31.5mm C Sand 31.5mm C Sand

31.5mm 20 mm 10mm C/ Sand


ultant Pvt. Ltd.
C Sand 31.5mm C Sand

31.5mm 20 mm 10mm C/ Sand


PUBLIC WORK DEPARTMENT, MAHARASHTRA
Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-
Karegaon Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction
KM 0/0 to 14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM 00/00
to 01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra
Client Public Work Department
Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

PROCTOR'S COMPACTION TEST


TEST METHOD : IS 2720 (PART VIII)
Location of Laboratory : Date of Sampling :

Sample No. : Date of Testing :

Chainage/Location : Type of Material :

Source of Material :

Mould No : Wt. of Mould, W1 (g) : Volume of mould, V (cc):


S.NO. I II III IV V VI
Container No.
Wt. of Container + Wet sample (gm) W4 (g/cc)
Wt.of Container + Dry sample (gm) W5
Wt. of water, W7=(W4-W5) (g)
Wt. of container,W6 (g)
Wt. of dry soil, W8=(W5-W6) (g)
Water content W9 =(W7/W8)*100 (%)
Wt. of wet soil + mould, W2 (g)
Wt. of wet soil, W3=(W2-W1) (g)
Wt. of Density(gm/cc) Yb=(W3/V)
Dry density Yd = (100x Yb)/(100+W9) (g/cc)
Dry density in ( g/cc )

Moisture content ( % )

MDD : -----------------gm/cc OMC : ------------------%

(EPC Contractor's Rep) (Authority Engineer's Rep)


PUBLIC WORK DEPARTMENT, MAHARASHTRA
Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-
Karegaon Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction
KM 0/0 to 14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM
00/00 to 01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra
Client Public Work Department
Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.
ATTERBERG'S LIMIT'S
TEST METHOD : IS 2720 (Part V)
Location of Laboratory : Date of Sampling :

Sample No : Date of Testing :

Chainage/Location : Sampled By :

Source of Material : Tested By :


Type of Material : :
Description Liquid Limit Plastic Limit
S.No 1 2 3 4 1 2
Depth of Penetration (mm) / No of Blows
Container No
Empty Wt. of Container (gm) W1
Wt. of Container + Wet sample (gm) W2
Wt.of Container + Dry sample (gm) W3
Wt. of Water (gm) [W2 - W3] = W4
Wt. of Dry sample (gm) [W3 - W1] = W5
Moisture Content (%) [W4 / W5] x 100
Average PL
Moisture Content (%)

Liquid Limit:- % Plastic Limit:- % Plasticity Index:- %


(EPC Contractor's Rep) (Authority Engineer's Rep)
PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-


Karegaon Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat
Junction KM 0/0 to 14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada
Bypass (KM 00/00 to 01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

GRAIN SIZE ANALYSIS OF SOIL


TEST METHOD : IS 2720 (Part IV)
: Date of Sampling :
Location of Laboratory
: Date of Testing :
Sample No.
: :
Chainage/Location Sampled by
: :
Source of Material Tested by
: :
Type of Material

I.S.Sieve Cumulative Wt. Cumulative %


Weight Retained (gms) Cumulative % Passing
(mm) Retained (gms) Retained

75.0

19.0

4.75

2.0

0.425

0.075

Pan

Gravel = %

Sand = %

Silt & Clay = %

Remarks :-

(EPC Contractor's Rep) (Authority Engineer's Rep)


PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-


Balegaon-Karegaon Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To
Mugat Junction KM 0/0 to 14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3)
Brahmanwada Bypass (KM 00/00 to 01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
FREE SWELL INDEX M/S
EPC Contractor
OFShreeji
SOIL Infraspace Pvt. Ltd.

TEST METHOD: IS: 2720 (PART – XXXX)


Location of Laboratory : Date of Sampling :

Sample No. : Date of Testing :

Chainage/Location : Sampled by :

Source of Material : Tested by :

Type of Material :

Wt of Sample Taken Passing on 425 mic (gm)

Volume of Soil in Distilled Water in cc (Vd)

Volume of Soil in Kerosene in cc (Vk)

Vd - Vk
Free Swell Index = x 100 (%)
Vk

Note : Free Swell Index should be < 50 % as per MoSRT&H Specification


Remarks:-

(EPC Contractor's Rep) (Authority Engineer's Rep)


PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-


Karegaon Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat
Junction KM 0/0 to 14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada
Bypass (KM 00/00 to 01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

