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
. 1550 0 0 0 1550 0 0 484 484 1422 0 0 0 128
K
E
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
C 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 6 10 19 0 0 0 0
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 344 12010 12010 44646 254 0 16195 16195 30070 5888 498 2070 6076 16 28
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 0 1050 1050 1050 0 0 0 3056 2 4
.
R
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 110 110 110 0 0 0 30
I T.O 1 in 8.5 22 0 20 20 22 0 0 4 4 4 0 0 0 18
T
E T.O 1 in 12 28 0 4 4 24 4 1 14 14 14 4 0 0 6
S CR(RITES) 1800 32 568 568 992 808 0 190 190 190 400 232 0 170
BG/TRIVENI 13520 0 0 0 9120 4216 0 720 720 8476 0 0 0 633 4 7
T.O. (1 IN 8.5)/TRIVENI 27 0 8 8 27 0 0 0 0 0 17 10 0 0
OTHERS PVT. C.R/MALHOTRA(T-4183) 800 0 120 120 552 248 0 0 0 0 12 172 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 100 1386 1386 3880 0 0 0 1083 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 5 5 0 1 1 1 0 0 0 4
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.19 0 480 370

1 TC/CONC/20-21-/97 BG SSE/PWAY/MHQ 731 30.04.20 0 0 731 2218 26218 7009


TC/CONC/20-21-/98 SSE/PWAY//CNI 2112 30.04.21 0 1738 374
SER
ADRA DIV SSE/P-WAY/SONA @ BQA _ _ 2700 12238 12238
_
2 _ _ 0 0 0 OPEN LINE

TC/CON/BI/20-21/Con/112 DT-31.03.21 SSE/P-WAY/CON/KGP 6403 30.05.21 0 5607 796 395722 1711 CONSTRUCTION

WIDER BASE 9644


TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021
SSE/P-WAY/CON/KGP 10000 15.06.21 160 4037 5963

160 21882 21882


STOCK OF RAW MATERIALS
5)INSERTS(T-381)
1)HTS WIRE = 65.970 MT 2)CEMENT(RLY)= 1669.150 MT 3)CEMENT(PVT)= 59.690 MT 4)INSERTS(T-6901)= 220952 NOS. = 92687 NOS

Note- U-2 2nd shift of yesterday did not run due to less labor as most of the people have been suffering from fever.

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 30.04.21 REVISED
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
producted as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2020 As on date Cumulative on date As on date month
During the year Cumulative MF REJ
month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 1044 20345 20345 415525 534475 1422 23304 23304 397144 13012 0 0 4971 168 230
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 0 33259 11980 744 2962 2962 26962 0 0 0 6265 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
E
dt-14.01.2019
L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 1340 1340 1340 0 0 0 2221 1 4
R CR WIDER-15134NOS 15134 80 3320 3320 11968 3166 0 3694 3694 3694 1776 0 12 6469 4 13
BA WIDER-124 SET 124 2 64 64 64 60 0 0 0 0 38 26 0 0
GR WIDER-3138 3138 8 248 248 248 2890 0 0 0 0 144 104 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 16 16 351 0 0 0 0 274 5 13 0 49
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
. 1550 0 0 0 1550 0 0 484 484 1422 0 0 0 128
K
E
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
C 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 6 10 19 0 0 0 0
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 312 12322 12322 44958 -58 0 16195 16195 30070 6200 0 2568 6076 16 28
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 0 1050 1050 1050 0 0 0 3056 2 4
.
R
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 110 110 110 0 0 0 30
I T.O 1 in 8.5 22 0 20 20 22 0 1 5 5 5 0 0 0 17
T
E T.O 1 in 12 28 0 4 4 24 4 0 14 14 14 4 0 0 6
S CR(RITES) 1800 0 568 568 992 808 0 190 190 190 400 232 0 170
BG/TRIVENI 13520 0 0 0 9120 4216 0 720 720 8476 0 0 0 633 4 7
T.O. (1 IN 8.5)/TRIVENI 27 0 8 8 27 0 0 0 0 0 17 10 0 0
OTHERS PVT. C.R/MALHOTRA(T-4183) 800 0 120 120 552 248 0 0 0 0 12 172 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 1386 1386 3880 0 0 0 1083 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 5 5 0 1 1 1 0 0 0 4
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.21 370 850 0

1
BG 2962 26962 6265
TC/CONC/20-21-/97 SSE/PWAY/MHQ 731 30.04.21 0 0 731

TC/CONC/20-21-/98 SSE/PWAY//CNI 2112 30.04.21 374 2112 0


TOTAL DESPATCH 744 2962
SER
ADRA DIV SSE/P-WAY/SONA @ BQA _ _ 0 12238 12238
_
2 _ _ 0 0 0 OPEN LINE

TC/CON/BI/20-21/Con/112 DT-31.03.21 SSE/P-WAY/CON/KGP 6403 30.05.21 196 5803 600 397144 5735 CONSTRUCTION

3
TC/CON/BI/21-22/Con/116 DT-
08.04.2021
WB SSE/P-WAY/CON/KGP 10000 15.06.21 1226 5263 4737
11066

TOTAL 1422 23304 23304


STOCK OF RAW MATERIALS
5)INSERTS(T-381)
1)HTS WIRE = 40.800 MT 2)CEMENT(RLY)= 1470.050 MT 3)CEMENT(PVT)= 25.790 MT 4)INSERTS(T-6901)= 211504 NOS. = 89903 NOS

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 03.05.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
producted as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2020 As on date Cumulative on date As on date month
During the year Cumulative MF REJ
month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 688 688 21033 416213 533787 945 945 24249 398089 10908 1660 1132 4026 168 230
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 288 288 288 33547 11692 0 0 2962 26962 288 0 0 6265 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
E
dt-14.01.2019
L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
R CR WIDER-15134NOS 15134 96 96 3416 12064 3070 0 0 3694 3694 1496 214 174 6469 4 13
BA WIDER-124 SET 124 2 2 66 66 58 0 0 0 0 32 34 0 0
GR WIDER-3138 3138 8 8 256 256 2882 0 0 0 0 120 136 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 16 351 0 0 0 0 276 5 13 0 47
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V
T
P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
G. R. /RVNL (KEC)
. 1550 0 0 0 1550 0 0 0 484 1422 0 0 0 128
K
E
B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
C 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 0 10 19 0 0 0 0
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 0 0 12322 44958 -58 0 0 16195 30070 4688 922 3158 6076 16 28
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 0 0 1050 1050 0 0 0 3056 2 4
.
R
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 0 110 110 0 0 0 30
I T.O 1 in 8.5 22 0 0 20 22 0 0 0 5 5 0 0 0 17
T
E T.O 1 in 12 28 0 0 4 24 4 0 0 14 14 4 0 0 6
S CR(RITES) 1800 16 16 584 1008 792 0 0 190 190 344 304 0 170
BG/TRIVENI 13520 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 17 10 0 0
OTHERS PVT. C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 0 0 12 172 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 0 1386 3880 0 0 0 1083 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 5 5 0 0 1 1 0 0 0 4
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.21 0 0 0

1 TC/CONC/20-21-/97 BG SSE/PWAY/MHQ 731 30.04.21 0 0 731 2743 26962 6265


TC/CONC/20-21-/98 SSE/PWAY//CNI 2112 30.04.21 0 0 0
SER
ADRA DIV SSE/P-WAY/SONA @ BQA _ _ 0 0 12238
_
2 _ _ 0 0 0 OPEN LINE

TC/CON/BI/20-21/Con/112 DT-31.03.21 SSE/P-WAY/CON/KGP 6403 30.05.21 196 196 208 CONSTRUCTION


398089 4026
WIDER BASE 12011
TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021 SSE/P-WAY/CON/KGP 10000 15.06.21 749 749 3988

945 945 24249


STOCK OF RAW MATERIALS
5)INSERTS(T-381)
1)HTS WIRE = 170.220 MT 2)CEMENT(RLY)= 1407.850 MT 3)CEMENT(PVT)= 24.910 MT 4)INSERTS(T-6901)= 208240 NOS. = 88751 NOS

Note- Both unit's 3rd shift of Friday(30.04.21) did not run due to less labor as most of the people have been suffering from fever.

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 04.05.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
producted as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2020 As on date Cumulative on date As on date month
During the year Cumulative MF REJ
month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 862 1550 21895 417075 532925 458 1403 24707 398547 11114 1126 2322 3568 168 230
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 496 784 1792 35051 10188 7220 7220 10182 34182 784 0 0 53 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
dt-14.01.2019
E L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
R CR WIDER-15134NOS 15134 104 200 3520 12168 2966 0 0 3694 3694 1496 318 174 6469 4 13
BA WIDER-124 SET 124 2 4 68 68 56 0 0 0 0 32 36 0 0
GR WIDER-3138 3138 8 16 264 264 2874 0 0 0 0 120 144 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 16 351 0 0 0 0 276 5 13 0 47
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
1550 0 0 0 1550 0 0 0 484 1422 0 0 0 128
.
K B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 2 2 2 2 13 0 0 0 0 0 0 0 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 0 0 11314 43950 950 0 0 16195 30070 4368 824 0 8641 17 30
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 0 0 1050 1050 0 0 0 3056 2 4
.
R
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 0 110 110 0 0 0 30
I T.O 1 in 8.5 22 0 0 20 22 0 0 0 5 5 0 0 0 17
T
E T.O 1 in 12 28 0 0 4 24 4 0 0 14 14 4 0 0 6
S CR(RITES) 1800 48 64 632 1056 744 0 0 190 190 368 328 0 170
BG/TRIVENI 13520 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 17 10 0 0
OTHERS PVT. C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 0 0 12 172 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 0 1386 3880 0 0 0 1083 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 5 5 0 0 1 1 0 0 0 4
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.21 0 0 0

1 TC/CONC/20-21-/97 SSE/PWAY/MHQ 731 30.04.21 0 0 731

TC/CONC/20-21-/98
BG
SSE/PWAY//CNI 2112 30.04.21 0 0 0 10182 34182 53
SSE-PWAY/ADTP /KANDRA 7220 7220
SER
ADRA DIV SSE/P-WAY/SONA @ BQA _ _ 0 0 12238
_
2 _ _ 0 0 0 OPEN LINE

TC/CON/BI/20-21/Con/112 DT-31.03.21 SSE/P-WAY/CON/KGP 6403 30.05.21 0 196 404 CONSTRUCTION


398547 3568
WIDER BASE 12469
TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021 SSE/P-WAY/CON/KGP 10000 15.06.21 458 1207 3530

458 1403 24707


STOCK OF RAW MATERIALS
5)INSERTS(T-381)
1)HTS WIRE = 157.124 MT 2)CEMENT(RLY)= 1324.620 MT 3)CEMENT(PVT)= 17.200 MT 4)INSERTS(T-6901)= 104336 NOS. = 86575 NOS

Note- unit-2 3rd shift of yesterday did not run due to less labor as most of the people have been suffering from fever & some people were stuck in rain.
Note- 1008 NOS of BG (T-2496) slp have been transfered to Zonal from RITES

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 05.05.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
producted as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2020 As on date Cumulative on date As on date month
During the year Cumulative MF REJ
month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 1134 2684 23029 418209 531791 1864 3267 26571 400411 11328 1528 2840 1704 168 230
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 392 1176 2184 35443 9796 0 7220 10182 34182 1176 0 0 53 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
dt-14.01.2019
E L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
R CR WIDER-15134NOS 15134 96 296 3616 12264 2870 0 0 3694 3694 1456 399 229 6469 4 13
BA WIDER-124 SET 124 2 6 70 70 54 0 0 0 0 32 38 0 0
GR WIDER-3138 3138 8 24 272 272 2866 0 0 0 0 120 152 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 16 351 0 0 0 0 276 5 13 0 47
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
1550 0 0 0 1550 0 0 0 484 1422 0 0 0 128
.
K B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 1 3 3 3 12 0 0 0 0 3 0 0 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 0 0 11314 43950 950 0 0 16195 30070 3824 948 420 8641 17 30
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 0 0 1050 1050 0 0 0 3056 2 4
.
R
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 0 110 110 0 0 0 30
I T.O 1 in 8.5 22 0 0 20 22 0 0 0 5 5 0 0 0 17
T
E T.O 1 in 12 28 0 0 4 24 4 0 0 14 14 4 0 0 6
S CR(RITES) 1800 32 96 664 1088 712 0 0 190 190 352 376 0 170
BG/TRIVENI 13520 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 17 10 0 0
OTHERS PVT. C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 0 0 12 172 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 0 1386 3880 0 0 0 1083 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 5 5 0 0 1 1 0 0 0 4
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.21 0 0 0

1 TC/CONC/20-21-/97 SSE/PWAY/MHQ 731 30.04.21 0 0 731

TC/CONC/20-21-/98
BG
SSE/PWAY//CNI 2112 30.04.21 0 0 0 10182 34182 53
SSE-PWAY/ADTP /KANDRA 0 7220
SER
ADRA DIV SSE/P-WAY/SONA @ BQA _ _ 0 0 12238
_
2 _ _ 0 0 0 OPEN LINE

TC/CON/BI/20-21/Con/112 DT-31.03.21 SSE/P-WAY/CON/KGP 6403 30.05.21 202 398 202 CONSTRUCTION


400411 1704
WIDER BASE 14333
TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021 SSE/P-WAY/CON/KGP 10000 15.06.21 1662 2869 1868

1864 3267 26571


STOCK OF RAW MATERIALS
5)INSERTS(T-381)
1)HTS WIRE = 219.220 MT 2)CEMENT(RLY)= 1235.120 MT 3)CEMENT(PVT)= 14.810 MT 4)INSERTS(T-6901)= 199736 NOS. = 84911 NOS

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 06.05.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
producted as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2020 As on date Cumulative on date As on date month
During the year Cumulative MF REJ
month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 1038 3722 24067 419247 530753 0 3267 26571 400411 12014 816 3904 1704 168 230
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 336 1512 2520 35779 9460 0 7220 10182 34182 1512 0 0 53 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
dt-14.01.2019
E L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
R CR WIDER-15134NOS 15134 112 408 3728 12376 2758 0 0 3694 3694 1496 132 568 6469 4 13
BA WIDER-124 SET 124 4 10 74 74 50 0 0 0 0 34 40 0 0
GR WIDER-3138 3138 16 40 288 288 2850 0 0 0 0 128 160 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 16 351 0 0 0 0 276 5 13 0 47
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
1550 0 0 0 1550 0 0 0 484 1422 0 0 0 128
.
K B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 2 5 5 5 10 0 0 0 0 5 0 0 0
BG /RITES.
P TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 0 0 11314 43950 950 0 0 16195 30070 3600 472 1120 8641 17 30
V
T
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 0 0 1050 1050 0 0 0 3056 2 4
.
R
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 0 110 110 0 0 0 30
I T.O 1 in 8.5 22 0 0 20 22 0 0 0 5 5 0 0 0 17
T
E T.O 1 in 12 28 0 0 4 24 4 0 0 14 14 4 0 0 6
S CR(RITES) 1800 16 112 680 1104 696 0 0 190 190 368 376 0 170
BG/TRIVENI 13520 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 17 10 0 0
OTHERS PVT. C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 0 0 12 172 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 90 300 1686 4180 0 0 0 783 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 5 5 1 1 2 2 0 0 0 3
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.21 0 0 0

1 TC/CONC/20-21-/97 SSE/PWAY/MHQ 731 30.04.21 0 0 731

TC/CONC/20-21-/98
BG
SSE/PWAY//CNI 2112 30.04.21 0 0 0 10182 34182 53
SSE-PWAY/ADTP /KANDRA 0 7220
SER
ADRA DIV SSE/P-WAY/SONA @ BQA _ _ 0 0 12238
_
2 _ _ 0 0 0 OPEN LINE

TC/CON/BI/20-21/Con/112 DT-31.03.21 SSE/P-WAY/CON/KGP 6403 30.05.21 0 398 202 CONSTRUCTION


400411 1704
WIDER BASE 14333
TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021 SSE/P-WAY/CON/KGP 10000 15.06.21 0 2869 1868

0 3267 26571
STOCK OF RAW MATERIALS
5)INSERTS(T-381)
1)HTS WIRE = 205.950 MT 2)CEMENT(RLY)= 1148.150 MT 3)CEMENT(PVT)= 9.150 MT 4)INSERTS(T-6901)= 194880 NOS. = 83375 NOS

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 07.05.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
producted as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2020 As on date Cumulative on date As on date month
During the year Cumulative MF REJ
month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 722 4444 24789 419969 530031 0 3267 26571 400411 11768 974 810 5603 170 233
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 296 1808 2816 36075 9164 0 7220 10182 34182 1808 0 0 53 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
dt-14.01.2019
E L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
R CR WIDER-15134NOS 15134 72 480 3800 12308 2686 0 0 3694 3694 1440 260 0 6896 4 14
BA WIDER-124 SET 124 1 11 75 75 49 0 0 0 0 33 42 0 0
GR WIDER-3138 3138 8 48 296 2842 296 0 0 0 0 128 168 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 16 351 0 0 0 0 276 5 13 0 47
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
1550 0 0 0 1550 0 0 0 484 1422 0 0 0 128
.
K B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 1 6 6 6 9 0 0 0 0 6 0 0 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 0 0 11314 43950 950 0 0 16195 30070 3072 610 390 9759 18 31
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 0 0 1050 1050 0 0 0 3056 2 4
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 120 120 120 120 0 0 0 20
R CR /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.21 140 0 0 0 140 0 0 0 110 110 0 0 0 30
I
T T.O 1 in 8.5 22 0 0 20 22 0 0 0 5 5 0 0 0 17
E
S
T.O 1 in 12 28 0 0 4 24 4 1 1 15 15 4 0 0 5
CR(RITES) 1800 40 152 720 1144 656 0 0 190 190 360 424 0 170
BG/TRIVENI 13520 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 17 10 0 0
OTHERS PVT. C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 0 0 12 172 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 300 1686 4180 0 0 0 783 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 5 5 0 1 2 2 0 0 0 3
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.21 0 0 0

1 TC/CONC/20-21-/97 SSE/PWAY/MHQ 731 30.04.21 0 0 731

TC/CONC/20-21-/98
BG
SSE/PWAY//CNI 2112 30.04.21 0 0 0 10182 34182 53
SSE-PWAY/ADTP /KANDRA 0 7220
SER
ADRA DIV SSE/P-WAY/SONA @ BQA _ _ 0 0 12238
_
2 _ _ 0 0 0 OPEN LINE

TC/CON/BI/20-21/Con/112 DT-31.03.21 SSE/P-WAY/CON/KGP 6403 30.05.21 0 398 202 CONSTRUCTION


400411 1704
WIDER BASE 14333
TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021 SSE/P-WAY/CON/KGP 10000 15.06.21 0 2869 1868

0 3267 26571
STOCK OF RAW MATERIALS
5)INSERTS(T-381)
1)HTS WIRE = 192.120 MT 2)CEMENT(RLY)= 1061.300 MT 3)CEMENT(PVT)= 2.114 MT 4)INSERTS(T-6901)= 190024 NOS. = 81681 NOS

NOTE- Less production due to less worker at U-2 3rd shift as 26 nos of labors(approx) have been suffering from fever & no production at U-1 3rd shift as the shift was not run.

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 08.05.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
producted as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2020 As on date Cumulative on date As on date month
During the year Cumulative MF REJ
month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 1228 5672 26017 421197 528803 508 3775 27079 400919 12076 1071 1633 5095 170 233
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 488 2296 3304 36563 8676 0 7220 10182 34182 2296 0 0 53 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
dt-14.01.2019
E L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
R CR WIDER-15134NOS 15134 28 508 3828 12476 2658 0 0 3694 3694 1324 404 0 7036 4 14
BA WIDER-124 SET 124 2 13 77 77 47 0 0 0 0 31 46 0 0
GR WIDER-3138 3138 8 56 304 304 2834 0 0 0 0 128 176 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 16 351 0 0 0 0 276 5 13 0 47
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
1550 0 0 0 1550 0 0 0 484 1422 0 0 0 128
.
K B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 2 8 8 8 7 0 0 0 0 8 0 0 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 0 0 11314 43950 950 0 0 16195 30070 2536 754 390 9759 18 31
P WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 0 0 1050 1050 0 0 0 3056 2 4
V
T
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 20 140 140 140 0 0 0 0
.
R
CR /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.21 140 0 0 0 140 0 30 30 140 140 0 0 0 0
I BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 2 2 2 2 0 0 0 0
T
E
T.O 1 in 8.5 22 0 0 20 22 0 0 0 5 5 0 0 0 17
S T.O 1 in 12 28 0 0 4 24 4 1 2 16 16 4 0 0 4
CR(RITES) 1800 24 176 744 1168 632 0 0 190 190 360 448 0 170
BG/TRIVENI 13520 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 17 10 0 0
OTHERS PVT. C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 0 0 12 172 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 300 1686 4180 0 0 0 783 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 5 5 0 1 2 2 0 0 0 3
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.21 0 0 0

1 TC/CONC/20-21-/97 SSE/PWAY/MHQ 731 30.04.21 0 0 731

TC/CONC/20-21-/98
BG
SSE/PWAY//CNI 2112 30.04.21 0 0 0 10182 34182 53
SSE-PWAY/ADTP /KANDRA 0 7220
SER
ADRA DIV SSE/P-WAY/SONA @ BQA _ _ 0 0 12238
_
2 _ _ 0 0 0 OPEN LINE

TC/CON/BI/20-21/Con/112 DT-31.03.21 SSE/P-WAY/CON/KGP 6403 30.05.21 0 398 202 CONSTRUCTION


400919 5095
WIDER BASE 14841
TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021 SSE/P-WAY/CON/KGP 10000 15.06.21 508 3377 1360

508 3775 27079


STOCK OF RAW MATERIALS
5)INSERTS(T-381)
1)HTS WIRE = 178.850 MT 2)CEMENT(RLY)= 774.202 MT 3)CEMENT(PVT)= 196.460 MT 4)INSERTS(T-6901)= 185168 NOS. = 80145 NOS

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 10.05.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
producted as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2020 As on date Cumulative on date As on date month
During the year Cumulative MF REJ
month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 1256 6928 27273 422453 527547 3336 7111 30415 404255 12252 1149 2635 1759 170 233
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 496 2792 3800 37059 8180 0 7220 10182 34182 2792 0 0 53 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
dt-14.01.2019
E L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
R CR WIDER-15134NOS 15134 120 628 3948 12596 2538 0 0 3694 3694 1300 293 255 7036 4 14
BA WIDER-124 SET 124 6 19 83 83 41 0 0 0 0 35 48 0 0
GR WIDER-3138 3138 24 80 328 328 2810 0 0 0 0 144 184 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 16 351 0 0 0 0 276 5 13 0 47
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
1550 0 0 0 1550 0 0 0 484 1422 0 0 0 128
.
K B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 3 11 11 11 4 0 0 0 0 11 0 0 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 0 0 11314 43950 950 0 0 16195 30070 2016 784 1272 9759 18 31
P WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 0 0 1050 1050 0 0 0 3056 2 4
V
T
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 140 140 140 0 0 0 0
.
R
CR /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.21 140 0 0 0 140 0 0 30 140 140 0 0 0 0
I BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 2 2 2 0 0 0 0
T
E
T.O 1 in 8.5 22 0 0 20 22 0 0 0 5 5 0 0 0 17
S T.O 1 in 12 28 0 0 4 24 4 0 2 16 16 4 0 0 4
CR(RITES) 1800 48 224 792 1216 584 0 0 0 190 360 496 0 170
BG/TRIVENI 13520 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 17 10 0 0
OTHERS PVT. C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 0 0 12 172 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 300 1686 4180 0 0 0 783 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 5 5 0 1 2 2 0 0 0 3
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.21 0 0 0

1 TC/CONC/20-21-/97 SSE/PWAY/MHQ 731 30.04.21 0 0 731

TC/CONC/20-21-/98
BG
SSE/PWAY//CNI 2112 30.04.21 0 0 0 10182 34182 53
SSE-PWAY/ADTP /KANDRA 0 7220
SER
ADRA DIV SSE/P-WAY/SONA @ BQA _ _ 0 12238
_
2 SSE/P-WAY/noamundi _ _ 2950 0 2950 OPEN LINE

TC/CON/BI/20-21/Con/112 DT-31.03.21 SSE/P-WAY/CON/KGP 6403 30.05.21 202 600 0 CONSTRUCTION


404255 1759
WIDER BASE 15227
TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021 SSE/P-WAY/CON/KGP 10000 15.06.21 184 3561 1176

3336 4161 30415


STOCK OF RAW MATERIALS
5)INSERTS(T-381)
1)HTS WIRE = 162.080 MT 2)CEMENT(RLY)= 2040.440 MT 3)CEMENT(PVT)= 186.660 MT 4)INSERTS(T-6901)= 179544 NOS. = 77873 NOS

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 11.05.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
producted as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2020 As on date Cumulative on date As on date month
During the year Cumulative MF REJ
month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 1462 8390 28735 423915 526085 0 7111 30415 404255 12466 1387 3645 1759 170 233
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 448 3240 4248 37507 7732 0 7220 10182 34182 3240 0 0 53 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
dt-14.01.2019
E L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
R CR WIDER-15134NOS 15134 144 772 7092 12740 2394 0 0 3694 3694 1236 297 459 7036 4 14
BA WIDER-124 SET 124 3 22 86 86 38 0 0 0 0 32 54 0 0
GR WIDER-3138 3138 16 96 344 344 2794 0 0 0 0 136 200 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 16 351 0 0 0 0 276 5 13 0 47
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
1550 0 0 0 1550 0 0 0 484 1422 0 0 0 128
.
K B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 1 12 12 12 3 0 0 0 0 12 0 0 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 0 0 11314 43950 950 0 0 16195 30070 1272 938 1862 9759 18 31
P WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 4112 1638 0 0 1050 1050 0 0 0 3056 2 4
V
T
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 140 140 140 0 0 0 0
.
R
CR /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.21 140 0 0 0 140 0 0 30 140 140 0 0 0 0
I BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 2 2 2 0 0 0 0
T
E
T.O 1 in 8.5 22 0 0 20 22 0 1 1 6 6 0 0 0 16
S T.O 1 in 12 28 0 0 4 28 0 3 5 19 19 4 0 0 9
CR(RITES) 1800 48 272 840 1264 536 0 0 0 190 360 568 0 170
BG/TRIVENI 13520 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 17 10 0 0
OTHERS PVT. C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 0 0 12 172 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 300 1686 4180 0 0 0 783 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 10 0 0 1 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.21 0 0 0

1 TC/CONC/20-21-/97 SSE/PWAY/MHQ 731 30.04.21 0 0 731

TC/CONC/20-21-/98
BG
SSE/PWAY//CNI 2112 30.04.21 0 0 0 10182 34182 53
SSE-PWAY/ADTP /KANDRA 0 7220
SER
ADRA DIV SSE/P-WAY/SONA @ BQA _ _ 0 12238
_
2 SSE/P-WAY/noamundi _ _ 0 0 2950 OPEN LINE

TC/CON/BI/20-21/Con/112 DT-31.03.21 SSE/P-WAY/CON/KGP 6403 30.05.21 0 600 0 CONSTRUCTION


404255 1759
WIDER BASE 15227
TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021 SSE/P-WAY/CON/KGP 10000 15.06.21 0 3561 1176

0 4161 30415
STOCK OF RAW MATERIALS
5)INSERTS(T-381)
1)HTS WIRE = 144.280 MT 2)CEMENT(RLY)= 1920.020 MT 3)CEMENT(PVT)= 181.570 MT 4)INSERTS(T-6901)= 172912 NOS. = 75985 NOS

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 12.05.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
producted as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2020 As on date Cumulative on date As on date month
During the year Cumulative MF REJ
month year

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 1508 9898 30243 425423 524577 0 7111 30415 404255 12516 0 0 8244 172 236
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 456 3696 4704 37963 7276 0 7220 10182 34182 3696 0 0 53 12 20
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
dt-14.01.2019
E L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
R CR WIDER-15134NOS 15134 136 908 7228 12876 2258 0 0 3694 3694 1260 219 649 7036 4 14
BA WIDER-124 SET 124 3 25 89 89 35 0 0 0 0 33 56 0 0
GR WIDER-3138 3138 8 104 352 352 2786 0 0 0 0 136 208 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 16 351 0 0 0 0 276 5 13 0 47
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
1550 0 0 0 1550 0 0 0 484 1422 0 0 0 128
.
K B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 2 14 14 14 1 0 0 0 0 14 0 0 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 0 0 11314 43950 950 0 0 16195 30070 872 828 2372 9759 18 31
P WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 5755 0 120 120 1170 1170 0 0 0 4577 3 5
V
T
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 140 140 140 0 0 0 0
.
R
CR /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.21 140 0 0 0 140 0 0 30 140 140 0 0 0 0
I BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 2 2 2 0 0 0 0
T
E
T.O 1 in 8.5 22 0 0 20 22 0 0 1 6 6 0 0 0 16
S T.O 1 in 12 28 0 0 4 28 0 1 6 20 20 4 0 0 4
CR(RITES) 1800 24 296 864 1288 512 0 0 0 190 336 592 0 170
BG/TRIVENI 13520 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 17 10 0 0
OTHERS PVT. C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 0 0 12 172 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 300 1686 4180 0 0 0 783 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 10 0 0 1 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.21 0 0 0

1 TC/CONC/20-21-/97 SSE/PWAY/MHQ 731 30.04.21 0 0 731

TC/CONC/20-21-/98
BG
SSE/PWAY//CNI 2112 30.04.21 0 0 0 10182 34182 53
SSE-PWAY/ADTP /KANDRA 0 7220
SER
ADRA DIV SSE/P-WAY/SONA @ BQA _ _ 0 12238
_
2 SSE/P-WAY/noamundi _ _ 0 0 2950 OPEN LINE

TC/CON/BI/20-21/Con/112 DT-31.03.21 SSE/P-WAY/CON/KGP 6403 30.05.21 0 600 0 CONSTRUCTION


404255 1759
WIDER BASE 15227
TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021 SSE/P-WAY/CON/KGP 10000 15.06.21 0 3561 1176

0 4161 30415
STOCK OF RAW MATERIALS
5)INSERTS(T-381)
1)HTS WIRE = 126.120 MT 2)CEMENT(RLY)= 1972.440 MT 3)CEMENT(PVT)= 175.560 MT 4)INSERTS(T-6901)= 216160 NOS. = 73969 NOS

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 15.05.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
producted as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2020 As on date Cumulative on date As on date month
During the year Cumulative MF REJ
month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 408 4560 5568 38827 6412 0 7220 10182 34182 4152 0 0 53 12 20

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 990 12024 32369 427549 522451 3864 10975 34279 408119 11284 1848 1510 4680 172 236
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 15134 128 1140 7460 13108 2026 0 0 3694 3694 1164 332 0 7899 4 15
BA WIDER-124 SET 124 2 29 93 93 31 0 0 0 0 29 44 0 20
GR WIDER-3138 3138 8 120 368 368 2770 0 0 0 0 128 240 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 16 351 0 0 0 0 276 5 13 0 47
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
1550 0 0 0 1550 0 0 128 612 1550 0 0 0 0
.
K B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 0 15 15 15 0 0 0 0 0 15 0 0 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 0 0 11314 43950 950 359 359 359 30429 336 496 3240 12637 19 33
P WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 5755 0 90 426 1476 1476 0 0 0 4271 3 5
V
T
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 140 140 140 0 0 0 0
.
R
CR /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.21 140 0 0 0 140 0 0 30 140 140 0 0 0 0
I BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 2 2 2 0 0 0 0
T
E
T.O 1 in 8.5 22 0 0 20 22 0 0 1 6 6 0 0 0 16
S T.O 1 in 12 28 0 0 4 28 0 0 6 21 21 4 0 0 3
CR(RITES) 1800 24 368 936 1360 440 0 0 0 190 352 128 0 690
BG/TRIVENI 13520 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
DS/TRIVENI 2 1 2 2 2 0 0 0 0 0 2 0 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 17 10 0 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 0 0 12 172 0 367 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 400 1786 4280 0 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 10 0 0 1 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.21 0 0 0

1 TC/CONC/20-21-/97 SSE/PWAY/MHQ 731 30.04.21 0 0 731

TC/CONC/20-21-/98
BG
SSE/PWAY//CNI 2112 30.04.21 0 0 0 10182 34182 53
SSE-PWAY/ADTP /KANDRA 0 7220
SER
ADRA DIV SSE/P-WAY/SONA @ BQA _ _ 3864 3864 16102
_
2 SSE/P-WAY/noamundi _ _ 0 0 2950 OPEN LINE

TC/CON/BI/20-21/Con/112 DT-31.03.21 SSE/P-WAY/CON/KGP 6403 30.05.21 0 600 0 CONSTRUCTION


408119 4380
WIDER BASE 15227
TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021 SSE/P-WAY/CON/KGP 10000 15.06.21 0 3561 1176

0 8025 34279
STOCK OF RAW MATERIALS
5)INSERTS(T-381)
1)HTS WIRE = 97.840 MT 2)CEMENT(RLY)= 2984.880 MT 3)CEMENT(PVT)= 164.450 MT 4)INSERTS(T-6901)= 206472 NOS. = 70225 NOS

U-2 (3rd) Shift of yesterday not run as most of the people have been suffering from fever.

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 31.05.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
producted as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2020 As on date Cumulative on date As on date month
During the year Cumulative MF REJ
month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 4832 4906 38165 7074 0 7220 10182 34182 0 1330 0 2618 13 22

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 0 12902 33247 428427 521573 0 12215 35519 409359 0 3280 0 15368 177 243
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 15134 0 1204 7524 13172 1962 0 0 3694 3694 0 0 349 9108 5 16
BA WIDER-124 SET 124 0 31 95 95 29 0 0 0 0 0 75 0 20
GR WIDER-3138 3138 0 128 376 376 2762 0 0 0 0 0 376 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 16 351 0 0 0 0 276 0 18 0 47
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
1550 0 0 0 1550 0 0 128 612 1550 0 0 0 0
.
K B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 0 15 15 15 0 0 0 0 0 0 15 0 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 0 0 12248 44934 0 0 2164 2164 32234 0 0 0 12646 20 34
P WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 5755 0 0 890 1966 1966 0 0 0 3781 3 5
V
T
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 140 140 140 0 0 0 0
.
R
CR /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.21 140 0 0 0 140 0 0 30 140 140 0 0 0 0
I BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 2 2 2 0 0 0 0
T
E
T.O 1 in 8.5 22 0 0 20 22 0 0 1 6 6 0 0 0 16
S T.O 1 in 12 28 0 0 4 28 0 0 6 21 21 0 4 0 3
CR(RITES) 1800 0 408 976 1400 400 0 90 90 280 0 520 0 600
BG/TRIVENI 13520 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
DS/TRIVENI 2 0 2 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 0 17 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 90 90 90 0 184 0 269 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 400 1786 4280 0 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 10 0 0 1 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.21 0 0 0

1 TC/CONC/20-21-/97 SSE/PWAY/MHQ 731 30.04.21 0 0 731

TC/CONC/20-21-/98
BG
SSE/PWAY//CNI 2112 30.04.21 0 0 0 10182 34182 2618
SSE-PWAY/ADTP /KANDRA 0 7220
SER
ADRA DIV SSE/P-WAY/SONA @ BQA _ _ 0 8054 17342
_
2 SSE/P-WAY/noamundi _ _ 0 0 2950 OPEN LINE

TC/CON/BI/20-21/Con/112 DT-31.03.21 SSE/P-WAY/CON/KGP 6403 30.05.21 0 600 0 CONSTRUCTION


409359 15368
WIDER BASE 15227
TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021 SSE/P-WAY/CON/KGP 10000 15.06.21 0 3561 1176

0 12215 35519
STOCK OF RAW MATERIALS
5)INSERTS(T-381)
1)HTS WIRE = 178.910 MT 2)CEMENT(RLY)= 1913.800 MT 3)CEMENT(PVT)= 160.070 MT 4)INSERTS(T-6901)= 202576 NOS. = 69041 NOS

NO PRODUCTION DUE TO LOOK DOWN

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 04.06.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
producted as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2020 As on date Cumulative on date As on date month
During the year Cumulative MF REJ
month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 0 0 4906 38165 7074 0 0 10182 34182 0 1330 0 2618 13 22

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 326 326 33573 428753 521247 0 0 35519 409359 326 3280 0 15368 177 243
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 15134 0 0 7524 13172 1962 0 0 3694 3694 0 0 349 9108 5 16
BA WIDER-124 SET 124 0 0 95 95 29 0 0 0 0 0 75 0 20
GR WIDER-3138 3138 0 0 376 376 2762 0 0 0 0 0 376 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 0 16 351 0 0 0 0 276 0 18 0 47
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
1550 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 0 0 15 15 0 0 0 0 0 0 15 0 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 0 0 12248 44934 0 0 0 2164 32234 0 0 0 12646 20 34
P WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 5755 0 0 0 1966 1966 0 0 0 3781 3 5
V
T
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 0 140 140 0 0 0 0
.
R
CR /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.21 140 0 0 0 140 0 0 0 140 140 0 0 0 0
I BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
T
E
T.O 1 in 8.5 22 0 0 20 22 0 0 0 6 6 0 0 0 16
S T.O 1 in 12 28 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 1800 0 0 976 1400 400 0 0 90 280 0 520 0 600
BG/TRIVENI 13520 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 0 17 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 90 90 0 184 0 269 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 0 1786 4280 0 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 10 0 0 0 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.21 0 0 0

1 TC/CONC/20-21-/97 SSE/PWAY/MHQ 731 30.04.21 0 0 731

TC/CONC/20-21-/98
BG
SSE/PWAY//CNI 2112 30.04.21 0 0 0 10182 34182 2618
SSE-PWAY/ADTP /KANDRA 0 0
SER
ADRA DIV SSE/P-WAY/SONA @ BQA _ _ 0 0 17342
_
2 SSE/P-WAY/noamundi _ _ 0 0 2950 OPEN LINE

TC/CON/BI/20-21/Con/112 DT-31.03.21 SSE/P-WAY/CON/KGP 6403 30.05.21 0 0 0 CONSTRUCTION


409359 15368
WIDER BASE 15227
TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021 SSE/P-WAY/CON/KGP 10000 15.06.21 0 0 1176

0 0 35519
STOCK OF RAW MATERIALS
5)INSERTS(T-381)
1)HTS WIRE = 208.340 MT 2)CEMENT(RLY)= 1893.610 MT 3)CEMENT(PVT)= 160.070 MT 4)INSERTS(T-6901)= 201272 NOS. = 69041 NOS

NO PRODUCTION IN UNIT 1 DUE TO LOCK DOWN

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 05.06.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
producted as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2020 As on date Cumulative on date As on date month
During the year Cumulative MF REJ
month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 128 128 5034 38293 6946 0 0 10182 34182 128 194 0 3753 13 23

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 1062 1388 34635 429815 520185 0 0 35519 409359 1388 136 0 18509 178 245
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 15134 32 32 7556 13204 1930 0 0 3694 3694 32 53 0 9404 5 16
BA WIDER-124 SET 124 4 4 99 99 25 0 0 0 0 4 75 0 20
GR WIDER-3138 3138 16 16 392 392 2746 0 0 0 0 16 376 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 0 16 351 0 0 0 0 276 0 18 0 47
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
1550 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 15 15 0 0 0 0 0 0 0 15 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 0 0 12248 44934 0 0 0 2164 32234 0 0 0 12646 20 34
P WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 5755 0 0 0 1966 1966 0 0 0 3781 3 5
V
T
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 0 140 140 0 0 0 0
.
R
CR /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.21 140 0 0 0 140 0 0 0 140 140 0 0 0 0
I BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
T
E
T.O 1 in 8.5 22 0 0 20 22 0 0 0 6 6 0 0 0 16
S T.O 1 in 12 28 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 1800 16 16 992 1416 384 0 0 90 280 16 520 0 600
BG/TRIVENI 13520 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 0 17 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 90 90 0 184 0 269 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 0 1786 4280 0 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 10 0 0 0 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 SSE/PWAY/VAA 850 30.04.21 0 0 0

