ROOM NO. ROOM NAME FLOOR FINISH BASE FINISH 1


WALL FINISH
2
CASEWORK
FINISH
COUNTERTOP
FINISH CEILING FINISH COMMENTS ROOM NO. ROOM NAME FLOOR FINISH BASE FINISH 1
WALL FINISH
2
CASEWORK
FINISH
COUNTERTOP
FINISH CEILING FINISH COMMENTS
NOT FOR
102B BREAK ROOM - - - - - - - REFER TO APPENDIX A FOR REMAINING FINISHES 2300
E02 ELEV
ELEV.2LOBBY T-2 -B-2 P-5
- -WOOD PANELING - - GYP,
- PAINTED REFER TO APPENDIX A FOR REMAINING FINISHES CONSTRUCTION
201 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10 CORR. 2301
S01 STAIR
SKY LOUNGE
1 T-1/CT-6
RFP-2A B-1
- T-16,
- P-2 -AWC-1 WD-1
- Q-2
- AWC-1,
- GYP, PAINTED RS-3
REFER TO APPENDIX A FOR REMAINING FINISHES
101B LOUNGE T-1/CT-1 B-1 WC-1, WVP-1 P-1, P-3 WD-1, F-1, F-2 Q-1 GYP, PAINTED RS-3 2303
S02 STAIR
FITNESS
2 RAF-1/RAF-2
RFP-2A B-2
- P-7,
- ACT-1 -P-2 - - ACT-1,
- GYP, PAINTED RS-3
REFER TO APPENDIX A FOR REMAINING FINISHES
105 CORRIDOR T-1 B-3 P-8 P-9 - - P-10 2305
600 SHOWER
ELEV. LOBBY T-2
T-4 B-2
T-11 P-5,
T-11WOOD PANELING P-1 - - GYP, PAINTED REFER TO APPENDIX A FOR SHOWER SURROUND
106 PARCEL RFP-1 RB-1 P-1 P-1 - - GYP, PAINTED HEAVY DUTY METAL SHELVING; REFER TO APPENDIX A 2306
600.1 RR
CORRIDOR RFP-2
T-4 B-3
T-11 T-11
P-8 P-9
P-1 -WD-1, MTL-1 Q-1
- GYP,
P-10 PAINTED
107 MAILROOM T-3 B-2 P-5 WOOD PANELING - - GYP, PAINTED 2307
600.2 CORRIDOR T-2
RFP-2 B-3 P-8 P-9 - - P-10 CORR.
108 PACKAGE HOLDING RFP-1 RB-1 GYP, PAINTED 76
700 ELEV. LOBBY T-2 B-2 P-5, WOOD PANELING P-1 - - GYP, PAINTED
110 LEASING OFFICE CT-2 B-1 P-1 P-1 - - GYP, PAINTED RS-3 700.2 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10
111 LEASING RFP-1 B-1 P-1 P-1 WD-1, MTL-1 Q-1 GYP, PAINTED RS-3 800 ELEV LOBBY T-2 B-2 P-5, WOOD PANELING P-1 - - GYP, PAINTED
112 MANAGER CT-2 B-1 P-1 P-1 - - GYP, PAINTED 800.2 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10 CORR.
113 OFFICE 2 CT-2 B-1 P-1 P-1 - - GYP, PAINTED 900 ELEV. LOBBY T-2 B-2 P-5, WOOD PANELING P-1 - - GYP, PAINTED
114 OFFICE 3 CT-2 B-1 P-1 P-1 - - GYP, PAINTED 900.2 CORRIDOR RFP-2 B-3 P-8 P- 9 - - P-10
115 RR T-4 T-11 T-11 P-1 WD-1, MTL-1 Q-1 GYP, PAINTED 1000 ELEV. LOBBY T-2 B-2 P-5, WOOD PANELING P-1 - - GYP, PAINTED
38 NORTHWEST DAVIS, SUITE 300
117 WORKROOM RFP-1 RB-1 P-1 P-1 WD-1 Q-1 GYP, PAINTED 1000.1 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10
PORTLAND, OR 97209
118 LEED SHOWER ROOM T-4 T-11 T-11 P-1 WD-1, MTL-1 Q-1 GYP, PAINTED 1000.2 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10 CORR.
503.245.7100
120 RETAIL ELEVATOR LOBBY T-3 B-2 P-5, WOOD PANELING P-1 - - GYP, PAINTED 1100 ELEV. LOBBY T-2 B-2 P-5, WOOD PANELING P-1 - - GYP, PAINTED
122B RR T-4 T-11 T-11 P-1 WD-1, MTL-1 GYP, PAINTED 1100.1 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10 1505 5TH AVE, SUITE 300