CALIFORNIA BEARING RATIO TEST


TEST METHOD : IS 2720 (Part XVI)
Location of Laboratory : Date of Casting :
Sample No : Date of Testing :
Location : MDD :
Source : OMC :
Type of Compaction : Surcharge Wt. Applied :
: Proving Ring No. :
Mould No
Before After Before After Before
Description Unit Soaking Soaking Soaking Soaking Soaking
Mould + Wet Soil (a) (gms)
Weight of Mould (b) (gms) 31.5mm 20 mm C/ Sand
Weight of Wet Soil c=(a-b) (gms)
Volume of Mould (d) (cc)
Wet Density e=(c/d)*100 (gm/cc)
Container No (f)
Weight of Container (g) (gms)
Wt. of Container + Wet Soil (h) (gms)
Wt.of Container + Dry Soil (i) (gms)
Wt. of Water j=(h-i) (gms)
Wt. of Dry Soil k=(i-g) (gms)
Moisture Content l=(j/k)*100 (%)
Dry Density m={(100*e)/(l+100)} (gm/cc)
Compaction n=(m/mdd)*100 (%)
Mould No. Correction Factor
Blows From Graph
Proving Proving
Penetration in Proving Ring Ring Ring
'mm' Reading (Div.)
Load(kg)
Reading
Load(kg)
Reading
Load(kg) Mould No.
(Div.) (Div.)
0.50
2.5 mm
1.00 CBR Value
1.50 %
5.0 mm
2.00
2.50
3.00
4.00
5.00
7.50
Average Value of
10.00
CBR(%)
12.50

(EPC Contractor's Rep) (Authority Engineer's Rep)


PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-Karegaon


Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction KM 0/0 to 14/815.2)
Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM 00/00 to 01/590) Total Length
19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

CALIBRATION OF SAND POURING CYLINDER


TEST METHOD : IS 2720, (PART-XXVIII)
Location of laboratory : Date of Calibration :

Pouring Set No : Due Date of Calibration :

Proposed Use : Calibrated by :

Source of Sand :

Trials
Weight of Sand in Cone Average
1 2 31.5mm
1. Weight of sand + Pouring cylinder before pouring, A (g)

2. Weight of sand + Pouring cylinder after pouring, B (g)

3. Weight of sand in the Cone C (g) = (A-B)

Bulk Density of Sand

1. Weight of sand + Pouring cylinder before pouring in Calibrating


Container W1 (g)
2. Weight of sand + Pouring cylinder after pouring the calibrating
container and cone, W2 (g)

3. Weight of sand in calibrating container and cone, W3 =W1-W2 (g)

4. Weight of sand in cone, C (g)

5. Weight of sand in calibrating container, W4 (g)=(W3-C)

6. Volume of calibrating container, V (cc)

7. Bulk Density of Sand, W4/V (g)

Note: Sand to be used shall be cleaned, uniformly graded natural sand


Passing 1.00 mm IS sieve and Retained on 600 micron IS sieve
CALIBRATION RESULTS

1. Average Bulk Density of Sand = g/cc


2. Weight of sand in cone = gms

(EPC Contractor's Rep) (Authority Engineer's Rep)


PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-Karegaon Phata-


Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction KM 0/0 to 14/815.2)
Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM 00/00 to 01/590) Total Length
19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

FIELD DENSITY TEST BY SAND REPLACEMENT METHOD


TEST METHOD : IS 2720, (PART-XXVIII)
RFI No. : Date of Testing :
Chainage : Layer & Layer No :
Lab Maximum Dry Density(g/cc) : OMC (%) :
Sand Pouring Cylinder No : Rapid Moisture meter No :
Bulk Density of sand Ys (gm/cc.) : Weight of Sand in Cone w3 (gms) :

Pit Number
Test pit location
Offset from centre line (m)
Layer Thickness (mm)
FIELD DENSITY Unit
Weight of sand + cylinder before pouring (W1) (g) (gms)
Weight of sand + cylinder after pouring (W2) (g) (gms)
Weight of sand in hole (W4=W1-W2-W3) (g) (gms)
Volume of Hole (V = W4/Ys) (cc)
Weight of wet material from hole (Ww) (g) (gms)
Wet density of material from Hole {Yb=Ww / V} (gm/cc)
MOISTURE CONTENT
Wt.of Wet Material (W5) in gm (gms)
Wt. of Dry Material (W6) in gm (gms)
Wt. of Water (W7) = (W5 - W6) in gm (gms)
Moisture Content (W) = 100x(W7)/( W6) in % (gms)
Moisture meter reading (%)
Corrected moisture content By Moisture Meter (%)
RESULTS
Field dry density {Yd=100XYb/(100+W)} (g/cc)
Compaction achieved (100xYd/MDD) (%)
Specified Compaction (%)
Average Compaction (%)
Remarks:-