1 TC/CONC/20-21-/97 SSE/PWAY/MHQ 731 30.04.21 0 0 731

TC/CONC/20-21-/98
BG
SSE/PWAY//CNI 2112 30.04.21 0 0 0 10182 34182 2618
SSE-PWAY/ADTP /KANDRA 0 0
SER
ADRA DIV SSE/P-WAY/SONA @ BQA _ _ 0 0 17342
_
2 SSE/P-WAY/noamundi _ _ 0 0 2950 OPEN LINE

TC/CON/BI/20-21/Con/112 DT-31.03.21 SSE/P-WAY/CON/KGP 6403 30.05.21 0 0 0 CONSTRUCTION


409359 15368
WIDER BASE 15227
TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021
SSE/P-WAY/CON/KGP 10000 15.06.21 0 0 1176

0 0 35519
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 197.360MT 2)CEMENT(RLY)= 1820.260MT 3)CEMENT(PVT)= 154.420MT 4)INSERTS(T-6901)= 196640NOS. 68337NOS
381) =

NO PRODUCTION IN UNIT 1 DUE TO LOCK DOWN

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 07.06.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
producted as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2020 As on date Cumulative on date As on date month
During the year Cumulative MF REJ
month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005 18.07.2021 45239 288 416 5322 38581 6658 0 0 10182 34182 416 194 0 3753 13 23

CS-172,WIDER BASE/950000 NOS 30.09.2021 868548 1192 2580 35827 431007 518993 0 0 35519 409359 2580 136 0 18509 178 245
SEJ(OL) ,CE/TP/SER/2018/006/B/10031 29.02.2020 310+93 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 58 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 120 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 3562 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 15134 32 104 7628 13276 1858 0 0 3694 3694 104 53 0 9404 5 16
BA WIDER-124 SET 124 8 12 107 107 17 0 0 0 0 12 75 0 20
GR WIDER-3138 3138 16 32 408 408 2730 0 0 0 0 32 376 0 0
1in12 T/OUT(SER/CON)/104 SETS 98 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 61 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL) 351SETS 0 0 16 351 0 0 0 0 276 0 18 0 47
B.G/RVNL/38000 NOS 14770 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 950 0 0 0 950 0 0 0 0 580 0 0 370 0
V P&C (1 in 12)/RVNL (KEC) 80 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
1550 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 22 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 38 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 140 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 15 15 0 0 0 0 0 0 0 15 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 44900 0 0 12248 44934 0 0 0 2164 32234 0 0 0 12646 20 34
P WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 5750 0 0 0 5755 0 0 0 1966 1966 0 0 0 3781 3 5
V
T
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 140 0 0 0 140 0 0 0 140 140 0 0 0 0
.
R
CR /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.21 140 0 0 0 140 0 0 0 140 140 0 0 0 0
I BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
T
E
T.O 1 in 8.5 22 0 0 20 22 0 0 0 6 6 0 0 0 16
S T.O 1 in 12 28 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 1800 32 48 1024 1448 352 0 0 90 280 48 520 0 600
BG/TRIVENI 13520 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 0 17 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 90 90 0 184 0 269 0 1
BG/MALHOTRA 6000 0 0 0 4968 1032 0 0 1786 4280 0 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 10 0 0 0 10 0 0 0 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 2618
0 0 0
SER
TOTAL DESPATCH 0 0 0
ADRA DIV _ _ 0 0 17342
_
2 _ _ 0 0 2950 OPEN LINE

0 0 0 CONSTRUCTION
409359 15368
TC/CON/BI/21-22/Con/116 DT-
WB 15227
3 08.04.2021 SSE/P-WAY/CON/KGP 10000 15.06.21 0 0 1176
TOTAL DESPATCH 0 0 35519
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 183.090MT 2)CEMENT(RLY)= 1724.680MT 3)CEMENT(PVT)= 147.880MT 4)INSERTS(T-6901)= 191136NOS. 66993NOS
381) =

NO PRODUCTION IN UNIT 1(2 SHIFT) DUE TO LOCK DOWN

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 08.06.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2021 As on date Cumulative on date As on date month
During the year Cumulative MF REJ
month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
18.07.2021 11980 136 552 5458 38717 652`2 0 0 10182 34182 552 194 0 3753 13 23

CS-172,WIDER BASE/950000 NOS 30.09.2021 556844 1308 3816 37135 432315 517685 0 0 35519 409359 3816 136 0 18509 178 245
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 -120 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 48 152 7676 13324 1810 0 0 3694 3694 152 53 0 9404 5 16
BA WIDER-124 SET 13 4 16 111 111 13 0 0 0 0 16 75 0 20
GR WIDER-3138 3138 32 64 440 440 2698 0 0 0 0 64 376 0 0
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 0 276 0 18 0 47
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 0 580 0 0 370 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 15 15 0 0 0 0 0 0 0 15 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 2164 32234 0 0 0 12646 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 1966 1966 0 0 0 3781 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 8 56 1032 1456 344 0 0 90 280 56 520 0 600
BG/TRIVENI 4216 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 0 17 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 90 90 0 184 0 269 0 1
BG/MALHOTRA 1032 0 0 0 4968 -3936 0 0 1786 4280 0 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 2618
0 0 0
SER
TOTAL DESPATCH 0 0 0
ADRA DIV _ _ 0 0 17342
_
2 _ _ 0 0 2950 OPEN LINE

0 0 0 CONSTRUCTION
409359 15368
TC/CON/BI/21-22/Con/116 DT-
WB 15227
3 08.04.2021
SSE/P-WAY/CON/KGP 10000 15.06.21 0 0 1176
TOTAL DESPATCH 0 0 35519
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 170.260 2)CEMENT(RLY)= 1638.830MT 3)CEMENT(PVT)= 142.670MT 4)INSERTS(T-6901)= 185568NOS. 66257NOS
381) =

NO PRODUCTION IN UNIT 1(2 SHIFT) DUE TO LOCK DOWN

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 09.06.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
rest on 01.04.2021 As on date Cumulative on date As on date month
During the year Cumulative MF REJ
month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
18.07.2021 11980 152 704 5610 38869 6370 0 0 10182 34182 704 194 0 3753 13 23

CS-172,WIDER BASE/950000 NOS 30.09.2021 556844 1296 5184 38431 433611 516389 0 0 35519 409359 5184 136 0 18509 178 245
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 -120 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 24 176 7700 13348 1786 0 0 3694 3694 176 53 0 9404 5 16
BA WIDER-124 SET 13 2 18 113 113 11 0 0 0 0 18 75 0 20
GR WIDER-3138 3138 16 80 456 456 2682 0 0 0 0 80 376 0 0
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 0 276 0 18 0 47
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 0 580 0 0 370 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 0 0 15 15 0 0 0 0 0 0 0 15 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 2164 32234 0 0 0 12646 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 1966 1966 0 0 0 3781 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 16 72 1048 1472 328 0 0 90 280 72 520 0 600
BG/TRIVENI 4216 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 0 17 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 90 90 0 184 0 269 0 1
BG/MALHOTRA 1032 0 0 0 4968 -3936 0 0 1786 4280 0 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANIS
ATION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 2618
0 0 0
SER
TOTAL DESPATCH 0 0 0
ADRA DIV _ _ 0 0 17342
_
2 _ _ 0 0 2950 OPEN LINE

0 0 0 CONSTRUCTION

15227 409359 15368


3
TC/CON/BI/21-22/Con/116 DT- WB SSE/P-WAY/CON/KGP 10000 15.06.21 0 0 1176
08.04.2021

TOTAL DESPATCH 0 0 35519


STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE =157.160 2)CEMENT(RLY)= 1550.450MT 3)CEMENT(PVT)= 137.030MT 4)INSERTS(T-6901)= 179968NOS. 65457NOS
381) =

NO PRODUCTION IN UNIT 1(2 SHIFT) DUE TO LOCK DOWN

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 10.06.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
on 01.04.2021 As on date Cumulative on date As on date month
During the year Cumulative MF REJ
month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
18.07.2021 11980 136 840 5746 39005 6234 0 0 10182 34182 840 194 0 3753 13 23

CS-172,WIDER BASE/950000 NOS 30.09.2021 556844 1244 6428 39675 434855 515145 0 0 35519 409359 6428 136 0 18509 178 245
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 48 224 4748 13396 1738 0 0 3694 3694 224 53 0 9404 5 16
BA WIDER-124 SET 124 4 22 117 117 7 0 0 0 0 22 75 0 20
GR WIDER-3138 3138 32 112 488 488 2650 0 0 0 0 112 376 0 0
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 1 1 1 277 0 18 0 46
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 0 580 0 0 370 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 0 0 15 15 0 0 0 0 0 0 0 15 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 2164 32234 0 0 0 12646 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 1966 1966 0 0 0 3781 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 16 88 648 1488 312 0 0 90 280 88 520 0 600
BG/TRIVENI 4216 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 0 17 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 90 90 0 184 0 269 0 1
BG/MALHOTRA 1032 0 0 0 4968 1032 0 0 1786 4280 0 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 2618
0 0 0
SER
TOTAL DESPATCH 0 0 0
ADRA DIV _ _ 0 0 17342
_
2 _ _ 0 0 2950 OPEN LINE

0 0 0 CONSTRUCTION

15227 409359 15368


3
TC/CON/BI/21-22/Con/116 DT- WB SSE/P-WAY/CON/KGP 10000 15.06.21 0 0 1176
08.04.2021

TOTAL DESPATCH 0 0 35519


ECR-OL 4 12/2020-21 P&C 1IN12 SSE/PWAY/ARA 4 21.06.21 1 1 3 1 277 46 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE = 144.720 2)CEMENT(RLY)= 1464.570MT 3)CEMENT(PVT)= 132.760MT 4)INSERTS(T-6901)= 174496NOS. 64817NOS
381) =

NO PRODUCTION IN UNIT 1(2 SHIFT) DUE TO LOCK DOWN

144.72364 64817 174496

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 11.06.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
on 01.04.2021 As on date Cumulative on date As on date month
During the year Cumulative MF REJ
month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
18.07.2021 11980 168 1008 5914 39173 6066 0 0 10182 34182 1008 194 0 3753 13 23

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1046 7474 40721 435901 514099 0 0 35519 409359 7474 136 0 18509 178 245
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 24 248 4772 13420 1714 0 0 3694 3694 248 53 0 9404 5 16
BA WIDER-124 SET 124 4 26 121 121 3 0 0 0 0 26 75 0 20
GR WIDER-3138 3138 32 144 520 520 2618 0 0 0 0 144 376 0 0
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 1 2 2 278 0 18 0 45
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 0 580 0 0 370 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 0 0 15 15 0 0 0 0 0 0 0 15 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 2164 32234 0 0 0 12646 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 1966 1966 0 0 0 3781 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 24 112 1088 1512 288 0 0 90 280 112 520 0 600
BG/TRIVENI 4216 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 0 17 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 90 90 0 184 0 269 0 1
BG/MALHOTRA 1032 0 0 0 4968 1032 0 0 1786 4280 0 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 2618
0 0 0
SER
TOTAL DESPATCH 0 0 0
ADRA DIV _ _ 0 0 17342
_
2 _ _ 0 0 2950 OPEN LINE

0 0 0 CONSTRUCTION

15227 409359 15368


3
TC/CON/BI/21-22/Con/116 DT- WB SSE/P-WAY/CON/KGP 10000 15.06.21 0 0 1176
08.04.2021

TOTAL DESPATCH 0 0 35519


ECR-OL 4 12/2020-21 P&C 1IN12 SSE/PWAY/ARA 4 21.06.21 1 2 2 2 278 45 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE = 133.480 2)CEMENT(RLY)= 1390.740MT 3)CEMENT(PVT)= 128.100MT 4)INSERTS(T-6901)= 169912NOS. 63953NOS
381) =

NO PRODUCTION IN UNIT 1(2 SHIFT) DUE TO LOCK DOWN

133.48718 63953 169912

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 12.06.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
on 01.04.2021 As on date Cumulative on date As on date month
During the year Cumulative MF REJ
month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
18.07.2021 11980 112 1120 6026 39285 5954 0 0 10182 34182 1120 194 0 3753 13 23

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1164 8638 41885 437065 512935 0 0 35519 409359 8638 136 0 18509 178 245
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 40 288 4812 13460 1674 0 0 3694 3694 288 53 0 9404 5 16
BA WIDER-124 SET 124 3 29 124 124 3 0 0 0 0 29 75 0 20
GR WIDER-3138 3138 16 158 536 536 2602 0 0 0 0 158 376 0 0
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 2 2 278 0 18 0 45
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 0 580 0 0 370 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 0 0 15 15 0 0 0 0 0 0 0 15 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 2164 32234 0 0 0 12646 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 1966 1966 0 0 0 3781 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 16 128 1104 1528 272 0 0 90 280 128 520 0 600
BG/TRIVENI 4216 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 0 17 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 90 90 0 184 0 269 0 1
BG/MALHOTRA 1032 0 0 0 4968 1032 0 0 1786 4280 0 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 2618
0 0 0
SER
TOTAL DESPATCH 0 0 0
ADRA DIV _ _ 0 0 17342
_
2 _ _ 0 0 2950 OPEN LINE

0 0 0 CONSTRUCTION

15227 409359 15368


3
TC/CON/BI/21-22/Con/116 DT- WB SSE/P-WAY/CON/KGP 10000 15.06.21 0 0 1176
08.04.2021

TOTAL DESPATCH 0 0 35519


ECR-OL 4 12/2020-21 P&C 1IN12 SSE/PWAY/ARA 4 21.06.21 0 2 2 2 278 45 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE = 122.300 2)CEMENT(RLY)= 1311.440MT 3)CEMENT(PVT)= 124.830MT 4)INSERTS(T-6901)= 164968NOS. 63409NOS
381) =

NO PRODUCTION IN UNIT 1(2 SHIFT) DUE TO LOCK DOWN

133.48718 63953 169912

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 14.06.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
on 01.04.2021 As on date Cumulative on date As on date During the year Cumulative MF REJ
month year month

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
18.07.2021 11980 312 1432 6332 39597 5642 0 0 10182 34182 1432 194 0 3753 13 23

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1308 9946 43193 438373 511627 1570 1570 37089 410929 9946 136 0 16939 178 245
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 64 352 4876 13524 1610 0 0 3694 3694 352 53 0 9404 5 16
BA WIDER-124 SET 124 0 29 124 124 0 0 0 0 0 29 75 0 20
GR WIDER-3138 3138 48 206 584 584 2554 0 0 0 0 206 376 0 0
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
BA WIDER-48 SET 48 6 6 6 6 42 0 0 0 0 6 0 0 0
SER CON
DS/TRAP 18 2 14 14 14 4 0 0 0 0 14 0 0 0
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 2 2 278 0 18 0 45
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 0 580 0 0 370 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 0 0 15 15 0 0 0 0 0 0 0 15 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 2164 32234 0 0 0 12646 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 1966 1966 0 0 0 3781 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 24 152 1128 1552 248 0 0 90 280 152 520 0 600
BG/TRIVENI 4216 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 0 17 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 90 90 0 184 0 269 0 1
BG/MALHOTRA 1032 0 0 0 4968 1032 0 0 1786 4280 0 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 2618
0 0 0
SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/SONA _ _ 1570 1570
_ 21862
2 _ _ 0 0 OPEN LINE

0 0 0 CONSTRUCTION

15227 410929 16939


3 TC/CON/BI/21-22/Con/116 DT- WB SSE/P-WAY/CON/KGP 10000 15.06.21 0 0 1176
08.04.2021

TOTAL DESPATCH 0 1570 37089


ECR-OL 4 12/2020-21 P&C 1IN12 SSE/PWAY/ARA 4 21.06.21 0 2 2 2 278 45 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =191.170 2)CEMENT(RLY)= 1145.110MT 3)CEMENT(PVT)= 157.410MT 4)INSERTS(T-6901)= 159024NOS. 60817NOS
381) =

NO PRODUCTION IN UNIT 1(2 SHIFT) DUE TO LOCK DOWN

133.48718 63953 169912

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 15.06.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
on 01.04.2021 As on date Cumulative on date As on date During the year Cumulative MF REJ
month year month

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
18.07.2021 11980 176 1608 6508 39773 5466 0 0 10182 34182 1608 194 0 3753 13 23

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1392 11338 44585 439765 510235 0 1570 37089 410929 11338 136 0 16939 178 245
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 32 384 4908 13556 1578 0 0 3694 3694 384 53 0 9404 5 16
BA WIDER-124 SET 124 0 29 124 124 0 0 0 0 0 29 75 0 20
GR WIDER-3138 3138 60 266 644 644 2494 0 0 0 0 244 400 0 0
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
BA WIDER-48 SET 48 4 10 10 10 38 0 0 0 0 10 0 0 0
SER CON
DS/TRAP 18 1 15 15 15 3 0 0 0 0 15 0 0 0
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 2 2 278 0 18 0 45
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 0 580 0 0 370 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 0 0 15 15 0 0 0 0 0 0 0 15 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 2164 32234 0 0 0 12646 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 1966 1966 0 0 0 3781 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 152 1128 1552 248 0 0 90 280 152 520 0 600
BG/TRIVENI 4216 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 0 17 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 90 90 0 184 0 269 0 1
BG/MALHOTRA 1032 0 0 0 4968 1032 0 0 1786 4280 0 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 2618
0 0 0
SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/SONA _ _ 0 1570
_ 21862
2 _ _ 0 0 OPEN LINE

0 0 0 CONSTRUCTION

15227 410929 16939


3 TC/CON/BI/21-22/Con/116 DT- WB SSE/P-WAY/CON/KGP 10000 15.06.21 0 0 1176
08.04.2021

TOTAL DESPATCH 0 1570 37089


ECR-OL 4 12/2020-21 P&C 1IN12 SSE/PWAY/ARA 4 21.06.21 0 2 2 2 278 45 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =203.240 2)CEMENT(RLY)= 1046.190MT 3)CEMENT(PVT)= 157.410MT 4)INSERTS(T-6901)= 152960NOS. 60017NOS
381) =

NO PRODUCTION IN UNIT 1(2 SHIFT) DUE TO LOCK DOWN

133.48718 63953 169912

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 16.06.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
on 01.04.2021 As on date Cumulative on date As on date During the year Cumulative MF REJ
month year month

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
18.07.2021 11980 216 1834 6724 39989 5250 0 0 10182 34182 1824 194 0 3753 13 23

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1434 12772 46019 441199 508801 0 1570 37089 410929 12772 136 0 16939 178 245
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 64 448 4972 13620 1514 0 0 3694 3694 448 53 0 9404 5 16
BA WIDER-124 SET 124 0 29 124 124 0 0 0 0 0 29 75 0 20
GR WIDER-3138 3138 16 282 660 660 2478 0 0 0 0 260 0 0 400
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 0 0 0 0 0 846
BA WIDER-48 SET 48 2 12 12 12 36 0 0 0 0 12 0 0 0
SER CON
DS/TRAP 18 2 17 17 17 1 0 0 0 0 17 0 0 0
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 2 2 278 0 18 0 45
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 122 122 122 702 0 0 0 248
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 0 0 15 15 0 0 0 0 0 0 0 15 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 2164 32234 0 0 0 12646 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 1966 1966 0 0 0 3781 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 48 200 1176 1600 200 0 0 90 280 200 0 0 1136
BG/TRIVENI 4216 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 0 17 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 90 90 0 0 0 461 0 1
BG/MALHOTRA 1032 0 0 0 4968 1032 0 0 1786 4280 0 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 2618
0 0 0
SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/SONA _ _ 0 1570
_ 21862
2 _ _ 0 0 OPEN LINE

0 0 0 CONSTRUCTION

15227 410929 16939


3
TC/CON/BI/21-22/Con/116 DT- WB SSE/P-WAY/CON/KGP 10000 15.06.21 0 0 1176
08.04.2021

TOTAL DESPATCH 0 1570 37089


ECR-OL 4 12/2020-21 P&C 1IN12 SSE/PWAY/ARA 4 21.06.21 0 2 2 2 278 45 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =224.140 2)CEMENT(RLY)= 939.590MT 3)CEMENT(PVT)= 154.770MT 4)INSERTS(T-6901)= 146840NOS. 58961NOS
381) =

NO PRODUCTION IN UNIT 1(2 SHIFT) DUE TO LOCK DOWN

133.48718 63953 169912

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 17.06.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
on 01.04.2021 As on date Cumulative on date As on date During the year Cumulative MF REJ
month year month

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
18.07.2021 11980 344 2168 7068 40333 4906 0 0 10182 34182 2168 194 0 3753 13 23

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1206 13978 47225 442405 507595 0 1570 37089 410929 13978 136 0 16939 178 245
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 56 504 5028 13676 1458 0 0 3694 3694 504 53 0 9404 5 16
BA WIDER-124 SET 124 0 29 124 124 0 0 0 0 0 29 75 0 20
GR WIDER-3138 3138 24 306 684 684 2454 0 0 0 0 284 0 0 400
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 0 0 0 0 0 846
BA WIDER-48 SET 48 3 15 15 15 33 0 0 0 0 15 0 0 0
SER CON
DS/TRAP 18 1 18 18 18 1 0 0 0 0 18 0 0 0
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 2 2 278 0 18 0 45
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 122 122 122 702 0 0 0 248
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 0 0 15 15 0 0 0 0 0 0 0 15 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 2164 32234 0 0 0 12646 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 1966 1966 0 0 0 3781 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 24 224 1200 1624 176 0 0 90 280 224 0 0 1136
BG/TRIVENI 4216 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 0 17 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 90 90 0 0 0 461 0 1
BG/MALHOTRA 1032 0 0 0 4968 1032 0 0 1786 4280 0 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 2618
0 0 0
SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/SONA _ _ 0 1570
_ 21862
2 _ _ 0 0 OPEN LINE

0 0 0 CONSTRUCTION

15227 410929 16939


3
TC/CON/BI/21-22/Con/116 DT- WB SSE/P-WAY/CON/KGP 10000 15.06.21 0 0 1176
08.04.2021

TOTAL DESPATCH 0 1570 37089


ECR-OL 4 12/2020-21 P&C 1IN12 SSE/PWAY/ARA 4 21.06.21 0 2 2 2 278 45 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =210.230 2)CEMENT(RLY)= 842.970MT 3)CEMENT(PVT)= 153.460MT 4)INSERTS(T-6901)= 141600NOS. 57489NOS
381) =

133.48718 63953 169912

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 18.06.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
on 01.04.2021 As on date Cumulative on date As on date During the year Cumulative MF REJ
month year month

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
18.07.2021 11980 392 2560 7460 40725 4514 0 0 10182 34182 2560 194 0 3753 13 23

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1276 15254 48501 443681 506319 0 1570 37089 410929 15254 136 0 16939 178 245
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 80 584 5108 13756 1378 0 0 3694 3694 584 53 0 9404 5 16
BA WIDER-124 SET 124 0 29 124 124 0 0 0 0 0 29 75 0 20
GR WIDER-3138 3138 24 330 708 708 2430 0 0 0 0 308 0 0 400
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 0 0 0 0 0 846
BA WIDER-48 SET 48 3 18 18 18 30 0 0 0 0 18 0 0 0
SER CON
DS/TRAP 18 0 18 18 18 1 0 0 0 0 18 0 0 0
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 2 4 4 280 0 18 0 43
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 122 122 122 702 0 0 0 248
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 0 0 15 15 0 0 0 0 0 0 0 15 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 2164 32234 0 0 0 12646 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 1966 1966 0 0 0 3781 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 24 248 1224 1648 152 0 0 90 280 248 0 0 1136
BG/TRIVENI 4216 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 0 17 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 90 90 0 0 0 461 0 1
BG/MALHOTRA 1032 0 0 0 4968 1032 0 0 1786 4280 0 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 2618
0 0 0
SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/SONA _ _ 0 1570
_ 21862
2 _ _ 0 0 OPEN LINE

0 0 0 CONSTRUCTION

15227 410929 16939


3
TC/CON/BI/21-22/Con/116 DT- WB SSE/P-WAY/CON/KGP 10000 15.06.21 0 0 1176
08.04.2021

TOTAL DESPATCH 0 1570 37089


ECR-OL 4 12/2020-21 P&C 1IN12 SSE/PWAY/ARA 4 21.06.21 2 4 0 4 280 43 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =195.390 2)CEMENT(RLY)= 740.630MT 3)CEMENT(PVT)= 152.140MT 4)INSERTS(T-6901)= 135972NOS. 55921NOS
381) =

133.48718 63953 169912

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 19.06.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
on 01.04.2021 As on date Cumulative on date As on date During the year Cumulative MF REJ
month year month

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
18.07.2021 11980 384 2944 7844 41109 4130 0 0 10182 34182 2944 194 0 3753 13 23

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1246 16500 49747 444927 505073 0 1570 37089 410929 16174 462 0 16939 178 245
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 72 656 5180 13828 1306 0 0 3694 3694 656 53 0 9404 5 16
BA WIDER-124 SET 124 0 29 124 124 0 0 0 0 0 29 75 0 20
GR WIDER-3138 3138 32 362 740 740 2398 0 0 0 0 340 0 0 400
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 0 0 0 0 0 846
BA WIDER-48 SET 48 4 22 22 22 26 0 0 0 0 22 0 0 0
SER CON
DS/TRAP 18 0 18 18 18 1 0 0 0 0 18 0 0 0
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 2 4 4 280 0 18 0 43
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 122 122 122 702 0 0 0 248
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 0 0 15 15 0 0 0 0 0 0 0 15 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 2164 32234 0 0 0 12646 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 1966 1966 0 0 0 3781 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 48 296 1272 1696 104 0 0 90 280 296 0 0 1136
BG/TRIVENI 4216 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 0 17 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 90 90 0 0 0 461 0 1
BG/MALHOTRA 1032 0 0 0 4968 1032 0 0 1786 4280 0 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 2618
0 0 0
SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/SONA _ _ 0 1570
_ 21862
2 _ _ 0 0 OPEN LINE

0 0 0 CONSTRUCTION

15227 410929 16939


3
TC/CON/BI/21-22/Con/116 DT- WB SSE/P-WAY/CON/KGP 10000 15.06.21 0 0 1176
08.04.2021

TOTAL DESPATCH 0 1570 37089


ECR-OL 4 12/2020-21 P&C 1IN12 SSE/PWAY/ARA 4 21.06.21 0 4 0 4 280 43 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =213.360 2)CEMENT(RLY)= 638.610MT 3)CEMENT(PVT)= 149.519MT 4)INSERTS(T-6901)= 130428NOS. 54284NOS
381) =

133.48718 63953 169912

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 22.06.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
on 01.04.2021 As on date Cumulative on date As on date During the year Cumulative MF REJ
month year month

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
18.07.2021 11980 0 2944 7844 41109 4130 0 0 10182 34182 2528 610 0 3753 13 23

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1350 19022 52269 447449 502551 0 5788 41307 415147 16442 2196 520 12721 178 245
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 104 824 5348 13996 1138 0 0 3694 3694 720 157 0 9404 5 16
BA WIDER-124 SET 124 0 29 124 124 0 0 0 0 0 29 75 0 20
GR WIDER-3138 3138 32 410 820 820 2318 0 0 0 0 388 32 0 400
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 0 0 0 0 0 846
BA WIDER-48 SET 48 4 28 28 28 20 0 0 0 0 28 0 0 0
SER CON
DS/TRAP 18 0 18 18 18 1 0 0 0 0 18 0 0 0
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 2 4 4 280 0 18 0 43
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 122 122 122 702 0 0 0 248
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 0 0 15 15 0 0 0 0 0 0 0 15 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 2164 32234 0 0 0 12646 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 1966 1966 0 0 0 3781 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 40 384 1360 1784 16 0 0 90 280 320 48 0 1136
BG/TRIVENI 4216 0 0 0 9120 4216 0 0 720 8476 0 0 0 633 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 0 17 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 90 90 0 0 0 461 0 1
BG/MALHOTRA 1032 368 840 840 5808 192 0 0 1786 4280 840 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 2618
0 0 0
SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/MURI- II _ 4218 5788
_ 26080
2 _ _ 0 0 OPEN LINE

0 0 0 CONSTRUCTION

15227 415147 12721


3
TC/CON/BI/21-22/Con/116 DT- WB SSE/P-WAY/CON/KGP 10000 15.06.21 0 0 1176
08.04.2021

TOTAL DESPATCH 0 5788 41307


ECR-OL 4 12/2020-21 P&C 1IN12 SSE/PWAY/ARA 4 21.06.21 0 4 0 4 280 43
ECR OL
ECR-OL 5 02/2021-22 SEJ SSE/PWAY/TD DHN 9 22.07.21 9 9 0 16 1271 0

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =182.260 2)CEMENT(RLY)= 468.900MT 3)CEMENT(PVT)= 101.160MT 4)INSERTS(T-6901)= 119284NOS. 50641NOS
381) =

SER/
4 B.A _ _ 0 0 _ 79 SETS NIL
O.L.
ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 23.06.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
on 01.04.2021 As on date Cumulative on date As on date During the year Cumulative MF REJ
month year month

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
18.07.2021 11980 0 2944 7844 41109 4130 0 0 10182 34182 2040 1098 0 3753 13 23

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1278 20300 53547 448727 501273 90 5878 41397 415237 16492 2544 1400 12631 178 245
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 64 888 5412 14060 1074 0 0 3694 3694 756 185 0 9404 5 16
BA WIDER-124 SET 124 0 29 124 124 0 0 0 0 0 29 75 0 20
GR WIDER-3138 3138 16 426 836 836 2302 0 0 0 0 396 40 0 400
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 0 0 0 0 0 846
BA WIDER-48 SET 48 2 30 30 30 18 0 0 0 0 30 0 0 0
SER CON
DS/TRAP 18 0 18 18 18 1 0 0 0 0 18 0 0 0
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 2 4 4 280 0 18 0 43
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 122 122 122 702 0 0 0 248
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 0 0 15 15 0 0 0 0 0 0 0 15 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 2164 32234 0 0 0 12646 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 1966 1966 0 0 0 3781 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 16 400 1376 1800 0 0 0 90 280 312 72 0 1136
BG/TRIVENI 4216 160 160 160 9280 4116 0 0 720 8476 160 0 0 633 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 0 17 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 90 90 0 0 0 461 0 1
BG/MALHOTRA 1032 192 1032 1032 6000 0 0 0 1786 4280 1032 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 2618
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/MURI- II _ 0 5788
_ 26080
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
SSE/P-WAY/CON/RNC1 10000 15.09.20
22.06.2020

TC/CON/BI/21-22/Con/159 DT-
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 90 90 2680 CONSTRUCTION
22.06.2021
15317 415237 12631
TC/CON/BI/21-22/Con/158 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21
22.06.2022

TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021
SSE/P-WAY/CON/KGP 10000 15.06.21 0 0 1176
TOTAL DESPATCH 90 5878 41397
ECR-OL 4 12/2020-21 P&C 1IN12 SSE/PWAY/ARA 4 21.06.21 0 4 0 4 280 43
ECR OL
ECR-OL 5 02/2021-22 SEJ SSE/PWAY/TD DHN 9 22.07.21 0 9 0 16 1271 0

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =168.150 2)CEMENT(RLY)= 389.570MT 3)CEMENT(PVT)= 80.200MT 4)INSERTS(T-6901)= 113980NOS. 49137NOS
381) =

SER/
4 B.A _ _ 0 0 _ 79 SETS NIL
O.L.
ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 24.06.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
on 01.04.2021 As on date Cumulative on date As on date During the year Cumulative MF REJ
month year month

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
18.07.2021 11980 0 2944 7844 41109 4130 0 0 10182 34182 1888 402 848 3753 13 23

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1246 21546 54793 449973 500027 90 5968 41487 415327 16442 80 5160 12541 178 245
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 96 984 5508 14156 978 0 0 3694 3694 828 209 0 9404 5 16
BA WIDER-124 SET 124 0 29 124 124 0 0 0 0 0 25 79 0 20
GR WIDER-3138 3138 32 458 868 868 2270 0 0 0 0 412 56 0 400
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 0 0 0 0 0 846
BA WIDER-48 SET 48 4 34 34 34 14 0 0 0 0 34 0 0 0
SER CON
DS/TRAP 18 0 18 18 18 1 0 0 0 0 18 0 0 0
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 2 4 4 280 0 18 0 43
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 122 122 122 702 0 0 0 248
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 0 0 15 15 0 0 0 0 0 0 0 15 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 3983 3983 6147 36217 0 0 0 8663 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 1966 1966 0 0 0 3781 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 400 1376 1800 0 0 0 90 280 296 88 0 1136
BG/TRIVENI 4216 400 560 560 9680 3716 120 120 720 8596 560 0 0 513 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 8 27 0 0 0 0 0 0 17 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 0 0 120 552 248 0 0 90 90 0 0 0 461 0 1
BG/MALHOTRA 1032 0 1032 1032 6000 0 0 0 1786 4280 1032 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 2618
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/MURI- II _ 0 5788
_ 26080
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
SSE/P-WAY/CON/RNC1 10000 15.09.20
22.06.2020

TC/CON/BI/21-22/Con/159 DT-
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 90 180 2590 CONSTRUCTION
22.06.2021
15407 415327 12541
TC/CON/BI/21-22/Con/158 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21
22.06.2022

TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021
SSE/P-WAY/CON/KGP 10000 15.06.21 0 0 1176
TOTAL DESPATCH 90 5968 41487
ECR-OL 4 12/2020-21 P&C 1IN12 SSE/PWAY/ARA 4 21.06.21 0 4 0 4 280 43
ECR OL
ECR-OL 5 02/2021-22 SEJ SSE/PWAY/TD DHN 9 22.07.21 0 9 0 16 1271 0

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =153.460 2)CEMENT(RLY)= 207.290MT 3)CEMENT(PVT)= 160.600MT 4)INSERTS(T-6901)= 108356NOS. 47537NOS
381) =

SER/
4 B.A _ _ 0 0 _ 79 SETS NIL
O.L.
ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 25.06.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
on 01.04.2021 As on date Cumulative on date As on date During the year Cumulative MF REJ
month year month

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
18.07.2021 11980 0 2944 7844 41109 4130 0 0 10182 34182 1752 538 0 4599 14 24

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1340 22886 56133 451313 498687 0 5968 41487 415327 16538 1324 0 17696 180 248
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 72 1056 5580 14228 906 0 0 3694 3694 852 57 0 9604 5 16
BA WIDER-124 SET 124 0 29 102 102 22 0 0 0 0 25 7 0 70
GR WIDER-3138 3138 16 474 884 884 2254 0 0 0 0 396 88 0 400
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 0 0 0 0 0 846
BA WIDER-48 SET 48 2 48 48 48 0 0 0 0 0 22 0 0 26 1
SER CON 1 IN 8.5 11 0 0 5 5 6 0 0 0 0 0 0 0 5
DS/TRAP 18 0 18 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 2 4 4 280 0 18 0 43
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 122 122 122 702 0 0 0 248
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 0 0 15 15 0 0 0 0 0 0 0 5 10
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 3983 3983 6147 36217 0 0 0 8663 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 1966 1966 0 0 0 3781 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 400 1376 1800 0 0 0 90 280 296 88 0 1136
BG/TRIVENI 4216 416 976 976 10096 3300 0 120 720 8596 560 0 0 513 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 12 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 16 16 136 568 232 0 0 90 90 16 0 0 461 0 1
BG/MALHOTRA 1032 0 1032 1032 6000 0 0 0 1786 4280 1032 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8

DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 2618
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/MURI- II _ 0 5788
_ 26080
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
SSE/P-WAY/CON/RNC1 10000 15.09.20
22.06.2020

TC/CON/BI/21-22/Con/159 DT-
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 0 180 2590 CONSTRUCTION
22.06.2021
15407 415327 12541
TC/CON/BI/21-22/Con/158 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21
22.06.2022

TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021
SSE/P-WAY/CON/KGP 10000 15.06.21 0 0 1176
TOTAL DESPATCH 0 5968 41487
ECR-OL 4 12/2020-21 P&C 1IN12 SSE/PWAY/ARA 4 21.06.21 0 4 0 4 280 43
ECR OL
ECR-OL 5 02/2021-22 SEJ SSE/PWAY/TD DHN 9 22.07.21 0 9 0 16 1271 0

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =138.066 2)CEMENT(RLY)= 120.710MT 3)CEMENT(PVT)= 139.330MT 4)INSERTS(T-6901)= 102516NOS. 45873NOS
381) =

22 sets of WB BA have been transfered from SER/OL to SER/CON & 05 sets of 1/8 .5 have been transferred to SER CON from Triveni

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 26.06.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
on 01.04.2021 As on date Cumulative on date As on date During the year Cumulative MF REJ
month year month

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
18.07.2021 11980 0 2944 7844 41109 4130 0 0 10182 34182 1584 498 208 4599 14 24

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1350 24236 57483 452663 497337 100 6068 41587 415427 16842 778 1592 17596 180 248
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 96 1152 5676 14324 810 0 0 3694 3694 924 81 0 9604 5 16
BA WIDER-124 SET 124 6 6 108 108 16 0 0 0 0 27 11 0 70
GR WIDER-3138 3138 32 506 916 916 2222 0 0 0 0 396 120 0 400
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 0 0 0 0 0 846
BA WIDER-48 SET 48 0 48 48 48 0 0 0 0 0 22 0 0 26 1
SER CON 1 IN 8.5 11 0 0 5 5 6 0 0 0 0 0 0 0 5
DS/TRAP 18 0 18 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 4 4 280 0 18 0 43
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 122 122 702 0 0 0 248
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 0 0 15 15 0 0 0 0 0 0 0 5 10
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 3983 6147 36217 0 0 0 8663 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 1966 1966 0 0 0 3781 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 400 1376 1800 0 0 0 90 280 296 88 0 1136
BG/TRIVENI 4216 376 1352 1352 10472 2924 0 120 720 8596 1352 0 0 513 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 12 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 16 32 152 674 126 0 0 90 90 32 0 0 551 0 1
BG/MALHOTRA 1032 0 1032 1032 6000 0 0 0 1786 4280 1032 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8

DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 2618
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/MURI- II _ 0 5788
_ 26080
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
SSE/P-WAY/CON/RNC1 10000 15.09.20
22.06.2020

TC/CON/BI/21-22/Con/159 DT-
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 100 280 2490 CONSTRUCTION
22.06.2021
15507 415427 17596
TC/CON/BI/21-22/Con/158 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21
22.06.2022

TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021
SSE/P-WAY/CON/KGP 10000 15.06.21 0 0 1176
TOTAL DESPATCH 100 6068 41587
ECR-OL 4 12/2020-21 P&C 1IN12 SSE/PWAY/ARA 4 21.06.21 0 4 0 4 280 43
ECR OL
ECR-OL 5 02/2021-22 SEJ SSE/PWAY/TD DHN 9 22.07.21 0 9 0 16 1271 0

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =177.310 2)CEMENT(RLY)= 2967.850MT 3)CEMENT(PVT)= 120.039MT 4)INSERTS(T-6901)= 96412NOS. 44369NOS
381) =

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 28.06.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
on 01.04.2021 As on date Cumulative on date As on date During the year Cumulative MF REJ
month year month

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
18.07.2021 11980 0 2944 7844 41109 4130 0 0 10182 34182 1472 190 628 4599 14 24