122C RR T-4 T-11 T-11 P-1 WD-1, MTL-1 Q-1 GYP, PAINTED 1100.2 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10 SEATTLE, WA 98101
100 ELEV. LOBBY T-2 B-2 P-2 WOOD PANELING - - GYP, PAINTED 1200 ELEV. LOBBY T-2 B-2 P-5, WOOD PANELING P-1 - - GYP, PAINTED 206.576.1600
101 RECEPTION T-1/CT-1 B-1 T-5, T-6, T-7, T-8, Q-1, WVP-1, WC-1 P-1, P-3 P-4 WDC-1 GYP, PAINTED RS-3 1200.2 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10 CORR.
1014 HOWARD STREET
101A VESTIBULE T-1/WM-1 B-1 P-1 P-1 - - GYP, PAINTED 1300 ELEV. LOBBY T-2 B-2 P-5, WOOD PANELING P-1 - - GYP, PAINTED
SAN FRANCISCO, CA 94103
114 OFFICE 3 - - - - - - - REFER TO APPENDIX A FOR REMAINING FINISHES 1300.2 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10
415.252.7063
200 ELEV. LOBBY T-2 B-2 P-5 WOOD PANELING - - GYP, PAINTED 1400 ELEV. LOBBY T-2 B-2 P-5, WOOD PANELING P-1 - - GYP, PAINTED
© ANKROM MOISAN ARCHITECTS, INC.
200.1 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10 1400.2 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10
202 BIKE ROOM CONC-S RB-1 WC-3 P-1 - - EXPOSED 1500 ELEV. LOBBY T-2 B-2 P-5, WOOD PANELING P-1 - - GYP, PAINTED
204 TRASH ROOM RFS-1 RFS-1 FRP-1 P-1 - - - 1500.1 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10
206 STUDY AREA CT-3 B-2 WC-2 T-12, P-1 WD-1 ST-2 GYP, PAINTED 1500.2 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10
207 RR T-4 T-11 T-11 P-1 WD-1, MTL-1 Q-1 GYP, PAINTED 1600 ELEV. LOBBY T-2 B-2 P-5, WOOD PANELING P-1 - - GYP, PAINTED
222 RETAIL RR T-4 T-11 T-11 P-1 WD-1, MTL-1 Q-1 GYP, PAINTED 1600.1 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10
300 ELEV. LOBBY T-2 B-2 P-5 WOOD PANELING - - GYP, PAINTED 1600.2 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10 CORR.
300.1 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10 1700 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10
311 OPEN STUDY CT-4 B-2 T-14, T-15 P-1 WD-1, F-3, F-4 ST-1 GYP, PAINTED RS-1 1700.2 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10
311A COMPUTER LAB C-4 B-2 WC-4 P-6 - Q-1 GYP, PAINTED RS-1 1800 ELEV. LOBBY T-2 B-2 P-5, WOOD PANELING P-1 - - GYP, PAINTED
312A STUDY CT-6 B-2 P-6 P-1 - - GYP, PAINTED RS-1 1800.1 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10
312B STUDY CT-6 B-2 P-6 P-1 - - GYP, PAINTED RS-1 1800.2 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10 CORR.
314 STUDY CT-6 B-2 P-6 P-1 - - GYP, PAINTED RS-1 1900 ELEV. LOBBY T-2 B-2 P-5, WOOD PANELING P-1 - - GYP, PAINTED
315 RR T-4 T-11 T-11 P-1 WD-1, MTL-1 Q-1 GYP, PAINTED 1900.2 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10
318 STUDY CT-6 B-2 P-6 P-1 - - GYP, PAINTED 2000 ELEV. LOBBY T-2 B-2 P-5, WOOD PANELING P-1 - - GYP, PAINTED
S01C CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10 CORR. 2000.2 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10 CORR.