(EPC Contractor's Rep) (Authority Engineer's Rep)


RMATE

FOR Vasuprada Consultan

B WORK
31.5mm C Sand 31.5mm C Sand

31.5mm 20 mm 10mm C/ Sand


ultant Pvt. Ltd.
C Sand 31.5mm C Sand

31.5mm 20 mm 10mm C/ Sand


PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-


Karegaon Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction KM
0/0 to 14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM 00/00 to
01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

SIEVE ANALYSIS OF GRANUALAR SUB-BASE


(As per MoRT&H Table 400)
Location of Laboratory : Date of Sampling :
Sample No : Date of Testing :
Source : Sampled by :
Location : Tested by :
Layer : :
Total Wt of Sample

Cumulative Weight Cumulative % Limits As per


IS.Sieve Weight Retained (gms) % Passing MoRT&H Grading-
of Retained (gms) Retained
V
75 100
53 80-100
26.5 55-90
9.5 35-65
4.75 25-50
2.36 10-20
0.850 2-10
0.425 0-5
Pan
Remarks:-

(EPC Contractor's Rep) (Authority Engineer's Rep)


RMATE

FOR Vasuprada Consultan

RETE WORK
31.5mm C Sand 31.5mm C Sand

31.5mm 20 mm 10mm C/ Sand


ultant Pvt. Ltd.
C Sand 31.5mm C Sand

31.5mm 20 mm 10mm C/ Sand


PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-Karegaon Phata-


Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction KM 0/0 to 14/815.2) Chaitanya
Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM 00/00 to 01/590) Total Length 19.920 KM) Pkg-
EPC-17 ADB ,Dist. Naded, Maharashtra
Client Public Work Department
Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.
SIEVE ANALYSIS OF COARSE AGREGATE FOR CONCRETE (TEST METHOD : IS 383)
(FOR COARSE AGGREGATE)
Location of Lab Date Sampled

Sample No Date Tested

Location Sampled by

Source Tested By

Type of Material
FOR INDIVIDUAL GRADATION OF COARSE AGGREGATE
Total Wt. of Sample:- 20mm Aggregate
Percentage Passing for Single sized aggregate of
Weight Retained Cum. Weight of Cumulative Percentage nominal size as per table 2 of IS: 383
I.S. Sieve (mm) (gms) Retained (gms) Percentage Passing (%)
Retained (%) 20mm
40 100
20 85 - 100
10 0 - 20
4.75 0-5
Pan
Total Wt. of Sample:- 10 mm Aggregate

Cumulative Percentage Passing for Single sized aggregate of


I.S. Sieve (mm) Weight Retained Cum. Weight of Percentage Percentage Passing nominal size as per table 2 of IS: 383
Retained (gms) Retained 10 mm
12.5 100
10 85 - 100
4.75 0 - 45
2.36 0 - 10
Pan
FOR COMBINED GRADATION OF COARSE AGGREGATE
Total Wt. of Sample:- Proportion :-
Cumulative Percentage Passing for Graded aggregate of
I.S. Sieve (mm) Weight Retained Cum. Weight of Percentage Percentage Passing nominal size as per table 2 of IS: 383
Retained (gms) Retained 20 mm+10 mm
40mm 100
20mm 95 - 100
10mm 25 - 55
4.75mm 0 - 10
Pan
Remarks :

(EPC Contractor's Rep) (Authority Engineer's Rep)


PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-Karegaon


Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction KM 0/0 to
14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM 00/00 to 01/590)
Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

SIEVE ANALYSIS OF FINE AGGREGATE FOR CONCRETE (TEST


METHOD : IS 383)
Location Of Laboratory Date Sampled
Sample No: Date Tested
Location: Sampled by
Source: Tested by
Proposed Use Total Sample Wt (gms):
Specification Limits As per MoSRT&H Table No
Wt. of Cum. Wt. Of 1000-2 & as per table-4 of IS 383
Cum. % of
Sieve Size (mm) Retained Retained % Passing
Retained
(gms) (gms) C Sand Zone II Zone III