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1446 25682 58929 454109 495891 5184 11252 46771 420611 17124 552 2982 12412 180 248
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 120 1272 5796 14444 690 0 0 3694 3694 1004 121 0 9604 5 16
BA WIDER-124 SET 124 4 10 112 112 12 0 0 0 0 28 14 0 70
GR WIDER-3138 3138 32 538 948 948 2190 0 0 0 0 412 136 0 400
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 0 0 0 0 0 846
BA WIDER-48 SET 48 0 48 48 48 0 0 0 0 0 22 0 0 26 1
SER CON 1 IN 8.5 11 0 0 5 5 6 0 0 0 0 0 0 0 5
DS/TRAP 18 0 18 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 4 4 280 0 18 0 43
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 122 122 702 0 0 0 248
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 0 0 15 15 0 0 0 0 0 0 0 5 10
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 3983 6147 36217 0 0 0 8663 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 1966 1966 0 0 0 3781 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 400 1376 1800 0 0 0 90 280 296 88 0 1136
BG/TRIVENI 4216 680 2032 2032 11152 1614 0 120 720 8596 2032 0 0 513 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 12 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 16 48 168 600 200 0 0 90 90 48 0 0 551 0 1
BG/MALHOTRA 1032 0 1032 1032 6000 0 0 0 1786 4280 1032 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8

DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 2618
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/PKU _ 5184 10972
_ 31264
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
SSE/P-WAY/CON/RNC1 10000 15.09.20
22.06.2020

TC/CON/BI/21-22/Con/159 DT-
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 0 280 2490 CONSTRUCTION
22.06.2021
15507 420611 12412
TC/CON/BI/21-22/Con/158 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21
22.06.2022

TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021
SSE/P-WAY/CON/KGP 10000 15.06.21 0 0 1176
TOTAL DESPATCH 5184 11252 46771
ECR-OL 4 12/2020-21 P&C 1IN12 SSE/PWAY/ARA 4 21.06.21 0 4 0 4 280 43
ECR OL
ECR-OL 5 02/2021-22 SEJ SSE/PWAY/TD DHN 9 22.07.21 0 9 0 16 1271 0

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =181.980 2)CEMENT(RLY)= 2957.680MT 3)CEMENT(PVT)= 85.840MT 4)INSERTS(T-6901)= 151056NOS. 41649NOS
381) =

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 29.06.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
on 01.04.2021 As on date Cumulative on date As on date During the year Cumulative MF REJ
month year month

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
18.07.2021 11980 0 2944 7844 41109 4130 0 0 10182 34182 1386 0 904 4599 14 24

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1574 27256 60503 455683 494317 0 11252 46771 420611 16026 0 6206 12412 180 248
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 88 1360 5884 14532 602 0 0 3694 3694 1013 0 200 9604 5 16
BA WIDER-124 SET 124 2 12 114 114 10 0 0 0 0 26 18 0 70
GR WIDER-3138 3138 16 554 964 964 2174 0 0 0 0 340 224 0 400
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 0 0 0 0 0 846
BA WIDER-48 SET 48 0 48 48 48 0 0 0 0 0 22 0 0 26 1
SER CON 1 IN 8.5 11 0 0 5 5 6 0 0 0 0 0 0 0 5
DS/TRAP 18 0 18 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 4 4 280 0 18 0 43
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 122 122 702 0 0 0 248
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 0 0 15 15 0 0 0 0 0 0 0 5 10
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 3983 6147 36217 0 0 0 8663 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 1966 1966 0 0 0 3781 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 400 1376 1800 0 0 0 90 280 296 88 0 1136
BG/TRIVENI 4216 384 2416 2416 11536 1230 0 120 720 8596 2416 0 0 513 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 12 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 16 64 184 616 184 0 0 90 90 64 0 0 551 0 1
BG/MALHOTRA 1032 0 1032 1032 6000 0 0 0 1786 4280 1032 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8

DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 2618
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/PKU _ 0 10972
_ 31264
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
SSE/P-WAY/CON/RNC1 10000 15.09.20
22.06.2020

TC/CON/BI/21-22/Con/159 DT-
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 0 280 2490 CONSTRUCTION
22.06.2021
15507 420611 12412
TC/CON/BI/21-22/Con/158 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21
22.06.2022

TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021
SSE/P-WAY/CON/KGP 10000 15.06.21 0 0 1176
TOTAL DESPATCH 0 11252 46771
ECR-OL 4 12/2020-21 P&C 1IN12 SSE/PWAY/ARA 4 21.06.21 0 4 0 4 280 43
ECR OL
ECR-OL 5 02/2021-22 SEJ SSE/PWAY/TD DHN 9 22.07.21 0 9 0 16 1271 0

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =165.020 2)CEMENT(RLY)= 2769.900MT 3)CEMENT(PVT)= 66.190MT 4)INSERTS(T-6901)= 144280NOS. 40113NOS
381) =

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
P
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 30.06.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
on 01.04.2021 As on date Cumulative on date As on date During the year Cumulative MF REJ
month year month

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
18.07.2021 11980 0 2944 7844 41109 4130 0 0 10182 34182 1210 176 0 5503 14 24

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1430 28686 61933 457113 492887 3100 14442 49961 423801 16064 1392 0 15422 183 251
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 8 1368 5892 14540 594 0 0 3694 3694 989 32 0 9804 5 16
BA WIDER-124 SET 124 4 16 118 118 6 0 0 0 0 30 18 0 70
GR WIDER-3138 3138 32 586 996 996 2142 0 0 0 0 312 60 0 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 0 0 0 0 0 846
BA WIDER-48 SET 48 0 48 48 48 0 0 0 0 0 22 0 0 26 1
SER CON 1 IN 8.5 11 0 0 5 5 6 0 0 0 0 0 0 0 5
DS/TRAP 18 0 18 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 4 4 280 0 18 0 43
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 122 122 702 0 0 0 248
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 0 0 15 15 0 0 0 0 0 0 0 5 10
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 3983 6147 36217 0 0 0 8663 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 1966 1966 0 0 0 3781 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 400 1376 1800 0 0 0 90 280 296 88 0 1136
BG/TRIVENI 4216 144 2560 2560 11680 1086 0 120 720 8596 2560 0 0 513 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 12 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 0 64 184 616 184 0 0 90 90 64 0 0 551 0 1
BG/MALHOTRA 1032 0 1032 1032 6000 0 0 0 1786 4280 1032 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8

DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 2618
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/SONA AT BQA _ 3100 14072
_ 34364
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
SSE/P-WAY/CON/RNC1 10000 15.09.20
22.06.2020

TC/CON/BI/21-22/Con/159 DT-
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 90 370 2400 CONSTRUCTION
22.06.2021
15597 423801 15422
TC/CON/BI/21-22/Con/158 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21
22.06.2022

TC/CON/BI/21-22/Con/116 DT-
3 08.04.2021
SSE/P-WAY/CON/KGP 10000 15.06.21 0 0 1176
TOTAL DESPATCH 3190 14442 49961
ECR-OL 4 12/2020-21 P&C 1IN12 SSE/PWAY/ARA 4 21.06.21 0 4 0 4 280 43
ECR OL
ECR-OL 5 02/2021-22 SEJ SSE/PWAY/TD DHN 9 22.07.21 0 9 0 16 1271 0

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =151.850 2)CEMENT(RLY)= 2681.730MT 3)CEMENT(PVT)= 59.130MT 4)INSERTS(T-6901)= 138272NOS. 39537NOS
381) =

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 01.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Balance to be Balance to be
Per day max production Under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the curing(in nos)
Under testing IC under issue
(in nos)
on 01.04.2021 As on date Cumulative on date As on date During the year Cumulative MF REJ
month year month

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
30.09.21 11980 376 376 8226 41485 3754 0 0 10182 34182 1370 212 180 5503 14 24

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1350 1350 63283 458463 491537 0 0 49936 423776 15980 1546 1280 15447 183 251
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 80 80 5972 14620 514 0 0 3694 3694 1005 96 0 9804 5 16
BA WIDER-124 SET 124 6 6 124 124 0 0 0 0 0 36 18 0 70
GR WIDER-3138 3138 16 16 1012 1012 2126 0 0 0 0 312 76 0 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 0 0 0 0 0 846
BA WIDER-48 SET 48 0 0 48 48 0 0 0 0 0 22 0 0 26 1
SER CON 1 IN 8.5 11 0 0 5 5 6 0 0 0 0 0 0 0 5
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 4 280 0 18 0 43
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 0 79 0 0 61 0
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 7183 37253 0 0 0 7627 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1800 0 0 0 90 280 296 88 0 1136
BG/TRIVENI 4216 0 0 2560 11680 1086 0 0 720 8596 2560 0 0 513 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 12 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 16 16 200 632 168 0 0 98 98 80 0 0 453 0 1
BG/MALHOTRA 1032 0 0 1032 6000 0 0 0 1786 4280 1032 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8

DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/SONA AT BQA _ 0 0 0
_ 34364
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
16.06.2020 SSE/P-WAY/CON/RNC1 10000 15.09.20 0 0 10000
TC/CON/BI/21-22/Con/158 DT-
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 0 0 2400 CONSTRUCTION
16.06.2021
15597 423801 15447
TC/CON/BI/21-22/Con/159 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
16.06.2022

3 TC/CON/BI/RVNL/I/174 DT-30.06.2022 DGM(P)/TATA/RVNL 20000 31.10.21 0 0 20000


TOTAL DESPATCH 0 0 49961
ECR-OL 4 0 4 280 43 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =164.02 MT 2)CEMENT(RLY)= 2633.890MT 3)CEMENT(PVT)= 58.260MT 4)INSERTS(T-6901)= 132424NOS. 38033NOS
381) =

SER/
4 B.A _ _ 0 0 _ 79 SETS NIL
O.L.
ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 02.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
IC under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) production produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
on capacity/DP up to 01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
30.09.21 11980 376 752 8602 41861 3378 0 0 10182 34182 1402 266 470 5503 14 24

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1452 2802 64735 459915 490085 192 192 50128 423968 16226 1390 2642 15255 183 251
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 64 144 6036 14684 450 0 0 3694 3694 1013 152 0 9804 5 16
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 33 21 0 70
GR WIDER-3138 3138 32 48 1044 1044 2094 0 0 0 0 320 100 0 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 0 0 0 0 0 846
BA WIDER-48 SET 48 0 0 48 48 0 0 0 0 0 0 22 0 26 1
SER CON
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 4 280 0 18 0 43
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 10 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 7183 37253 0 0 0 7627 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
2 0 0 2 2 0 0 0 2 2 0 0 0 0
172/298 DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1800 0 90 90 890 890 160 224 0 526
BG/TRIVENI 4216 0 0 2560 11680 1086 0 0 720 8596 2560 0 0 513 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 12 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 8 24 208 640 160 0 0 98 98 88 0 0 453 0 1
BG/MALHOTRA 1032 0 0 1032 6000 0 0 0 1786 4280 1032 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
0 0 0
TC/CONC/20-21-/98
BG 10182 34182 5503
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/SONA AT BQA _ 0 0 0
_ 34339
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
16.06.2020
SSE/P-WAY/CON/RNC1 10000 15.09.20 0 0 10000
TC/CON/BI/21-22/Con/158 DT-
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 192 192 2208 CONSTRUCTION
16.06.2021
15789 423968 15255
TC/CON/BI/21-22/Con/159 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
16.06.2022

3 TC/CON/BI/RVNL/I/174 DT-30.06.2022 DGM(P)/TATA/RVNL 20000 31.10.21 0 0 20000


TOTAL DESPATCH 192 192 50128
ECR-OL 4 0 4 280 43 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =148.36 MT 2)CEMENT(RLY)= 2522.080MT 3)CEMENT(PVT)= 57.820MT 4)INSERTS(T-6901)= 126232NOS. 36529NOS
381) =

SER/
4 B.A _ _ 0 0 _ 79 SETS NIL
O.L.
ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 03.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
IC under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) production produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
on capacity/DP up to 01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
30.09.21 11980 128 880 8730 41989 3250 0 0 10182 34182 1138 378 750 5503 14 24

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1160 3962 65895 461075 488925 4241 4433 54369 428209 16110 1406 3902 11014 183 251
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 64 208 6100 14748 386 0 0 3694 3694 997 232 0 9804 5 16
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 32 22 0 70
GR WIDER-3138 3138 16 64 1060 1060 2078 0 0 0 0 312 124 0 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 0 0 0 0 0 846
BA WIDER-48 SET 48 0 0 48 48 0 0 0 0 0 0 22 0 26 1
SER CON
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 4 280 0 18 0 43
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 7183 37253 0 0 0 7627 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
2 0 0 2 2 0 0 0 2 2 0 0 0 0
172/298 DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1800 0 0 90 890 890 160 224 0 526
BG/TRIVENI 4216 304 304 2864 11984 782 0 0 720 8596 2864 0 0 513 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 12 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 16 40 224 656 144 0 0 196 196 104 0 0 355 0 1
BG/MALHOTRA 1032 0 0 1032 6000 0 0 0 1786 4280 1032 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
0 0 0
TC/CONC/20-21-/98
BG 10182 34182 5503
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/MURI-II AT TIS _ 2884 2884 2884
_ 37223
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
16.06.2020
SSE/P-WAY/CON/RNC1 10000 15.09.20 0 0 10000
TC/CON/BI/21-22/Con/158 DT-
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 697 889 1511 CONSTRUCTION
16.06.2021
17146 428209 11014
TC/CON/BI/21-22/Con/159 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
16.06.2022

3 TC/CON/BI/RVNL/I/174 DT-30.06.2022 DGM(P)/TATA/RVNL 20000 31.10.21 660 660 19340


TOTAL DESPATCH 4241 4433 54369
ECR-OL 4 0 4 280 43 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =168.46 MT 2)CEMENT(RLY)= 2368.050MT 3)CEMENT(PVT)= 56.942MT 4)INSERTS(T-6901)= 121272NOS. 34801NOS
381) =

NOTE:- WB(CS-172) PRODUCTION LESS DUE TO UNIT-2 MACHINERY BREAKDOWN

SER/
4 B.A _ _ 0 0 _ 79 SETS NIL
O.L.
ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 05.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
IC under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) production produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
on capacity/DP up to 01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
30.09.21 11980 240 1120 8970 42229 3010 0 0 10182 34182 994 562 950 5503 14 24

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1574 5536 67469 462649 487351 1752 6185 56121 429961 16438 1442 5112 9262 183 251
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 80 288 6180 14828 306 0 0 3694 3694 1005 174 130 9804 5 16
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 28 26 0 70
GR WIDER-3138 3138 32 96 1092 1092 2046 0 0 0 0 312 156 0 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 0 0 0 0 0 846
BA WIDER-48 SET 48 0 0 48 48 0 0 0 0 0 0 22 0 26 1
SER CON
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 4 280 0 18 0 43
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 7183 37253 0 0 0 7627 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
2 0 0 2 2 0 0 0 2 2 0 0 0 0
172/298 DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1800 0 0 90 890 890 160 224 0 526
BG/TRIVENI 4216 264 568 3128 12248 518 0 0 720 8596 3128 0 0 513 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 12 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 16 56 240 672 128 0 0 196 196 120 0 0 355 0 1
BG/MALHOTRA 1032 0 0 1032 6000 0 0 0 1786 4280 1032 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
0 0 0
TC/CONC/20-21-/98
BG 10182 34182 5503
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/MURI-II AT TIS _ 0 2884 2884
_ 37223
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
16.06.2020
SSE/P-WAY/CON/RNC1 10000 15.09.20 0 0 10000
TC/CON/BI/21-22/Con/158 DT-
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 974 1863 537 CONSTRUCTION
16.06.2021
18898 429961 9262
TC/CON/BI/21-22/Con/159 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
16.06.2022

3 TC/CON/BI/RVNL/I/174 DT-30.06.2022 DGM(P)/TATA/RVNL 20000 31.10.21 778 1438 18562


TOTAL DESPATCH 1752 6185 56121
ECR-OL 4 0 4 280 43 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =150.496 MT 2)CEMENT(RLY)= 2254.880MT 3)CEMENT(PVT)= 43.130MT 4)INSERTS(T-6901)= 114528NOS. 32785NOS
381) =

SER/
4 B.A _ _ 0 0 _ 79 SETS NIL
O.L.
ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 06.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
IC under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) production produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
on capacity/DP up to 01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
30.09.21 11980 136 1256 9106 42365 2874 0 0 10182 34182 1130 347 1165 5503 14 24

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1536 7072 69005 464185 485815 690 6875 56811 430651 16802 1294 6432 8572 183 251
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 80 368 6260 14908 226 0 0 3694 3694 1021 134 234 9804 5 16
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 28 26 0 70
GR WIDER-3138 3138 16 112 1108 1108 2030 0 0 0 0 312 172 0 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 0 0 0 0 0 846
BA WIDER-48 SET 48 0 0 48 48 0 0 0 0 0 0 22 0 26 1
SER CON
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 4 280 0 18 0 43
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 7183 37253 0 0 0 7627 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
2 0 0 2 2 0 0 0 2 2 0 0 0 0
172/298 DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1800 0 0 90 890 890 160 224 0 526
BG/TRIVENI 4216 256 824 3384 12504 262 0 0 720 8596 3382 0 0 513 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 12 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 8 64 248 680 120 0 0 196 196 128 0 0 355 0 1
BG/MALHOTRA 1032 0 0 1032 6000 0 0 0 1786 4280 1032 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
0 0 0
TC/CONC/20-21-/98
BG 10182 34182 5503
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/MURI-II AT TIS _ 0 2884 2884
_ 37223
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
16.06.2020
SSE/P-WAY/CON/RNC1 10000 15.09.20 0 0 10000
TC/CON/BI/21-22/Con/158 DT-
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 402 2265 135 CONSTRUCTION
16.06.2021
19588 430651 8572
TC/CON/BI/21-22/Con/159 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
16.06.2022

3 TC/CON/BI/RVNL/I/174 DT-30.06.2022 DGM(P)/TATA/RVNL 20000 31.10.21 288 1726 18274


TOTAL DESPATCH 690 6875 56811
ECR-OL 4 0 4 280 43 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =134.020 2)CEMENT(RLY)= 2149.140MT 3)CEMENT(PVT)= 30.140MT 4)INSERTS(T-6901)= 108000NOS. 31217NOS
381) =

SER/
4 B.A _ _ 0 0 _ 79 SETS NIL
O.L.
ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 07.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
IC under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) production produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
on capacity/DP up to 01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
30.09.21 11980 136 1392 9242 42501 2738 0 0 10182 34182 1266 0 1512 5503 14 24

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1552 8624 70557 465737 484263 769 7644 57580 431420 17004 1240 7836 7803 183 251
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 48 416 6308 14956 178 0 0 3694 3694 965 148 324 9804 5 16
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 28 26 0 70
GR WIDER-3138 3138 32 144 1140 1140 1998 0 0 0 0 312 204 0 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 0 0 0 0 0 846
BA WIDER-48 SET 48 0 0 48 48 0 0 0 0 0 0 22 0 26 1
SER CON
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 2 2 6 282 0 18 0 41
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 7183 37253 0 0 0 7627 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
2 0 0 2 2 0 0 0 2 2 0 0 0 0
172/298 DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1800 0 0 90 890 890 160 224 0 526
BG/TRIVENI 4216 256 1080 3640 12760 760 0 0 720 8596 3638 0 0 513 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 12 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 16 80 264 696 104 0 0 196 196 144 0 0 355 0 1
BG/MALHOTRA 1032 0 0 1032 6000 0 0 0 1786 4280 1032 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
0 0 0
TC/CONC/20-21-/98
BG 10182 34182 5503
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/MURI-II AT TIS _ 0 2884 2884
_ 37223
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
16.06.2020
SSE/P-WAY/CON/RNC1 10000 15.09.20 0 0 10000
TC/CON/BI/21-22/Con/158 DT-
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 67 2332 68 CONSTRUCTION
16.06.2021
20357 431420 7803
TC/CON/BI/21-22/Con/159 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
16.06.2022

3 TC/CON/BI/RVNL/I/174 DT-30.06.2022 DGM(P)/TATA/RVNL 20000 31.10.21 702 2428 17572


TOTAL DESPATCH 769 7644 57580
ECR-OL 4 25/2021-22 P&C(1/12) SSE/PWAY/W/JPL 38 22.07.21 2 2 36 2 282 41 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =229.800 2)CEMENT(RLY)= 2044.370MT 3)CEMENT(PVT)= 16.720MT 4)INSERTS(T-6901)= 101472NOS. 29649NOS
381) =

SER/
4 B.A _ _ 0 0 _ 79 SETS NIL
O.L.
ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 08.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
IC under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) production produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
on capacity/DP up to 01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
30.09.21 11980 120 1512 9362 42621 2618 0 0 10182 34182 1386 0 1512 5503 14 24

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1544 10168 72101 467281 482719 6112 13756 63692 437532 17270 1734 8620 1691 183 251
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 72 488 6380 15028 106 0 0 3694 3694 920 64 525 9804 5 16
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 28 26 0 70
GR WIDER-3138 3138 16 160 1156 1156 1982 0 0 0 0 312 16 204 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 0 0 0 0 0 846
BA WIDER-48 SET 48 0 0 48 48 0 0 0 0 0 0 22 0 26 1
SER CON
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 1 3 7 283 0 18 0 40
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 7183 37253 0 0 0 7627 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
2 0 0 2 2 0 0 0 2 2 0 0 0 0
172/298 DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1800 0 0 90 890 890 160 224 0 526
BG/TRIVENI 4216 240 1320 3880 13000 520 0 0 720 8596 3718 160 0 513 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 12 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 16 96 280 712 88 0 0 196 196 160 0 0 355 0 1
BG/MALHOTRA 1032 0 0 1032 6000 0 0 0 1786 4280 1032 0 0 683 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
0 0 0
TC/CONC/20-21-/98
BG 10182 34182 5503
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/KGP at KGP _ 5044 7928
_ 42267
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
16.06.2020
SSE/P-WAY/CON/RNC1 10000 15.09.20 0 0 10000
TC/CON/BI/21-22/Con/158 DT-
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 68 2400 0 CONSTRUCTION
16.06.2021
21425 437532 7803
TC/CON/BI/21-22/Con/159 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
16.06.2022

3 TC/CON/BI/RVNL/I/174 DT-30.06.2022 DGM(P)/TATA/RVNL 20000 31.10.21 1000 3428 16572


TOTAL DESPATCH 6112 13756 63692
ECR-OL 4 25/2021-22 P&C(1/12) SSE/PWAY/W/JPL 38 22.07.21 1 3 35 3 383 40 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =236.270 2)CEMENT(RLY)= 1943.510MT 3)CEMENT(PVT)= 4.090MT 4)INSERTS(T-6901)= 94944NOS. 28209NOS
381) =

SER/
4 B.A _ _ 0 0 _ 79 SETS NIL
O.L.
ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 09.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
IC under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) production produced as on During the During the producted as During the During the curing(in Under testing
As on date Cumulative As on date Cumulative issue (in nos)
on capacity/DP up to 01.04.2021 month year on date month year nos) MF REJ

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
30.09.21 11980 256 1768 9618 42877 2362 0 0 10182 34182 1642 0 1512 5503 14 24

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1402 11570 73503 468683 481317 464 14220 64156 437996 17426 1670 1330 9819 186 256
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 48 536 5903 14551 583 0 0 3694 3694 872 160 0 9804 5 16
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 28 26 0 70
GR WIDER-3138 3138 32 192 1188 1188 1950 0 0 0 0 312 48 204 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 0 0 0 0 0 846
BA WIDER-48 SET 48 0 0 48 48 0 0 0 0 0 0 22 0 26 1
SER CON
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 1 4 8 284 0 18 0 39
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 7183 37253 0 0 0 7627 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
2 0 0 2 2 0 0 0 2 2 0 0 0 0
172/298 DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1802 0 0 90 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 1320 3880 13000 520 0 0 720 8596 3318 560 0 513 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 12 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 8 104 288 720 80 0 0 196 196 168 0 0 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 0 525 919 0 0 0 0 0 0 0 525
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/KGP at KGP _ 0 7928
_ 42267
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
16.06.2020 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000
TC/CON/BI/21-22/Con/158 DT-
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 0 2400 0 CONSTRUCTION
16.06.2021
21889 437996 7803
TC/CON/BI/21-22/Con/159 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
16.06.2022

3 TC/CON/BI/RVNL/I/174 DT-30.06.2022 DGM(P)/TATA/RVNL 20000 31.10.21 464 3892 16108


TOTAL DESPATCH 464 14220 64156
ECR-OL 4 25/2021-22 P&C(1/12) SSE/PWAY/W/JPL 38 22.07.21 1 4 35 2 384 39 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =222.190 2)CEMENT(RLY)= 1468.501MT 3)CEMENT(PVT)= 373.119MT 4)INSERTS(T-6901)= 89016NOS. 27185NOS
381) =

SER/
4 B.A _ _ 0 0 _ 79 SETS NIL
O.L.
ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 10.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
IC under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) production produced as on During the During the producted as During the During the curing(in Under testing
As on date Cumulative As on date Cumulative issue (in nos)
on capacity/DP up to 01.04.2021 month year on date month year nos) MF REJ

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
30.09.21 11980 256 2024 9874 43133 2106 0 0 10182 34182 1898 0 1512 5503 14 24

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1284 12854 74787 469967 480033 1108 15328 65264 439104 17370 1751 2589 8711 186 256
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 48 584 5951 14599 539 0 0 3694 3694 848 232 0 9804 5 16
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 28 26 0 70
GR WIDER-3138 3138 32 224 1220 1220 1918 0 0 0 0 328 64 204 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 36 36 36 36 0 0 0 810
BA WIDER-48 SET 48 0 0 48 48 0 8 8 8 8 0 22 0 18 1
SER CON
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 2 6 10 286 0 18 0 37
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 7183 37253 0 0 0 7627 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
2 0 0 2 2 0 0 0 2 2 0 0 0 0
172/298 DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1802 0 0 90 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 1320 3880 13000 520 0 0 720 8596 3318 560 0 513 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 12 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 8 112 296 728 72 0 0 196 196 160 16 0 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 0 525 919 0 0 0 0 0 0 0 525
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/KGP at KGP _ 0 7928
_ 42267
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
16.06.2020 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000
TC/CON/BI/21-22/Con/158 DT-
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 0 2400 0 CONSTRUCTION
16.06.2021
22997 439104 8711
TC/CON/BI/21-22/Con/159 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
16.06.2022

3 TC/CON/BI/RVNL/I/174 DT-30.06.2022 DGM(P)/TATA/RVNL 20000 31.10.21 1108 5000 15000


TOTAL DESPATCH 1108 15328 65264
ECR-OL 4 25/2021-22 P&C(1/12) SSE/PWAY/W/JPL 38 22.07.21 2 6 32 10 386 37 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =209.050 2)CEMENT(RLY)= 1374.290MT 3)CEMENT(PVT)= 372.680MT 4)INSERTS(T-6901)= 83560NOS. 26161NOS
381) =

SER/
4 B.A _ _ 0 0 _ 79 SETS NIL
O.L.
ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 12.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
IC under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) production produced as on During the During the producted as During the During the curing(in Under testing
As on date Cumulative As on date Cumulative issue (in nos)
on capacity/DP up to 01.04.2021 month year on date month year nos) MF REJ

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
30.09.21 11980 272 2296 10146 43405 1834 0 0 10182 34182 2170 0 1512 5503 14 24

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1600 14454 76387 471567 478433 4990 20318 70254 444094 17650 1751 3939 3721 186 256
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 120 704 6071 14719 415 0 0 3694 3694 872 218 110 9804 5 16
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 28 26 0 70
GR WIDER-3138 3138 32 256 1252 1252 1886 0 0 0 0 328 66 234 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 36 36 36 36 0 0 0 810
BA WIDER-48 SET 48 0 0 48 48 0 8 8 8 8 0 22 0 18 1
SER CON
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 4 10 14 290 0 18 0 33
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 7183 37253 0 0 0 7627 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
2 0 0 2 2 0 0 0 2 2 0 0 0 0
172/298 DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1802 0 0 90 890 890 0 0 0 910 2
BG/TRIVENI 4216 344 1664 4224 13344 176 0 0 720 8596 2870 842 510 513 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 12 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 24 136 320 752 48 0 0 196 196 168 32 0 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 0 525 919 0 0 0 0 0 0 0 525
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/Muri at TIS _ 4990 12918
_ 47257
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
16.06.2020 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000
TC/CON/BI/21-22/Con/158 DT-
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 0 2400 0 CONSTRUCTION
16.06.2021
22997 444094 3721
TC/CON/BI/21-22/Con/159 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
16.06.2022

3 TC/CON/BI/RVNL/I/174 DT-30.06.2022 DGM(P)/TATA/RVNL 20000 31.10.21 0 5000 15000


TOTAL DESPATCH 4990 20318 70254
ECR-OL 4 25/2021-22 P&C(1/12) SSE/PWAY/W/JPL 38 22.07.21 4 10 28 14 390 33 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =288.910 2)CEMENT(RLY)= 1284.210MT 3)CEMENT(PVT)= 325.800MT 4)INSERTS(T-6901)= 76552NOS. 23697NOS
381) =

SER/
4 B.A _ _ 0 0 _ 79 SETS NIL
O.L.
ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 13.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
IC under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) production produced as on During the During the producted as During the During the curing(in Under testing
As on date Cumulative As on date Cumulative issue (in nos)
on capacity/DP up to 01.04.2021 month year on date month year nos) MF REJ

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
30.09.21 11980 200 2496 10346 43605 1634 0 0 10182 34182 2370 0 1512 5503 14 24

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1508 15962 77895 473075 476925 0 20318 70254 444094 17682 1682 5454 3721 186 256
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 72 776 6143 14791 343 0 0 3694 3694 824 188 260 9804 5 16
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 28 26 0 70
GR WIDER-3138 3138 32 288 1284 1284 1854 0 0 0 0 328 58 274 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 36 36 36 36 0 0 0 810
BA WIDER-48 SET 48 0 0 48 48 0 8 8 8 8 0 22 0 18 1
SER CON
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 3 13 17 293 0 18 0 30
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 7183 37253 0 0 0 7627 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
2 0 0 2 2 0 0 0 2 2 0 0 0 0
172/298 DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1802 0 0 90 890 890 0 0 0 910 2
BG/TRIVENI 4216 176 1840 4400 13520 0 0 0 720 8596 2366 1022 1010 513 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 12 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 8 144 328 760 40 0 0 196 196 160 48 0 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 0 525 919 0 0 0 0 0 0 0 525
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/Muri at TIS _ 0 12918
_ 47257
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
16.06.2020 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000
TC/CON/BI/21-22/Con/158 DT-
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 0 2400 0 CONSTRUCTION
16.06.2021
22997 444094 3721
TC/CON/BI/21-22/Con/159 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
16.06.2022

3 TC/CON/BI/RVNL/I/174 DT-30.06.2022 DGM(P)/TATA/RVNL 20000 31.10.21 0 5000 15000


TOTAL DESPATCH 0 20318 70254
ECR-OL 4 25/2021-22 P&C(1/12) SSE/PWAY/W/JPL 38 22.07.21 3 13 25 17 393 30 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =306.690 2)CEMENT(RLY)= 1177.530MT 3)CEMENT(PVT)= 316.740MT 4)INSERTS(T-6901)= 95094NOS. 22193NOS
381) =

SER/
4 B.A _ _ 0 0 _ 79 SETS NIL
O.L.
ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 14.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
IC under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) production produced as on During the During the producted as During the During the curing(in Under testing
As on date Cumulative As on date Cumulative issue (in nos)
on capacity/DP up to 01.04.2021 month year on date month year nos) MF REJ

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
30.09.21 11980 344 2840 10690 43949 1290 0 0 10182 34182 2714 0 1512 5503 14 24

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1594 17556 79489 474669 475331 527 20845 70781 444621 17702 1736 1008 9155 188 259
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 64 840 6207 14767 279 0 0 3694 3694 800 80 456 9804 5 16
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 28 26 0 70
GR WIDER-3138 3138 0 288 1284 1284 1854 0 0 0 0 312 44 304 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 36 36 36 36 0 0 0 810
BA WIDER-48 SET 48 0 0 48 48 0 8 8 8 8 0 22 0 18 1
SER CON
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 2 15 19 295 0 18 0 28
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 7183 37253 0 0 0 7627 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
2 0 0 2 2 0 0 0 2 2 0 0 0 0
172/298 DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1802 0 0 90 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 1840 4400 13520 0 0 0 720 8596 1982 144 2272 513 4 7
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 2 0 0
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 12 10 0
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 16 160 344 776 24 0 0 196 196 160 64 0 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 0 525 919 0 0 0 0 0 0 0 525
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/Muri at TIS _ 0 12918
_ 47257
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000
TC/CON/BI/21-22/Con/158 DT-
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 0 2400 0 CONSTRUCTION
16.06.2021
23524 444621 9155
TC/CON/BI/21-22/Con/159 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
16.06.2021

3 TC/CON/BI/RVNL/I/174 DT-30.06.2021 DGM(P)/TATA/RVNL 20000 31.10.21 527 5527 14473


TOTAL DESPATCH 527 20845 70781
ECR-OL 4 25/2021-22 P&C(1/12) SSE/PWAY/W/JPL 38 22.07.21 2 15 23 19 395 28 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =290.370 2)CEMENT(RLY)= 1059.022MT 3)CEMENT(PVT)= 315.860MT 4)INSERTS(T-6901)= 88462NOS. 20817NOS
381) =

SER/
4 B.A _ _ 0 0 _ 79 SETS NIL
O.L.
ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 15.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
IC under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) production produced as on During the During the producted as During the During the curing(in Under testing
As on date Cumulative As on date Cumulative issue (in nos)
on capacity/DP up to 01.04.2021 month year on date month year nos) MF REJ

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
30.09.21 11980 392 3232 11082 44341 898 0 0 10182 34182 3106 0 572 6437 15 25

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1522 19078 81011 476191 475331 1284 22129 72065 445905 17794 1732 0 10310 189 261
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 80 920 6287 13939 1195 0 0 3694 3694 794 80 0 9804 5 16
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 28 4 0 92
GR WIDER-3138 3138 0 288 980 980 2158 0 0 0 0 312 44 0 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 36 36 36 36 0 0 0 810
WB GR 3335 0 0 304 304 3031 0 0 0 0 0 0 0 304
SER CON BA WIDER-48 SET 48 0 0 48 48 0 8 8 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 6 21 25 301 0 18 32
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 7183 37253 0 0 0 7627 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
2 0 0 2 2 0 0 0 2 2 0 0 0 0
172/298 DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1802 0 0 90 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 1840 4400 13520 0 0 0 720 8596 1724 0 0 3184 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 12 0 10
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 8 168 352 784 16 0 0 196 196 168 64 0 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 0 525 919 0 0 0 0 0 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/Muri at TIS _ 0 12918
_ 47257
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000
TC/CON/BI/21-22/Con/158 DT-
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 0 2400 0 CONSTRUCTION
16.06.2021
24808 445905 10310
TC/CON/BI/21-22/Con/159 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
16.06.2021

3 TC/CON/BI/RVNL/I/174 DT-30.06.2021 DGM(P)/TATA/RVNL 20000 31.10.21 1284 6811 13189


TOTAL DESPATCH 1284 22129 72065
ECR-OL 4 25/2021-22 P&C(1/12) SSE/PWAY/W/JPL 38 22.07.21 6 21 17 25 301 22 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =273.880 2)CEMENT(RLY)= 969.420MT 3)CEMENT(PVT)= 287.630MT 4)INSERTS(T-6901)= 106936NOS. 19249NOS
381) =

SER/
O.L.
4 B.A _ _ 0 0 _ 79 SETS NIL

ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 16.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
IC under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) production produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
on capacity/DP up to 01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
30.09.21 11980 256 3488 11338 44597 642 0 0 10182 34182 2986 376 576 6437 15 25

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1548 20626 82559 477739 472261 3272 25401 75337 449177 17992 1586 1496 7038 189 261
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 40 960 6327 14433 701 0 0 3694 3694 754 160 0 9804 5 16
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 28 4 0 92
GR WIDER-3138 3138 16 336 1028 1028 2110 0 0 0 0 312 92 0 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 36 36 36 0 0 0 810
WB GR 3335 0 0 304 304 3031 0 0 0 0 0 0 0 304
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 8 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 21 25 301 0 18 32
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 7183 37253 0 0 0 7627 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
2 0 0 2 2 0 0 0 2 2 0 0 0 0
172/298 DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1802 0 0 90 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 1840 4400 13520 0 0 0 720 8596 1724 0 0 3184 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 12 0 10
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 8 176 360 792 8 0 0 196 196 160 80 0 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 0 525 919 0 0 0 0 0 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/SONA AT BQA _ 2060 14978
_ 49317
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000
TC/CON/BI/21-22/Con/158 DT-
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 0 2400 0 CONSTRUCTION
16.06.2021
26020 449177 7038
TC/CON/BI/21-22/Con/159 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
16.06.2021

3 TC/CON/BI/RVNL/I/174 DT-30.06.2021 DGM(P)/TATA/RVNL 20000 31.10.21 1212 8023 11977


TOTAL DESPATCH 3272 25401 75337
ECR-OL 4 25/2021-22 P&C(1/12) SSE/PWAY/W/JPL 38 22.07.21 0 21 17 25 301 22 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =258.700 2)CEMENT(RLY)= 859.520MT 3)CEMENT(PVT)= 286.310MT 4)INSERTS(T-6901)= 100520NOS. 18225NOS
381) =

SER/
4 B.A _ _ 0 0 _ 79 SETS NIL
O.L.
ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 17.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
IC under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) production produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
on capacity/DP up to 01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
30.09.21 11980 352 3840 11690 44949 386 0 0 10182 34182 2962 552 776 6437 15 25

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1454 22080 84013 479193 470807 1048 26449 76385 450225 17994 2518 2016 5990 189 261
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 80 1040 6407 14513 621 0 0 3694 3694 770 224 0 9804 5 16
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 28 4 0 92
GR WIDER-3138 3138 32 368 1060 1060 2078 0 0 0 0 312 104 20 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 36 36 36 0 0 0 810
WB GR 3335 0 0 304 304 3031 0 0 0 0 0 0 0 304
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 8 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 2 23 27 303 0 18 30
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 7183 37253 0 0 0 7627 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
2 0 0 2 2 0 0 0 2 2 0 0 0 0
172/298 DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1802 0 0 90 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 1840 4400 13520 0 0 0 720 8596 1724 0 0 3184 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 12 0 10
OTHERS PVT.
C.R/MALHOTRA(T-4183) 800 8 184 368 800 0 0 0 196 196 160 88 0 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 0 525 919 0 0 0 0 0 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/SONA AT BQA _ 0 14978
_ 49317
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000
TC/CON/BI/21-22/Con/158 DT-
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 0 2400 0 CONSTRUCTION
16.06.2021
27068 450225 5990
TC/CON/BI/21-22/Con/159 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
16.06.2021

3 TC/CON/BI/RVNL/I/174 DT-30.06.2021 DGM(P)/TATA/RVNL 20000 31.10.21 1048 9071 10929


TOTAL DESPATCH 1048 26449 76385
ECR-OL 4 25/2021-22 P&C(1/12) SSE/PWAY/W/JPL 38 22.07.21 2 23 15 27 303 30 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =243.670 2)CEMENT(RLY)= 752.630MT 3)CEMENT(PVT)= 258.860MT 4)INSERTS(T-6901)= 94544NOS. 16817NOS
381) =

SER/
4 B.A _ _ 0 0 _ 79 SETS NIL
O.L.
ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 19.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
IC under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) production produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
on capacity/DP up to 01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
30.09.21 11980 290 4130 11980 45239 0 0 0 10182 34182 3124 376 1080 6437 15 25

