For Storm / Drainage Lines

Length of Vertical Pipes

60.40m 20.23m 21.20m 37.99m 81.60m

Total Length of Vertical Pipes

221.42m = 726.44357 ft (Approximately 730ft)

For Septic Tank

All rebars 10mm dia

15 rebars (2.1m) =31.5

6 rebars (4.8m) = 28.8

20 rebars(4.8m) = 96

40 rebars(2.1m) = 84

40 rebars (1.5m) = 60

Total Rebars Length = 300.3m

Density of Steel ( 8050kg/m3)

Kg’s of steel bar = (8050kg/m^3) x (300.3 x pi/4 x (0.010m)^2) = 189.863kg(Approx. 190kg)

For Cast in Concrete Septic Tank

2.88 + 2.16 = 5.04m^2 x 1.8m = 9.072m^3

Plastering Works

Plumbing works

(11.45m + 3.6m)x8 =120.4m 4 inch

(17.92 .54m 1.54m)x2 = 40.51m .51m 4 inch

Total: Approx 527.919948ft = 530ft

84.96+1.25m+.42m = approx. 284.219 ft or 290 ft 3 inch


LIGHTING

Wiring Length

1st Floor – 717m

2nd Floor – 777m

3rd Floor – 805m

4th Floor – 678m