10 100 100 100

4.75 90 - 100 90 - 100 90 - 100

2.36 60 - 95 75 - 100 85 - 100

1.18 30 - 70 55 - 90 75-100

0.600 15 - 34 35 - 59 60 - 79

0.300 5 - 20 8-30 12-40

0.150 0 - 10 0 - 10 0 - 10

Pan

Zone :-

Fineness modulus :-
Remarks:-

(EPC Contractor's Rep) (Authority Engineer's Rep)


PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-Karegaon


Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction KM 0/0 to
14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM 00/00 to 01/590)
Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

SILT CONTENT
TEST METHOD IS : 2386 Part-1
Location of Lab. Date Sampled:
Sample No Date Tested
Location Sampled by
Source Tested by
Proposed Use

Fine Aggregate, in %
Sr. No. Description
Trial - 1 Trial - II Trial - III Remarks

1 Wt. of dry material in gms.(A)

2 Dry wt. of material retained after sieving on 75 mic.


Sieve (B)

3 Silt content %= ((A-B)/A*100)

4 Average Value ………………….in %

(EPC Contractor's Rep) (Authority Engineer's Rep)


PUBLIC WORK DEPARTMENT, MAHARASHTRA.

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-Karegaon Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist
(Part of Nila Junction To Mugat Junction KM 0/0 to 14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM 00/00 to 01/590) Total Length 19.920 KM) P
EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.
DAILY MOISTURE CORRECTION REPORT
Location of Lab. : Date Sampled: :
Sample No : Date Tested :
Proposed Use : Sampled by :
Location of Batching Plant : Tested by :
Source of Coarse Aggregate : Source Fine Aggregate :

Water Absorption of Material (%) Today's Moisture in Material (%) Correction Required in Material (%)

31.5mm 20mm 10mm C Sand 31.5mm 20mm 10 mm C Sand 31.5mm 20mm 10 mm C Sand

Wt. of Material For one M3 in Kg. After Water Correction (As Per
Wt of Material For one M3 in Kg. (As Per Mix Design) in SSD Condition
Mix Design)
Admixt
Sr. No. Grade of Concrete W/C
ure (%) Admixtu Admixtu
Cement GGBS 31.5mm 20 mm 10mm C/ Sand Water Cement GGBS 31.5mm 20 mm 10mm C/ Sand Water
re re

1
2
3
4
5
6
7
8
Remarks:-

(EPC Contractor's Rep) (Authority Engineer's


DEPARTMENT, MAHARASHTRA.

a-Malkautha-Balegaon-Karegaon Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1


dge Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM 00/00 to 01/590) Total Length 19.920 KM) Pkg-
ist. Naded, Maharashtra

CORRECTION REPORT
:
:
:
:
:

Remarks

(Authority Engineer's Rep


PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-Karegaon


Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction KM 0/0 to
14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM 00/00 to 01/590)
Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.
COMPRESSIVE STRENGTH OF CONCRETE CUBE
(TEST METHOD : IS 516)
Location of Lab : Date of Casting

Sample No. : Date of Testing

Location : Age of the Cube

Name of Structure : Tested by


Part of the Structure :
Grade of Concrete :

Comp.
S.NO. L x B x H (cm) Area (cm2) Volume Weight (Kg) Density Load (kN) Strength Average(N/mm2)
(Cc) (gm/cc)
(N/mm2)

Average Strength

EPC Contractor's Representative Authority Engineer's Representative


PUBLIC WORK DEPARTMENT, MAHARASHTRA.

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-Karegaon Phata-Babli Phata-Bellur to
Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction KM 0/0 to 14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge
Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM 00/00 to 01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department

Authority Engineer

EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

FLEXURAL STRENGTH OF BEAM (AS PER IS 516)


LOCATION :- DATE OF CASTING: -

GRADE OF CONCRETE: - DATE OF TESTING: -

AGE OF CONCRETE : - Tested by :

WEIGHT OF
CONCRETE DENSITY SIZE OF SPAN Span Length Position of LOAD FLEXURAL AVERAGE
S. NO. Fracture STRENGTH FLEXURAL
BEAM
N/mm2 STRENGTH N/mm2
(gms) (gm/cc) L (MM) B (MM) D (MM) (l) mm 'a' ( mm ) P (KN)