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1414 23494 85427 480607 469393 1161 27610 77546 451386 18248 2146 3548 4829 189 261
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 64 1104 6471 14577 557 0 0 3694 3694 770 196 92 9804 5 16
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 28 4 0 92
GR WIDER-3138 3138 32 400 1092 1092 2046 0 0 0 0 328 120 20 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 36 36 36 0 0 0 810
WB GR 3335 0 0 304 304 3031 0 0 0 0 0 0 0 304
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 8 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 4 27 31 307 0 18 26
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 7183 37253 0 0 0 7627 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
2 0 0 2 2 0 0 0 2 2 0 0 0 0
172/298 DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1802 0 0 90 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 1840 4400 13520 0 0 0 720 8596 1724 0 0 3184 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 12 0 10
OTHERS PVT. BG CR/TRIVENI 400 16 24 24 24 376 0 0 0 0 24 0 0 0
C.R/MALHOTRA(T-4183) 800 0 184 368 800 0 0 0 196 196 144 104 0 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 0 525 919 0 0 0 0 0 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/SONA AT BQA _ 0 14978
_ 49317
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000
TC/CON/BI/21-22/Con/158 DT-
16.06.2021
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 0 2400 0 CONSTRUCTION

27068 450225 5990


TC/CON/BI/21-22/Con/159 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
16.06.2021

3 TC/CON/BI/RVNL/I/174 DT-30.06.2021 DGM(P)/TATA/RVNL 20000 31.10.21 1161 10232 9768


TOTAL DESPATCH 1161 27610 76385
ECR-OL 4 25/2021-22 P&C(1/12) SSE/PWAY/W/JPL 38 22.07.21 4 27 11 31 307 26 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =228.800 2)CEMENT(RLY)= 646.724MT 3)CEMENT(PVT)= 284.996MT 4)INSERTS(T-6901)= 88504NOS. 15569NOS
381) =

SER/
4 B.A _ _ 0 0 _ 79 SETS NIL
O.L.
ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 20.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
IC under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) production produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
on capacity/DP up to 01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
30.09.21 11980 0 4130 11980 45239 0 0 0 10182 34182 2884 304 1392 6437 15 25

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1468 24962 86895 482075 467925 494 28104 78040 451880 18142 2210 5058 4335 189 261
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 80 1184 6551 14657 477 0 0 3694 3694 770 176 192 9804 5 16
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 28 4 0 92
GR WIDER-3138 3138 16 416 1108 1108 2030 0 0 0 0 312 102 70 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 36 36 36 0 0 0 810
WB GR 3335 0 0 304 304 3031 0 34 34 34 0 0 0 304
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 8 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 4 31 35 311 0 18 22
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 7183 37253 0 0 0 7627 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
2 0 0 2 2 0 0 0 2 2 0 0 0 0
172/298 DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1802 0 0 90 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 1840 4400 13520 0 0 0 720 8596 1724 0 0 3184 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 12 0 10
OTHERS PVT. BG CR/TRIVENI 400 16 24 24 24 376 0 0 0 0 24 0 0 0
C.R/MALHOTRA(T-4183) 800 0 184 368 800 0 0 0 196 196 128 120 0 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 0 525 919 0 0 0 0 0 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/SONA AT BQA _ 0 14978
_ 49317
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000
TC/CON/BI/21-22/Con/158 DT-
16.06.2021
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 0 2400 0 CONSTRUCTION

27562 450719 5943


TC/CON/BI/21-22/Con/159 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
16.06.2021

3 TC/CON/BI/RVNL/I/174 DT-30.06.2021 DGM(P)/TATA/RVNL 20000 31.10.21 494 10726 9274


TOTAL DESPATCH 494 28104 76879
ECR-OL 4 25/2021-22 P&C(1/12) SSE/PWAY/W/JPL 38 22.07.21 4 31 7 35 311 22 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =216.280 2)CEMENT(RLY)= 551.815MT 3)CEMENT(PVT)= 284.115MT 4)INSERTS(T-6901)= 82248NOS. 15569NOS
381) =

SER/
4 B.A _ _ 0 0 _ 79 SETS NIL
O.L.
ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 21.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
IC under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) production produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
on capacity/DP up to 01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
30.09.21 11980 0 4130 11980 45239 0 0 0 10182 34182 2748 440 1392 6437 15 25

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1406 26368 88301 483481 466519 580 28684 78620 452460 18012 1260 1374 9919 192 264
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 64 1248 6615 14721 413 0 0 3694 3694 754 72 376 9804 5 16
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 28 4 0 92
GR WIDER-3138 3138 32 448 1140 1140 1998 0 0 0 0 328 118 70 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 36 36 36 0 0 0 810
WB GR 3335 0 0 304 304 3031 0 34 34 34 0 0 0 304
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 8 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 1 32 36 312 0 18 21
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 7183 37253 0 0 0 7627 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
2 0 0 2 2 0 0 0 2 2 0 0 0 0
172/298 DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1802 0 0 90 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 1840 4400 13520 0 0 0 720 8596 1724 0 0 3184 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 12 0 10
OTHERS PVT. BG CR/TRIVENI 400 32 56 56 56 344 0 0 0 0 56 0 0 0
C.R/MALHOTRA(T-4183) 800 0 184 368 800 0 0 0 196 196 128 120 0 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 0 525 919 0 0 0 0 0 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/SONA AT BQA _ 0 14978
_ 49317
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000
TC/CON/BI/21-22/Con/158 DT-
16.06.2021
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 0 2400 0 CONSTRUCTION

29303 452460 3755


TC/CON/BI/21-22/Con/159 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
16.06.2021

3 TC/CON/BI/RVNL/I/174 DT-30.06.2021 DGM(P)/TATA/RVNL 20000 31.10.21 580 11306 8694


TOTAL DESPATCH 580 28684 78620
ECR-OL 4 25/2021-22 P&C(1/12) SSE/PWAY/W/JPL 38 22.07.21 1 32 6 36 312 21 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =202.050 2)CEMENT(RLY)= 732.680MT 3)CEMENT(PVT)= 450.319MT 4)INSERTS(T-6901)= 76240NOS. 14641NOS
381) =

SER/
4 B.A _ _ 0 0 _ 79 SETS NIL
O.L.
ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 22.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Factory Per day max Balance to be Balance to be Under
IC under Stock as on date
weekly rest ORGANISATION Agreement (Ordered Qty) production produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
on capacity/DP up to 01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239
Nos
30.09.21 11980 0 4130 11980 45239 0 0 0 10182 34182 2612 325 1643 6437 15 25

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 982 27350 89283 484463 465537 530 29214 79150 452990 17442 1320 2866 9389 192 264
SEJ(OL)
,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 48 1296 6663 14769 365 0 0 3694 3694 754 50 446 9804 5 16
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 28 4 0 92
GR WIDER-3138 3138 16 464 1156 1156 1982 0 0 0 0 312 100 120 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 36 36 36 0 0 0 810
WB GR 3335 0 0 304 304 3031 0 34 34 34 0 0 0 304
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 8 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 6 38 42 318 0 18 15
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC)
P TC/CON/PRIL/CS-169/I/294 dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 7183 37253 0 0 0 7627 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-
2 0 0 2 2 0 0 0 2 2 0 0 0 0
172/298 DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1802 0 0 90 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 1840 4400 13520 0 0 0 720 8596 1724 0 0 3184 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 12 0 10
OTHERS PVT. BG CR/TRIVENI 400 32 56 56 56 344 0 0 0 0 56 0 0 0
C.R/MALHOTRA(T-4183) 800 0 184 368 800 0 0 0 196 196 64 184 0 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 0 525 919 0 0 0 0 0 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34
DETAILS OF DESPATCH
DESPATCH
ORGANISAT
ION Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/SONA AT BQA _ 0 14978
_ 49317
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-
16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000
TC/CON/BI/21-22/Con/158 DT-
16.06.2021
SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 0 2400 0 CONSTRUCTION

29833 452990 9389


TC/CON/BI/21-22/Con/159 DT- WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
16.06.2021

3 TC/CON/BI/RVNL/I/174 DT-30.06.2021 DGM(P)/TATA/RVNL 20000 31.10.21 530 11836 8164


TOTAL DESPATCH 530 29214 79150
ECR-OL 4 25/2021-22 P&C(1/12) SSE/PWAY/W/JPL 38 22.07.21 6 38 0 42 318 15 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =193.770 2)CEMENT(RLY)= 1387.160MT 3)CEMENT(PVT)= 282.360MT 4)INSERTS(T-6901)= 101536NOS. 14641NOS
381) =

NOTE-2 SHIFTS (UNIT-1&2 NIGHT SHIFT) NOT RUN DUE TO BAKHRI EID FESTIVAL

SER/
4 B.A _ _ 0 0 _ 79 SETS NIL
O.L.
ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

_ _ 0 0 0
ECR/O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 23.07.21
Factor Producion(in nos) Despatch (in nos) REJECTION &MF
y Balance to be Balance to be Under
Per day max production IC under Stock as on date
weekly ORGANISATION Agreement (Ordered Qty) produced as on During the During the producted as During the During the curing(in Under testing
capacity/DP up to As on date Cumulative As on date Cumulative issue (in nos)
rest 01.04.2021 month year on date month year nos) MF REJ
on

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 0 4130 11980 45239 0 0 0 10182 34182 2492 235 1853 6437 15 25

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1492 28842 90775 485955 464045 466 29680 79616 453456 17390 1384 4346 8923 192 264
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 72 1368 6735 14841 293 0 0 3694 3694 754 40 0 10332 5 16
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 0 0 0 92
GR WIDER-3138 3138 16 480 964 964 2206 0 0 0 0 312 28 0 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 36 36 36 0 0 0 810
WB GR 3335 0 0 512 512 2823 0 34 34 34 0 0 0 477 1
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 8 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 38 42 318 0 8 25
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 7183 37253 0 0 0 7627 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1802 0 0 90 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 1840 4400 13520 0 0 0 720 8596 580 0 0 4328 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 8 64 64 64 336 0 0 0 0 64 0 0 0
C.R/MALHOTRA(T-4183) 800 0 184 368 800 0 0 0 196 196 48 200 0 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 0 525 919 0 0 0 0 0 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34
DETAILS OF DESPATCH
ORGA DESPATCH
NISATI
ON
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0

SER
TOTAL DESPATCH 0 0 0
SSE/P-WAY/SONA AT BQA _ 0 14978
_ 49317
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000


TC/CON/BI/21-22/Con/158 DT-16.06.2021 SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 0 2400 0 CONSTRUCTION

30299 453456 8923


TC/CON/BI/21-22/Con/159 DT-16.06.2021
WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
3 TC/CON/BI/RVNL/I/174 DT-30.06.2021 DGM(P)/TATA/RVNL 20000 31.10.21 466 12302 7698
TOTAL DESPATCH 466 29680 79616
ECR-
OL 4 25/2021-22 P&C(1/12) SSE/PWAY/W/JPL 38 22.07.21 0 38 0 42 318 25 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =197.690 2)CEMENT(RLY)= 1229.140MT 3)CEMENT(PVT)= 281.930MT 4)INSERTS(T-6901)= 95216NOS. 34569NOS
381) =

NOTE-2 SHIFTS (UNIT-1&2 NIGHT SHIFT) NOT RUN DUE TO BAKHRI EID FESTIVAL

SER/
4 B.A _ _ 0 0 _ 79 SETS NIL
O.L.
ECR/
CON. 5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

ECR/OL 6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS

7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS

ECR/ _ _ 0 0 0
O.L. 8 1 in 12 0 273 SETS 39 SETS
_ _ 0 0 0
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
24.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 0 4130 11980 45239 0 0 0 10182 34182 2236 287 2057 6437 15 25

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1278 30120 92053 487233 462767 806 30486 80422 454262 17266 1283 4475 9490 192 265
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 64 1432 6799 14905 229 0 0 3694 3694 770 88 0 10332 5 16
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 0 0 0 92
GR WIDER-3138 3138 32 512 996 996 2174 0 0 0 0 312 60 0 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 36 36 36 0 0 0 810
WB GR 3335 0 0 512 512 2823 0 34 34 34 0 0 0 477 1
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 8 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 38 42 318 0 8 25
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 7183 37253 0 0 0 7627 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1802 0 0 90 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 1840 4400 13520 0 0 0 720 8596 580 0 0 4328 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 8 72 72 72 328 0 0 0 0 72 0 0 0
C.R/MALHOTRA(T-4183) 800 0 184 368 800 0 0 0 196 196 48 200 0 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 0 525 919 0 0 0 0 0 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34

DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/SONA AT BQA _ 0 14978
_ 49317
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000


TC/CON/BI/21-22/Con/158 DT-16.06.2021 SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 0 2400 0 CONSTRUCTION

31105 454262 9490


TC/CON/BI/21-22/Con/159 DT-16.06.2021
WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
3 TC/CON/BI/RVNL/I/174 DT-30.06.2021 DGM(P)/TATA/RVNL 20000 31.10.21 806 13108 6892
TOTAL DESPATCH 806 30486 80422
4 25/2021-22 P&C(1/12) SSE/PWAY/W/JPL 38 22.07.21 0 38 0 42 318 25 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =184.110 2)CEMENT(RLY)= 1131.960MT 3)CEMENT(PVT)= 281.930MT 4)INSERTS(T-6901)= 110240NOS. 33353NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 26.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 0 4130 11980 45239 0 0 0 10182 34182 1708 405 2467 6437 15 25

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1014 31134 93067 488247 461753 3668 34154 84090 457930 15396 2298 6344 5822 192 265
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 48 1480 6847 14953 181 0 0 3694 3694 650 256 0 10332 5 16
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 0 0 0 92
GR WIDER-3138 3138 16 528 1012 1012 2158 0 0 0 0 264 124 0 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 36 36 36 0 0 0 810
SEJ 408 8 8 8 8 400 0 0 0 0 8 0 0 0
WB GR 3335 0 0 512 512 2823 0 34 34 34 0 0 0 477 1
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 8 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 38 42 318 0 8 25
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 7183 37253 0 0 0 7627 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1802 0 0 90 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 1840 4400 13520 0 0 0 720 8596 176 404 0 4328 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 16 88 88 88 312 0 0 0 0 88 0 0 0
C.R/MALHOTRA(T-4183) 800 0 184 368 800 0 0 0 196 196 16 232 0 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 0 525 919 0 0 0 0 0 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/LGP _ 2200 17178
_ 51517
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000


TC/CON/BI/21-22/Con/158 DT-16.06.2021 SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 0 2400 0 CONSTRUCTION

32573 457930 5822


TC/CON/BI/21-22/Con/159 DT-16.06.2021
WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
3 TC/CON/BI/RVNL/I/174 DT-30.06.2021 DGM(P)/TATA/RVNL 20000 31.10.21 1468 14576 5424
TOTAL DESPATCH 3668 34154 84090
4 31/2021-22 P&C(1/12) SSE/PWAY/DOS 2 08.08.2021 0 0 2 42 318 25 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =175.360 2)CEMENT(RLY)= 1066.265MT 3)CEMENT(PVT)= 281.050MT 4)INSERTS(T-6901)= 105928NOS. 33353 NOS
381) =

NOTE-2 SHIFTS OF BOTH UNIT NOT RUN DUE TO VACCINATION CAMPAIGN

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 27.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 0 4130 11980 45239 0 0 0 10182 34182 1708 195 2677 6437 15 25

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1562 32696 94629 489809 460191 1238 35392 85328 459168 16958 1234 3402 8585 194 268
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 1480 6847 14953 181 0 0 3694 3694 650 256 0 10332 5 16
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 0 0 0 92
GR WIDER-3138 3138 32 560 1044 1044 2126 0 0 0 0 296 124 0 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 36 36 36 0 0 0 810
SEJ 408 8 16 16 16 392 0 0 0 0 16 0 0 0
WB GR 3335 0 0 512 512 2823 0 34 34 34 0 0 0 477 1
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 8 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 38 42 318 0 8 25
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 856 4400 11583 41653 0 0 0 3227 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1802 0 0 90 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 1840 4400 13520 0 0 0 720 8596 176 404 0 4328 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 16 104 104 104 296 0 0 0 0 104 0 0 0
C.R/MALHOTRA(T-4183) 800 0 184 368 800 0 0 0 196 196 8 241 0 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 0 525 919 0 0 0 0 0 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/LGP _ 0 17178
_ 51517
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000


TC/CON/BI/21-22/Con/158 DT-16.06.2021 SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 0 2400 0 CONSTRUCTION

33811 459168 8585


TC/CON/BI/21-22/Con/159 DT-16.06.2021
WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
3 TC/CON/BI/RVNL/I/174 DT-30.06.2021 DGM(P)/TATA/RVNL 20000 31.10.21 1238 15814 4186
TOTAL DESPATCH 1238 35392 85328
4 31/2021-22 P&C(1/12) SSE/PWAY/DOS 2 08.08.2021 0 0 2 42 318 25 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =159.330 2)CEMENT(RLY)= 952.850MT 3)CEMENT(PVT)= 279.590MT 4)INSERTS(T-6901)= 99552NOS. 31393 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 28.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 0 4130 11980 45239 0 0 0 10182 34182 1508 344 2728 6437 15 25

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1510 34206 96139 491319 458681 1296 36688 86624 460464 16972 0 6132 7289 194 268
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 1480 6847 14953 181 0 0 3694 3694 490 0 416 10332 5 16
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 0 0 0 92
GR WIDER-3138 3138 16 576 1060 1060 2078 0 0 0 0 280 156 0 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 36 36 36 0 0 0 810
SEJ 408 8 16 16 16 392 0 0 0 0 16 0 0 0
WB GR 3335 0 0 512 512 2823 0 34 34 34 0 0 0 477 1
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 8 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 2 40 44 320 0 0 0 31
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 856 4400 11583 41653 0 0 0 3227 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1802 0 0 90 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 1840 4400 13520 0 0 0 720 8596 176 404 0 4328 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 16 136 136 136 264 0 0 0 0 136 0 0 0
C.R/MALHOTRA(T-4183) 800 0 184 368 800 0 0 0 196 196 8 241 0 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 0 525 919 0 0 0 0 0 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/LGP _ 0 17178
_ 51517
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000


TC/CON/BI/21-22/Con/158 DT-16.06.2021 SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 0 2400 0 CONSTRUCTION

35107 460464 7289


TC/CON/BI/21-22/Con/159 DT-16.06.2021
WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
3 TC/CON/BI/RVNL/I/174 DT-30.06.2021 DGM(P)/TATA/RVNL 20000 31.10.21 1296 17110 2890
TOTAL DESPATCH 1296 36688 86624
4 31/2021-22 P&C(1/12) SSE/PWAY/DOS 2 08.08.2021 2 40 0 44 320 31 ECR OL

STOCK OF RAW MATERIALS


5)INSERTS(T-
1)HTS WIRE =145.400 2)CEMENT(RLY)= 850.860MT 3)CEMENT(PVT)= 278.720MT 4)INSERTS(T-6901)= 93448NOS. 30625 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 29.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 0 4130 11980 45239 0 0 0 10182 34182 1164 398 249 9202 17 27

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1614 35820 97753 492933 457067 4614 41302 91238 465078 16992 1094 500 8801 196 272
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 0 0 0 0 0 120
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 1480 6847 14953 181 0 0 3694 3694 426 64 0 10747 5 17
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 0 0 0 92
GR WIDER-3138 3138 32 608 1092 1092 2046 0 0 0 0 280 154 0 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 36 36 36 0 0 0 810
SEJ 408 16 32 32 32 376 0 0 0 0 32 0 0 0
WB GR 3335 0 0 512 512 2823 0 34 34 34 0 0 0 477 1
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 8 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 2 40 44 320 0 0 0 31
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 4400 11583 41653 0 0 0 3227 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1802 0 0 90 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 1840 4400 13520 0 0 0 720 8596 176 404 0 4328 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 16 152 152 152 248 0 0 0 0 152 0 0 0
C.R/MALHOTRA(T-4183) 800 0 184 368 800 0 0 0 196 196 8 241 0 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 0 525 919 0 0 0 0 0 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/BQA _ 3220 20398
_ 54737
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000


TC/CON/BI/21-22/Con/158 DT-16.06.2021 SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 0 2400 0 CONSTRUCTION

36501 465078 8801


TC/CON/BI/21-22/Con/159 DT-16.06.2021
WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
3 TC/CON/BI/RVNL/I/174 DT-30.06.2021 DGM(P)/TATA/RVNL 20000 31.10.21 1394 18504 1496
TOTAL DESPATCH 4614 41302 91238
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE =129.600 2)CEMENT(RLY)= 737.017MT 3)CEMENT(PVT)= 277.840MT 4)INSERTS(T-6901)= 86864NOS. 29505 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 30.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 0 4130 11980 45239 0 0 0 10182 34182 772 481 558 9202 17 27

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1444 37264 99197 494377 455623 696 41998 91934 465774 16914 1566 1550 8105 196 272
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 36 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 1480 6847 14953 181 0 0 3694 3694 426 64 0 10747 5 17
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 0 0 0 92
GR WIDER-3138 3138 16 624 1108 1108 2030 0 0 0 0 264 186 0 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 36 36 36 0 0 0 810
SEJ 408 8 40 40 40 368 0 0 0 0 40 0 0 0
WB GR 3335 0 0 512 512 2823 0 34 34 34 0 0 0 477 1
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 8 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 0 0 0 8 0 10
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 2 40 44 320 0 0 0 31
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 4400 11583 41653 0 0 0 3227 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1802 0 0 90 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 1840 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 16 168 168 168 232 0 0 0 0 168 0 0 0
C.R/MALHOTRA(T-4183) 800 0 184 368 800 0 0 0 196 196 8 0 249 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 0 525 919 0 0 0 0 0 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/BQA _ 0 20398
_ 54737
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000


TC/CON/BI/21-22/Con/158 DT-16.06.2021 SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 0 2400 0 CONSTRUCTION

37197 465774 8105


TC/CON/BI/21-22/Con/159 DT-16.06.2021
WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
3 TC/CON/BI/RVNL/I/174 DT-30.06.2021 DGM(P)/TATA/RVNL 20000 31.10.21 696 19200 800
TOTAL DESPATCH 696 41998 91934
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE =115.840 2)CEMENT(RLY)= 636.920MT 3)CEMENT(PVT)= 276.960MT 4)INSERTS(T-6901)= 81024NOS. 28609 NOS
381) =

NOTE- LESS PRODUCTION & DISPATCH DUE TO LESS LABOR AS HEAVY RAINFALL SINCE YESTERDAY NIGHT.

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 31.07.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 0 4130 11980 45239 0 0 0 10182 34182 516 427 868 9202 17 27

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1502 38766 100699 495879 454121 800 42798 92734 466574 16868 1592 3072 7305 196 272
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 36 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 1480 6847 14953 181 0 0 3694 3694 306 184 0 10747 5 17
BA WIDER-124 SET 124 0 6 124 124 0 0 0 0 0 0 0 0 92
GR WIDER-3138 3138 32 656 1140 1140 1998 0 0 0 0 280 202 0 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 36 36 36 0 0 0 810
SEJ 408 16 56 56 56 352 0 0 0 0 56 0 0 0
WB GR 3335 0 0 512 512 2823 0 34 34 34 0 0 0 477 1
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 8 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 4 4 4 4 0 0 8 6
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 40 44 320 0 0 0 31
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 10 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 4400 11583 41653 0 0 0 3227 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 21 21 0 4 0 3
CR(RITES) 960 0 0 1376 1802 0 0 90 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 1840 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 32 200 200 200 200 0 0 0 0 200 0 0 0
C.R/MALHOTRA(T-4183) 800 0 184 368 800 0 0 0 196 196 8 0 249 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 0 525 919 0 0 0 0 0 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/BQA _ 0 20398
_ 54737
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000


TC/CON/BI/21-22/Con/158 DT-16.06.2021 SSE/P-WAY/CON/KGP(SORO) 2770 15.09.21 0 2400 0 CONSTRUCTION

37997 466574 7305


TC/CON/BI/21-22/Con/159 DT-16.06.2021
WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
3 TC/CON/BI/RVNL/I/174 DT-30.06.2021 DGM(P)/TATA/RVNL 20000 31.10.21 800 20000 0
TOTAL DESPATCH 800 42798 92734
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE =101.340 2)CEMENT(RLY)= 531.510MT 3)CEMENT(PVT)= 276.080MT 4)INSERTS(T-6901)= 74952NOS. 27617 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 02.08.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 0 0 11980 45239 0 0 0 10182 34182 164 489 1158 9202 17 27

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1548 1548 102247 497427 452573 914 914 93648 467488 16962 1554 4564 6391 196 272
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 6847 14953 181 0 0 3694 3694 226 264 0 10747 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 0 0 0 0 0 92
GR WIDER-3138 3138 32 32 1172 1172 1966 0 0 0 0 280 234 0 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 408 8 8 64 64 344 0 0 0 0 64 0 0 0
WB GR 3335 0 0 512 512 2823 0 0 34 34 0 0 0 477 1
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 4 4 0 0 8 6
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 11583 41653 0 0 0 3227 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 0 200 200 200 0 0 0 0 200 0 0 0
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 196 196 8 0 249 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 0 525 919 0 0 0 0 0 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/BQA _ 0 0
_ 54737
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000


TC/CON/BI/21-22/Con/158 DT-16.06.2021 CONSTRUCTION

38911 467488 6391


TC/CON/BI/21-22/Con/159 DT-16.06.2021
WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 45000 31.10.21 914 914 44086
TOTAL DESPATCH 914 914 93648
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE =86.370 2)CEMENT(RLY)= 2659.190MT 3)CEMENT(PVT)= 835.280MT 4)INSERTS(T-6901)= 68536NOS. 26625 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 03.08.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 0 0 11980 45239 0 0 0 10182 34182 0 443 1368 9202 17 27

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1582 3130 103829 499009 450991 678 1592 94326 468166 17130 1448 6084 5713 196 272
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 6847 14953 181 0 0 3694 3694 162 223 105 10747 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 0 0 0 0 0 92
GR WIDER-3138 3138 48 80 1220 1220 1918 0 0 0 0 296 266 0 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 408 8 16 72 72 336 0 0 0 0 72 0 0 0
WB GR 3335 0 0 512 512 2823 0 0 34 34 0 0 0 477 1
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 4 4 0 0 8 6
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 11583 41653 0 0 0 3227 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 16 16 216 216 184 0 0 0 0 216 0 0 0
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 196 196 0 0 249 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 16 16 16 995 449 0 0 0 0 16 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/BQA _ 0 0
_ 54737
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000


TC/CON/BI/21-22/Con/158 DT-16.06.2021 CONSTRUCTION

39589 468166 5713


TC/CON/BI/21-22/Con/159 DT-16.06.2021
WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 45000 31.10.21 678 1592 43408
TOTAL DESPATCH 678 1592 94326
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE =71.005 2)CEMENT(RLY)= 2550.440MT 3)CEMENT(PVT)= 832.260MT 4)INSERTS(T-6901)= 61952NOS. 25761 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 04.08.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 0 0 11980 45239 0 0 0 10182 34182 0 220 1591 9202 17 27

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1420 4550 105249 500429 449571 878 2470 95204 469044 17082 1486 7514 4835 196 272
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 6847 14953 181 0 0 3694 3694 82 203 205 10747 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 0 0 0 0 0 92
GR WIDER-3138 3138 48 128 1268 1268 1870 0 0 0 0 328 282 0 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 408 32 48 104 104 304 0 0 0 0 104 0 0 0
WB GR 3335 0 0 512 512 2823 0 0 34 34 0 0 0 477 1
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 4 4 0 0 8 6
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 11583 41653 0 0 0 3227 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 16 32 248 248 152 0 0 0 0 248 0 0 0
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 196 196 0 0 249 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 24 40 40 1035 409 0 0 0 0 40 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/BQA _ 0 0
_ 54737
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000


TC/CON/BI/21-22/Con/158 DT-16.06.2021 CONSTRUCTION

40467 469044 4835


TC/CON/BI/21-22/Con/159 DT-16.06.2021
WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 45000 31.10.21 878 2470 42530
TOTAL DESPATCH 878 2470 95204
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE =57.280 2)CEMENT(RLY)= 2452.810MT 3)CEMENT(PVT)= 830.210MT 4)INSERTS(T-6901)= 77404NOS. 63089 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 05.08.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 0 0 11980 45239 0 0 0 10182 34182 0 0 1811 9202 17 27

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1438 5988 106687 501867 448133 724 3194 95928 469768 17114 1866 8540 4111 196 272
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 6847 14953 181 0 0 3694 3694 18 99 400 10747 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 0 0 0 0 0 92
GR WIDER-3138 3138 48 176 1316 1316 1316 0 0 0 0 344 54 260 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 408 32 80 136 136 272 0 0 0 0 136 0 0 0
WB GR 3335 0 0 512 512 2823 0 0 34 34 0 0 0 477 1
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 4 4 0 0 8 6
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 11583 41653 0 0 0 3227 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 32 64 280 280 120 0 0 0 0 280 0 0 0
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 196 196 0 0 249 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 24 64 64 1059 385 0 0 0 0 64 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/BQA _ 0 0
_ 54737
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000


TC/CON/BI/21-22/Con/158 DT-16.06.2021 CONSTRUCTION

41191 469768 4111


TC/CON/BI/21-22/Con/159 DT-16.06.2021
WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 45000 31.10.21 724 3194 41806
TOTAL DESPATCH 724 3194 95928
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE =79.420 2)CEMENT(RLY)= 2354.850MT 3)CEMENT(PVT)= 826.990MT 4)INSERTS(T-6901)= 62385NOS. 71364 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 06.08.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 0 0 11980 45239 0 0 0 10182 34182 0 0 1811 9202 17 27

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1612 7600 108299 503479 446521 976 4170 96904 470744 17744 1944 9444 3135 196 272
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 6847 14953 181 0 0 3694 3694 18 99 400 10747 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 0 0 0 0 0 92
GR WIDER-3138 3138 40 216 1356 1356 1782 0 0 0 0 368 70 260 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 408 16 96 152 152 256 0 0 0 0 152 0 0 0
WB GR 3335 0 0 512 512 2823 0 0 34 34 0 0 0 477 1
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 4 4 0 0 8 6
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31
B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 11583 41653 0 0 0 3227 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 16 80 296 296 104 0 0 0 0 296 0 0 0
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 196 196 0 0 249 355 0 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 16 80 80 1075 369 0 0 0 0 80 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 0 0 0 0 34
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/BQA _ 0 0
_ 54737
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000


TC/CON/BI/21-22/Con/158 DT-16.06.2021 CONSTRUCTION

42167 470744 3135


TC/CON/BI/21-22/Con/159 DT-16.06.2021
WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 976 4170 40830
TOTAL DESPATCH 976 4170 96904
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE =91.120 2)CEMENT(RLY)= 2241.710MT 3)CEMENT(PVT)= 825.130MT 4)INSERTS(T-6901)= 64692NOS. 61265 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 07.08.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 0 0 11980 45239 0 0 0 10182 34182 0 0 0 11040 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1566 9166 109865 505045 444955 880 5050 97784 471624 17818 1926 2484 10715 200 278
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 0 310 0 0 0 93
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 6847 14953 181 0 0 3694 3694 18 99 0 14747 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 0 0 0 0 0 92
GR WIDER-3138 3138 56 256 1140 1140 1998 0 0 0 0 408 74 0 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 408 32 128 184 184 224 0 0 0 0 184 0 0 0
WB GR 3335 0 0 512 512 2823 0 0 34 34 0 0 0 748 2
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 4 4 0 0 8 6
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 11583 41653 0 0 0 3227 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R
I
BA /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 8 88 304 304 96 0 0 0 0 304 0 0 0
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 196 196 0 0 0 603 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 24 104 104 1099 345 0 0 0 0 104 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/BQA _ 0 0
_ 54737
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000


TC/CON/BI/21-22/Con/158 DT-16.06.2021 CONSTRUCTION

43047 471624 10715


TC/CON/BI/21-22/Con/159 DT-16.06.2021
WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 880 5050 39950
TOTAL DESPATCH 880 5050 97784
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE =75.670 2)CEMENT(RLY)= 2132.380MT 3)CEMENT(PVT)= 823.220MT 4)INSERTS(T-6901)= 58108NOS. 60273 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 09.08.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 0 0 11980 45239 0 0 0 10182 34182 0 0 0 11040 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1612 10778 111477 506657 443343 1094 6144 98878 472718 17138 2708 3994 9621 200 278
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 93 93 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 6847 14953 181 0 0 3694 3694 18 99 0 14747 5 17
BA WIDER-124 SET 124 0 0 124 124 0 124 124 124 124 0 0 0 0
GR WIDER-3138 3138 64 320 1204 1204 1934 0 0 0 0 424 122 0 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 408 32 160 216 216 192 0 0 0 0 216 0 0 0
WB GR 3335 0 0 512 512 2823 0 0 34 34 0 0 0 748 2
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 4 4 0 0 8 6
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 401 501 12544 42614 0 0 0 2268 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R
I
BA /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 88 304 304 96 0 0 0 0 304 0 0 0
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 196 196 0 0 0 603 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 64 168 168 1163 281 0 0 0 0 168 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/BQA _ 0 0
_ 54737
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000


TC/CON/BI/21-22/Con/158 DT-16.06.2021 CONSTRUCTION

44141 472718 9621


TC/CON/BI/21-22/Con/159 DT-16.06.2021
WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 1094 6144 38856
TOTAL DESPATCH 1094 6144 98878
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE =223.380 2)CEMENT(RLY)= 2016.020MT 3)CEMENT(PVT)= 819.200MT 4)INSERTS(T-6901)= 51404NOS. 58937 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 10.08.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 0 0 11980 45239 0 0 0 10182 34182 0 0 0 11040 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1704 12482 113181 508361 441639 1191 7335 100069 473909 17280 2590 5674 8430 200 278
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 93 93 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 6847 14953 181 0 0 3694 3694 18 99 0 14747 5 17
BA WIDER-124 SET 124 0 0 124 124 0 124 124 124 124 0 0 0 0
GR WIDER-3138 3138 32 352 1236 1236 1902 0 0 0 0 424 154 0 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 408 32 160 192 248 160 0 0 0 0 248 0 0 0
WB GR 3335 0 0 512 512 2823 0 0 34 34 0 0 0 748 2
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 4 4 0 0 8 6
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 603 1104 13147 43217 0 0 0 1665 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R
I
BA /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 890 890 0 0 0 910 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 88 304 304 96 0 0 0 0 304 0 0 0
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 196 196 0 0 0 603 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 48 216 216 1211 233 0 0 0 0 216 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/BQA _ 0 0
_ 54737
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000


TC/CON/BI/21-22/Con/158 DT-16.06.2021 CONSTRUCTION

45332 473909 8430


TC/CON/BI/21-22/Con/159 DT-16.06.2021
WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 1191 7335 37665
TOTAL DESPATCH 1191 7335 100069
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE =233.220 2)CEMENT(RLY)= 1897.460MT 3)CEMENT(PVT)= 816.330MT 4)INSERTS(T-6901)= 44268NOS. 74657 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 11.08.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 0 0 11980 45239 0 0 0 10182 34182 0 0 0 11040 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1686 14168 114867 510047 439953 2642 9977 102711 476551 17456 2610 4010 8939 201 280
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 93 93 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 6847 14953 181 0 0 3694 3694 18 99 0 14747 5 17
BA WIDER-124 SET 124 0 0 124 124 0 124 124 124 124 0 0 0 0
GR WIDER-3138 3138 40 392 1276 1276 1862 0 0 0 0 448 120 50 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 408 16 176 108 264 144 0 0 0 0 264 0 0 0
WB GR 3335 0 0 512 512 2823 0 0 34 34 0 0 0 748 2
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 4 4 0 0 8 6
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 575 1679 13722 43792 0 0 0 1090 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R
I
BA /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 76 170 1207 1207 0 0 0 593 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 88 304 304 96 0 0 0 0 304 0 0 0
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 196 196 0 0 0 603 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 32 248 248 1243 201 0 0 0 0 248 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/BQA _ 1960 1960
_ 56697
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000


TC/CON/BI/21-22/Con/158 DT-16.06.2021 CONSTRUCTION

46014 476551 8939


TC/CON/BI/21-22/Con/159 DT-16.06.2021
WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 682 8017 36983
TOTAL DESPATCH 2642 9977 102711
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE =217.170 2)CEMENT(RLY)= 1782.130MT 3)CEMENT(PVT)= 814.330MT 4)INSERTS(T-6901)= 37236NOS. 73729 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 12.08.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 0 0 11980 45239 0 0 0 10182 34182 0 0 0 11040 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1674 15842 116541 511721 438279 1090 11067 103801 477641 17516 2544 5690 7849 201 280
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 93 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 6847 14953 181 0 0 3694 3694 18 99 0 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 124 124 124 0 0 0 0
GR WIDER-3138 3138 56 448 1332 1332 1806 0 0 0 0 472 92 110 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 408 16 184 116 274 134 0 0 0 0 274 0 0 0
WB GR 3335 0 0 512 512 2823 0 0 34 34 0 0 0 748 2
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 4 4 0 0 8 6
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 1679 13722 43792 0 0 0 1090 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R
I
BA /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 152 322 1359 1359 0 0 0 441 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 88 304 304 96 0 0 0 0 304 0 0 0
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 196 196 0 0 0 603 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 40 288 288 1283 161 0 0 0 0 288 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/BQA _ 0 1960
_ 56697
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000


TC/CON/BI/21-22/Con/158 DT-16.06.2021 CONSTRUCTION

47104 477641 7849


TC/CON/BI/21-22/Con/159 DT-16.06.2021
WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 1090 9107 35893
TOTAL DESPATCH 1090 11067 103801
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE =201.970 2)CEMENT(RLY)= 1666.370MT 3)CEMENT(PVT)= 813.840MT 4)INSERTS(T-6901)= 30556NOS. 72865 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 13.08.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 0 0 11980 45239 0 0 0 10182 34182 0 0 0 11040 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1664 17506 118205 513385 436615 1050 12117 104851 478691 19180 282 7952 6799 201 280
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 93 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 6847 14953 181 0 0 3694 3694 18 99 0 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 124 124 124 0 0 0 0
GR WIDER-3138 3138 0 448 1332 1332 1806 0 0 0 0 456 108 110 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 408 16 200 200 290 118 0 0 0 0 258 32 0 0
WB GR 3335 32 32 816 816 2519 0 0 34 34 32 0 0 748 2
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 4 4 0 0 8 6
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 1679 13722 43792 0 0 0 1090 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R
I
BA /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 322 1359 1359 0 0 0 441 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 88 304 304 96 0 0 0 0 304 0 0 0
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 196 196 0 0 0 603 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 32 320 320 1315 129 0 0 0 0 320 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/BQA _ 0 1960
_ 56697
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000


TC/CON/BI/21-22/Con/158 DT-16.06.2021 CONSTRUCTION

48154 478691 6799


TC/CON/BI/21-22/Con/159 DT-16.06.2021
WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 1050 10157 34843
TOTAL DESPATCH 1050 12117 104851
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE =219.470 2)CEMENT(RLY)= 1552.010MT 3)CEMENT(PVT)= 811.870MT 4)INSERTS(T-6901)= 45634NOS. 105225 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 14.08.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 0 0 11980 45239 0 0 0 10182 34182 0 0 0 11040 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1686 19192 119891 515071 434929 1103 13220 105954 479794 19422 1726 0 13640 204 285
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 93 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 6847 14953 181 0 0 3694 3694 18 99 0 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 124 124 124 0 0 0 0
GR WIDER-3138 3138 0 448 1332 1332 1806 0 0 0 0 456 108 110 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 408 32 232 232 322 86 0 0 0 0 258 64 0 0
WB GR 3335 64 96 880 880 2455 0 0 34 34 96 0 0 748 2
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 4 4 0 0 8 6
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 644 2323 14366 44436 0 0 0 446 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R
I
BA /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 322 1359 1359 0 0 0 441 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 88 304 304 96 0 0 0 0 304 0 0 0
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 196 196 0 0 0 603 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 32 352 352 1347 97 0 0 0 0 352 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/BQA _ 0 1960
_ 56697
_ _ 0 0 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000