THE MARK AT SEATTLE


400 ELEV. LOBBY T-2 B-2 P-5, WOOD PANELING P-1 - - GYP, PAINTED 2100 ELEV. LOBBY T-2 B-2 P-5, WOOD PANELING P-1 - - GYP, PAINTED

1200 45TH ST SEATTLE, WA 98105


400.2 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10 CORR. 2100.2 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10
500.1 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10 2200 ELEV. LOBBY T-2 B-2 P-5, WOOD PANELING P-1 - - GYP, PAINTED
E01 ELEV 1 T-2 - - - - - - REFER TO APPENDIX A FOR REMAINING FINISHES 2200.2 CORRIDOR RFP-2 B-3 P-8 P-9 - - P-10 CORR.

LCD ACQUISITIONS, LLC


UNIT FINISH SCHEDULE

TYPICAL UNLESS NOTED KITCHEN BATHROOM BEDROOM

CABINET WINDOW TUB/SHOWER


FLOOR FINISH BASE FINISH WALL FINISH CEILING FINISH LW CABINET UP CABINET COUNTERTOP BACKSPLASH WALL FINISH BASE FINISH CABINET FINISH COUNTERTOP WALL FINISH CEILING FINISH MIRROR FLOOR FINISH WALL FINISH CEILING FINISH
PULLS TREATMENT WALL SURROUND

RFP-2 B-4 P-13 P-17 PU-1 BL-1, BL-2, RS-2 CAB-1 CAB-2 Q-4 T-18 P-14 RB-3 CAB-1 Q-4 T-17 P-16 P-19 MIR-1 C-1, C-1A P-15 P-18

TYPICAL FINISH ABBREVIATIONS GENERAL NOTES - FINISH


1. SEE INTERIOR ELEVATIONS (A10.00 SERIES) AND FINISH PLANS (A9.00 SERIES) FOR EXACT FINISH LOCATIONS AND REVISION DATE REASON FOR ISSUE
ACT Acoustical Ceiling Tile INSTALLATION DIRECTION OF FINISHES
AWC Acoustical Wood Ceiling 2. REFER TO PROJECT MANUAL 09 06 02 FOR AMENITY MATERIALS AND FINISHES SPECIFICATIONS.
B Base 3. REFER TO APPENDIX A FOR UNIT, CORRIDOR, AND BACK OF HOUSE MATERIALS AND FINISHES SPECIFICATIONS.
BL Blinds 4. ALL FLOORING SHALL COMPLY WITH CODES LISTED ON SHEET X.XX. FLOORING SHALL BE STABLE, FIRM, AND SLIP
BS Base: Shoe RESISTANT. CHANGES IN LEVEL OF 1/4" MAXIMUM IN HEIGHT SHALL BE PERMITED TO BE VERTICAL. CHANGES IN LEVEL
C Carpet GREATER THAN 1/4" IN HEIGHT AND NOT MORE THANK 1/2" MAXIMUM IN HEIGHT SHALL BE BEVELED WITH A SLOPE NOT
CAB Residential Cabinet STEEPER THAN 1:2.
CG Corner Guard 5. EXTEND FLOOR FINISHES, WALL FINISHES, AND FINISH SURROUNDING CABINETRY UNDER REMOVABLE CABINETRY BELOW
CONC-S Concrete, Sealed SINK AND WORK SURFACES AS REQUIRED.
CT Carpet: Tile
DGL Decorative Glass
EM Entrance Mat
F Fabric
FRP Fiberglass Reinforced Panels
G Grout
HR Handrail SDCI APPROVAL STAMP
P Paint
PL Plastic Laminate
PU Pull, Doors and Drawers
Q Quartz Solid Surfacing
RAF Resilient Athletic Flooring
RB Resilient Base
RFP Resilient Flooring Plank
RFS Resilient Flooring Sheet
RS Roller Shade
SS Stainless Steel
ST Stone Slab
T Tile
TB Tackboard
WC
WD
Wall Covering
Wood
FINISH SCHEDULE
WDC Wood Countertop
WP Wall Protection Paneling
WVP Wood Veneer Paneling
BIM 360://Seattle II/210310-20-Seattle II.rvt

60% CD SET

DATE PROJECT NUMBER


11/18/2022 210310
SHEET NUMBER

A12.31

You might also like