9
AVERAGE FLEXURAL STRENGTH N/mm2

EPC Contractor's Representative Authority Engineer's Representative


PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-


Karegaon Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction
KM 0/0 to 14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM
00/00 to 01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

AGGREGATE GRADATION FOR PQC


(MoRT&H Table : 600-3)
Location of Laboratory : Date of Sampling :

Location/Chainage : Date of Testing :

Source of Material : Tested By :

Total Wt. Sample (gms) : :

: :

Sieves Wt. of Retained Cum.Wt. of Retained Cum. % of % of Passing Limit


(gms.) (gms.) Retained Material

31.5 100

26.5 85-95

19.0 68-88

9.5 45-65

4.750 30-55

0.600 8-30

0.150 5-15

0.075 0-5

Pan
Remarks:-

(EPC Contractor's Rep) (Authority Engineer's Rep)


PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-


Karegaon Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction
KM 0/0 to 14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM
00/00 to 01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

AGGREGATE GRADATION FOR DLC


(MoRT&H Table : 600-1)
Location of Laboratory : Date of Sampling :

Location/Chainage : Date of Testing :

Source of Material : Tested By :

Total Wt. Sample (gms) : :


: :

Sieves Wt. of Retained Cum.Wt. of Retained Cum. % of % of Passing Limit


(gms.) (gms.) Retained Material

26.5 100

19.0 75-95

9.50 50-70

4.75 30-55

2.36 17-42

0.600 8-22

0.300 7-17

0.150 2-12

0.075 0-10

Pan

Remarks:-
(EPC Contractor's Rep) (Authority Engineer's Rep)
PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-Karegaon Phata-Babli


Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction KM 0/0 to 14/815.2) Chaitanya Nagar Shiv
Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM 00/00 to 01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist.
Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

CONCRETE POUR CARD (Site Control)


RFI No & Date : Date of Pour :

Chainage : Grade Of Concrete :

Structure : Starting Time :

Part of Structure : Completion Time :

Lift No : Method of Pour : Chute/ Pump/ Manual/Machine

Time Quantity (m3) Temperature ( 0C)


Slump
Sr. No. Vehicle No. (mm) Remarks
Arrival Departure Received C Sand Atmosphere Concrete

Total Qty. (m3) :-

(EPC Contractor's Rep) (Authority Engineer's Rep)


PUBLIC WORK DEPARTMENT, MAHARASHTRA.

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-Karegaon Phata-Babli Phata-Bellur to Naigaon to State Border
MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction KM 0/0 to 14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass
(KM 00/00 to 01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

COMPRESSIVE STRENGTH OF CORE CUTTING


(As per IS - 516, 1956 & Clause - 602.11.5.4 of MoRT&H 5th
Revision)
RFI No & Date : Date of Casting :13.09.2020

Chainage :75+730-75+830 RHS Grade Of Concrete :M-40 PQC

side :RHS Date of testing :11.10.2020

Type of Material :PQC Reqd. Strength fy : fck x 0.80 x 0.85 x 1.25

Aactual Cross-Sec. Volume of Weight of Density of Corrected Equivalent Required


Finished Avg. Dia of Crushing Correction
Hight of Hight Cores Area of Core cores Cores Load ( P ) Crushing Cube strength
Sr. No. Location/Chainage Side Core cores Factor ( F )
Strength Strength ( ECS )
MM MM MM (MM²) (MM³) (gm) (gm/cc) (kn) (f = 0.11n + 0.78) (N/mm²) (N/mm²) (N/mm²)

(EPC Contractor's Rep) (Authority Engineer's Rep)


PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-Karegaon


Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction KM 0/0 to 14/815.2)
Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM 00/00 to 01/590) Total Length
19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

Location of Lab. Date of Dispatch :

Location/Chainage : Grade of concrete :

Name of Structure : Slump at Batching Plant (mm) :

Part of Structure : Transit mixer No. :

Concrete Qty. dispatch (m3) :


Remarks:-

(EPC Contractor's Rep) (Authority Engineer's Rep)

PUBLIC WORK DEPARTMENT, MAHARASHTRA.