TC/CON/BI/21-22/Con/158 DT-16.06.2021 CONSTRUCTION

49257 479794 13640


TC/CON/BI/21-22/Con/159 DT-16.06.2021
WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 1103 11260 33740
TOTAL DESPATCH 1103 13220 105954
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE =232.090 2)CEMENT(RLY)= 1438.460MT 3)CEMENT(PVT)= 809.900MT 4)INSERTS(T-6901)= 38506NOS. 104489 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 16.08.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 0 0 11980 45239 0 0 0 10182 34182 0 0 0 11040 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1732 20924 121623 516803 433197 4754 17974 110708 484548 19652 1696 1532 8886 204 285
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 93 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 6847 14953 181 0 0 3694 3694 18 99 0 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 124 124 124 0 0 0 0
GR WIDER-3138 3138 0 448 1332 1332 1806 0 0 0 0 456 108 110 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 408 32 264 264 354 54 0 0 0 0 258 96 0 0
WB GR 3335 40 136 920 920 2415 0 0 34 34 136 0 0 748 2
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 8 8 0 0 0 40 1
1 IN 8.5 11 0 0 11 11 0 0 0 0 0 0 0 0 11
DS/TRAP 18 0 0 18 18 0 0 0 4 4 0 0 8 6
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 46 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 2323 14366 44436 0 0 0 446 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 4674 4674 0 0 0 1073 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R
I
BA /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 322 1359 1359 0 0 0 441 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 88 304 304 96 0 0 0 0 304 0 0 0
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 196 196 0 0 0 603 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 1786 4280 0 0 0 1719 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 24 376 376 1371 73 0 0 0 0 376 0 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/GBA _ 1190 3150
_ 60537
SSE/P-WAY/KGP _ 2650 2650 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000


TC/CON/BI/21-22/Con/158 DT-16.06.2021 CONSTRUCTION

50171 484548 8886


TC/CON/BI/21-22/Con/159 DT-16.06.2021
WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 914 12174 32826
TOTAL DESPATCH 4754 17974 110708
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE =215.810 2)CEMENT(RLY)= 1320.900MT 3)CEMENT(PVT)= 808.420MT 4)INSERTS(T-6901)= 86302NOS. 124561 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 19.08.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 578 578 12558 45845 29655 0 0 10182 34182 578 0 0 11040 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1158 22082 122781 517961 432039 828 18802 111536 485376 16260 4226 3552 8058 204 285
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 93 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 6847 14953 181 0 0 3694 3694 18 99 0 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 124 124 124 0 0 0 0
GR WIDER-3138 3138 0 448 1332 1332 1806 0 0 0 0 296 158 220 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 376 22 376 376 376 0 0 0 0 0 232 144 0 0
WB GR 3335 56 192 976 976 2359 0 0 34 34 192 0 0 748 2
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 6 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 4 5 5 0 0 0 6
DS/TRAP 18 0 0 18 18 0 0 5 9 9 0 0 8 1
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 32 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 2323 14366 44436 0 0 0 446 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 5350 5350 0 0 0 397 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R
I
BA /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.22 2 0 0 2 2 0 0 0 2 2 0 0 0 0
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 380 702 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 104 400 400 0 0 0 0 0 80 320 0 0
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 324 324 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 460 460 2246 4740 0 0 0 1259 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 32 408 408 1403 41 0 0 0 0 336 40 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/GBA _ 0 3150
_ 60537
SSE/P-WAY/KGP _ 0 2650 OPEN LINE

2 TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000


TC/CON/BI/21-22/Con/158 DT-16.06.2021 CONSTRUCTION

50999 485376 8058


TC/CON/BI/21-22/Con/159 DT-16.06.2021
WB SSE/P-WAY/CON/KGP 6000 15.09.21 0 0 6000
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 828 13002 31998
TOTAL DESPATCH 828 18802 111536
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE =241.180 2)CEMENT(RLY)= 1243.630MT 3)CEMENT(PVT)= 806.460MT 4)INSERTS(T-6901)= 106308NOS. 124049 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 20.08.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 564 1142 13122 46409 29091 0 0 10182 34182 1142 0 0 11040 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1518 23600 124299 519479 430521 1046 19848 112582 486422 16340 3104 4655 8467 205 286
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 93 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 6847 14953 181 0 0 3694 3694 0 0 91 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 124 124 124 0 0 0 0
GR WIDER-3138 3138 0 448 1332 1332 1806 0 0 0 0 248 66 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 376 0 376 376 376 0 0 0 0 0 224 152 0 0
WB GR 3335 32 224 1008 1008 2327 0 0 34 34 224 0 0 748 2
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 6 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 4 5 5 0 0 0 6
DS/TRAP 18 0 0 18 18 0 0 5 9 9 0 0 8 1
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 32 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 2323 14366 44436 0 0 0 446 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 5350 5350 0 0 0 397 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 702 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 104 400 400 0 0 0 0 0 80 320 0 0
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 324 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 460 2246 4740 0 0 0 1259 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 32 440 440 1435 9 0 0 0 0 336 72 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/GBA _ 0 3150
_ 60537
2 SSE/P-WAY/KGP _ 0 2650 OPEN LINE

TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000

6000 250 250 5750 52045 486422 8467


TC/CON/BI/21-22/Con/159 DT-16.06.2021
WB SSE/P-WAY/CON/KGP 15.09.21

3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 796 13798 31202


TOTAL DESPATCH 1046 19848 112582
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE =226.600 2)CEMENT(RLY)= 1139.190MT 3)CEMENT(PVT)= 804.500MT 4)INSERTS(T-6901)= 124990NOS. 123121 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 21.08.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 576 1718 13698 46985 28515 0 0 10182 34182 1718 0 0 11040 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1468 25068 125767 520947 429053 3980 23828 116562 490402 16196 1695 1600 10558 207 289
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 93 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 40 40 6887 14993 141 0 0 3694 3694 40 0 90 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 124 124 124 0 0 0 0
GR WIDER-3138 3138 0 448 1204 1204 1934 0 0 0 0 208 100 272 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 376 0 376 376 376 0 0 0 0 0 208 168 0 0
WB GR 3335 32 256 1168 1168 2167 0 0 34 34 0 0 0 1131 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 6 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 4 5 5 0 0 0 6
DS/TRAP 18 0 0 18 18 0 0 5 9 9 0 0 8 1
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 32 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 2323 14366 44436 0 0 0 446 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 5350 5350 0 0 0 397 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 702 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 104 400 400 0 0 0 0 0 20 380 0 0
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 324 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 460 2246 4740 0 0 0 1259 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 9 449 449 1444 0 0 0 0 0 329 136 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/BJMD AT NOAMUNDI _ 3170 8970 63707
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 0 250 5750 52855 490402 10558
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 810 14608 30392
TOTAL DESPATCH 3980 23828 116562
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE =212.570 2)CEMENT(RLY)= 1036.540MT 3)CEMENT(PVT)= 804.500MT 4)INSERTS(T-6901)= 118830NOS. 122289 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 24.08.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
Agreement (Ordered Qty) produced as on During the During the producted as During the During the curing(in Under testing
ON capacity/DP up to As on date Cumulative As on date Cumulative issue (in nos)
01.04.2021 month year on date month year nos) MF REJ

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 576 2878 14858 48145 27355 0 0 10182 34182 2878 0 0 11040 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1678 28440 129139 524319 425681 3534 28190 120924 494764 16390 1687 3292 7688 208 290
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 93 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 32 104 6951 15057 77 0 0 3694 3694 104 0 90 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 124 124 124 0 0 0 0
GR WIDER-3138 3138 0 448 1204 1204 1934 0 0 0 0 88 220 272 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 376 0 376 376 376 0 0 0 0 0 208 168 0 0
WB GR 3335 64 384 1296 1296 2039 0 0 34 34 128 0 0 1131 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 6 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 4 5 5 0 0 0 6
SG/CR 2640 64 176 176 176 2464 0 0 0 0 176 0 0 0
DS/TRAP 18 0 0 18 18 0 0 5 9 9 0 0 8 1
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 32 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 160 2483 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 5350 5350 0 0 0 397 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 702 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 104 400 400 0 0 0 0 0 20 380 0 0
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 324 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 460 2246 4740 0 0 0 1259 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 449 449 1444 0 0 0 0 0 329 136 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/GBA AT GBA _ 2650 11620 66357
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 56 306 5694 54567 494764 7688
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 828 16264 28736
TOTAL DESPATCH 3534 28190 120924
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE =233.460 2)CEMENT(RLY)= 778.140MT 3)CEMENT(PVT)= 804.500MT 4)INSERTS(T-6901)= 103518NOS. 119857 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 25.08.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
Agreement (Ordered Qty) produced as on During the During the producted as During the During the curing(in Under testing
ON capacity/DP up to As on date Cumulative As on date Cumulative issue (in nos)
01.04.2021 month year on date month year nos) MF REJ

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 584 3462 15442 48729 26771 0 0 10182 34182 3462 0 0 11040 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1720 30160 130859 526039 423961 993 29183 121917 495757 16406 1603 5080 6695 208 290
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 93 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 16 120 6967 15073 61 0 0 3694 3694 120 0 90 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 124 124 124 0 0 0 0
GR WIDER-3138 3138 0 448 1204 1204 1934 0 0 0 0 88 220 272 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 376 0 376 376 376 0 0 0 0 0 208 168 0 0
WB GR 3335 64 448 1360 1360 1975 0 0 34 34 192 0 0 1131 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 6 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 4 5 5 0 0 0 6
SG/CR 2640 64 240 240 240 2400 0 0 0 0 240 0 0 0
DS/TRAP 18 0 0 18 18 0 0 5 9 9 0 0 8 1
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 32 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 160 2483 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 5350 5350 0 0 0 397 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 702 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 104 400 400 0 0 0 0 0 20 380 0 0
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 324 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 460 2246 4740 0 0 0 1259 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 449 449 1444 0 0 0 0 0 329 136 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/GBA AT GBA _ 0 11620 66357
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 125 431 5569 55560 495757 6695
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 868 17132 27868
TOTAL DESPATCH 993 29183 121917
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE =217.920 2)CEMENT(RLY)= 664.810MT 3)CEMENT(PVT)= 804.500MT 4)INSERTS(T-6901)= 118865NOS. 96846 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 26.08.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
Agreement (Ordered Qty) produced as on During the During the producted as During the During the curing(in Under testing
ON capacity/DP up to As on date Cumulative As on date Cumulative issue (in nos)
01.04.2021 month year on date month year nos) MF REJ

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 576 4038 16018 49305 26195 0 0 10182 34182 4038 0 0 11040 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1702 31862 132561 527741 422259 949 30132 122866 496706 16422 1399 6970 5746 208 290
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 93 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 16 136 6983 15089 45 0 0 3694 3694 136 0 90 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 124 124 124 0 0 0 0
GR WIDER-3138 3138 0 448 1204 1204 1934 0 0 0 0 16 292 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 376 0 376 376 376 0 0 0 0 0 112 264 0 0
WB GR 3335 64 512 1424 1424 1911 0 0 34 34 256 0 0 1131 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 6 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 4 5 5 0 0 0 6
SG/CR 2640 56 296 296 296 2344 0 0 0 0 296 0 0 0
DS/TRAP 18 0 0 18 18 0 0 5 10 10 0 0 8 0
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 32 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 2483 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 0 0 5350 5350 0 0 0 397 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 702 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 104 400 400 0 0 0 0 0 0 400 0 0
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 324 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 460 2246 4740 0 0 0 1259 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 449 449 1444 0 0 0 0 0 329 136 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/GBA AT GBA _ 0 11620 66357
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 148 579 5421 56509 496706 5746
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 801 17933 27067
TOTAL DESPATCH 949 30132 122866
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE =200.980 2)CEMENT(RLY)= 3230.690MT 3)CEMENT(PVT)= 804.500MT 4)INSERTS(T-6901)= 89718NOS. 117585 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 27.08.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
Agreement (Ordered Qty) produced as on During the During the producted as During the During the curing(in Under testing
ON capacity/DP up to As on date Cumulative As on date Cumulative issue (in nos)
01.04.2021 month year on date month year nos) MF REJ

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 588 4626 16606 49893 25607 0 0 10182 34182 4626 0 0 11040 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1752 33614 134313 529493 420507 4129 34261 126995 500835 16500 1481 1592 8580 211 294
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 93 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 16 152 6999 15105 29 0 0 3694 3694 152 0 90 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 124 124 124 0 0 0 0
GR WIDER-3138 3138 0 448 1204 1204 1934 0 0 0 0 0 308 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 376 0 376 376 376 0 0 0 0 0 112 264 0 0
WB GR 3335 32 544 1456 1456 1879 0 0 34 34 256 32 0 1131 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 6 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 4 5 5 0 0 0 6
SG/CR 2640 64 360 360 360 2280 0 0 0 0 360 0 0 0
DS/TRAP 18 0 0 18 18 0 0 5 10 10 0 0 8 0
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 32 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 2483 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 0 299 299 5649 5649 0 0 0 101 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 702 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 104 400 400 0 0 0 0 0 0 400 0 0
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 324 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 460 2246 4740 0 0 0 1259 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 449 449 1444 0 0 0 0 0 297 168 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/SONA AT BQA _ 2950 14570 69307
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 10000
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 375 954 5046 57688 500835 8580
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 804 18737 26263
TOTAL DESPATCH 4129 34261 126995
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE =185.720 2)CEMENT(RLY)= 3119.020MT 3)CEMENT(PVT)= 804.500MT 4)INSERTS(T-6901)= 108046NOS. 116657 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 28.08.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
Agreement (Ordered Qty) produced as on During the During the producted as During the During the curing(in Under testing
ON capacity/DP up to As on date Cumulative As on date Cumulative issue (in nos)
01.04.2021 month year on date month year nos) MF REJ

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 600 5226 17206 50493 25007 0 0 10182 34182 5226 0 0 11040 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1614 35228 135927 531107 418893 1029 35290 128024 501864 16450 1558 3179 7551 211 294
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 93 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 29 191 7028 15134 0 0 0 3694 3694 181 0 90 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 124 124 124 0 0 0 0
GR WIDER-3138 3138 0 448 1204 1204 1934 0 0 0 0 0 308 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 376 0 376 376 376 0 0 0 0 0 112 264 0 0
WB GR 3335 64 608 1520 1520 1815 0 0 34 34 256 96 0 1131 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 6 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 4 5 5 0 0 0 6
SG/CR 2640 64 424 424 424 2216 0 0 0 0 424 0 0 0
DS/TRAP 18 0 0 18 18 0 0 5 10 10 0 0 8 0
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 32 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 2483 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 101 400 400 5750 5750 0 0 0 0 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 702 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 104 400 400 0 0 0 0 0 0 400 0 0
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 324 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 460 2246 4740 0 0 0 1259 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 449 449 1444 0 0 0 0 0 261 204 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/SONA AT BQA _ 0 14570 69307
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 120 120 9880
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 125 1079 4921 58717 501864 7551
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 784 19521 25479
TOTAL DESPATCH 1029 35290 128024
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 169.970 2)CEMENT(RLY)= 3810.640 MT 3)CEMENT(PVT)= 804.500 MT 4)INSERTS(T-6901)= 101270 NOS. 115601 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 29.08.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
Agreement (Ordered Qty) produced as on During the During the producted as During the During the curing(in Under testing
ON capacity/DP up to As on date Cumulative As on date Cumulative issue (in nos)
01.04.2021 month year on date month year nos) MF REJ

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 500 5726 17706 50993 24507 0 0 10182 34182 5726 0 0 11040 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1747 36975 137674 532854 417146 1586 36876 129610 503450 16511 2724 3699 5965 211 294
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 93 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 191 7028 15134 0 0 0 3694 3694 181 0 90 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 124 124 124 0 0 0 0
GR WIDER-3138 3138 0 448 1204 1204 1934 0 0 0 0 0 308 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 376 0 376 376 376 0 0 0 0 0 112 264 0 0
WB GR 3335 0 608 1520 1520 1815 0 0 34 34 256 96 0 1131 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 6 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 4 5 5 0 0 0 6
SG/CR 2640 0 424 424 424 2216 0 0 0 0 424 0 0 0
DS/TRAP 18 0 0 18 18 0 0 5 10 10 0 0 8 0
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 32 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 2483 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 101 0 400 5750 5750 0 0 0 0 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 702 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 104 400 400 0 0 0 0 0 0 400 0 0
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 324 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 460 2246 4740 0 0 0 1259 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 449 449 1444 0 0 0 0 0 261 204 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/SONA AT BQA _ 0 14570 69307
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 519 639 9361
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 242 1321 4679 60303 503450 5965
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 825 20346 24654
TOTAL DESPATCH 1586 36876 129610
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 151.700 2)CEMENT(RLY)= 2874.580 MT 3)CEMENT(PVT)= 804.500 MT 4)INSERTS(T-6901)= 94282 NOS. 113601 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 30.08.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
Agreement (Ordered Qty) produced as on During the During the producted as During the During the curing(in Under testing
ON capacity/DP up to As on date Cumulative As on date Cumulative issue (in nos)
01.04.2021 month year on date month year nos) MF REJ

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 96 5822 17802 51089 24411 0 0 10182 34182 5822 0 0 11040 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 544 37519 138218 533398 416602 303 37179 129913 503753 17055 1164 3725 7196 211 294
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 93 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 191 7028 15134 0 0 0 3694 3694 181 0 90 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 124 124 124 0 0 0 0
GR WIDER-3138 3138 0 448 1204 1204 1934 0 0 0 0 0 308 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 376 0 376 376 376 0 0 0 0 0 80 296 0 0
WB GR 3335 64 672 1584 1584 1751 0 0 34 34 256 160 0 1131 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 6 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 4 5 5 0 0 0 6
SG/CR 2640 72 496 496 496 2144 0 0 0 0 496 0 0 0
DS/TRAP 18 0 0 18 18 0 0 5 10 10 0 0 8 0
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 32 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 2483 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 101 0 400 5750 5750 0 0 0 0 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 702 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 104 400 400 0 0 0 0 0 0 400 0 0
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 324 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 460 2246 4740 0 0 0 1259 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 449 449 1444 0 0 0 0 0 261 204 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/SONA AT BQA _ 0 14570 69307
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 17 656 9344
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 286 1607 4393 60606 503753 7196
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 0 20346 24654
TOTAL DESPATCH 303 37179 129913
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 200.390 2)CEMENT(RLY)= 2839.610 MT 3)CEMENT(PVT)= 804.500 MT 4)INSERTS(T-6901)= 202752 NOS. 113473 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 31.08.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
Agreement (Ordered Qty) produced as on During the During the producted as During the During the curing(in Under testing
ON capacity/DP up to As on date Cumulative As on date Cumulative issue (in nos)
01.04.2021 month year on date month year nos) MF REJ

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 576 6398 18378 51665 23835 0 0 10182 34182 5822 0 0 11040 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1636 39155 139854 535034 414966 4602 41781 134515 508355 16959 1276 5345 2594 211 294
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 93 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 191 7028 15134 0 0 0 3694 3694 181 0 90 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 124 124 124 0 0 0 0
GR WIDER-3138 3138 0 448 1204 1204 1934 0 0 0 0 0 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 376 0 376 376 376 0 0 0 0 0 64 312 0 0
WB GR 3335 32 704 1616 1616 1719 0 0 34 34 248 200 0 1131 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 6 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 4 5 5 0 0 0 6
SG/CR 2640 72 568 568 568 2072 0 0 0 0 568 0 0 0
DS/TRAP 18 0 0 18 18 0 0 5 10 10 0 0 8 0
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 32 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 2483 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 101 0 400 5750 5750 0 0 0 0 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 702 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 104 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 324 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 460 2246 4740 0 0 0 1259 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 449 449 1444 0 0 0 0 0 204 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/MURI-II AT MURI _ 3180 17750 72487
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 222 878 9122
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 423 2030 3970 62028 508355 2594
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 777 21123 23877
TOTAL DESPATCH 4602 41781 134515
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 185.130 2)CEMENT(RLY)= 2726.660 MT 3)CEMENT(PVT)= 804.500 MT 4)INSERTS(T-6901)= 195792 NOS. 112801 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 01.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
Agreement (Ordered Qty) produced as on During the During the producted as During the During the curing(in Under testing
ON capacity/DP up to As on date Cumulative As on date Cumulative issue (in nos)
01.04.2021 month year on date month year nos) MF REJ

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 574 574 18952 52239 23261 0 0 10182 34182 6972 0 0 11040 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1600 1600 141454 536634 413366 917 917 135201 509041 18559 577 6044 1908 211 294
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 181 0 90 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 1204 1204 1934 0 0 0 0 0 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 376 0 0 376 376 0 0 0 0 0 64 312 0 0
WB GR 3335 64 64 1680 1680 1655 0 0 34 34 248 264 0 1131 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 48 48 616 616 2024 0 0 0 0 616 0 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 32 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 101 0 0 5750 5750 0 0 0 0 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 2246 4740 0 0 0 1259 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 0 0 204 0 979
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
SSE/P-WAY/MURI-II AT MURI _ 0 0 72487
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 9122
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 231 231 3970 62714 509041 1908
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 686 686 23191
TOTAL DESPATCH 917 917 135201
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 202.340 2)CEMENT(RLY)= 2619.930 MT 3)CEMENT(PVT)= 804.500 MT 4)INSERTS(T-6901)= 222754 NOS. 112097 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 02.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
Agreement (Ordered Qty) produced as on During the During the producted as During the During the curing(in Under testing
ON capacity/DP up to As on date Cumulative As on date Cumulative issue (in nos)
01.04.2021 month year on date month year nos) MF REJ

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 582 1156 19534 52821 22679 0 0 10182 34182 7554 0 0 11040 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1684 3284 143138 538318 411682 523 1440 135724 509564 20243 577 0 7423 214 297
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 181 0 90 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 1204 1204 1934 0 0 0 0 0 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 376 0 0 376 376 0 0 0 0 0 64 312 0 0
WB GR 3335 32 96 1712 1712 1623 0 0 34 34 80 0 0 1595 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 72 120 688 688 1952 0 0 0 0 688 0 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 32 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 101 0 0 5750 5750 0 0 0 0 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 2246 4740 0 0 0 1259 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 0 979 88 23 354
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

TC/CONC/20-21-/96 0 0 0
1 TC/CONC/20-21-/97 0 0 0
TC/CONC/20-21-/98
BG 0 0 0 10182 34182 5503
0 0 0
TOTAL DESPATCH 0 0 0
_ 0 0 72487
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 9122
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 125 356 3845 63237 509564 7423
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 398 1084 22793
TOTAL DESPATCH 523 1440 135724
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 186.270 2)CEMENT(RLY)= 2506.090 MT 3)CEMENT(PVT)= 804.500 MT 4)INSERTS(T-6901)= 218302 NOS. 111233 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 03.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
Agreement (Ordered Qty) produced as on During the During the producted as During the During the curing(in Under testing
ON capacity/DP up to As on date Cumulative As on date Cumulative issue (in nos)
01.04.2021 month year on date month year nos) MF REJ

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 490 1646 20024 53311 22189 3860 3860 14042 38042 7466 578 0 7180 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1422 4706 144560 539740 410260 1051 2491 136775 510615 20507 1735 0 6372 214 297
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 181 0 90 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 1204 1204 1934 0 0 0 0 0 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 376 0 0 376 376 0 0 0 0 0 64 312 0 0
WB GR 3335 32 128 1744 1744 1591 0 0 34 34 112 0 0 1595 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 56 176 744 744 1896 0 0 0 0 728 16 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 32 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 101 0 0 5750 5750 0 0 0 0 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 720 8596 0 0 0 4919 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 2246 4740 0 0 0 1259 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 0 979 88 23 354
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

SSE/P-WAY/KGP AT KGP 3860 3860 0


1 0 0 0
BG 0 0 0 14042 38042 7180
0 0 0
TOTAL DESPATCH 0 0 0
_ 0 0 72487
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 9122
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 215 571 3630 64288 510615 6372
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 836 1920 21957
TOTAL DESPATCH 1051 2491 136775
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 196.180 2)CEMENT(RLY)= 2412.630 MT 3)CEMENT(PVT)= 804.500 MT 4)INSERTS(T-6901)= 212262 NOS. 110721 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
04.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 592 2238 20616 53903 21597 0 3860 14042 38042 7494 724 418 7180 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1668 6374 146228 541408 408592 737 3228 137521 511352 20657 1631 1622 5635 214 297
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 181 0 90 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 1204 1204 1934 0 0 0 0 0 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 376 0 0 376 376 0 0 0 0 0 64 312 0 0
WB GR 3335 32 160 1776 1776 1559 0 0 34 34 112 32 0 1595 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 80 256 824 824 1816 0 0 0 0 784 40 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 32 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 101 0 0 5750 5750 0 0 0 0 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 120 120 840 8716 0 0 0 4799 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 2246 4740 0 0 0 1259 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 0 979 88 23 354
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0

DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 0 3860 0
BG 0 0 0 14042 38042 7180
TOTAL DESPATCH 0 0 0
_ 0 0 72487
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 9122
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 215 786 3415 65025 511352 5635
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 522 2442 21435
TOTAL DESPATCH 737 3228 137512
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 180.180 2)CEMENT(RLY)= 2299.770 MT 3)CEMENT(PVT)= 804.500 MT 4)INSERTS(T-6901)= 205142 NOS. 109857 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 05.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 128 2366 20744 54031 21469 0 3860 14042 38042 7622 724 418 7180 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 694 7068 146922 542102 407890 1078 4306 138599 512430 21351 1631 1622 4557 214 297
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 181 0 90 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 1204 1204 1934 0 0 0 0 0 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 376 0 0 376 376 0 0 0 0 0 64 312 0 0
WB GR 3335 0 160 1776 1776 1559 0 0 34 34 112 32 0 1595 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 256 824 824 1816 0 0 0 0 784 40 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 140 0 0 0 10 89 0 0 32 5
1in 8.5 DS 15 0 0 15 15 0 0 0 10 10 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 101 0 0 5750 5750 0 0 0 0 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 120 840 8716 0 0 0 4799 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 2246 4740 0 0 0 1259 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 0 979 88 23 354
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0

DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 0 3860 0
BG 0 0 0 14042 38042 7180
TOTAL DESPATCH 0 0 0
_ 0 0 72487
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 0 9122
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 224 1010 3191 66103 512430 4557
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 854 3296 20581
TOTAL DESPATCH 1078 4306 138590
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 173.550 2)CEMENT(RLY)= 2250.940 MT 3)CEMENT(PVT)= 804.500 MT 4)INSERTS(T-6901)= 227356 NOS. 109345 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 06.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 572 2938 21316 54603 20897 0 3860 14042 38042 7618 708 1010 7180 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1670 8738 148592 543772 406228 900 5206 139490 513330 21553 1509 3212 3657 214 297
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 181 0 90 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 1204 1204 1934 0 0 0 0 0 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 0 102 0 0 0 2
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 43 0 20
WB GR 3335 64 224 1840 1840 1495 0 0 34 34 112 96 0 1595 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 64 320 888 888 1752 0 0 0 0 824 64 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 101 0 0 5750 5750 0 0 0 0 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 120 840 8716 0 0 0 4799 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 2246 4740 0 0 0 1259 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 0 979 88 23 354
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0

DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 0 3860 0
BG 0 0 0 14042 38042 7180
TOTAL DESPATCH 0 3860 0
_ 0 0 72487
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 220 220 8902
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 0 1010 3191 67003 513330 3657
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 680 3976 19901
TOTAL DESPATCH 900 5206 139490
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 158.690 2945.6 2945.000 MT 3)CEMENT(PVT)= 804.500 MT 4)INSERTS(T-6901)= 220164 NOS. 109057 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 07.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 104 3042 21420 54707 20793 0 3860 14042 38042 7138 602 1700 7180 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1514 10252 150106 545286 404714 3095 8301 142585 516425 21373 1838 1701 3435 215 299
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 145 36 90 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 1204 1204 1934 0 0 0 0 0 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 1 1 1 103 0 0 0 1
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 43 0 20
WB GR 3335 32 256 1872 1872 1463 0 0 34 34 112 128 0 1595 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 48 368 936 936 1704 0 0 0 0 824 112 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 44 320 0 0 0 31


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 101 0 0 5750 5750 0 0 0 0 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 120 240 960 8836 0 0 0 4679 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 2246 4740 0 0 0 1259 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 0 979 72 39 354
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0

DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 0 3860 0
BG 0 0 0 14042 38042 7180
TOTAL DESPATCH 0 3860 0
SSE/P-WAY/GBA AT GBA _ 2430 2430 74917
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 110 330 8792
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 23 1033 3168 67668 516425 3435
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 532 4508 19369
TOTAL DESPATCH 3095 8301 142585
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 180.040 2)CEMENT(RLY)= 2040.230 MT 3)CEMENT(PVT)= 804.500 MT 4)INSERTS(T-6901)= 213788 NOS. 108641 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 08.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 208 3250 21628 54915 20585 0 3860 14042 38042 6770 358 2520 7180 17 28

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1630 11882 151736 546916 403084 822 9123 143407 517247 21325 1606 3611 1983 215 299
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 145 36 90 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 1204 1204 1934 0 0 0 0 0 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 1 1 1 103 0 0 0 1
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 43 0 20
WB GR 3335 64 320 1936 1936 1399 0 0 34 34 112 192 0 1595 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 56 424 992 992 1648 0 0 0 0 816 176 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 3 3 47 323 0 0 0 28


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 101 0 0 5750 5750 0 0 0 0 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 600 840 1560 9436 0 0 0 4079 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 400 400 2646 5140 0 0 0 851 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 0 979 72 39 354
ADANI
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0

DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 0 3860 0
BG 0 0 0 14042 38042 7180
TOTAL DESPATCH 0 3860 0
_ 0 2430 74917
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 192 522 8600
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 40 1073 3128 68490 517247 2613
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 590 5098 18779
TOTAL DESPATCH 822 9123 143407
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 164.346 2)CEMENT(RLY)= 1926.660 MT 3)CEMENT(PVT)= 804.500 MT 4)INSERTS(T-6901)= 251818 NOS. 107809 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 09.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 132 3382 21760 55047 20453 0 3860 14042 38042 6318 416 173 10050 18 30

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1740 13622 153476 548656 401344 973 10096 144380 518220 21345 1643 0 6930 217 301
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 0 69 202 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 1204 1204 1934 0 0 0 0 0 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 1 1 1 103 0 0 0 1
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 43 0 20
WB GR 3335 32 352 1968 1968 1367 0 0 34 34 64 16 0 1850 1 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 64 488 1056 1056 1584 0 0 0 0 816 240 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 3 3 47 323 0 0 0 28


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 101 0 0 5750 5750 0 0 0 0 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 598 1438 2158 10034 0 0 0 3481 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 600 1000 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 0 979 72 39 354
ADANI T.OUT 1IN12 17 0 0 10 10 7 0 0 5 5 0 0 0 5
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0

DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 0 3860 0
BG 0 0 0 14042 38042 7180
TOTAL DESPATCH 0 3860 0
_ 0 2430 74917
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 522 8600
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 231 1304 2897 69463 518220 6930
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 742 5840 18037
TOTAL DESPATCH 973 10096 144380
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 183.220 2)CEMENT(RLY)= 1809.590 MT 3)CEMENT(PVT)= 804.500 MT 4)INSERTS(T-6901)= 244474 NOS. 107281 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 10.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 136 3518 21896 55183 20317 0 3860 14042 38042 5878 412 753 10050 18 30

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1558 15180 155034 550214 399786 982 11078 145362 519202 21201 1453 1892 5948 217 301
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 0 69 202 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 1204 1204 1934 0 0 0 0 0 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 1 2 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 43 0 20
WB GR 3335 64 416 2032 2032 1303 0 0 34 34 96 48 0 1850 1 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 56 544 1112 1112 1528 0 0 0 0 816 296 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 3 6 50 326 0 0 0 25


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 101 0 0 5750 5750 0 0 0 0 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 1438 2158 10034 0 0 0 3481 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 1000 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 0 979 72 39 354
ADANI T.OUT 1IN12 17 0 0 10 10 7 0 0 5 5 0 0 0 5
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0

DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 0 3860 0
BG 0 0 0 14042 38042 7180
TOTAL DESPATCH 0 3860 0
_ 0 2430 74917
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 100 622 8500
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 125 1429 2772 70445 519202 5948
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 757 6597 17280
TOTAL DESPATCH 982 11078 145362
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 168.740 2)CEMENT(RLY)= 2508.470 MT 3)CEMENT(PVT)= 804.500 MT 4)INSERTS(T-6901)= 237762 NOS. 106737 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 11.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 104 3622 22000 55287 20213 0 3860 14042 38042 5394 495 1258 10050 18 30

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1644 16824 156678 551858 398142 1014 12092 146376 520216 21093 1610 3487 4934 217 301
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 0 69 202 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 1204 1204 1934 0 0 0 0 0 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 2 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 43 0 20
WB GR 3335 32 448 2064 2064 1271 0 0 34 34 96 80 0 1850 1 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 64 608 1176 1176 1464 0 0 0 0 816 360 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 6 50 326 0 0 0 25


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 101 0 0 5750 5750 0 0 0 0 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 1438 2158 10034 0 0 0 3481 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 1000 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 0 979 72 39 354
ADANI T.OUT 1IN12 17 0 0 10 10 7 0 0 5 5 0 0 0 5
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0

DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 0 3860 0
BG 0 0 0 14042 38042 7180
TOTAL DESPATCH 0 3860 0
_ 0 2430 74917
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 100 722 8400
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 100 1529 2672 71459 520216 4934
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 814 7411 16466
TOTAL DESPATCH 1014 12092 146376
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 154.050 2)CEMENT(RLY)= 1594.160 MT 3)CEMENT(PVT)= 804.500 MT 4)INSERTS(T-6901)= 230802 NOS. 106321 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 12.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 0 3622 22000 55287 20213 0 3860 14042 38042 5394 495 1258 10050 18 30

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 600 17424 157278 552458 397542 3885 15977 150261 524101 20077 1686 1849 4224 219 302
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 0 69 202 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 1204 1204 1934 0 0 0 0 0 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 2 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 43 0 20
WB GR 3335 0 448 2064 2064 1271 0 0 34 34 96 80 0 1850 1 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 608 1176 1176 1464 0 0 0 0 816 360 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 6 50 326 0 0 0 25


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 101 0 0 5750 5750 0 0 0 0 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 1438 2158 10034 0 0 0 3481 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 1000 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 0 979 72 39 354
ADANI T.OUT 1IN12 17 0 0 10 10 7 0 0 5 5 0 0 0 5
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0

DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 0 3860 0
BG 0 0 0 14042 38042 7180
TOTAL DESPATCH 0 3860 0
SSE/P-WAY/MURI-II AT MURI _ 2920 5350 77837
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 722 8400
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 209 1738 2463 72424 524101 4224
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 756 8167 15710
TOTAL DESPATCH 3885 15977 150261
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 149.300 2)CEMENT(RLY)= 1557.370 MT 3)CEMENT(PVT)= 804.500 MT 4)INSERTS(T-6901)= 228402 NOS. 106321 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 13.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 272 3894 22272 55559 19941 0 3860 14042 38042 4566 915 1938 10050 18 30

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1660 19084 158938 554118 395882 924 16901 151185 525025 19990 1823 3459 3300 219 302
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 0 69 202 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 1204 1204 1934 0 0 0 0 0 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 2 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 43 0 20
WB GR 3335 64 512 2128 2128 1207 0 0 34 34 96 144 0 1850 1 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 72 680 1248 1248 1392 0 0 0 0 824 424 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 6 50 326 0 0 0 25


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 101 0 0 5750 5750 0 0 0 0 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 120 1558 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 1000 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 0 979 72 39 354
ADANI T.OUT 1IN12 17 0 0 10 10 7 2 2 7 7 0 0 0 3
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0

DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 0 3860 0
BG 0 0 0 14042 38042 7180
TOTAL DESPATCH 0 3860 0
SSE/P-WAY/MURI-II AT MURI _ 0 5350 77837
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 106 828 8294
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 0 1738 2463 73348 525025 3300
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 818 8985 14892
TOTAL DESPATCH 924 16901 151185
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 192.820 2)CEMENT(RLY)= 1437.850 MT 3)CEMENT(PVT)= 804.500 MT 4)INSERTS(T-6901)= 221218 NOS. 105233 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 14.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 132 4026 22404 55691 19809 0 3860 14042 38042 4602 501 2448 10050 18 30

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1390 20474 160328 555508 394492 976 17877 152161 526001 20836 773 5053 2324 219 302
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 0 69 202 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 1204 1204 1934 0 0 0 0 0 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 2 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 43 0 20
WB GR 3335 64 576 2192 2192 1143 0 0 34 34 128 176 0 1850 1 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 40 720 1288 1288 1352 0 0 0 0 792 496 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 6 50 326 0 0 0 25


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 101 0 0 5750 5750 0 0 0 0 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 120 1558 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 1000 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 0 979 72 39 354
ADANI T.OUT 1IN12 17 0 0 10 10 7 2 2 7 7 0 0 0 3
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 0 3860 0
BG 0 0 0 14042 38042 10050
TOTAL DESPATCH 0 3860 0
SSE/P-WAY/MURI-II AT MURI _ 0 5350 77837
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 186 1014 8108
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 0 1738 2463 74324 526001 2324
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 790 9775 14102
TOTAL DESPATCH 976 17877 152161
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 211.970 2)CEMENT(RLY)= 1343.700 MT 3)CEMENT(PVT)= 804.500 MT 4)INSERTS(T-6901)= 215242 NOS. 104705 NOS
381) =

Note- One shift(U-1) not run due to less labor (heavy rain)

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 15.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 240 4266 22644 55931 19569 0 3860 14042 38042 4266 587 2938 10050 18 30

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1676 22150 162004 557184 392816 1093 18970 153254 527094 20876 1619 5843 1231 219 302
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 0 69 202 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 1204 1204 1934 0 0 0 0 0 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 2 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 43 0 20
WB GR 3335 32 608 2224 2224 1111 0 0 34 34 96 240 0 1850 1 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 64 784 1352 1352 1288 0 0 0 0 784 568 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 6 50 326 0 0 0 25


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 101 0 0 5750 5750 0 0 0 0 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 1558 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 1000 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 0 979 72 39 354
ADANI T.OUT 1IN12 17 0 0 10 10 7 0 2 7 7 0 0 0 3
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0

DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 0 3860 0
BG 0 0 0 14042 38042 10050
TOTAL DESPATCH 0 3860 0
SSE/P-WAY/MURI-II AT MURI _ 0 5350 77837
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 1014 8108
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 221 1959 2242 75417 527094 1231
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 872 10647 13230
TOTAL DESPATCH 1093 18970 153254
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 195.820 2)CEMENT(RLY)= 1225.060 MT 3)CEMENT(PVT)= 804.500 MT 4)INSERTS(T-6901)= 208154 NOS. 103745 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 18.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATI Per day max production IC under Stock as on date
ON Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 176 4622 23000 56287 19213 0 3860 14042 38042 2888 1553 250 13501 20 33

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1754 25614 165468 560648 389352 0 19186 153470 527310 20674 2992 950 8194 222 306
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403
sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 0 69 202 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 1204 1204 1934 0 0 0 0 0 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 2 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 43 0 20
WB GR 3335 64 738 2352 2352 983 0 451 755 755 176 288 0 1129 1 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 56 855 1456 1456 1184 0 0 0 0 712 744 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/
CON.
T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 6 50 326 0 0 0 25


