The document provides measurements and calculations for storm drainage lines, a septic tank, and other construction details. It lists the total length of vertical drainage pipes as approximately 730 feet. It also calculates the amount of rebar needed for the septic tank, which is approximately 190 kilograms, and the volume of the septic tank as 9.072 cubic meters. Finally, it summarizes plumbing, wiring, and other lengths for a construction project.
The document provides measurements and calculations for storm drainage lines, a septic tank, and other construction details. It lists the total length of vertical drainage pipes as approximately 730 feet. It also calculates the amount of rebar needed for the septic tank, which is approximately 190 kilograms, and the volume of the septic tank as 9.072 cubic meters. Finally, it summarizes plumbing, wiring, and other lengths for a construction project.
The document provides measurements and calculations for storm drainage lines, a septic tank, and other construction details. It lists the total length of vertical drainage pipes as approximately 730 feet. It also calculates the amount of rebar needed for the septic tank, which is approximately 190 kilograms, and the volume of the septic tank as 9.072 cubic meters. Finally, it summarizes plumbing, wiring, and other lengths for a construction project.