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-Karegaon


Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction KM 0/0 to 14/815.2)
Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM 00/00 to 01/590) Total Length
19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

Location of Lab. Date of Dispatch :

Location/Chainage : Grade of concrete :

Name of Structure : Slump at Batching Plant (mm) :

Part of Structure : Transit mixer No. :

Concrete Qty. dispatch (m3) :


Remarks:-

(EPC Contractor's Rep) (Authority Engineer's Rep)


RMATE

FOR Vasuprada Consultan

EGATE TEST
31.5mm C Sand 31.5mm C Sand

31.5mm 20 mm 10mm C/ Sand


ultant Pvt. Ltd.
C Sand 31.5mm C Sand

31.5mm 20 mm 10mm C/ Sand


PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-


Balegaon-Karegaon Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To
Mugat Junction KM 0/0 to 14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3)
Brahmanwada Bypass (KM 00/00 to 01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

AGGREGATE IMPACT VALUE TEST


TEST METHOD : IS 2386 (Part IV)
Location of Laboratory : Date Sampling :

Sample No : Date Testing :

Location : Sampled by :

Layer : Tested by :

Proposed Use: : Source

Sample No Trial No. 1 Trial No. 2

Weight of sample passing 12.5 mm and retained on 10 mm IS sieves, W1 (gms)

Weight of material after fraction passing on 2.36 mm IS sieve, W2 (gms)

Weight of material after fraction retained on 2.36 mm IS sieve, W3 (gms)

A.I.V. = (W2 / W1)X100

Average value of A.I.V. (%)

Specified Limit:-

Remarks:-

(EPC Contractor's Rep) (Authority Engineer's Rep)


PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-Karegaon


Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction KM 0/0 to 14/815.2)
Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM 00/00 to 01/590) Total Length
19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

FLAKINESS & ELONGATION INDEX


TEST METHOD : IS 2386 (Part I)
Location of Laboratory : Date Sampled :

Sample No : Date Tested :

Location : Sampled by :

Source : Tested by :

Proposed Use : Layer

SIEVES Wt. of agg. ret. on length


Total Wt. of Agg. Ret. on
Wt. of agg. passing from Wt of Retained on gauge after ret. on
sieves
thickness gauge (gm) thickness gause(gm) thickness gauge
(gm)
Passing Retained (gm)

63.0 50.0

50.0 40.0

40.0 31.5

31.5 25.0

25.0 20.0

20.0 16.0

16.0 12.5

12.5 10.0

10.0 6.3

Total A= B= C= D=

RESULTS : Specific Limit:-


Flakiness Index = (B/A)*100) =

Elongation Index = (D/C )X 100) =

Combined FI and EI =
Remarks:-

(EPC Contractor's Rep) (Authority Engineer's Rep)


PUBLIC WORK DEPARTMENT, MAHARASHTRA.

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-


Balegaon-Karegaon Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To
Mugat Junction KM 0/0 to 14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3)
Brahmanwada Bypass (KM 00/00 to 01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.
SPECIFIC GRAVITY AND WATER ABSORPTION FOR FINE AGGREGATE
TEST METHOD : IS 2386 (Part III)
Location of Lab. : Date Sampled :

Sample No : Date Tested :

Location : Sampled by :

Type of Material : Tested by :

Proposed Use : Source :

Sl No Determination 1 2 3

1 Pycnometer Number

2 Wt.of SSD sample in air (A)


Average
3 Wt of Pycnometer + Water + Sample (B)

4 Wt of Pycnometer + Water (C)

5 Wt of Oven Dry sample (D)

6 Bulk Specific Gravity (Oven Dry) D/{A-(B-C)}

7 Bulk Specific Gravity (SSD Basis) A/{A-(B-C)}

8 Apparent Specific Gravity D/{D-(B-C)}

9 Water Absorption (% of Dry Basis) 100 x (A-D)/D

Remarks :-

(EPC Contractor's Rep) (Authority Engineer's Rep)


PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-


Balegaon-Karegaon Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To
Mugat Junction KM 0/0 to 14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3)
Brahmanwada Bypass (KM 00/00 to 01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

CLEANLINESS TEST
Location of Lab. : Date of sampling :

Type of material : Date of testing :

Source of material : Sampled By :

Size of Material : Tested By :

Dry Weight after % passing in


Size of Material Initial Weight of Agg. washing in 0.075 0.075mm IS Requirement as per
in gm MoSRT&H Table No.500-3
mm IS Sieve Sieve

31.5mm
Max 5% passing
0.075mm Sieve

Remarks:-

(EPC Contractor's Rep) (Authority Engineer's Rep)


PUBLIC WORK DEPARTMENT, MAHARASHTRA.