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294
P dt- 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC)
0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG /RITES.
TC/CONC/PRIL/CS-172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 3662 0 0 0 5755 101 0 0 5750 5750 0 0 0 0 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298
DT 18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298
2 0 0 2 2 0 0 0 2 2 0 0 0 0
DT 18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 1558 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 1000 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 0 979 72 39 354
ADANI T.OUT 1IN12 17 0 0 10 10 7 0 2 7 7 0 0 0 3
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0

DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 0 3860 0
BG 0 0 0 14042 38042 10050
TOTAL DESPATCH 0 3860 0
SSE/P-WAY/MURI-II AT MURI _ 0 5350 77837
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 1014 8108
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 0 1959 2242 75633 527310 1015
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 0 10863 13014
TOTAL DESPATCH 0 19186 153470
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 192.250 2)CEMENT(RLY)= 988.830 MT 3)CEMENT(PVT)= 804.520 MT 4)INSERTS(T-6901)= 193370 NOS. 102321 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 20.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATIO Per day max production IC under Stock as on date
N Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 288 4910 23288 56575 18925 0 3860 14042 38042 2456 1403 1120 13501 20 33

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1824 27438 167292 562472 387528 814 20000 154284 528124 20136 3804 2500 7380 222 306
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 0 69 202 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 1204 1204 1934 0 0 0 0 0 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 2 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 43 0 20
WB GR 3335 64 802 2416 2416 919 0 451 755 755 176 64 0 1417 1 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 80 912 1536 1536 1104 0 0 0 0 712 824 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 6 50 326 0 0 0 25


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294 dt-
P 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC) 0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298 DT
18.09.20 3662 0 0 0 5755 101 0 0 5750 5750 0 0 0 0 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298 DT
18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298 DT
2 0 0 2 2 0 0 0 2 2 0 0 0 0
18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 1558 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 1000 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 0 979 72 39 354
ADANI T.OUT 1IN12 17 0 0 10 10 7 0 2 7 7 0 0 0 3
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0

DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 0 3860 0
BG 0 0 0 14042 38042 13501
TOTAL DESPATCH 0 3860 0
SSE/P-WAY/MURI-II AT MURI _ 0 5350 77837
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 1014 8108
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 0 1959 2242 76447 528124 7380
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 814 11677 12200
TOTAL DESPATCH 814 20000 154284
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 174.120 2)CEMENT(RLY)= 857.980 MT 3)CEMENT(PVT)= 804.520 MT 4)INSERTS(T-6901)= 185498 NOS. 101169 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 21.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATIO Per day max production IC under Stock as on date
N Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 160 5070 23448 56735 18965 0 3860 14042 38042 2044 1060 2035 13501 20 33

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1834 29272 169126 564306 385694 3670 23670 157954 531794 20300 3738 4236 3710 222 306
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 0 69 202 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 1204 1204 1934 0 0 0 0 0 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 2 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 43 0 20
WB GR 3335 64 866 2480 2480 855 0 451 755 755 240 64 0 1417 1 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 72 984 1608 1608 1032 0 0 0 0 720 888 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ CON. T.OUT1in12(ECR/CON)/399 SETS 0 0 0 0 399 0 0 0 0 399 0 0 0 0

ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 6 50 326 0 0 0 25


B.G/RVNL/38000 NOS 6635 0 0 0 31365 6635 0 0 0 29038 0 0 0 2290 11 26
L.C/RVNL(KEC) TC/CON/PRIL/CS-169/I/294 dt-
P 01.10.19 0 0 0 0 950 0 0 0 350 950 0 0 0 0
V P&C (1 in 12)/RVNL (KEC) 0 0 0 0 80 0 0 0 0 80 0 0 0 0
T G. R. /RVNL (KEC) 0 0 0 0 1550 0 0 0 612 1550 0 0 0 0
.
K B.A/KEC 0 0 0 0 22 0 0 0 0 22 0 0 0 0
E 1 IN 8.5 (KEC) 0 0 0 0 38 0 0 0 10 19 0 0 0 0
C
SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG /RITES. TC/CONC/PRIL/CS-
172/298 DT 18.09.20 12264 0 0 12248 44934 0 0 0 14526 44596 0 0 0 306 20 34
P
V
WB /RITES. TC/CONC/PRIL/CS-172/298 DT
18.09.20 3662 0 0 0 5755 101 0 0 5750 5750 0 0 0 0 3 5
T
.
L.C /RITES. TC/CONC/PRIL/CS-172/298 DT
18.09.20 0 0 0 0 140 0 0 0 140 140 0 0 0 0
R BA /RITES. TC/CONC/PRIL/CS-172/298 DT
2 0 0 2 2 0 0 0 2 2 0 0 0 0
18.09.22
I
T T.O 1 in 8.5 19 0 0 20 22 0 0 0 6 6 0 0 0 16
E
S
T.O 1 in 12 18 0 0 4 28 0 0 0 23 23 0 0 0 5
CR(RITES) 960 0 0 1376 1802 0 0 0 1739 1739 0 0 0 61 2
BG/TRIVENI 4216 0 0 4400 13520 0 0 1558 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT. BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 1000 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 0 979 72 39 354
ADANI T.OUT 1IN12 17 0 0 10 10 7 0 2 7 7 0 0 0 3
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0

DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 0 3860 0
BG 0 0 0 14042 38042 13501
TOTAL DESPATCH 0 3860 0
SSE/P-WAY/KGP AT KGP _ 2530 7880 80367
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 1014 8108
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 0 1959 2242 77587 531794 3710
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 1140 12817 11060
TOTAL DESPATCH 3670 23670 157954
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 233.640 2)CEMENT(RLY)= 733.270 MT 3)CEMENT(PVT)= 804.520 MT 4)INSERTS(T-6901)= 177618 NOS. 100529 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 22.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATIO Per day max production IC under Stock as on date
N Agreement (Ordered Qty) produced as on During the During the producted as During the During the curing(in Under testing
capacity/DP up to As on date Cumulative As on date Cumulative issue (in nos)
01.04.2021 month year on date month year nos) MF REJ

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 228 5298 23676 56963 18537 0 3860 14042 38042 2168 596 2603 13501 20 33

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1736 31008 170862 566042 383958 632 24302 158586 532426 20522 3092 6396 3078 222 306
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 0 0 271 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 1204 1204 1934 0 0 0 0 0 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 2 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 43 0 20
WB GR 3335 32 898 2512 2512 823 0 451 755 755 144 192 0 1417 1 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 48 1032 1656 1656 984 0 0 0 0 720 936 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 2 8 53 328 0 0 0 23

K
SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 1558 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 1000 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 0 979 72 39 354
ADANI

T.OUT 1IN12 17 0 0 13 13 4 3 5 10 10 0 0 0 3
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 0 3860 0
BG 0 0 0 14042 38042 13501
TOTAL DESPATCH 0 3860 0
_ 0 7880 80367
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 1014 8108
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 0 1959 2242 78219 532426 3078
WB
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 632 13449 10428
TOTAL DESPATCH 632 24302 158586
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 251.310 2)CEMENT(RLY)= 612.720 MT 3)CEMENT(PVT)= 804.520 MT 4)INSERTS(T-6901)= 170354 NOS. 99617 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 23.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
ORGANISATIO Per day max production IC under Stock as on date
N Agreement (Ordered Qty) produced as on During the During the producted as During the During the curing(in Under testing
capacity/DP up to As on date Cumulative As on date Cumulative issue (in nos)
01.04.2021 month year on date month year nos) MF REJ

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 160 5458 23836 57123 18377 0 3860 14042 38042 2120 224 623 16059 21 34

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1800 32808 172662 567842 382158 572 24874 159158 532998 20692 2366 0 11251 225 310
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 0 0 271 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 64 64 1268 1268 1870 0 0 0 0 64 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 2 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 23 0 40
WB GR 3335 0 898 2512 2512 823 0 451 755 755 112 32 0 1609 1 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 72 1104 1728 1728 912 0 0 0 0 736 992 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23

K
SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 1558 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 1000 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 0 979 72 39 354
ADANI

T.OUT 1IN12 17 0 0 13 13 4 0 5 10 10 0 0 0 3
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 0 3860 0
BG 0 0 0 14042 38042 16059
TOTAL DESPATCH 0 3860 0
_ 0 7880 80367
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 1014 8108
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 0 1959 2242 78791 532998 11251
WB
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 572 14021 9856
TOTAL DESPATCH 572 24874 159158
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 234.570 2)CEMENT(RLY)= 490.100 MT 3)CEMENT(PVT)= 804.520 MT 4)INSERTS(T-6901)= 162610 NOS. 98977 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 24.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) produced as on During the During the producted as During the During the curing(in Under testing
capacity/DP up to As on date Cumulative As on date Cumulative issue (in nos)
01.04.2021 month year on date month year nos) MF REJ

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 224 5682 24060 57347 18153 0 3860 14042 38042 2212 264 715 16059 21 34

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1310 34118 173972 569152 380848 786 25660 159944 533784 20262 1914 2192 10465 225 310
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 0 0 271 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 32 96 1300 1300 1838 0 0 0 0 96 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 2 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 23 0 40
WB GR 3335 0 898 2512 2512 823 0 451 755 755 112 32 0 1609 1 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 16 1120 1744 1744 896 0 0 0 0 688 1056 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23

K
SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 1558 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 1000 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 0 979 72 39 354
ADANI

T.OUT 1IN12 17 0 0 13 13 4 0 5 10 10 0 0 0 3
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 0 3860 0
BG 0 0 0 14042 38042 16059
TOTAL DESPATCH 0 3860 0
_ 0 7880 80367
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 1014 8108
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 0 1959 2242 79577 533784 10465
WB
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 786 14807 9070
TOTAL DESPATCH 786 25660 159944
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 221.840 2)CEMENT(RLY)= 397.820 MT 3)CEMENT(PVT)= 804.520 MT 4)INSERTS(T-6901)= 157178 NOS. 98081 NOS
381) =

LASE PRODUCTION DUE TO BREACK DWON IN UNIT 1 (2SHIFT)

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 25.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) produced as on During the During the producted as During the During the curing(in Under testing
capacity/DP up to As on date Cumulative As on date Cumulative issue (in nos)
01.04.2021 month year on date month year nos) MF REJ

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 160 5842 24220 57507 17993 0 3860 14042 38042 2236 206 909 16059 21 34

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1638 35756 175610 570790 379210 778 26438 160722 534562 20342 1760 3904 9687 225 310
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 0 0 271 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 64 160 1364 1364 1774 0 0 0 0 160 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 2 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 23 0 40
WB GR 3335 0 898 2512 2512 823 0 451 755 755 112 32 0 1609 1 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 24 114 1768 1768 872 0 0 0 0 656 1112 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23

K
SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 1558 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 1000 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 0 979 72 39 354
ADANI

T.OUT 1IN12 17 0 0 13 13 4 0 5 10 10 0 0 0 3
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 0 3860 0
BG 0 0 0 14042 38042 16059
TOTAL DESPATCH 0 3860 0
_ 0 7880 80367
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 1014 8108
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 0 1959 2242 80355 534562 9687
WB
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 778 15585 8292
TOTAL DESPATCH 778 26438 160722
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 206.760 2)CEMENT(RLY)= 3159.400 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 248299 NOS. 97441 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 27.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) produced as on During the During the producted as During the During the curing(in Under testing
capacity/DP up to As on date Cumulative As on date Cumulative issue (in nos)
01.04.2021 month year on date month year nos) MF REJ

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 128 5970 24348 57635 17865 3060 6920 17102 41102 2260 130 1089 12999 21 34

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1984 37740 177594 572774 377226 1569 28007 162291 536131 20082 2114 5794 8118 225 310
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 0 0 271 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 64 224 1428 1428 1710 0 0 0 0 224 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 2 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 23 0 40
WB GR 3335 0 898 2512 2512 823 410 861 1165 1165 112 32 0 1199 1 3
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 96 1240 1864 1864 776 0 0 0 0 688 1176 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23

K
SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 1558 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 1000 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 0 979 72 39 354
ADANI

T.OUT 1IN12 17 0 0 13 13 4 0 5 10 10 0 0 0 3
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 SSE/P-WAY/SONA AT BQA - - 3060 6920 0


BG 0 0 0 17102 41102 12999
TOTAL DESPATCH 0 6920 0
_ 0 7880 80367
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 1014 8108
TC/CON/BI/21-22/Con/159 DT-16.06.2021 SSE/P-WAY/CON/KGP 6000 15.09.21 0 1959 2242 81924 536131 8118
WB
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 1569 17154 6723
TOTAL DESPATCH 1569 28007 162291
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 188.660 2)CEMENT(RLY)= 3025.600 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 239723 NOS. 96929 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 28.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 224 6194 24572 57859 17641 0 6920 17102 41102 2212 210 1281 12999 21 34

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1958 39698 179552 574732 375268 2924 30931 165215 539055 20380 1877 7691 5194 225 310
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 0 0 271 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 64 288 1492 1492 1646 0 0 0 0 288 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 2 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 23 0 40
WB GR 3335 0 898 2512 2512 823 410 861 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 72 1312 1936 1936 704 0 0 0 0 688 1248 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 1558 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 1000 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 13 13 4 0 5 10 10 0 0 0 3
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 SSE/P-WAY/SONA AT BQA - - 3060 6920 0


BG 0 0 0 17102 41102 12999
TOTAL DESPATCH 0 6920 0
SSE/P-WAY/KGP AT KGP _ 1890 9770 82257
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 1014 8108
TC/CON/BI/21-22/Con/261 DT-28.09.2021 SSE/P-WAY/CON/KGP 6000 30.11.21 0 1959 2242 82958 539055 5194
WB
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 1034 18188 5689
TOTAL DESPATCH 2924 30931 165215
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 170.100 2)CEMENT(RLY)= 2890.160 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 231347 NOS. 96033 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 29.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 256 6450 24828 58115 17385 0 6920 17102 41102 2336 162 1461 12999 21 34

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1942 41640 181494 576674 373326 586 31517 165801 539641 20932 1671 9287 4608 225 310
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 0 0 271 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 64 352 1556 1556 1582 0 0 0 0 352 180 400 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 2 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 23 0 40
WB GR 3335 0 898 2512 2512 823 410 861 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 64 1376 2000 2000 640 0 0 0 0 712 1288 0 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 1558 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 1000 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 13 13 4 0 5 10 10 0 0 0 3
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 - - 0 6920 0
BG 0 0 0 17102 41102 12999
TOTAL DESPATCH 0 6920 0
_ 0 9770 82257
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 1014 8108
TC/CON/BI/21-22/Con/261 DT-28.09.2021 SSE/P-WAY/CON/KGP 6000 30.11.21 0 1959 2242 83544 539641 4608
WB
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 586 18774 5103
TOTAL DESPATCH 586 31517 165801
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 151.450 2)CEMENT(RLY)= 2754.620 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 223067 NOS. 95009 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 30.09.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 96 6546 24924 58211 17289 0 6920 17102 41102 2192 155 1708 12999 21 34

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1240 42880 182734 577914 372086 722 32239 166523 540363 20496 772 11862 3886 225 310
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 0 0 271 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 32 384 1588 1588 1550 0 0 0 0 384 132 448 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 2 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 23 0 40
WB GR 3335 0 898 2512 2512 823 410 861 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 32 1408 2032 2032 608 0 0 0 0 680 1152 200 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 1558 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 1000 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 3 8 13 13 0 0 0 4
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 - - 0 6920 0
BG 0 0 0 17102 41102 12999
TOTAL DESPATCH 0 6920 0
_ 0 9770 82257
2
TC/CON/BI/21-22/Con/157 DT-16.06.2021 SSE/P-WAY/CON/RNC1 10000 15.09.21 0 1014 8108
TC/CON/BI/21-22/Con/261 DT-28.09.2021 SSE/P-WAY/CON/KGP 6000 30.11.21 0 1959 2242 84266 540363 3886
WB
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 30.09.21 722 19496 4381
TOTAL DESPATCH 722 32239 166523
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 140.280 2)CEMENT(RLY)= 2671.930 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 217851 NOS. 94625 NOS
381) =

NOTE- DUE TO HEAVY RAIN 2 SHIFT NOT RUN ON 29.09.2021

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 01.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 128 128 25052 58339 17161 0 0 17102 41102 2140 95 1948 12999 21 34

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1644 1644 184378 579558 370442 0 0 166523 540363 20430 838 0 17378 231 318
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1340 1340 0 0 0 2221 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 3694 3694 0 0 271 11147 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 32 32 1620 1620 1518 0 0 0 0 416 132 448 624
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 23 0 40
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 72 72 2104 2104 536 0 0 0 0 704 1200 200 0
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 13 13 0 0 0 4
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 - - 0 0 0
BG 0 0 0 17102 41102 12999
TOTAL DESPATCH 0 0 0
_ 0 0 82257
2

TC/CON/BI/21-22/Con/261 DT-28.09.2021 SSE/P-WAY/CON/KGP 6000 30.11.21 0 0 2242 84266 540363 17378


WB
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 0 0 4381
TOTAL DESPATCH 0 0 166523
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 125.310 2)CEMENT(RLY)= 2560.450 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 210859 NOS. 94113 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 02.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 160 288 25212 58499 17001 0 0 17102 41102 2300 95 0 14945 22 35

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1750 3394 186128 581308 368692 726 726 167249 541089 22180 335 503 16652 231 318
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 480 480 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 2664 2664 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 64 96 1684 1684 1454 0 0 0 0 480 132 0 1104
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 23 0 40
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 56 128 2160 2160 480 0 0 0 0 760 560 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 13 13 0 0 0 4
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 - - 0 0 0
BG 0 0 0 17102 41102 14945
TOTAL DESPATCH 0 0 0
_ 0 0 82257
2

TC/CON/BI/21-22/Con/261 DT-28.09.2021 SSE/P-WAY/CON/KGP 6000 30.11.21 0 0 2242 84992 541089 16652


WB
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 726 726 3655
TOTAL DESPATCH 726 726 167249
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 109.090 2)CEMENT(RLY)= 2441.880 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 203379 NOS. 93473 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 04.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 288 576 25500 58787 16713 0 0 17102 41102 2412 121 150 14945 22 35

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1886 5280 188014 583194 366806 1730 2456 168979 542819 22312 599 1993 14922 231 318
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 480 480 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 2664 2664 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 64 160 1748 1748 1390 0 0 0 0 512 132 0 1104
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 23 0 40
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 72 200 2232 2232 408 0 0 0 0 776 616 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 13 13 0 0 0 4
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 - - 0 0 0
BG 0 0 0 17102 41102 14945
TOTAL DESPATCH 0 0 0
_ 0 0 82257
2

TC/CON/BI/21-22/Con/261 DT-28.09.2021 SSE/P-WAY/CON/KGP 6000 30.11.21 0 0 2242 86722 542819 14922


WB
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 1730 2456 1925
TOTAL DESPATCH 1730 2456 168979
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 125.340 2)CEMENT(RLY)= 2936.820 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 195291 NOS. 92321 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 05.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 128 704 25628 58915 16585 0 0 17102 41102 2252 149 410 14945 22 35

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1882 7162 189896 585076 364924 968 3424 169947 543787 22370 838 3578 13954 231 318
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 480 480 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 2664 2664 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 64 224 1812 1812 1326 0 0 0 0 512 196 0 1104
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 23 0 40
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 48 248 2280 2280 360 0 0 0 0 744 696 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 13 13 0 0 0 4
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 - - 0 0 0
BG 0 0 0 17102 41102 14945
TOTAL DESPATCH 0 0 0
_ 0 0 82257
2

TC/CON/BI/21-22/Con/261 DT-28.09.2021 SSE/P-WAY/CON/KGP 6000 30.11.21 0 0 2242 87690 543787 13954


WB
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 968 3424 957
TOTAL DESPATCH 968 3424 169947
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 143.300 2)CEMENT(RLY)= 2812.310 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 187315 NOS. 91817 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 06.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 192 896 25820 59107 16393 0 0 17102 41102 2284 59 660 14945 22 35

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1808 8970 191704 586884 363116 5622 9046 175569 549409 22344 1452 4798 8332 231 318
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 480 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 2664 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 32 256 1844 1844 1294 0 0 0 0 544 196 0 1104
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 23 0 40
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 64 312 2344 2344 296 0 0 0 0 736 768 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 13 13 0 0 0 4
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 - - 0 0 0
BG 0 0 0 17102 41102 14945
TOTAL DESPATCH 0 0 0
SSE/P-WAY/MURI-I AT MURI _ 4740 4740 86997
2

TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 0 2242 88572 549409 13954
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 10.10.21 882 4306 75
TOTAL DESPATCH 5622 9046 175569
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 126.530 2)CEMENT(RLY)= 2688.120 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 204689 NOS. 91049 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 07.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 128 1024 25948 59235 16265 0 0 17102 41102 2111 220 0 15745 22 35

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1842 10812 193546 588726 361274 75 9121 175644 549484 21276 1660 0 15750 234 322
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 480 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 2664 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 64 320 1908 1908 1230 0 0 0 0 516 32 0 1359 1
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 36 36 0 0 0 810
SEJ 63 0 0 63 63 0 0 0 0 0 0 23 0 40
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 48 360 2392 2392 248 0 0 0 0 736 816 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 13 13 0 0 0 4
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 - - 0 0 0
BG 0 0 0 17102 41102 15745
TOTAL DESPATCH 0 0 0
_ 0 4740 86997
2

TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 0 2242 88647 549484 15750
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 10.10.21 75 4381 0
TOTAL DESPATCH 75 9121 175644
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 109.93` 2)CEMENT(RLY)= 2565.970 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 221883 NOS. 90537 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 08.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 224 1248 26172 59459 16041 0 0 17102 41102 2175 206 174 15745 22 35

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1774 12586 195320 590500 359500 0 9121 175644 549484 21250 1805 1655 15750 234 322
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 480 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 2664 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 32 352 1940 1940 1198 0 0 0 0 484 96 0 1359 1
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 40 400 2432 2432 208 0 0 0 0 704 888 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 13 13 0 0 0 4
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 - - 0 0 0
BG 0 0 0 17102 41102 15745
TOTAL DESPATCH 0 0 0
_ 0 4740 86997
2

TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 0 2242 88647 549484 15750
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 10.10.21 0 4381 0
TOTAL DESPATCH 0 9121 175644
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 93.330 2)CEMENT(RLY)= 2443.780 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 214499 NOS. 89641 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 09.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 160 1408 26332 59619 15881 0 0 17102 41102 2111 175 429 15745 22 35

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1774 14360 197094 592274 357726 4050 13171 179694 553534 21714 1423 3347 11700 234 322
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 480 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 2664 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 64 416 2004 2004 1134 0 0 0 0 516 128 0 1359 1
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 32 432 2464 2464 176 0 0 0 0 720 904 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 13 13 0 0 0 4
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 - - 0 0 0
BG 0 0 0 17102 41102 15745
TOTAL DESPATCH 0 0 0
SSE/P-WAY/GBA AT GBA _ 4050 8790 91047
2

TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 0 2242 88647 553534 11700
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 10.10.21 0 4381 0
TOTAL DESPATCH 4050 13171 179694
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 112.370 2)CEMENT(RLY)= 2324.430 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 207019 NOS. 89001 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 11.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 288 1696 26620 59907 15593 0 0 17102 41102 2175 0 828 15745 22 35

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1916 16276 199010 594190 355810 0 13171 179694 553534 21518 0 6882 11700 234 322
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 480 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 2664 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 64 480 2068 2068 1070 0 0 0 0 452 256 0 1359 1
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 48 480 2512 2512 128 0 0 0 0 648 1024 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 13 13 0 0 0 4
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 - - 0 0 0
BG 0 0 0 17102 41102 15745
TOTAL DESPATCH 0 0 0
_ 0 8790 91047
2

TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 0 2242 88647 553534 11700
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 10.10.21 0 4381 0
TOTAL DESPATCH 0 13171 179694
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 119.060 2)CEMENT(RLY)= 2189.900 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 198907 NOS. 87849 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
12.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 160 1856 26780 60067 15433 0 0 17102 41102 2079 58 198 16572 22 36

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1898 18174 200908 596088 353912 1960 15131 181654 555494 21432 962 1022 16616 236 326
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 480 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 2664 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 64 544 2132 2132 1006 0 0 0 0 452 320 0 1359 1
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 40 520 2552 2552 88 0 0 0 0 624 1088 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 13 13 0 0 0 4
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 - - 0 0 0
BG 0 0 0 17102 41102 16572
TOTAL DESPATCH 0 0 0
SSE/P-WAY/KGP AT KGP _ 1960 10750 93007
2

TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 0 2242 88647 555494 16616
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 10.10.21 0 4381 0
TOTAL DESPATCH 1960 15131 181654
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 126.970 2)CEMENT(RLY)= 2063.240 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 190899 NOS. 87209 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 16.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 212 2068 26992 60279 15221 0 0 17102 41102 1587 397 563 16572 22 36

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1646 19820 202554 597734 352266 0 15131 181654 555494 16294 5856 2912 16616 236 326
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 480 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 2664 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 32 576 2164 2164 974 0 0 0 0 292 314 198 1359 1
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 32 552 2584 2584 56 0 0 0 0 416 1328 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 13 13 0 0 0 4
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 - - 0 0 0
BG 0 0 0 17102 41102 16572
TOTAL DESPATCH 0 0 0
_ 0 10750 93007
2

TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 0 2242 88647 555494 16616
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 10.10.21 0 4381 0
TOTAL DESPATCH 0 15131 181654
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 145.760 2)CEMENT(RLY)= 1949.970 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 184059 NOS. 86361 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 17.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 152 2220 27144 60431 15069 0 0 17102 41102 1579 295 825 16572 22 36

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1462 21282 204016 599196 350804 0 15131 181654 555494 16006 5586 4932 16616 236 326
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 480 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 2664 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 64 640 2228 2228 910 0 0 0 0 292 278 298 1359 1
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 24 576 2608 2608 32 0 0 0 0 384 1328 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 13 13 0 0 0 4
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 - - 0 0 0
BG 0 0 0 17102 41102 16572
TOTAL DESPATCH 0 0 0
_ 0 10750 93007
2

TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 0 2242 88647 555494 16616
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 10.10.21 0 4381 0
TOTAL DESPATCH 0 15131 181654
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 132.150 2)CEMENT(RLY)= 1851.410 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 177859 NOS. 85753 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 18.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 128 2348 27272 60559 14941 0 0 17102 41102 1707 125 995 16572 22 36

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1174 22456 205190 600370 349630 0 15131 181654 555494 17180 3605 6913 16616 236 326
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 480 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 2664 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 32 672 2260 2260 878 0 0 0 0 324 158 418 1359 1
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 24 600 2632 2632 8 0 0 0 0 408 1384 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 13 13 0 0 0 4
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 - - 0 0 0
BG 0 0 0 17102 41102 16572
TOTAL DESPATCH 0 0 0
_ 0 10750 93007
2

TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 0 2242 88647 555494 16616
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 10.10.21 0 4381 0
TOTAL DESPATCH 0 15131 181654
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 146.380 2)CEMENT(RLY)= 1771.690 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 172939 NOS. 85241 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 19.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 188 2536 27460 60747 14753 0 0 17102 41102 1607 187 1221 16572 22 36

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1676 24132 206866 602046 347954 0 15131 181654 555494 16970 3493 8911 16616 236 326
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 480 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 2664 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 32 704 2292 2292 846 0 0 0 0 292 122 518 1359 1
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 8 608 2640 2640 0 0 0 0 0 344 1456 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 13 13 0 0 0 4
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 - - 0 0 0
BG 0 0 0 17102 41102 16572
TOTAL DESPATCH 0 0 0
_ 0 10750 93007
2

TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 0 2242 88647 555494 16616
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 10.10.21 0 4381 0
TOTAL DESPATCH 0 15131 181654
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 156.480 2)CEMENT(RLY)= 1659.230 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 166075 NOS. 84489 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 20.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 124 2660 27584 60871 14629 0 0 17102 41102 1731 64 344 16572 22 36

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1806 25938 208672 603852 346148 5820 20951 187474 561314 17620 1797 11763 10796 236 326
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 480 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 2664 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 64 768 2356 2356 782 0 0 0 0 324 74 598 1359 1
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 8 608 2640 2640 0 0 0 0 0 344 1456 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 13 13 0 0 0 4
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 - - 0 0 0
BG 0 0 0 17102 41102 16572
TOTAL DESPATCH 0 0 0
SSE/P-WAY/GBX at RNC _ 5820 16570 98827
2

TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 0 2242 88647 561314 10796
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 10.10.21 0 4381 0
TOTAL DESPATCH 5820 20951 187474
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 140.580 2)CEMENT(RLY)= 1542.420 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 158595 NOS. 83993 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 21.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 216 2876 27800 61087 14413 0 0 17102 41102 1755 256 0 17913 23 38

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1772 27710 210444 605624 344376 0 20951 187474 561314 17584 1808 0 24340 242 336
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 480 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 2664 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 32 800 2388 2388 750 0 0 0 0 324 64 0 1998 2
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 608 2640 2640 0 0 0 0 0 272 1528 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 2 2 15 15 0 0 0 2
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 - - 0 0 0
BG 0 0 0 17102 41102 16572
TOTAL DESPATCH 0 0 0
_ 0 16570 98827
2

TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 0 2242 88647 561314 24340
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 10.10.21 0 4381 0
TOTAL DESPATCH 0 20951 187474
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 149.960 2)CEMENT(RLY)= 1423.190 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 151379 NOS. 83129 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 22.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 152 3028 27952 61239 14261 0 0 17102 41102 1779 186 198 17913 23 38

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1454 29164 211898 607078 342922 0 20951 187474 561314 17196 1760 1890 24340 242 336
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 480 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 2664 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 64 864 2452 2452 686 0 0 0 0 324 80 48 1998 2
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 608 2640 2640 0 0 0 0 0 224 1576 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 2 2 15 15 0 0 0 2
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 - - 0 0 0
BG 0 0 0 17102 41102 16572
TOTAL DESPATCH 0 0 0
_ 0 16570 98827
2

TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 0 2242 88647 561314 24340
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 10.10.21 0 4381 0
TOTAL DESPATCH 0 20951 187474
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 136.600 2)CEMENT(RLY)= 1326.590 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 145307 NOS. 82521 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 23.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 212 3240 28164 61451 14049 0 0 17102 41102 1767 200 408 17913 23 38

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1772 30936 213670 608850 341150 125 21076 187599 561439 17194 1581 3843 24215 242 336
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 480 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 2664 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 32 896 2484 2484 654 0 0 0 0 324 80 80 1998 2
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 608 2640 2640 0 0 0 0 0 224 1576 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 2 2 15 15 0 0 0 2
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 - - 0 0 0
BG 0 0 0 17102 41102 17913
TOTAL DESPATCH 0 0 0
_ 0 16570 98827
2

TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 125 125 2117 88772 561439 24215
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 10.10.21 0 4381 0
TOTAL DESPATCH 125 21076 187599
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 169.300 2)CEMENT(RLY)= 1207.560 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 138091 NOS. 81673 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 25.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 212 3452 28376 61663 13837 0 0 17102 41102 1819 210 558 17913 23 38

CS-172,WIDER BASE/950000 NOS 30.09.2021 554540 1890 32826 215560 610740 339260 231 21307 187830 561670 17310 1759 5439 23984 242 336
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 480 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 2664 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 64 960 2548 2548 590 0 0 0 0 324 72 152 1998 2
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 608 2640 2640 0 0 0 0 0 152 1648 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 2 15 15 0 0 0 2
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

1 - - 0 0 0
BG 0 0 0 17102 41102 17913
TOTAL DESPATCH 0 0 0
_ 0 16570 98827
2

TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 231 356 1886 89003 561670 23984
3 TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 10.10.21 0 4381 0
TOTAL DESPATCH 231 21307 187830
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 177.260 2)CEMENT(RLY)= 1081.290 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 130275 NOS. 80825 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 26.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 148 3600 28524 61811 13689 0 0 17102 41102 1679 233 823 17913 23 38

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1920 34746 217480 612660 337340 276 21583 188106 561946 17314 1983 7131 23708 242 336
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 480 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 2664 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 32 992 2580 2580 558 0 0 0 0 292 86 202 1998 2
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 608 2640 2640 0 0 0 0 0 104 1696 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 2 15 15 0 0 0 2
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 17102 41102 17913
TOTAL DESPATCH 0 0 0
_ 0 16570 98827
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 96 96 4904
2
2)TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 180 536 1706 89279 561946 23708
3)TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 10.10.21 0 4381 0
TOTAL DESPATCH 276 21583 188106
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 185.750 2)CEMENT(RLY)= 956.320 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 122467 NOS. 80233 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 27.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 212 3812 28736 62023 13477 0 0 17102 41102 1831 177 939 17913 23 38

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1814 36560 219294 614474 335526 391 21974 188497 562337 17254 1947 9041 23317 242 336
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 480 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 2664 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 64 1056 2644 2644 494 0 0 0 0 292 80 272 1998 2
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 608 2640 2640 0 0 0 0 0 64 1736 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3246 5740 0 0 0 251 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 2 15 15 0 0 0 2
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 17102 41102 17913
TOTAL DESPATCH 0 0 0
_ 0 16570 98827
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 80 176 4824
2
2)TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 311 847 1395 89670 562337 23317
3)TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 10.10.21 0 4381 0
TOTAL DESPATCH 391 21974 188497
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 169.000 2)CEMENT(RLY)= 834.710 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 114955 NOS. 79385 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 28.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 148 3960 28884 62171 13329 5040 5040 22142 46142 1979 0 0 13989 23 38

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1836 38396 221130 616310 333690 125 22099 188622 562462 19090 0 0 34170 246 342
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 480 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 2664 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 32 1088 2676 2676 462 0 0 0 0 324 0 352 1998 2
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 608 2640 2640 0 0 0 0 0 64 1736 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 100 100 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 2 15 15 0 0 0 2
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

SSE/P-WAY/KGP AT NIMPURA - - 5040 5040 0


1 BG 0 0 0 22142 46142 13989
TOTAL DESPATCH 0 5040 0
_ 0 16570 98827
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 176 4824
2
2)TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 125 972 1270 89795 562462 34170
3)TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 10.10.21 0 4381 0
TOTAL DESPATCH 125 22099 188622
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 178.140 2)CEMENT(RLY)= 714.890 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 107483 NOS. 78793 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 29.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 212 4172 29096 62383 13117 0 5040 22142 46142 2191 0 0 13989 23 38

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1742 40138 222872 618052 331948 2225 24324 190847 564687 20832 0 0 31945 246 342
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 480 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 2664 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 64 1152 2740 2740 398 0 0 0 0 388 0 352 1998 2
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 608 2640 2640 0 0 0 0 0 64 1736 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 100 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 2 2 0 0 0 8
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 2 15 15 0 0 0 2
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 5040 0
1 BG 0 0 0 22142 46142 13989
TOTAL DESPATCH 0 5040 0
SSE/P-WAY/KGP AT KGP _ 2010 18580 100837
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 176 4824
2
2)TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 215 1187 1055 90010 564687 31945
3)TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 10.10.21 0 4381 0
TOTAL DESPATCH 2225 24324 190847
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 161.960 2)CEMENT(RLY)= 597.700 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 100259 NOS. 77945 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 30.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 148 4320 29244 62531 12969 0 5040 22142 46142 2339 0 0 13989 23 38

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1804 41942 224676 619856 330144 300 24624 191147 564987 22636 0 0 31645 246 342
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 480 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 2664 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 32 1184 2772 2772 366 0 0 0 0 420 0 352 1998 2
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 608 2640 2640 0 0 0 0 0 64 1736 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 8 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 100 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 2 2 5 5 0 0 0 5
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 2 4 17 17 0 0 0 0
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 5040 0
1 BG 0 0 0 22142 46142 13989
TOTAL DESPATCH 0 5040 0
_ 0 18580 100837
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 200 376 4624
2
2)TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 100 1287 955 90310 564987 31645
3)TC/CON/BI/RVNL/I/213 DT-27.07.2021 DGM(P)/TATA/RVNL 65000 10.10.21 0 4381 0
TOTAL DESPATCH 300 24624 191147
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 146.120 2)CEMENT(RLY)= 479.840 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 92915 NOS. 77353 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 31.10.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 112 4440 29364 62651 12849 0 5040 22142 46142 2247 212 0 13989 23 38

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1198 43140 225874 621054 328946 96 24720 191243 565083 22188 1646 0 31549 246 342
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 32 1216 2804 2804 334 0 0 0 0 420 32 352 1998 2
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 0 0 32 1768 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 17 17 0 0 0 0
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 5040 0
1 BG 0 0 0 22142 46142 13989
TOTAL DESPATCH 0 5040 0
_ 0 18580 100837
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 96 472 4528
2)TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 1287 955 90406 565083 31549
2
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 65000 10.10.21 0 4381 0
TOTAL DESPATCH 96 24720 191243
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 13.330 2)CEMENT(RLY)= 400.510 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 87995 NOS. 76873 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 01.11.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 212 212 29576 62863 12637 0 0 22142 46142 2307 156 208 13989 23 38

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1598 1598 227472 622652 327348 355 355 191598 565438 22324 1212 1896 31194 246 342
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 64 64 2868 2868 270 0 0 0 0 420 96 352 1998 2
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 0 0 32 1738 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 17 17 0 0 0 0
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 22142 46142 13989
TOTAL DESPATCH 0 0 0
_ 0 0 100837
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 0 4528
2)TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 355 355 600 90761 565438 31194
2
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 0 0 20000
TOTAL DESPATCH 355 355 191598
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 147.220 2)CEMENT(RLY)= 292.140 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 81347 NOS. 76025 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 02.11.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 148 360 29724 63011 12489 0 0 22142 46142 2319 0 500 13989 23 38

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1820 3418 229292 624472 325528 859 1214 192457 566297 22956 0 4296 30335 246 342
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 32 96 2900 2900 238 0 0 0 0 420 76 404 1998 2
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 0 0 0 1800 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 17 17 0 0 0 0
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 22142 46142 13989
TOTAL DESPATCH 0 0 0
_ 0 0 100837
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 302 302 4226
2)TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 110 465 490 91620 566297 30335
2
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 447 447 19553
TOTAL DESPATCH 859 1214 192457
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 157.440 2)CEMENT(RLY)= 1517.300 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 73937 NOS. 75443 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 03.11.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 228 588 29952 63239 12261 0 0 22142 46142 2359 94 594 13989 23 38

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1724 5142 231016 626196 323804 3116 4330 195573 569413 23004 950 726 31510 248 345
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 64 160 2964 2964 174 0 0 0 0 452 108 404 1998 2
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 0 0 0 1800 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 17 17 0 0 0 0
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 22142 46142 13989
TOTAL DESPATCH 0 0 0
SSE/P-WAY/BJMD AT NOAMUNDI _ 2920 2920 2920 103757
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 302 4528
2)TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 465 490 91816 569413 31510
2
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 196 643 19357
TOTAL DESPATCH 3116 4330 195573
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 141.270 2)CEMENT(RLY)= 1454.430 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 66787 NOS. 74521 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 05.11.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 92 680 30044 63331 12261 0 0 22142 46142 2111 314 714 13989 23 38

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1198 6340 232214 627394 322606 2077 6407 197650 571490 20624 3708 1546 29433 248 345
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7028 15134 0 0 0 6358 6358 0 0 271 8483 5 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 64 224 3028 3028 110 0 0 0 0 420 148 460 1998 2
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 0 0 0 1800 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 8 0
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 17 17 0 0 0 0
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH AS ON 05.11.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 22142 46142 13989
TOTAL DESPATCH 0 0 0
SSE/P-WAY/BJMD AT NOAMUNDI _ 0 2920 2920 103757
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 302 4528
2)TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 490 955 0 93893 571490 28843
2
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 1587 2230 17770
TOTAL DESPATCH 2077 6407 197650
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 146.320 2)CEMENT(RLY)= 2739.360 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 61739 NOS. 74153 NOS
381) =

Note- Less Production due to Kali Puja Holiday

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 06.11.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 0 680 30044 63331 12261 0 0 22142 46142 1959 316 864 13989 23 38

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 0 6340 232214 627394 322606 1202 7609 198852 572692 19170 4312 2396 28231 248 345
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7045 15151 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 224 3028 3028 110 0 0 0 0 356 212 460 1998 2
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 0 0 0 1800 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 17 17 0 0 0 0
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH AS ON 06.11.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 22142 46142 13989
TOTAL DESPATCH 0 0 0
SSE/P-WAY/BJMD AT NOAMUNDI _ 0 2920 2920 103757
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 302 4528
2)TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 955 0 95095 572692 28231
2
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 1202 3432 16568
TOTAL DESPATCH 1202 7609 198852
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 146.320 2)CEMENT(RLY)= 2739.360 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 61739 NOS. 74153 NOS
381) =

Note- No Production due to Kali Puja & Bhai Fonta Holiday

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 08.11.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 64 744 60108 63395 12105 0 0 22142 46142 1811 336 1056 13989 23 38

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 774 7114 232988 628168 321832 4425 12034 203277 577117 18172 3804 4676 23806 248 345
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7045 15151 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 32 256 3060 3060 78 0 0 0 0 356 164 540 1998 2
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 0 0 0 1800 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 17 17 0 0 0 0
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH AS ON 08.11.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 22142 46142 13989
TOTAL DESPATCH 0 0 0
SSE/P-WAYGBA at GBA _ 3195 6115 106952
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 388 690 3838
2)TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 955 0 96325 577117 23806
2
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 842 4274 15726
TOTAL DESPATCH 4425 12034 203277
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 149.370 2)CEMENT(RLY)= 2688.760 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 58515 NOS. 73897 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 09.11.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 132 876 60240 63527 11973 0 0 22142 46142 1731 216 1388 13989 23 38

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1846 8960 234834 630014 319986 748 12782 204025 577865 18128 5420 4950 23058 248 345
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7045 15151 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 32 288 3092 3092 46 0 0 0 0 324 176 592 1998 2
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 0 2512 2512 823 0 0 1165 1165 112 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 0 0 0 1800 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 10 89 0 0 0 5
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 5 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
WB CR 1444 0 0 449 1444 0 0 0 336 1315 0 0 129
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 17 17 0 0 0 0
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH AS ON 09.11.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 22142 46142 13989
TOTAL DESPATCH 0 0 0
SSE/P-WAYGBA at GBA _ 0 6115 106952
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 110 800 3728
2)TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 955 0 97073 577865 23058
2
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 638 4912 15088
TOTAL DESPATCH 748 12782 204025
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 133.340 2)CEMENT(RLY)= 2569.110 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 67653 NOS. 73369 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 10.11.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 224 1100 60464 63751 11749 0 0 22142 46142 1807 364 360 15014 24 40

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1796 10756 236630 631810 318190 416 13198 204441 578281 18004 5375 1965 27586 250 349
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 46 334 3138 3138 0 0 0 0 0 338 158 642 1998 2
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 18 18 2530 2530 805 0 0 1165 1165 130 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 0 0 0 1800 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
K SEJ/KEC 0 0 0 0 94 0 0 0 15 94 0 0 0 0
E
C 1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
WB CR 1444 0 0 449 1444 0 0 0 465 1444 0 0 0 0
ADANI

T.OUT 1IN12 17 0 0 17 17 0 0 0 17 17 0 0 0 0
WB LC 34 0 0 0 34 0 0 0 0 34 0 0 0 0
DETAILS OF DESPATCH AS ON 10.11.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 22142 46142 15014
TOTAL DESPATCH 0 0 0
SSE/P-WAYGBA at GBA _ 0 6115 106952
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 800 3728
2)TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 955 0 97489 578281 27586
2
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 416 5328 14672
TOTAL DESPATCH 416 13198 204441
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 116.630 2)CEMENT(RLY)= 2448.010 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 60213 NOS. 72473 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 11.11.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 168 1268 60632 63919 11581 0 0 22142 46142 1763 314 622 15014 24 40

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1830 12586 238460 633640 316360 321 13519 204762 578602 18020 4900 4254 27265 250 349
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 0 79 0 0 14 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 334 3138 3138 0 0 0 0 0 274 186 678 1998 2
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 32 50 2562 2562 773 0 0 1165 1165 162 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 0 0 0 1800 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2278 10154 0 0 0 3361 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 11.11.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 22142 46142 15014
TOTAL DESPATCH 0 0 0
SSE/P-WAYGBA at GBA _ 0 6115 106952
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 800 3728

2)TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 955 0 97810 578602 27265
2
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 321 5649 14351
TOTAL DESPATCH 321 13519 204762
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 126.400 2)CEMENT(RLY)= 2327.590 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 52765 NOS. 71801 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 12.11.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 228 1496 60860 64147 11353 0 0 22142 46142 1843 256 828 15014 24 40

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1700 14286 240160 635340 314660 892 14411 205654 579494 17884 4312 6678 26373 250 349
SEJ(OL) ,CE/TP/SER/2018/006/B/10031/403 sets 29.02.2020 0 0 0 0 403 0 0 0 93 403 0 0 0 0
S B.A/SER/93 SETS 12.08.2020 0 0 0 0 93 0 0 0 14 93 0 0 0 0
E LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 334 3138 3138 0 0 0 0 0 242 160 736 1998 2
1in12 T/OUT(SER/CON)/104 SETS 0 0 0 0 104 0 0 0 2 104 0 0 0 0
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 64 114 2626 2626 709 0 0 1165 1165 226 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 0 0 0 1800 0 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 120 120 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 12.11.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 22142 46142 15014
TOTAL DESPATCH 0 0 0
SSE/P-WAYGBA at GBA _ 0 6115 106952
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 800 3728

2)TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 955 0 98702 579494 26373
2
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 892 6541 13459
TOTAL DESPATCH 892 14411 205654
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 115..600 2)CEMENT(RLY)= 2212.180 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 45709 NOS. 70889 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 13.11.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 172 1668 61032 64319 11181 0 0 22142 46142 1803 288 1008 15014 24 40

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1838 16124 241998 637178 312822 392 14803 206046 579886 17980 3162 9570 25981 250 349
S LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
E 14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
R 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 17
CR WIDER-15134NOS 6
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 334 3138 3138 0 0 0 0 0 178 144 816 1998 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 32 146 2658 2658 677 0 0 1165 1165 258 32 0 1199 1 3
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 277 277 277 277 0 0 1800 839 0 1
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 120 120 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 13.11.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 22142 46142 15014
TOTAL DESPATCH 0 0 0
_ 0 6115 106952
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 110 910 3618
2)TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 955 0 99094 579886 25981
2
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 282 6823 13177
TOTAL DESPATCH 392 14803 206046
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 99.280 2)CEMENT(RLY)= 2091.060 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 51919 NOS. 70201 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 15.11.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 276 1944 61308 64595 10905 0 0 22142 46142 1811 266 218 16093 24 41

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1862 17986 243860 639040 310960 1466 15877 207512 581352 16840 3584 1112 35541 255 356
S LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
E 14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
R 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 17
CR WIDER-15134NOS 6
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 334 3138 3138 0 0 0 0 0 178 144 816 1998 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 23 0 30
WB GR 3335 0 146 3335 3335 0 0 0 1165 1165 0 0 107 2061 2 4
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 192 469 469 469 0 0 0 2447 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 120 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 15.11.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 22142 46142 16093
TOTAL DESPATCH 0 0 0
_ 0 6115 106952
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 526 1436 3092
2)TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 955 0 100560 581352 35541
2
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 940 7763 12237
TOTAL DESPATCH 1466 16269 207512
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 81.590 2)CEMENT(RLY)= 1963.370 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 44215 NOS. 69097 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 16.11.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 136 2080 61444 64731 10769 0 0 22142 46142 1735 242 454 16093 24 41

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1846 19832 245706 640886 309114 1313 17582 208825 582665 17088 2898 3396 34228 255 356
S LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
E 14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
R 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 17
CR WIDER-15134NOS 6
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 334 3138 3138 0 0 0 0 0 178 144 816 1998 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR 3335 0 146 3335 3335 0 0 0 1165 1165 0 0 107 2061 2 4
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 469 469 469 0 0 0 2447 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 120 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 16.11.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 22142 46142 16093
TOTAL DESPATCH 0 0 0
_ 0 6115 106952
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 105 1541 2987
2)TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 955 0 101873 582665 34228
2
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 1208 8971 11029
TOTAL DESPATCH 1313 17582 208825
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 65.270 2)CEMENT(RLY)= 1843.520 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 36575 NOS. 68553 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 17.11.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 220 2300 61664 64951 10549 0 0 22142 46142 1807 186 658 16093 24 41

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1696 21528 247402 642582 307418 906 18488 209731 583571 16964 2320 5794 33322 255 356
S LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
E 14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
R 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 17
CR WIDER-15134NOS 6
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 334 3138 3138 0 0 0 0 0 178 144 816 1998 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR 3335 0 146 3335 3335 0 0 0 1165 1165 0 0 107 2061 2 4
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 469 469 469 0 0 0 2447 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 120 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 17.11.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 22142 46142 16093
TOTAL DESPATCH 0 0 0
_ 0 6115 106952
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 96 1637 2891

2)TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 955 0 102779 583571 33322
2
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 810 9781 10219
TOTAL DESPATCH 906 18488 209731
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 78.590 2)CEMENT(RLY)= 1728.760 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 29663 NOS. 68553 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 18.11.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 104 2404 61768 65055 10445 0 0 22142 46142 1683 224 848 16093 24 41

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1678 23206 249080 644260 305740 1444 19932 211175 585015 16918 1841 7997 31878 255 356
S LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
E 14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
R 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 17
CR WIDER-15134NOS 6
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 334 3138 3138 0 0 0 0 0 178 144 816 1998 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR 3335 0 146 3335 3335 0 0 0 1165 1165 0 0 107 2061 2 4
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 469 469 469 0 0 0 2447 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 120 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 18.11.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 22142 46142 16093
TOTAL DESPATCH 0 0 0
_ 0 6115 106952
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 0 0 29417
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 1637 2891
WB 104223 585015 31878
2 2)TC/CON/BI/21-22/Con/261 DT-28.09.2021 SSE/P-WAY/CON/KGP 6000 30.11.21 0 955 0
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 1444 11225 8775
TOTAL DESPATCH 1444 19932 211175
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 127.970 2)CEMENT(RLY)= 1620.780 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 22695 NOS. 67257 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 19.11.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 236 2640 62004 65291 10209 0 0 22142 46142 1919 120 104 16941 24 41

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1548 24754 250628 645808 304192 1563 21495 212738 586578 18466 547 1145 38453 258 361
S LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
E 14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
R 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 17
CR WIDER-15134NOS 6
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 334 3138 3138 0 0 0 0 0 178 144 816 1998 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR 3335+400 3735 32 178 3367 3367 368 0 0 1165 1165 32 0 0 2168 2 4
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 469 469 469 0 0 0 2447 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 120 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 19.11.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 22142 46142 16941
TOTAL DESPATCH 0 0 0
_ 0 6115 106952
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 360 360 29057
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 1637 2891
WB 105786 586578 38453
2 2)TC/CON/BI/21-22/Con/261 DT-28.09.2021 SSE/P-WAY/CON/KGP 6000 30.11.21 0 955 0
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 1203 12428 7572
TOTAL DESPATCH 1563 21495 212738
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 186.720 2)CEMENT(RLY)= 1514.310 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 66375 NOS. 66313 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 20.11.21
Per day max production
Balance to be Producion(in nos) Balance to be Despatch (in nos) Under
IC under Stock as on date REJECTION &MF
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 160 2800 62164 65451 10049 0 0 22142 46142 1987 106 210 16941 24 41
CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1710 26464 252338 647518 302482 5417 26912 218155 591995 18978 1165 1725 33036 258 361
S LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
R CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 334 3138 3138 0 0 0 0 0 178 144 816 1998 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR 3335+400 3735 32 178 3367 3367 368 0 0 1165 1165 32 0 0 2168 2 4
SER CON
BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 100 569 569 569 0 0 0 2347 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 120 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 20.11.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 22142 46142 16941
TOTAL DESPATCH 0 0 0
KGP AT KGP _ 4110 10225 111062
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 0 360 29417
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 1637 2891
2 2)TC/CON/BI/21-22/Con/261 DT-28.09.2021
WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 955 0
107093 591995 33036
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 1307 13735 6265
TOTAL DESPATCH 5417 26912 218155
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 196.940 2)CEMENT(RLY)= 1401.620 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 84269 NOS. 65673 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 22.11.21
Balance to be Producion(in nos) Balance to be Despatch (in nos) Under REJECTION &MF
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 180 2980 62344 65631 9869 0 0 22142 46142 2167 106 210 16941 24 41
CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1912 28376 254250 649430 300570 1920 28832 220075 593915 20890 1165 1725 31116 258 361
S
LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
R CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 334 3138 3138 0 0 0 0 0 178 144 816 1998 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR 3335+400 3735 64 242 3431 3431 304 0 0 1165 1165 96 0 0 2168 2 4
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 270 839 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 120 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 22.11.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 22142 46142 16941
TOTAL DESPATCH 0 0 0
KGP AT KGP _ 0 10225 111062
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 410 770 28647
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 1637 2891
WB 109013 593915 31116
2 2)TC/CON/BI/21-22/Con/261 DT-28.09.2021 SSE/P-WAY/CON/KGP 6000 30.11.21 0 955 0
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 1510 15245 4755
TOTAL DESPATCH 1920 28832 220075
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 179.710 2)CEMENT(RLY)= 1275.570 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 101375 NOS. 64953 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 23.11.21
Balance to be Producion(in nos) Balance to be Despatch (in nos) Under REJECTION &MF
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 232 3212 62576 65863 9637 0 0 22142 46142 2335 115 265 16941 24 41
CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1908 30284 256158 651338 298662 1228 30060 221303 595143 22024 379 3285 29888 258 361
S
LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
R CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 334 3138 3138 0 0 0 0 0 178 144 816 1998 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR 3335+400 3735 64 306 3495 3495 240 0 0 1165 1165 160 0 0 2168 2 4
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 839 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 120 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 23.11.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 22142 46142 16941
TOTAL DESPATCH 0 0 0
KGP AT KGP _ 0 10225 111062
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 464 1234 28183
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 206 1843 2685
WB 110241 595143 29888
2 2)TC/CON/BI/21-22/Con/261 DT-28.09.2021 SSE/P-WAY/CON/KGP 6000 30.11.21 0 955 0
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 558 15803 4197
TOTAL DESPATCH 1228 30060 221303
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 222.390 2)CEMENT(RLY)= 1147.220 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 93487 NOS. 64025 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 24.11.21
Balance to be Producion(in nos) Balance to be Despatch (in nos) Under REJECTION &MF
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 264 3476 62840 66127 9373 0 0 22142 46142 2467 99 413 16941 24 41
CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1912 32196 258070 653250 296750 1570 31630 222873 596713 22090 733 4777 28318 258 361
S
LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
R CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 334 3138 3138 0 0 0 0 0 178 144 816 1998 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR 3335+400 3735 64 370 3559 3559 176 0 0 1165 1165 224 0 0 2168 2 4
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 839 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 120 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 24.11.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 22142 46142 16941
TOTAL DESPATCH 0 0 0
KGP AT KGP _ 0 10225 111062
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 144 1378 28503
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 80 1923 2605
WB 111811 596713 28318
2 2)TC/CON/BI/21-22/Con/261 DT-28.09.2021 SSE/P-WAY/CON/KGP 6000 30.11.21 0 955 0
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 1346 17149 2851
TOTAL DESPATCH 1570 31630 222873
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 204.410 2)CEMENT(RLY)= 1017.050 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 85583 NOS. 62969 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 25.11.21
Balance to be Producion(in nos) Balance to be Despatch (in nos) Under REJECTION &MF
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 293 3769 63133 66420 9080 0 0 22142 46142 2536 216 520 16941 24 41
CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1782 33978 259852 655032 294968 1552 33182 224425 598265 22076 1714 5592 26766 258 361
S
LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
R CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 334 3138 3138 0 0 0 0 0 178 144 816 1998 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR 3335+400 3735 32 402 3591 3591 144 0 0 1165 1165 256 0 0 2168 2 4
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 839 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 120 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 25.11.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 22142 46142 16941
TOTAL DESPATCH 0 0 0
KGP AT KGP _ 0 10225 111062
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 264 1642 28383
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 1923 2605
WB 113363 598265 26766
2 2)TC/CON/BI/21-22/Con/261 DT-28.09.2021 SSE/P-WAY/CON/KGP 6000 30.11.21 0 955 0
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 1288 18437 1563
TOTAL DESPATCH 1552 33182 224425
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 223.430 2)CEMENT(RLY)= 893.430 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 78327 NOS. 61797 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 26.11.21
Balance to be Producion(in nos) Balance to be Despatch (in nos) Under REJECTION &MF
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 224 3993 63357 66644 8856 0 0 22142 46142 2592 186 198 17459 25 42
CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 988 34966 260840 656020 293980 1455 34637 225880 599720 21234 1684 1860 30898 260 364
S
LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
R CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 334 3138 3138 0 0 0 0 0 178 144 816 1998 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR 3335+400 3735 64 466 3655 3655 80 0 0 1165 1165 320 0 0 2168 2 4
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 839 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 120 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 26.11.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 22142 46142 17459
TOTAL DESPATCH 0 0 0
KGP AT KGP _ 0 10225 111062
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 304 1946 28343
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 91 2014 2514
WB 114818 599720 30898
2 2)TC/CON/BI/21-22/Con/261 DT-28.09.2021 SSE/P-WAY/CON/KGP 6000 30.11.21 0 955 0
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 1060 19497 503
TOTAL DESPATCH 1455 34637 225880
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 212.800 2)CEMENT(RLY)= 819.420 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 73395 NOS. 60901 NOS
381) =

UNIT-1 TWO SHIFT NOT RUN DUE TO LESS LABOUR.

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 27.11.21
Balance to be Producion(in nos) Balance to be Despatch (in nos) Under REJECTION &MF
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 264 4257 63621 66908 8592 0 0 22142 46142 2628 226 386 17459 25 42
CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1556 36522 262396 657576 292424 1242 35879 227122 600962 21090 1742 3502 29656 260 364
S
LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
R CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 334 3138 3138 0 0 0 0 0 178 144 816 1998 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR 3335+400 3735 0 466 3655 3655 80 0 0 1165 1165 320 0 0 2168 2 4
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 839 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 120 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 27.11.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 22142 46142 17459
TOTAL DESPATCH 0 0 0
KGP AT KGP _ 0 10225 111062
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 648 2594 27999
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 110 2124 2404
WB 116060 600962 29656
2 2)TC/CON/BI/21-22/Con/261 DT-28.09.2021 SSE/P-WAY/CON/KGP 6000 30.11.21 0 955 0
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 484 19981 19
TOTAL DESPATCH 1242 35879 227122
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 197.630 2)CEMENT(RLY)= 711.080 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 67479 NOS. 59845 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 29.11.21
Balance to be Producion(in nos) Balance to be Despatch (in nos) Under REJECTION &MF
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date Cumulative on date As on date Cumulative nos) MF REJ
month year month year
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 296 4553 63917 67204 8296 0 0 22142 46142 2752 298 486 17459 25 42
CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1884 38406 264280 659460 290540 7638 43517 234760 608600 21136 2340 4742 22033 260 364
S
LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
R CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 334 3138 3138 0 0 0 0 0 178 144 816 1998 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR 3335+400 3735 0 466 3655 3655 80 0 0 1165 1165 320 0 0 2168 2 4
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 839 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 120 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 29.11.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 22142 46142 17459
TOTAL DESPATCH 0 0 0
GBA at GBA _ 5125 15350 116187
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 1392 3986 24661
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 205 2329 2199

2
2)TC/CON/BI/21-22/Con/261 DT-28.09.2021 WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 955 5045 118573 608600 22033
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 19 20000 0
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 897 897 19103
TOTAL DESPATCH 7638 43517 234760
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 179.580 2)CEMENT(RLY)= 581.064 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 59687 NOS. 58661 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- REVISED 30.11.21
Balance to be Producion(in nos) Balance to be Despatch (in nos) Under REJECTION &MF
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 232 4785 34149 67436 8064 1540 1540 23682 47682 2708 364 696 15919 25 42
CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1948 40954 266828 662008 287992 1898 45415 236658 610498 21822 2152 6792 20120 260 364
S
LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
R CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 334 3138 3138 0 0 0 0 0 178 144 816 1998 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR 3335+400 3735 80 546 3735 3735 0 0 0 1165 1165 272 128 0 2168 2 4
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 839 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 120 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 30.11.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

SSE/P-WAY/SONA AT BQA - - 1540 1540 0


1 BG 0 0 0 23682 47682 15919
TOTAL DESPATCH 0 1540 0
GBA at GBA _ 0 15350 116187
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 720 4706 23941
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 2329 2199

2
2)TC/CON/BI/21-22/Con/261 DT-28.09.2021 WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 955 5045 120471 610498 20120
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 0 20000 0
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 1178 2075 17925
TOTAL DESPATCH 1898 45415 236658
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 161.600 2)CEMENT(RLY)= 2966.660 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 118239 NOS. 57733 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 01.12.21
Balance to be Producion(in nos) Balance to be Despatch (in nos) Under REJECTION &MF
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 204 204 34353 67640 7860 0 0 23682 47682 2776 210 986 15919 25 42
CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1844 1844 268672 663852 286148 892 892 237550 611390 21820 2026 8764 19228 260 364
S
LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
R CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 0 0 178 144 816 1998 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR 3335+400 3735 0 0 3735 3735 0 0 0 1165 1165 240 160 0 2168 2 4
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
OTHERS PVT.

T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400
C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 01.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

SSE/P-WAY/SONA AT BQA - - 0 0 0
1 BG 0 0 0 23682 47682 15919
TOTAL DESPATCH 0 0 0
GBA at GBA _ 0 0 116187
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 480 480 23461
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 0 2199

2
2)TC/CON/BI/21-22/Con/261 DT-28.09.2021 WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 0 0 121363 611390 19228
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 0 0 0
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 412 412 17513
TOTAL DESPATCH 892 892 237550
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 153.040 2)CEMENT(RLY)= 2783.690 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 117335 NOS. 55450 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 02.12.21
Balance to be Producion(in nos) Balance to be Despatch (in nos) Under REJECTION &MF
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 192 396 34545 67832 7668 0 0 23682 47682 2748 226 1190 15919 25 42
CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1574 3418 270246 665426 284574 626 1518 238176 612016 21698 1810 7076 22198 262 366
S
LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
R CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 0 0 178 144 816 1998 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR 3335+400 3735 0 0 3735 3735 0 0 0 1165 1165 176 224 0 2168 2 4
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 20 20 0 0 0 28 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/KEC NEW 4 1 4 4 4 0 0 0 0 0 4 0 0 0
T.O. (1 IN 12)/MOON HOUSE 9 1 1 1 1 8 0 0 0 0 1 0 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 02.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

SSE/P-WAY/SONA AT BQA - - 0 0 0
1 BG 0 0 0 23682 47682 15919
TOTAL DESPATCH 0 0 0
GBA at GBA _ 0 0 116187
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 440 920 23021
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 0 2199

2
2)TC/CON/BI/21-22/Con/261 DT-28.09.2021 WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 0 0 121989 612016 22198
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 0 0 0
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 186 598 17327
TOTAL DESPATCH 626 1518 238176
STOCK OF RAW MATERIALS
5)INSERTS(T-
1)HTS WIRE = 135.290 2)CEMENT(RLY)= 2662.360 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 124483 NOS. 53704 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 03.12.21
Balance to be Producion(in nos) Balance to be Despatch (in nos) Under REJECTION &MF
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 220 616 34765 68052 7448 0 0 23682 47682 2864 124 1396 15919 25 42
CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1644 5062 271890 667070 282930 1578 3096 239754 613594 21664 1702 8862 20620 262 366
S
LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
R CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 0 0 178 144 816 1998 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR 3335+400 3735 0 0 3735 3735 0 0 0 1165 1165 0 400 0 2168 2 4
SER CON BA WIDER-48 SET 48 0 0 48 48 0 12 12 32 32 0 0 0 16 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/KEC NEW 4 1 4 4 4 0 0 0 0 0 4 0 0 0
T.O. (1 IN 12)/MOON HOUSE 9 2 3 3 3 6 0 0 0 0 3 0 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 03.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

SSE/P-WAY/SONA AT BQA - - 0 0 0
1 BG 0 0 0 23682 47682 15919
TOTAL DESPATCH 0 0 0
GBA at GBA _ 0 0 116187
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 1176 2096 22615
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 0 2199

2
2)TC/CON/BI/21-22/Con/261 DT-28.09.2021 WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 0 0 123567 613594 20620
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 0 0 0
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 402 1000 16925
TOTAL DESPATCH 1578 3096 239754
STOCK OF RAW MATERIALS .
5)INSERTS(T-
1)HTS WIRE = 118.530 2)CEMENT(RLY)= 2543.070 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 125779 NOS. 52335 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 04.12.21
Balance to be Producion(in nos) Balance to be Despatch (in nos) Under REJECTION &MF
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 164 780 34929 68216 7284 3480 3480 27162 51162 2792 240 120 13834 25 43
CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1646 6708 273536 668716 281284 1400 4496 241154 614994 21762 1942 1308 28073 265 372
S
LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
R CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 0 0 178 144 816 1998 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR 3335+400 3735 0 0 3735 3735 0 0 0 1165 1165 0 0 0 2568 2 4
SER CON BA WIDER-48 SET 48 0 0 48 48 0 12 12 32 32 0 0 0 16 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 53 328 0 0 0 23
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 4 0 0 0
T.O. (1 IN 12)/MOON HOUSE 9 1 4 4 4 5 0 0 0 0 4 0 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 04.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

SSE/P-WAY/SONA AT BQA - - 3480 3480 0


1 BG 0 0 0 27162 51162 13834
TOTAL DESPATCH 0 3480 0
_ 0 0 116187
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 440 2536 22175
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 100 100 2099

2
2)TC/CON/BI/21-22/Con/261 DT-28.09.2021 WB SSE/P-WAY/CON/KGP 6000 30.11.21 0 0 0 124967 614994 28073
3)TC/CON/BI/RVNL/283 DT-27.10.2021 DGM(P)/RVNL/TATA 20000 30.12.21 0 0 0
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 860 1860 16065
TOTAL DESPATCH 1400 4496 241154
STOCK OF RAW MATERIALS .
5)INSERTS(T-
1)HTS WIRE = 127.720 2)CEMENT(RLY)= 2426.400 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 135609 NOS. 51190 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 05.12.21
Balance to be Producion(in nos) Balance to be Despatch (in nos) Under REJECTION &MF
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 64 844 34993 68280 7220 0 3480 27162 51162 2696 187 333 13834 25 43
CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 622 7330 274158 669338 280662 1645 6141 242799 616639 20674 1800 3160 26428 265 372
S
LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
R CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 0 0 178 144 816 1998 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR 3335+400 3735 0 0 3735 3735 0 0 0 1165 1165 0 0 0 2568 2 4
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 12 32 32 0 0 0 16 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 531 0 0 0 20
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 4 0 0 0
T.O. (1 IN 12)/MOON HOUSE 9 1 5 5 5 4 0 0 0 0 5 0 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 05.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 13834
TOTAL DESPATCH 0 3480 0
_ 0 0 116187
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 672 3208 21503

2
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 WB SSE/P-WAY/CON/RNC 5000 30.12.21 94 194 2005 126612 616639 26428
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 879 2739 15186
TOTAL DESPATCH 1645 6141 242799
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 172.110 2)CEMENT(RLY)= 2385.130 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 149643 NOS. 50934 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 06.12.21
Balance to be Producion(in nos) Balance to be Despatch (in nos) Under REJECTION &MF
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 224 1068 35217 68504 6996 0 3480 27162 51162 2920 84 436 13834 25 43
CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1732 9062 275890 671070 278930 1374 7515 244173 618013 22406 726 4234 25054 265 372
S
LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
R CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 68 68 68 68 178 144 816 1930 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR 3335+400 3735 0 0 3735 3735 0 0 0 1165 1165 0 0 0 2568 2 4
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 12 32 32 0 0 0 16 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 531 0 0 0 20
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 4 0 0 0
T.O. (1 IN 12)/MOON HOUSE 9 1 6 6 6 3 0 0 0 0 6 0 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 06.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 13834
TOTAL DESPATCH 0 3480 0
_ 0 0 116187
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 312 3520 21191

2
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 WB SSE/P-WAY/CON/RNC 5000 30.12.21 220 414 1785 127986 618013 25054
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 842 3581 14344
TOTAL DESPATCH 1374 7515 244173
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 179.650 2)CEMENT(RLY)= 2260.250 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 142587 NOS. 49549 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 07.12.21
Balance to be Producion(in nos) Balance to be Despatch (in nos) Under REJECTION &MF
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 160 1228 35377 68664 6836 0 3480 27162 51162 2900 171 529 13834 25 43
CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1726 10788 277616 672796 277204 4137 11652 248310 622150 22220 1140 5732 20917 265 372
S
LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
R CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 68 68 68 178 144 816 1930 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR 3335+400 3735 0 0 3735 3735 0 0 0 1165 1165 0 0 0 2568 2 4
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 12 32 32 0 0 0 16 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 531 0 0 0 20
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 4 0 0 0
T.O. (1 IN 12)/MOON HOUSE 9 1 7 7 7 2 0 0 0 0 7 0 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 07.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 13834
TOTAL DESPATCH 0 3480 0
SSE/P-WAY/KGP AT KGP _ 2945 2945 119132
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 296 3816 20895

2
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 WB SSE/P-WAY/CON/RNC 5000 30.12.21 0 414 1785 129178 622150 20917
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 896 4477 13448
TOTAL DESPATCH 4137 11652 248310
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 161.490 2)CEMENT(RLY)= 2131.170 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 135683 NOS. 47931 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 08.12.21
Balance to be Producion(in nos) Balance to be Despatch (in nos) Under REJECTION &MF
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 224 1452 35601 68888 6612 0 3480 27162 51162 2892 191 741 13834 25 43
CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1768 12556 279384 674564 275436 1454 13106 249764 623604 22080 1199 7581 19463 265 372
S
LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
R CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 120 188 188 188 178 144 816 1810 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR 3335+400 3735 0 0 3735 3735 0 0 0 1165 1165 0 0 0 2568 2 4
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 12 32 32 0 0 0 16 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 531 0 0 0 20
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 4 0 0 0
T.O. (1 IN 12)/MOON HOUSE 9 1 8 8 8 1 0 0 0 0 8 0 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 08.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 13834
TOTAL DESPATCH 0 3480 0
SSE/P-WAY/KGP AT KGP _ 0 2945 119132
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 600 4416 20295

2
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 WB SSE/P-WAY/CON/RNC 5000 30.12.21 0 414 1785 130632 623604 19463
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 854 5331 12594
TOTAL DESPATCH 1454 13106 249764
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 174.140 2)CEMENT(RLY)= 2004.090 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 145261 NOS. 46546 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 09.12.21
Balance to be Producion(in nos) Balance to be Despatch (in nos) Under REJECTION &MF
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year
BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.21 11980 200 1652 35801 69088 6412 0 3480 27162 51162 2828 188 1008 13834 25 43
CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1740 14296 281124 676304 273696 1267 14373 251031 624871 21908 1300 9392 18196 265 372
S
LC , P.O No.-CE/TP/SER/2018/006/B/10031 dt-
14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 1 4
R CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 67 255 255 255 178 144 816 1743 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR 3335+400 3735 0 0 3735 3735 0 0 0 1165 1165 0 0 0 2568 2 4
SER CON BA WIDER-48 SET 48 0 0 48 48 0 0 12 32 32 0 0 0 16 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR/ O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 531 0 0 0 20
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 4 0 0 0
T.O. (1 IN 12)/MOON HOUSE 9 1 8 8 8 1 0 0 0 0 8 0 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 09.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 13834
TOTAL DESPATCH 0 3480 0
SSE/P-WAY/KGP AT KGP _ 0 2945 119132
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 0 4416 20295

2
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 WB SSE/P-WAY/CON/RNC 5000 30.12.21 395 809 1390 131899 624871 18196
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 872 6203 11722
TOTAL DESPATCH 1267 14373 251031
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 165.600 2)CEMENT(RLY)= 1752.820 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 131229 NOS. 43872 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 10.12.21
Balance to be Producion(in nos) Balance to be Despatch (in nos) Under REJECTION &MF
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 168 1820 35969 69256 6244 0 3480 27162 51162 2703 201 1288 13834 25 43

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1470 15766 282594 677774 272226 1809 16182 252840 626680 21596 1536 10938 16387 265 372
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E
L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 4
R 1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 255 255 255 178 144 816 1743 2
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1165 1165 0 0 0 2568 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 12 32 32 0 0 0 16 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 531 0 0 0 20
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 4 0 0 0
T.O. (1 IN 12)/MOON HOUSE 9 1 9 9 9 0 0 0 0 0 9 0 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 10.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 13834
TOTAL DESPATCH 0 3480 0
SSE/P-WAY/KGP AT KGP _ 0 2945 119132
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 752 5168 19543

2
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 WB SSE/P-WAY/CON/RNC 5000 30.12.21 320 1129 1070 133708 624871 18196
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 737 6940 10985
TOTAL DESPATCH 1809 16182 252840
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 152.480 2)CEMENT(RLY)= 1654.460 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 125349 NOS. 43200 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 11.12.21
Balance to be Producion(in nos) Balance to be Despatch (in nos) Under REJECTION &MF
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 0 1820 35969 69256 6244 0 3480 27162 51162 2479 425 260 14860 26 44

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 192 15958 282786 677966 272034 896 17078 253736 627576 20800 2524 1546 24874 269 377
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E
L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 4
R 1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 255 255 255 178 144 299 2259 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1165 1165 0 0 0 2568 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 12 32 32 0 0 0 16 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 531 0 0 0 20
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 0 0 0 2 0 20
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 4 0 0 0
T.O. (1 IN 12)/MOON HOUSE 9 1 9 9 9 0 0 0 0 0 9 0 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 11.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 14860
TOTAL DESPATCH 0 3480 0
SSE/P-WAY/KGP AT KGP _ 0 2945 119132
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 120 5288 19423

2
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 WB SSE/P-WAY/CON/RNC 5000 30.12.21 0 1129 1070 134604 627576 24874
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 776 7716 10209
TOTAL DESPATCH 896 17078 253736
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 152.480 2)CEMENT(RLY)= 1654.460 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 125349 NOS. 43200 NOS
381) =

NOTE:- LESS PRODUCTION(10.12.21 2ND SHIFT TO TILL NOW) DUE TO ALL STAFF'S OF PLANT WORK STRIKE

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 13.12.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 72 1892 36041 69328 6172 0 3480 27162 51162 2287 370 579 14860 26 44

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1358 17316 284144 679324 270676 1074 18152 254810 628650 20602 2294 3332 23800 269 377
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E
0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 132 387 387 387 178 144 299 2127 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1165 1165 0 0 0 2568 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 12 32 32 0 0 0 16 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 531 0 0 0 20
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 3 3 3 3 0 2 0 17
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 4 0 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 9 9 9 0 0 0 0 0 9 0 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 13.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 14860
TOTAL DESPATCH 0 3480 0
SSE/P-WAY/KGP AT KGP _ 0 2945 119132
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 120 5408 19303

2
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 WB SSE/P-WAY/CON/RNC 5000 30.12.21 316 1445 754 135678 628650 23800
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 638 8354 9571
TOTAL DESPATCH 1074 18152 254810
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 216.090 2)CEMENT(RLY)= 1555.900 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 119149 NOS. 42912 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 14.12.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 224 2116 36265 69552 5948 0 3480 27162 51162 2215 362 883 14860 26 44

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1836 19152 285980 681160 268840 608 18760 255418 629258 20554 2308 5202 23192 269 377
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E
0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 387 387 387 178 144 299 2127 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1165 1165 0 0 0 2568 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 12 32 32 0 0 0 16 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 531 0 0 0 20
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 3 6 6 6 0 2 0 14
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 4 0 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 9 9 9 0 0 0 0 0 9 0 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 14.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 14860
TOTAL DESPATCH 0 3480 0
SSE/P-WAY/KGP AT KGP _ 0 2945 119132
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 0 5408 19303

2
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 WB SSE/P-WAY/CON/RNC 5000 30.12.21 0 1445 754 136286 629258 23192
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 608 8962 8963
TOTAL DESPATCH 608 18760 255418
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 199.570 2)CEMENT(RLY)= 1432.360 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 111805 NOS. 42016 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 15.12.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 112 2228 36377 69664 5836 0 3480 27162 51162 2095 380 1097 14860 26 44

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1942 21094 287922 683102 266898 690 19450 256108 629948 20548 2237 7221 22502 269 377
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E
0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 387 387 387 178 144 299 2127 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR (3335+400) 3735 0 0 3735 3735 0 190 190 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 12 32 32 0 0 0 16 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 531 0 0 0 20
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 3 6 6 6 0 2 0 14
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 4 0 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 9 9 9 0 0 0 0 0 9 0 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 15.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 14860
TOTAL DESPATCH 0 3480 0
SSE/P-WAY/KGP AT KGP _ 0 2945 119132
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 0 5408 19303

2
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 WB SSE/P-WAY/CON/RNC 5000 30.12.21 0 1445 754 136976 629948 22502
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 690 9652 8273
TOTAL DESPATCH 690 19450 256108
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 183.210 2)CEMENT(RLY)= 1307.810 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 104037 NOS. 41568 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 16.12.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 224 2452 36601 69888 5612 0 3480 27162 51162 2115 361 1320 14860 26 44

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1852 22946 289774 684954 265046 848 20298 256956 630796 20556 2158 5608 25186 271 379
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E
0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 387 387 387 178 91 352 2127 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 10 10 0 0 0 53
WB GR (3335+400) 3735 0 0 3735 3735 0 0 190 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 12 32 32 0 0 0 16 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 531 0 0 0 20
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 6 6 6 0 2 0 14
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 4 0 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 9 9 9 0 0 0 0 0 9 0 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 16.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 14860
TOTAL DESPATCH 0 3480 0
SSE/P-WAY/KGP AT KGP _ 0 2945 119132
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 250 250 9750
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 0 5408 19303
WB 137824 630796 25186
2 1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 1445 754
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 598 10250 7675
TOTAL DESPATCH 848 20298 256956
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 191.970 2)CEMENT(RLY)= 1183.290 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 96629 NOS. 40672 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 17.12.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 176 2628 36777 70064 5436 0 3480 27162 51162 2099 293 260 16179 26 45

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1580 24526 291354 686534 263466 938 21236 257894 631734 20562 1722 534 31323 274 385
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E
0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 387 387 387 178 91 352 2127 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 10 10 20 20 0 0 0 43
WB GR (3335+400) 3735 0 0 3735 3735 0 0 190 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 4 16 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 531 0 0 0 20
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 6 6 6 0 2 0 14
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 3 1 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 9 9 9 0 0 0 0 0 9 0 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 17.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 16179
TOTAL DESPATCH 0 3480 0
SSE/P-WAY/KGP AT KGP _ 0 2945 119132
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 230 480 9520
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 0 5408 19303
WB 138762 631734 31323
2 1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 110 1555 644
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 598 10848 7077
TOTAL DESPATCH 938 21236 257894
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 177.900 2)CEMENT(RLY)= 1077.790 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 90309 NOS. 39968 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 18.12.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 160 2788 36937 70224 5276 0 3480 27162 51162 2039 303 470 16179 26 45

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1918 26444 293272 688452 261548 718 21954 258612 632452 20836 1634 2266 30605 274 385
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E
0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 66 453 453 453 178 31 60 2413 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 10 10 20 20 0 0 0 43
WB GR (3335+400) 3735 0 0 3735 3735 0 0 190 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 4 16 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 531 0 0 0 20
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 6 6 6 0 2 0 14
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 1 3 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 9 9 9 0 0 0 0 0 9 0 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 18.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 16179
TOTAL DESPATCH 0 3480 0
SSE/P-WAY/KGP AT KGP _ 0 2945 119132
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 0 480 9520
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 0 5408 19303
WB 139480 632452 30605
2 1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 100 1655 544
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 618 11466 6459
TOTAL DESPATCH 718 21954 258612
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 161.560 2)CEMENT(RLY)= 952.360 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 116237 NOS. 39328 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 19.12.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 64 2852 37001 70288 5212 0 3480 27162 51162 1939 305 632 16179 26 45

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 374 26818 293646 688826 261174 628 22582 259240 633080 19564 2070 3476 29977 274 385
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E
0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 453 453 453 114 95 60 2413 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 10 20 20 0 0 0 43
WB GR (3335+400) 3735 0 0 3735 3735 0 0 190 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 16 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 531 0 0 0 20
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 6 6 6 0 2 0 14
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 9 9 9 0 0 0 0 0 8 1 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 19.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 16179
TOTAL DESPATCH 0 3480 0
SSE/P-WAY/KGP AT KGP _ 0 2945 119132
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 0 480 9520
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 0 5408 19303
WB 140108 633080 29977
2 1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 1655 544
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 628 12094 5831
TOTAL DESPATCH 628 22582 259240
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 158.030 2)CEMENT(RLY)= 926.290 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 114741 NOS. 39072 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 20.12.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 112 2964 37113 70400 5100 0 3480 27162 51162 1987 219 782 16179 26 45

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1974 28792 295620 690800 259200 770 23352 260010 633850 20916 1172 4996 29207 274 385
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E
0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 453 453 453 114 95 60 2413 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 10 20 20 0 0 0 43
WB GR (3335+400) 3735 0 0 3735 3735 0 0 190 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 16 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 531 0 0 0 20
1in 8.5 DS 20 0 0 20 20 0 0 0 15 15 0 0 0 5
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 6 6 6 0 2 0 14
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 9 9 9 0 0 0 0 0 8 1 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 20.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 16179
TOTAL DESPATCH 0 3480 0
SSE/P-WAY/KGP AT KGP _ 0 2945 119132
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 0 480 9520
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 0 5408 19303
WB 140878 633850 29207
2 1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 190 1845 354
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 580 12674 5251
TOTAL DESPATCH 770 23352 260010
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 141.410 2)CEMENT(RLY)= 799.770 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 106845 NOS. 38624 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 21.12.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 180 3144 37293 70580 4920 0 3480 27162 51162 1943 253 972 16179 26 45

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1918 30710 297538 692718 257282 6568 29920 266578 640418 21102 1007 3643 25886 275 387
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E
0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 66 519 519 519 50 97 122 2347 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 10 20 20 0 0 0 43
WB GR (3335+400) 3735 0 0 3735 3735 0 0 190 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 16 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 531 0 0 0 20
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 2398 10274 0 0 0 3241 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 6 6 6 0 2 0 14
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 520 520 0 0 0 279 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 151 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 9 9 9 0 0 0 0 0 6 3 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 21.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 16179
TOTAL DESPATCH 0 3480 0
SSE/P-WAY/GBX at RNC _ 5870 8815 125002
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 0 480 9520
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 0 5408 19303
WB 141576 640418 22639
2 1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 110 1955 244
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 588 13262 4663
TOTAL DESPATCH 6568 29920 266578
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 150.740 2)CEMENT(RLY)= 673.350 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 99173 NOS. 37904 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 22.12.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 136 3280 37429 70716 4784 0 3480 27162 51162 1919 231 1154 16179 26 45

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1844 32554 299382 694562 255438 658 30578 267236 641076 21220 1137 5239 25228 275 387
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E
0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 519 519 519 0 97 172 2347 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 10 20 20 0 0 0 43
WB GR (3335+400) 3735 0 0 3735 3735 0 0 190 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 16 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 331 0 0 0 20
BG/TRIVENI 4216 0 0 4400 13520 0 0 1660 4058 12054 0 0 0 1461 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 7 7 7 0 2 0 13
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 9 9 9 0 0 0 0 0 5 4 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 22.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 16179
TOTAL DESPATCH 0 3480 0
_ 0 8815 125002
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 0 480 9520
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 0 5408 19303
WB 142234 641076 25228
2 1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 1955 244
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 658 13920 4005
TOTAL DESPATCH 658 30578 267236
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 186.090 2)CEMENT(RLY)= 553.640 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 109177 NOS. 37360 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 23.12.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 200 3480 37629 70916 4584 0 3480 27162 51162 1895 385 1224 16179 26 45

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1692 34246 301074 696254 253746 672 31250 267908 641748 21144 1039 7105 24556 275 387
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E
0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 519 519 519 0 0 272 2347 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 10 20 20 0 0 0 43
WB GR (3335+400) 3735 0 0 3735 3735 0 0 190 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 16 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 331 0 0 0 20
BG/TRIVENI 4216 0 0 4400 13520 0 0 1660 4058 12054 0 0 0 1461 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 7 7 7 0 2 0 13
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 9 9 9 0 0 0 0 0 3 6 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 23.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 16179
TOTAL DESPATCH 0 3480 0
_ 0 8815 125002
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 0 480 9520
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 0 5408 19303
WB 142906 641748 24556
2 1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 1955 244
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 672 14592 3333
TOTAL DESPATCH 672 31250 267908
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 170.930 2)CEMENT(RLY)= 440.100 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 102409 NOS. 36560 NOS
381) =

NOTE:- LESS PRODUCTION DUE TO SHORTAGE OF BOILER FUEL.