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-


Balegaon-Karegaon Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction
To Mugat Junction KM 0/0 to 14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3)
Brahmanwada Bypass (KM 00/00 to 01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.
BULK DENSITY & VOIDS OF AGGREGATE
Test Method : IS 2386 (Part III)1963
Location of Laboratory : Date of sampling :
Sample No. : Date of testing :
Source of material : Type of material :
Diameter of cylinder : Sampled by :
Height of cylinder : Volume of Cylinder
Description Units Test 1
DETERMINATION OF BULK DENSITY (COMPACTED)
Weight of empty cylinder (M1) gms
Weight of cylinder+sample (M2) gms
Weight of sample(Compacted) W=M2-M1 gms
Volume of the cylinder (V) cc
Bulk density Yc = (W/V) gms /cc
Average Bulk density gms /cc
DETERMINATION OF BULK DENSITY (LOOSE)
Weight of empty cylinder (M1) gms
Weight of cylinder+sample (M3) gms
Weight of sample (Loose) W1=M3-M1 gms
Volume of the cylinder (V) cc
Bulk density Yc = (W/V) gms /cc
Average Bulk density gms /cc
DETERMINATION OF VOIDS
Specific gravity of aggregates (Gs) -
Bulk density of aggregates (Y) gms / cc
Voids in Aggregates Va= ((100x(Gs-Y)/Gs)) %
Average Voids %
Remarks:
(EPC Contractor's Rep) (Authority Engineer's Rep)
WORK DEPARTMENT, MAHARASHTRA.

ction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-


-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction
2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3)
o 01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

OIDS OF AGGREGATE
t Method : IS 2386 (Part III)1963
:
:
:
:

Test 2
OMPACTED)

OOSE)

(Authority Engineer's Rep)


RMATE

FOR Vasuprada Consultan

ENT TEST
31.5mm C Sand 31.5mm C Sand

31.5mm 20 mm 10mm C/ Sand


ultant Pvt. Ltd.
C Sand 31.5mm C Sand

31.5mm 20 mm 10mm C/ Sand


PUBLIC WORK DEPARTMENT, MAHARASHTRA.

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-


Karegaon Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat
Junction KM 0/0 to 14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada
Bypass (KM 00/00 to 01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

FINENESS OF CEMENT
TEST METHOD : IS 4031 (Part 1 )
Location of Laboratory : Date of Sampling :

Week No : Date of Testing :

Grade/Type of cement : Tested by :

Sl. No. Sample Taken Retained on 90 micron sieve (g) Fineness % Average % Specified limit
(g)

2 Maximum 10%

Remarks :-

(EPC Contractor's Rep) (Authority Engineer's Rep)


PUBLIC WORK DEPARTMENT, MAHARASHTRA.

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-


Balegaon-Karegaon Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction
To Mugat Junction KM 0/0 to 14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3)
Brahmanwada Bypass (KM 00/00 to 01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

STANDARD CONSISTENCY AND SETTING TIME OF CEMENT


TEST METHOD : IS 4031 (Part 4 & 5)
Location of Lab. : :
Sample No. : :
Cement Brand Name : :
Cement Grade : Tested by :
Batch / Week No : Test Temperature °C

Is the penetration
Trial Wt. of Cement Wt. of Water (gm) Reading in mm of between 5 to 7 mm Remarks
No. (gm) (A) (B) VNA (Yes/No)

INITIAL & FINAL SETTING


Time
TIME (IS: 4031 PART - V)
when the
needle Time when needle Initial Final
Wt. of Cement Wt. of Water 0.85 Time of falls to makes an impression Setting Setting
S.No. Times of Standard Adding penetrate Remarks
(gms) Consistency (gms) Water test block but the attachment Time >30 Time <600
falls to do so minutes minutes
by 5±
0.5mm
1 2 3 4 5 6 (5-4) (6-4)

(EPC Contractor's Rep) (Authority Engineer's Rep)


PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-Karegaon


Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction KM 0/0 to
14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM 00/00 to 01/590)
Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

COMPRESSIVE STRENGTH TEST OF CEMENT MORTOR CUBES


(TEST METHOD IS : 516)
Location of Laboratory : Date of Casting

Location / Source : Sampled by

Type of Cement: : Tested by

Batch No./Week No. : Consistency %

Cube Weight of Cube Density of the Maximum Comp. Average Strength


No (gm) LxBxH Area Volume (c/c) Cube (g/cc) Load (KN) Strength (N/mm2)
(N/mm2)