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 24.12.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 176 3656 37805 71092 4408 0 3480 27162 51162 1871 321 264 17402 26 45

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1924 3656 37805 698178 251822 618 31868 268526 642366 21328 1023 1387 31405 278 391
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E
0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 519 519 519 0 0 272 2347 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 10 20 20 0 0 0 43
WB GR (3335+400) 3735 0 0 3735 3735 0 0 190 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 16 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 331 0 0 0 20
BG/TRIVENI 4216 0 0 4400 13520 0 120 1780 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 7 7 7 0 2 0 13
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 9 9 9 0 0 0 0 0 1 8 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 24.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 17402
TOTAL DESPATCH 0 3480 0
_ 0 8815 125002
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 0 480 9520
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 0 5408 19303
WB 143524 642366 31405
2 1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 1955 244
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 618 15210 2715
TOTAL DESPATCH 618 31868 268526
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 154.140 2)CEMENT(RLY)= 313.520 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 94713 NOS. 35856 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 25.12.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 112 3768 37917 71204 4296 0 3480 27162 51162 1815 235 518 17402 26 45

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1912 38082 304910 700090 249910 876 32744 269402 643242 21833 1032 2785 30529 278 391
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E
0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 519 519 519 0 0 272 2347 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 10 20 20 0 0 0 43
WB GR (3335+400) 3735 0 0 3735 3735 0 0 190 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 16 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 331 0 0 0 20
BG/TRIVENI 4216 0 0 4400 13520 0 0 1780 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 7 7 7 0 2 0 13
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 9 9 9 0 0 0 0 0 0 9 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 25.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 17402
TOTAL DESPATCH 0 3480 0
_ 0 8815 125002
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 160 640 9360
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 0 5408 19303
WB 144400 643242 30529
2 1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 110 2065 134
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 606 15816 2109
TOTAL DESPATCH 876 32744 269402
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 189.510 2)CEMENT(RLY)= 390.810 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 87065 NOS. 35408 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
26.12.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 0 3768 37917 71204 4296 0 3480 27162 51162 1815 235 518 17402 26 45

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 0 38082 304910 700090 249910 824 33568 270226 644066 21641 1224 2785 29705 278 391
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E
0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 519 519 519 0 0 272 2347 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 10 20 20 0 0 0 43
WB GR (3335+400) 3735 0 0 3735 3735 0 0 190 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 16 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 331 0 0 0 20
BG/TRIVENI 4216 0 0 4400 13520 0 0 1780 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 7 7 7 0 2 0 13
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 9 9 9 0 0 0 0 0 0 9 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 26.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 17402
TOTAL DESPATCH 0 3480 0
_ 0 8815 125002
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 120 760 9240
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 0 5408 19303
WB 145224 644066 29705
2 1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 110 2175 24
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 594 16410 1515
TOTAL DESPATCH 824 33568 270226
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 189.510 2)CEMENT(RLY)= 390.810 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 87065 NOS. 35408 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
27.12.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 136 3904 38053 71340 4160 0 3480 27162 51162 1951 59 694 17402 27 45

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1742 39824 306652 701832 248168 604 34172 270830 644670 23063 994 3335 29101 278 391
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 36 36 0 0 0 84
E
0 0 0 0 3562 0 0 0 1820 1820 0 0 0 1741 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 519 519 519 0 0 272 2347 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 15 25 35 35 0 0 0 28
WB GR (3335+400) 3735 0 0 3735 3735 0 0 190 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 16 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 331 0 0 0 20
BG/TRIVENI 4216 0 0 4400 13520 0 0 1780 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 7 7 7 0 2 0 13
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 9 9 9 0 0 0 0 0 0 9 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 27.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 17402
TOTAL DESPATCH 0 3480 0
_ 0 8815 125002
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 0 760 9240
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 0 5408 19303
WB 145828 644670 29101
2 1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 2175 24
3)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 604 17014 911
TOTAL DESPATCH 604 34172 270830
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 176.100 2)CEMENT(RLY)= 289.600 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 80897 NOS. 34864 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
28.12.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 224 4128 38277 71564 3936 0 3480 27162 51162 2103 61 764 17402 27 45

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1852 41676 308504 703684 246316 3032 37204 273862 647702 23877 412 4955 26069 278 391
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 120 120 120 120 0 0 0 0
E
0 0 0 0 3562 0 1741 1741 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 1998 2517 2517 2517 0 0 272 349 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 12 37 47 47 0 0 0 16
WB GR (3335+400) 3735 0 0 3735 3735 0 0 190 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 16 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 331 0 0 0 20
BG/TRIVENI 4216 0 0 4400 13520 0 0 1780 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 7 7 7 0 2 0 13
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 9 9 9 0 0 0 0 0 0 9 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 28.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 17402
TOTAL DESPATCH 0 3480 0
SSE/P WAY/ODM AT BQA _ 1940 10755 126942
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 80 840 9160
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 0 5408 19303

2
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 WB SSE/P-WAY/CON/RNC 5000 30.12.21 24 2199 0 146920 647702 26069
4)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 616 17630 295
5)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 372 372 9628
TOTAL DESPATCH 3032 37204 273862
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 159.450 2)CEMENT(RLY)= 165.070 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 90139 NOS. 33968 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 29.12.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 136 4264 38413 71700 3800 0 3480 27162 51162 2015 183 866 17402 27 45

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1950 43626 310454 705634 244366 580 37784 274442 648282 23991 668 6535 25489 278 391
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 120 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 1741 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 2517 2517 2517 0 0 272 349 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 37 47 47 0 0 0 16
WB GR (3335+400) 3735 0 0 3735 3735 0 0 190 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 16 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 331 0 0 0 20
BG/TRIVENI 4216 0 0 4400 13520 0 0 1780 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 7 7 7 0 2 0 13
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 9 9 9 0 0 0 0 0 0 9 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 29.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 17402
TOTAL DESPATCH 0 3480 0
SSE/P WAY/ODM AT BQA _ 0 10755 126942
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 180 1020 8980
1)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 0 5408 19303

2
1)TC/CON/BI/21-22/Con/255 DT-22.09.2021 WB SSE/P-WAY/CON/RNC 5000 30.12.21 0 2199 0 147500 648282 25489
4)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 295 17925 0
5)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 105 477 9523
TOTAL DESPATCH 580 37784 274442
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 142.820 2)CEMENT(RLY)= 38.850 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 82339 NOS. 33424 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 30.12.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 120 4384 38533 71820 3680 0 3480 27162 51162 2076 236 0 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1510 45136 311964 707144 242856 83 37867 274525 648365 22322 1942 0 33838 281 396
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 120 120 120 0 0 0 0
E
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 1741 3561 3561 0 0 0 0 1 4
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 2517 2517 2517 0 0 272 349 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 14 51 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 190 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 16 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 331 0 0 0 20
BG/TRIVENI 4216 0 0 4400 13520 0 0 1780 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 7 7 7 0 2 0 13
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 9 9 9 0 0 0 0 0 0 9 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 30.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 3480 0
SSE/P WAY/ODM AT BQA _ 0 10755 126942
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 0 1020 8980
2)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 0 5408 19303
3)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 2199 0
4)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 0 17925 0

2
5)TC/CON/BI/RVNL/342 DT-24.12.2021 WB DGM(P)/RVNL/TATA 20000 31.03.22 0 0 20000 147583 648365 33838
6)TC/CON/BI/333 DT-16.12.2021 SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 83 560 9440
TOTAL DESPATCH 83 37867 274525
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 160.250 2)CEMENT(RLY)= 0.000 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 106649 NOS. 32944 NOS
381) =

NOTE:- LESS PRODUCTION DUE TO SHORTAGE OF CEMENT.

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 31.12.21
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 0 4384 38533 71820 3680 0 3480 27162 51162 1852 244 216 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 896 46032 312860 708040 241960 618 38485 275143 648983 21366 1830 1964 33220 281 396
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 120 120 120 0 0 0 0
E
R L.C WIDER- 3562 NOS 0 0 0 0 3562 0 0 1741 3561 3561 0 0 0 0 1 4
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 91 2608 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 51 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 190 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 16 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 3 56 331 0 0 0 20
BG/TRIVENI 4216 0 0 4400 13520 0 0 1780 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 7 7 7 0 2 0 13
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 4 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 9 9 9 0 0 0 0 0 0 9 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 31.12.21
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 3480 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 3480 0
SSE/P WAY/ODM AT BQA _ 0 10755 126942
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 0 1020 8980
2)TC/CON/BI/21-22/Con/246 DT- 13.09.2021 SSE/P-WAY/CON/BKSC 29417 15.12.21 0 5408 19303
3)TC/CON/BI/21-22/Con/255 DT-22.09.2021 SSE/P-WAY/CON/RNC 5000 30.12.21 0 2199 0
4)TC/CON/BI/RVNL/308 DT-16.11.2021 DGM(P)/RVNL/TATA 20000 31.01.22 0 17925 0

2
5)TC/CON/BI/RVNL/342 DT-24.12.2021 WB DGM(P)/RVNL/TATA 20000 31.03.22 618 618 19382 148201 648983 33220
6)TC/CON/BI/333 DT-16.12.2021 SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 0 560 9440
TOTAL DESPATCH 618 38485 275143
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 181.900 2)CEMENT(RLY)= 79.690 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 104345 NOS. 32944 NOS
381) =

NOTE:- LESS PRODUCTION DUE TO SHORTAGE OF CEMENT.

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 03.01.2022
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 112 112 38645 71932 3568 0 0 27162 51162 1524 481 419 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1558 1558 314418 709598 240402 701 701 275844 649684 19052 3592 4074 32519 281 396
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 56 331 0 0 0 20
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 7 7 0 2 0 13
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 9 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 03.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 0 126942
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 115 115 8865
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 0 0 19303
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 586 586 18796

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 148902 649684 32519
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 0 0 9440
TOTAL DESPATCH 701 701 275844
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 168.580 2)CEMENT(RLY)= 53.680 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 98113 NOS. 32496 NOS
381) =

NOTE:- LESS PRODUCTION DUE TO UNIT-2 CONTRACTOR LABOR AGREEMENT ISSUE.

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 04.01.2022
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 0 112 38645 71932 3568 0 0 27162 51162 1412 329 683 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 808 2366 315226 710406 239594 808 1509 276652 650492 17886 3310 6330 31711 281 396
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 56 331 0 0 0 20
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 7 7 0 2 0 13
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 9 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 04.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 0 126942
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 200 315 8665
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 0 0 19303
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 608 1194 18188

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 149710 650492 31711
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 0 0 9440
TOTAL DESPATCH 808 1509 276652
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 162.189 2)CEMENT(RLY)= 29.143 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 94881 NOS. 32496 NOS
381) =

NOTE:- LESS PRODUCTION DUE TO UNIT-2 CONTRACTOR LABOR AGREEMENT ISSUE.

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 05.01.2022
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 128 240 38773 72060 3440 0 0 27162 51162 1360 317 875 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1798 4164 317024 712204 237796 970 2479 277622 651462 17766 3089 8469 30741 281 396
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 56 331 0 0 0 20
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 7 7 0 2 0 13
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 9 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 05.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 0 126942
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 328 643 8337
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 0 0 19303
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 642 1836 17546

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 150680 651462 30741
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 0 0 9440
TOTAL DESPATCH 970 2479 277622
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 199.840 2)CEMENT(RLY)= 2708.640 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 87689 NOS. 31984 NOS
381) =

NOTE:- LESS PRODUCTION DUE TO UNIT-2 EOT BREAK DOWN.

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 06.01.2022
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 120 360 38893 72180 3320 0 0 27162 51162 1344 363 965 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1908 6072 318932 714112 235888 573 3052 278195 652035 17830 2635 10767 30168 281 396
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 56 331 0 0 0 20
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 7 7 0 2 0 13
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 9 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 06.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 0 126942
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 0 643 8337
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 0 0 19303
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 573 2409 16973

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 151253 652035 30168
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 0 0 9440
TOTAL DESPATCH 573 3052 278195
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 183.680 2)CEMENT(RLY)= 2585.780 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 80057 NOS. 31504 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 07.01.2022
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 188 548 39081 72368 3132 0 0 27162 51162 1332 347 1181 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1870 7942 320802 715982 234018 926 3978 279121 652961 18008 2369 3101 38855 285 403
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 56 331 0 0 0 20
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 7 7 0 2 0 13
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 9 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 07.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 0 126942
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 332 975 8005
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 0 0 19303
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 594 3003 16379

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 152179 652961 38855
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 0 0 9440
TOTAL DESPATCH 926 3978 279121
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 167.210 2)CEMENT(RLY)= 2461.920 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 72577 NOS. 30752 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
08.01.2022
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 136 684 39217 72504 2996 0 0 27162 51162 1292 313 1391 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1956 9898 322758 717938 232062 5956 9934 285077 658917 18040 2197 5197 32899 285 403
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 56 331 0 0 0 20
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 7 7 0 2 0 13
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 9 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 08.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
SSE/P-WAY/ODM AT BQA _ 4750 4750 131692
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 608 1583 7397
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 0 0 19303
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 598 3601 15781

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 153385 658917 32899
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 0 0 9440
TOTAL DESPATCH 5956 9934 285077
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 150.530 2)CEMENT(RLY)= 2335.330 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 64753 NOS. 30208 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 09.01.2022
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 0 684 39217 72504 2996 0 0 27162 51162 1292 313 1391 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 320 10218 323078 718258 231742 602 10536 285679 659519 16448 2689 6617 32297 285 403
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 56 331 0 0 0 20
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 7 7 0 2 0 13
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 9 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 09.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 4750 131692
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 0 1583 7397
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 0 0 19303
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 602 4203 15179

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 153987 659519 32297
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 0 0 9440
TOTAL DESPATCH 602 10536 285679
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 148.000 2)CEMENT(RLY)= 2315.740 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 63473 NOS. 30208 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 10.01.2022
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 136 820 39353 72640 2860 0 0 27162 51162 1428 123 1581 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1884 12102 324962 720142 229858 482 11018 286161 660001 18332 1191 8115 31815 285 403
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 56 331 0 0 0 20
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 7 7 0 2 0 13
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 9 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 10.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 4750 131692
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 0 1583 7397
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 0 0 19303
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 482 4685 14697

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 154469 660001 31815
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 0 0 9440
TOTAL DESPATCH 482 11018 286161
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 131.887 2)CEMENT(RLY)= 2193.568 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 55937 NOS. 29664 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 11.01.2022
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 208 1028 39561 72848 2652 0 0 27162 51162 1500 139 1701 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1798 13900 326760 721940 228060 100 11118 28261 660101 18388 1335 9713 31715 285 403
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 56 331 0 0 0 20
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 2 2 9 9 0 2 0 11
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 9 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 11.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 4750 131692
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 0 1583 7397
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 0 0 19303
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 100 4785 14597

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 154569 660101 31715
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 0 0 9440
TOTAL DESPATCH 100 11118 286261
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 115.814 2)CEMENT(RLY)= 2073.140 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 48745 NOS. 28832 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 12.01.2022
Producion(in nos) Despatch (in nos) REJECTION &MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 136 1164 39697 72984 2516 0 0 27162 51162 1412 232 1832 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1948 15848 328708 723888 226112 195 11313 286456 660296 18484 1966 10934 31520 285 403
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 56 331 0 0 0 20
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 2 9 9 0 2 0 11
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 9 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 12.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 4750 131692
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 0 1583 7397
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 0 0 19303
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 195 4980 14402

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 154764 660296 31520
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 0 0 9440
TOTAL DESPATCH 195 11313 286456
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 99.190 2)CEMENT(RLY)= 1947.040 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 40953 NOS. 28288 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 13.01.2022
Producion(in nos) Despatch (in nos) REJECTION & MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 0 1164 39697 72984 2516 0 0 27162 51162 1276 368 668 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1558 17406 330266 725446 224554 600 11913 287056 660896 18092 1925 1991 41841 290 411
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 56 331 0 0 0 20
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 2 9 9 0 2 0 11
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 9 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 13.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 4750 131692
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 0 1583 7397
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 0 0 19303
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 600 5580 13802

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 155364 660896 41937
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 0 0 9440
TOTAL DESPATCH 600 11913 287056
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 130.846 2)CEMENT(RLY)= 1851.519 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 40953 NOS. 28288 NOS
381) =

NOTE:- LESS PRODUCTION DUE TO LESS LABOUR'S, UNIT-2, 3-RD SHIFT NOT RUN.

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 15.01.2022
Producion(in nos) Despatch (in nos) REJECTION & MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 84 1248 38617 71904 3596 0 0 27162 51162 1240 338 818 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1240 18646 331506 726686 223314 645 12558 287701 661541 16926 2441 3881 41196 290 411
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 6 6 62 337 0 0 0 14
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 1 3 10 10 0 2 0 10
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 9 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 15.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 4750 131692
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 69 1652 7328
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 0 0 19303
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 576 6156 13226

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 156009 661541 41196
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 0 0 9440
TOTAL DESPATCH 645 12558 287701
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 145.670 2)CEMENT(RLY)= 1771.379 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 29761 NOS. 27952 NOS
381) =

NOTE:- LESS PRODUCTION DUE TO LESS LABOUR (MAKAR SANKRANTI UTSAB).

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 16.01.2022
Producion(in nos) Despatch (in nos) REJECTION & MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 0 1248 38617 71904 3596 0 0 27162 51162 1240 338 818 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 0 18646 331506 726686 223314 684 13242 288385 662225 16926 2441 3881 40512 290 411
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 3 9 65 340 0 0 0 11
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 3 10 10 0 2 0 10
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 0 0 0 0 4 0 0
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 9 0 0
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 16.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 4750 131692
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 200 1852 7128
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 0 0 19303
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 484 6640 12742

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 156693 662225 40512
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 0 0 9440
TOTAL DESPATCH 684 13242 288385
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 145.670 2)CEMENT(RLY)= 1771.379 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 29761 NOS. 27952 NOS
381) =

NOTE:- LESS PRODUCTION DUE TO LESS LABOUR (MAKAR SANKRANTI UTSAB).

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 17.01.2022
Producion(in nos) Despatch (in nos) REJECTION & MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 0 1248 38617 71904 3596 0 0 27162 51162 1240 338 818 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1128 19774 332634 727814 22186 6714 19956 295099 668939 18054 1043 5279 33798 290 411
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 2 11 67 342 0 0 0 9
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 3 10 10 0 2 0 10
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 2 2 2 2 0 0 0 2
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 4 0 5
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 17.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
SSE/P-WAY/KGP AT KGP _ 5870 10620 137562
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 256 2108 6872
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 0 0 19303
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 588 7228 12154

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 157537 668939 33798
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 0 0 9440
TOTAL DESPATCH 6714 19956 295099
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 134.000 2)CEMENT(RLY)= 1683.380 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 75187 NOS. 27456 NOS
381) =

NOTE:- LESS PRODUCTION DUE TO LESS LABOUR (MAKAR SANKRANTI MELA IN ANARA).

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 18.01.2022
Producion(in nos) Despatch (in nos) REJECTION & MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 104 1352 38721 72008 3492 0 0 27162 51162 1344 338 818 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1876 21650 334510 729690 220310 1838 21794 296937 670777 19798 407 6047 31960 290 411
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 11 67 342 0 0 0 9
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 3 10 10 0 2 0 10
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 2 2 2 0 0 0 2
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 4 0 5
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 18.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 10620 137562
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 1046 3154 5826
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 216 216 19087
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 576 7804 11578

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 159375 670777 31960
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 0 0 9440
TOTAL DESPATCH 1838 21794 296937
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 173.060 2)CEMENT(RLY)= 1559.137 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 67683 NOS. 26704 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 19.01.2022
Producion(in nos) Despatch (in nos) REJECTION & MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 64 1416 38785 72072 3428 0 0 27162 51162 1408 338 818 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1886 23536 336396 731576 218424 1846 23640 298783 672623 20876 808 6454 30114 290 411
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 3 14 70 345 0 0 0 6
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 3 10 10 0 2 0 10
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 2 2 2 0 0 0 2
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 4 0 5
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 19.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 10620 137562
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 527 3681 5299
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 532 748 18555
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 682 8486 10896

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 161221 672623 30114
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 105 105 9335
TOTAL DESPATCH 1846 23640 298783
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 156.610 2)CEMENT(RLY)= 1435.050 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 67739 NOS. 26016 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 20.01.2022
Producion(in nos) Despatch (in nos) REJECTION & MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 88 1504 38873 72160 3340 0 0 27162 51162 1496 338 818 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1860 25396 338256 733436 216564 1211 24851 299994 673834 20938 1044 1562 35349 294 415
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 3 17 73 348 0 0 0 3
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 3 10 10 0 2 0 10
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 2 2 2 0 0 0 2
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 4 0 5
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 20.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 10620 137562
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 441 4122 4858
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 108 856 18447
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 542 9028 10354

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 162432 673834 35349
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 120 225 9215
TOTAL DESPATCH 1211 24851 299994
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 140.260 2)CEMENT(RLY)= 1311.970 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 87139 NOS. 25280 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 21.01.2022
Producion(in nos) Despatch (in nos) REJECTION & MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 40 1544 38913 72200 3300 0 0 27162 51162 1536 338 818 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 950 26346 339206 734386 215614 1344 26195 301338 675178 19980 1166 3348 34005 294 415
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 17 73 348 0 0 0 3
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 3 10 10 0 2 0 10
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 2 2 2 0 0 0 2
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 0 0 9
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 21.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 10620 137562
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 164 4286 4694
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 396 1252 18051
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 498 9526 9856

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 163776 675178 34005
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 286 511 8929
TOTAL DESPATCH 1344 26195 301338
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 184.045 2)CEMENT(RLY)= 1250.198 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 83339 NOS. 24992 NOS
381) =

NOTE:- LESS PRODUCTION DUE TO LESS LABOUR (GRAM PUJA)

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 22.01.2022
Producion(in nos) Despatch (in nos) REJECTION & MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 104 1648 39017 72304 3196 0 0 27162 51162 1640 236 920 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1846 28192 341052 736232 213768 839 27034 302177 676017 19956 1438 4946 33166 294 415
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 17 73 348 0 0 0 3
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 3 10 10 0 2 0 10
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 2 2 2 0 0 0 2
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 0 0 9
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 22.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 10620 137562
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 0 4286 4694
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 540 1792 17511
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 179 9705 9677

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 164615 676017 33166
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 120 631 8809
TOTAL DESPATCH 839 27034 302177
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 167.734 2)CEMENT(RLY)= 1127.580 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 127635 NOS. 24224 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 23.01.2022
Producion(in nos) Despatch (in nos) REJECTION & MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 0 1648 39017 72304 3196 0 0 27162 51162 1640 236 920 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1252 29444 342304 737484 212516 626 27660 302803 676643 19252 2014 6326 32540 294 415
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 17 73 348 0 0 0 3
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 3 10 10 0 2 0 10
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 2 2 2 0 0 0 2
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 0 0 9
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 23.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 10620 137562
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 0 4286 4694
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 396 2188 17115
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 110 9815 9567

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 165241 676643 32540
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 120 751 8689
TOTAL DESPATCH 626 27660 302803
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 157.800 2)CEMENT(RLY)= 1050.610 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 122627 NOS. 24208 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 24.01.2022
Producion(in nos) Despatch (in nos) REJECTION & MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 224 708 39241 72528 2972 0 0 27162 51162 1740 170 1110 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1924 31368 344228 739408 210592 782 28442 303585 677425 20856 676 7984 31758 294 415
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 17 73 348 0 0 0 3
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 3 10 10 0 2 0 10
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 2 2 2 0 0 0 2
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 0 0 9
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 24.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 10620 137562
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 83 4369 4611
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 96 2284 17019
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 603 10418 8964

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 166023 677425 31758
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 0 751 8689
TOTAL DESPATCH 782 28442 303585
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 140.125 2)CEMENT(RLY)= 919.112 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 114931 NOS. 23104 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 25.01.2022
Producion(in nos) Despatch (in nos) REJECTION & MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 148 856 39389 72676 2824 0 0 27162 51162 1752 164 1252 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1862 33230 346090 741270 208730 1847 30289 305432 679272 20834 1140 9404 29911 294 415
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 17 73 348 0 0 0 3
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 3 10 10 0 2 0 10
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 2 2 2 0 0 0 2
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 0 0 9
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 25.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 10620 137562
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 616 4985 3995
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 402 2686 16617
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 628 11046 8336

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 167870 679272 29911
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 201 952 8488
TOTAL DESPATCH 1847 30289 305432
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 163.430 2)CEMENT(RLY)= 797.490 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 107483 NOS. 22496 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 27.01.2022
Producion(in nos) Despatch (in nos) REJECTION & MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 140 996 39529 72816 2684 0 0 27162 51162 1548 292 1468 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1932 351162 348022 743202 206798 2146 32435 307578 681418 19020 2994 11296 27765 294 415
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 2 2 20 76 351 0 0 0 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 3 10 10 0 2 0 10
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 2 2 2 0 0 0 2
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 0 0 9
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 27.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 10620 137562
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 904 5889 3091
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 108 2794 16509
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 614 11660 7722

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 170016 681418 27765
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 520 1472 7968
TOTAL DESPATCH 2146 32435 307578
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 146.870 2)CEMENT(RLY)= 671.970 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 99755 NOS. 21920 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 28.01.2022
Producion(in nos) Despatch (in nos) REJECTION & MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 96 1092 39625 72912 2588 0 0 27162 51162 1576 192 1636 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1798 36960 349820 745000 205000 1375 33810 308953 682793 19260 2759 13089 26390 294 415
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1355 1355 0 0 0 2378 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 36 36 0 0 0 12 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 2 0 20 76 351 0 0 0 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 3 10 10 0 2 0 10
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 2 2 2 0 0 0 2
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 0 0 9
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 28.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 10620 137562
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 0 5889 3091
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 576 3370 15933
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 584 12244 7138

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 171391 682793 26390
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 215 1687 7753
TOTAL DESPATCH 1375 33810 308953
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 156.800 2)CEMENT(RLY)= 1925.720 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 92563 NOS. 21520 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 29.01.2022
Producion(in nos) Despatch (in nos) REJECTION & MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 148 1240 39773 73060 2440 0 0 27162 51162 1712 44 1796 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1876 38836 351696 746876 203124 978 34788 309931 683771 20512 1386 15086 25412 294 415
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 400 400 1755 1755 0 0 0 1978 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 6 6 42 42 0 0 0 6 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 20 76 351 0 0 0 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 3 10 10 0 2 0 10
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 2 2 2 0 0 0 2
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 0 0 9
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 29.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 10620 137562
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 0 5889 3091
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 396 3766 15537
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 582 12826 6556

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 172369 683771 25412
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 0 1687 7753
TOTAL DESPATCH 978 34788 309931
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 140.608 2)CEMENT(RLY)= 1803.241 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 132059 NOS. 20912 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 30.01.2022
Producion(in nos) Despatch (in nos) REJECTION & MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 152 1392 39925 73212 2288 0 0 27162 51162 1864 44 1796 18273 27 46

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1158 39994 352854 748034 201966 850 35638 310781 684621 21670 1386 15086 24562 294 415
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 400 1755 1755 0 0 0 1978 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 6 42 42 0 0 0 6 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 20 76 351 0 0 0 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 3 10 10 0 2 0 10
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 2 2 2 0 0 0 2
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 0 0 9
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 30.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 10620 137562
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 69 5958 3022
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 288 4054 15249
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 388 13214 6168

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 173219 684621 24562
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 105 1792 7648
TOTAL DESPATCH 850 35638 310781
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 154.820 2)CEMENT(RLY)= 1724.380 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 127427 NOS. 20272 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 31.01.2022
Producion(in nos) Despatch (in nos) REJECTION & MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 140 1532 40065 73352 2148 0 0 27162 51162 1920 92 0 20103 28 47

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1916 41910 354770 749950 200050 1230 36868 312011 685851 22346 1240 0 39786 301 426
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 272 258 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 400 1755 1755 0 0 0 1978 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 6 42 42 0 0 0 6 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 20 76 351 0 0 0 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 3 10 10 0 2 0 10
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 2 2 2 0 0 0 2
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 0 0 9
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 31.01.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

- - 0 0 0
1 BG 0 0 0 27162 51162 18273
TOTAL DESPATCH 0 0 0
_ 0 10620 137562
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 320 6278 2702
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 384 4438 14865
5)TC/CON/BI/RVNL/342 DT-24.12.2021 DGM(P)/RVNL/TATA 20000 31.03.22 130 13344 6038

2
6)TC/CON/BI/333 DT-16.12.2021 WB SSE/P-WAY/CON/RNC 10000 31.03.22 0 0 10000 174449 685851 39786
7)TC/CON/BI/331 DT-16.12.2021 SSE/P-WAY/CON/BLS 11906 31.03.22 0 0 11906
8)TC/CON/BI/332 DT-16.12.2021 SSE/P-WAY/CON/KGP 15344 31.03.22 0 0 15344
9)TC/CON/BI/326 DT-10.12.2021 SSE/P-WAY/CON/RNC-1 10000 31.03.22 396 2188 7252
TOTAL DESPATCH 1230 36868 312011
STOCK OF RAW MATERIALS .

5)INSERTS(T-
1)HTS WIRE = 138.380 2)CEMENT(RLY)= 1599.840 MT 3)CEMENT(PVT)= 0.000 MT 4)INSERTS(T-6901)= 166763 NOS. 19696 NOS
381) =

4 B.A _ _ 0 0 _ 79 SETS NIL

5 SEJ _ _ 0 0 _ 310 SETS 93 SETS

6 1 in 12 _ _ - 0 0 _ 0 102 SETS 02 SETS


7 1 in 8.5 _ _ _ _ _ 0 93 SETS 10 SETS
_ _ 0 0 0
8 1 in 12
_ _ 0 0 0
0 273 SETS 39 SETS
ECR/OPEN LINE
9 SEJ _ _ 0 0 0 0 1255 16
PSC SLEEPER PRODUCTION AND DESPATCH DETAILS OF CSP/ANARA AS ON:- 01.02.2022
Producion(in nos) Despatch (in nos) REJECTION & MF
Balance to be Balance to be Under
Per day max production IC under Stock as on date
ORGANISATION Agreement (Ordered Qty) capacity/DP up to
produced as on During the producted as During the During the curing(in Under testing
issue (in nos)
01.04.2021 As on date During the year Cumulative on date As on date Cumulative nos) MF REJ
month month year

BG(ZONAL RLY)P.O
No:-CE/TP/SER/2020/004/A/10005/45239 Nos 30.09.2021 11980 200 200 40265 73552 1948 4540 4540 31702 55702 2120 56 36 15563 28 47

CS-172,WIDER BASE/950000 NOS 30.06.2022 554540 1798 1798 356568 751748 198252 885 885 312896 686736 23016 770 1598 38901 301 426
S LC , P.O No.-CE/TP/SER/2018/006/B/10031
dt-14.01.2019 25.11.2020 0 0 0 0 120 0 0 0 120 120 0 0 0 0
E
0 0 0 0 3562 0 0 0 3561 3561 0 0 0 0 4
R L.C WIDER- 3562 NOS
1
CR WIDER-15134NOS 6486 0 0 7045 15134 0 0 0 6358 6358 0 0 0 8770 6 17
BA WIDER-124 SET 124 0 0 124 124 0 0 0 124 124 0 0 0 0
GR WIDER-3138 3138 0 0 3138 3138 0 0 0 2608 2608 0 0 0 530 3
LC WIDER- 846 0 0 846 846 0 0 0 606 606 0 0 0 240
SEJ 63 0 0 63 63 0 0 0 61 61 0 0 0 2
WB GR (3335+400) 3735 0 0 3735 3735 0 0 0 1755 1755 0 0 0 1978 2 4
SER / CON BA WIDER-48 SET 48 0 0 48 48 0 0 0 42 42 0 0 0 6 1
1 IN 8.5 11 0 0 11 11 0 0 0 5 5 0 0 0 6
SG/CR 2640 0 0 2640 2640 0 0 0 839 839 0 0 0 2077 1 3
DS/TRAP 18 0 0 18 18 0 0 0 10 10 0 0 0 8
ECR / O.L. T.OUT1in12(ECR/OL)/351 Sets 22 SET 0 0 16 351 0 0 0 76 351 0 0 0 0
BG/TRIVENI 4216 0 0 4400 13520 0 0 0 4178 12174 0 0 0 1341 5 11
DS/TRIVENI 2 0 0 2 2 0 0 0 0 0 0 1 0 1
T.O. (1 IN 8.5)/TRIVENI 27 0 0 3 22 5 0 0 10 10 0 2 0 10
OTHERS PVT.

BG CR/TRIVENI 400 0 0 400 400 0 0 0 0 0 0 0 0 400


C.R/MALHOTRA(T-4183) 800 0 0 368 800 0 0 0 620 620 0 0 0 179 1 1
BG/MALHOTRA 1032 0 0 1032 6004 0 0 0 3346 5840 0 0 0 159 1 4
T.O. (1 IN 12)/KEC NEW 4 0 0 4 4 0 0 0 2 2 0 0 0 2
T.O. (1 IN 12)/MOON HOUSE 9 0 0 9 9 0 0 0 0 0 0 0 0 9
T.O. (1 IN 12)/MALHOTRA 5 0 0 0 10 0 0 0 5 5 0 0 0 5
DETAILS OF DESPATCH AS ON 01.02.2022
DESPATCH
Srl.No BI NO TYPE OF SLEEPER CONSIGNEE BI QUANTITY IN NOS BI VALIDITY ON DATE IN
NOS
MONTHLY
DESPATCH
BALANCE TO BE DESPATCH During the year CUMULATIVE DESPATCH
QTY STOCK IN
HAND
ORGANISATION REMARKS

SSE/P-WAY/SONA AT BQA - - 4540 4540 0


1 BG 0 0 0 31702 55702 15563
TOTAL DESPATCH 0 4540 0
_ 0 0 137562
1)TC/CON/BI/21-22/Con/327 DT- 10.12.2021 SSE/P-WAY/CON/BLS 10000 31.03.22 163 163 2539
2)TC/CON/BI/21-22/Con/339 DT- 21.12.2021 SSE/P-WAY/CON/BKSC 29417 21.02.22 144 144 14721

You might also like