Age of Cubes: 3 Days Date of Testing :-

Age of Cubes: 7 Days Date of Testing :-

Age of Cubes: 28 Days Date of Testing :-

EPC Contractor's Representative Authority Engineer's Representative


PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-


Karegaon Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction KM
0/0 to 14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM 00/00 to
01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

SOUNDNESS OF CEMENT (By Le-Chatlier Method)


TEST METHOD : IS 4031 (Part IV)
Location of Laboratory : Date Sampled :

Week No. : Date Tested :

Type of Cement: : Sampled by :

Standard Consistency : Tested by :

Mould No. Initial Distance in (mm) Final Distance in (mm) Difference in (mm)

SOUNDNESS (mm) :-
Remarks:-

(EPC Contractor's Rep) (Authority Engineer's Rep)


RMATE

FOR Vasuprada Consultan

OTHER
31.5mm C Sand 31.5mm C Sand

31.5mm 20 mm 10mm C/ Sand


ultant Pvt. Ltd.
C Sand 31.5mm C Sand

31.5mm 20 mm 10mm C/ Sand


PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-


Karegaon Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction
KM 0/0 to 14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM
00/00 to 01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.
Sample Card
Location of Laboratory
Sample No.
Date of Sampling
Sampling By
Location/Chainage
Type of Material
Source of Material
Details of Sample
Remarks:-

(EPC Contractor's Rep) (Authority Engineer's Rep)

PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-


Karegaon Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction
KM 0/0 to 14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM
00/00 to 01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.
Sample Card
Location of Laboratory
Sample No.
Date of Sampling
Sampling By
Location/Chainage
Type of Material
Source of Material
Details of Sample
Remarks:-

(EPC Contractor's Rep) (Authority Engineer's Rep)


PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-


Karegaon Phata-Babli Phata-Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction
KM 0/0 to 14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM
00/00 to 01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer's
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

Weather Condition:- Rainfall (mm):- Date :-


DAILY TESTING PROGRAMME FOR QA/QC DEPT.
Sl. No Description of Works Name of Test Location Remarks

(EPC Contractor's Rep) (Authority Engineer's Rep)


PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-Karegaon Phata-Babli Phata-
Bellur to Naigaon to State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction KM 0/0 to 14/815.2) Chaitanya Nagar Shiv Mandir to
Asna Bridge Junction ( KM 00/000 to 03/515.3) Brahmanwada Bypass (KM 00/00 to 01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded,
Maharashtra

Client Public Work Department

Authority Engineer

EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.

Texture Depth
As per MORTH (Section 600),TEST METHOD : TABLE NO. 600-5

Location/Chainage: No. of days

Date of testing: Tested by

Diameter of patch (mm) Avg. of Dia of Surface texture


S.no Date of Laying Date of testing Location patch (mm)
(mm) 31000/d*d
D1 D2 D3 D4 D5

Remarks:

EPC Contractor's rep Authority Engineer's rep


PUBLIC WORK DEPARTMENT, MAHARASHTRA

Engineering Procurement & Constraction Mode , Improvement of Nila Junction-Brahmanwada-Amdura-Malkautha-Balegaon-Karegaon Phata-Babli Phata-Bellur to Naigaon to
State Border MDR-83 in Nanded Dist.1 (Part of Nila Junction To Mugat Junction KM 0/0 to 14/815.2) Chaitanya Nagar Shiv Mandir to Asna Bridge Junction ( KM 00/000 to
03/515.3) Brahmanwada Bypass (KM 00/00 to 01/590) Total Length 19.920 KM) Pkg-EPC-17 ADB ,Dist. Naded, Maharashtra

Client Public Work Department


Authority Engineer
EPC Contractor M/S Shreeji Infraspace Pvt. Ltd.
SURFACE REGULARITY TEST (MoRT&H 5 Rev, Table no - 900-2)
Chainage/Location: Date of Testing
Reading on Reading on
S.No Chainage Offset Side Remarks
Longitudinal direction Transverse direction

Number of surface irregularities


Number of surface irregularities < 7 mm
Description <4 mm
Achieved Permitted Achieved Permitted
For 75 m length of stretch 9 1
For 300 m length of stretch 15 2

EPC Contractor's Representative Authority Engineer's Representative