PUBLIC WORK DEPARTMENT, MAHARASHTRA.

Engineering Procurement and Construction (EPC) for Improvement To Riddhapur-Tiwsa-Anjansighi-Dhamangaon-Devgaon-


Yavatmal Road SH-300 (Section-Tiwsa To Babhulgaon &Dhamangaon Bypass)Km 44+300 To Km 66+250,Km58+100 To
Project Km82+150,Km 85+700 To Km 108+300 & Dhamangaon Bypass Km 0000 To Km 6+560.Taluka Tiwsa and Babhulgaon,Dist
Amaravati and Yavatmal)Totallength-64.600m (EPC-6) ADB
Public Work Department
Client
Authority Engincer M/S Lion Engineering Consultants. Pvt Ltd. Associate with Krushnaji constro.
EPC Contractor M/S ShreeijiInfraspace Pvt. Ltd.
Test Frequency
NO. DESCRIPTION OF TEST Testing Frequency of Test as per Morth Specification
Methods
EXISTING SHOULDER
(A) |Modified Proctor Test IS 2720-Part 8 onetest/1500m3
Grain Size Analysis IS 2720-Part 4 one test/1500m3
(B)
Atter Berg's Limit IS 2720-FPart 5 one test1500m3
(C)
(D) F.S.I Test IS 2720-Part 40 onetest/1500m3
(E) C.B.R IS 2720-Part 16 one test/3000m3

2 oGL
one test/1500m3
(A) Modified Proctor IS2720-Part 8
Grain Size Analysis IS 2720-Part 4 one test/1500m3
(8)
IS 2720-Part 5 one test/1500m3
(C) Atter Berg's Limit
()FS.I Test IS 2720-Part 40 onetest/1500m3
IS 2720-Part 16 one test/3000m3
(E) C.B.R
IS 2720-Part 28 one set of Tests( one set=10 pits )/3000m
F) Field Density test on OGL
Borrow Area
3
Embankmen/Subgrade/Shoulder) IS 2720-Part 8 one test/1500m3
(A) |Modified Proctor Test
(B) Grain Size Analysis IS 2720-Part 4 one test/1500m3

(C) Atter Berg's Limit IS 2720-Part 5 one test/1500m3

(D) F.S.I Test IS 2720-Part 40 one test1500m3


(E) C.B.R IS 2720-Part16 one test/3000m3

(F) Field Density test on Embankment one set of Tests (one set=10 pits)/3000m
IS2720-Part 28
(G) Field Density test on Subgrade IS 2720-Part 28 one set of Tests ( one set=10 pits)/2000m

(H) Shoulder/Hard Shoulder IS 2720-Part 28 one set of Tests ( one set=10 pits)/2000m
4 G.S.B. Test
(A) Modified Proctor Test IS 2720-Part 8 as required
(B) Sieve Analysis IS 2386-Part 1 one test/400m3

(C) Atter Berg's Limit IS2720-Part 5 one test/400m3

(D) Aggregate Impact Value IS 2386-Part 4 as required


(E) C.B.R IS2720-Part 16 as required

(F) Field Density test on GSB IS2720-Part 28 one Tests of /1000m


Initially one set of 3 representative specimens for each source
(G) Water Absorption IS 2386-Part 3
O1supply
w.M.M. Test
(A)Gradation IS 2386-Part 1 one test/200m3
(B) Modifed Prottor IS 2720-Part 8 as required

(C) Atter Berg's Limit IS 2720-Part 5 one test/200m3

(0) A.V IS 2386-Part 4 onetest/1000m3


(E) Flakiness&Elongation IS2386-Part 1 onetest/500m3
(E) FieidDenstyteston WMM IS2720-Pat 28 one set of Three Tests/1000m
Cement testing
(A) F.M
Normal consistency IS 4031 Part 3
(C) intialsetting IS 4031 Part 5
Once for Each Source of Supply and occasionally when called
(D) Final Setting IS 4031 Part 5
for in case of longlimproperstorage Besides, the Contractor
(E) Soundness IS4031 Part 3 also will submit daily test data on cement released by the
7
Compressive strength IS 4031 Part 6 manufactuer
(A) 3 Days
(B) 7 Days
(C) 28 Days
8 Concrete Test
IS 2386 onetest for every day's work of each fraction
(A) Individual Gradation test of CA
IS 2386 one test for every day's work of each fraction
(B) Individual Gradation test of FA
(C) Combined Gradation of Agg IS 2386 one test for every day's work of each fraction

(D) Fiakiness index test IS 2386-Part 1 orne lesi ior every day's worK of each íraction

(E) AIV Test IS 2386-Part 4 one test for every day's work of each fraction
Fineness Modulas one test for every day's work of each fraction_
G) Silt &Clay onetest for every day's work of each fraction
Specific Gravity of C A(20mm +10mm) TS2386-Part 3 one test for source/month
Specific Gravity of FA IS2386-Part 1 one test for source/month
|Water Absorption of CA(20mm+ 10mm) IS2386-Part 3 one test for source/month
Water Absorption of F A_ IS 2386-Part
1 one test for source/monthh
One test per each load at both batching plant site and F
(L) Workability of fresh concrete-slump Test site initially when work starts. Subsequently sampling
done from alternate Vehicle.
10 Compressive strength Test Concrete
Grade M-15(PCC)
(A) |7 Days 1-5 one samples
(B) 28 Days 6- 15 Two samples,
Grade M-20 (PCC) 16 30 Three samples
A) 17 Days 31 50 Four samples,
(B) 28 Days 51 and Above 4 plus one additional sample for each addi
Grade M-20 (RCC) 50 m or piant thereof
(A) |7 Days
(B) |28 Days
|Grade M-25(RCC)
(A)|7 Days
(B) 28 Days
Grade M-30(RCC)
A) 17 Days
(B) |28 Days
|Grade M-40(RCC)
(A) 7 Days
(B) 28 Days
11 DLCTest
(A) Gradation one test for every day's work of each fraction

(B) Flakines index & Elongation Index one test for every day's work of ach fraction

(C) A.I.V. one test for every day's work of each traction

(D) Water absorption as required

(E) |Compressive strength in 7 Days At the rate of 03 Samples for each 1000m or part thereof lai
each day

(F) |Field Density test on DLC IS2720-Part 28 Three Holes of Tests/2000m


12 P.Q.C. Test
(A) Gradation one test for every day's work of each fraction

(B) Flakiness index & Elongation Index one test for every day's work of each fraction
(C) A.I.V. one test for every day's work of each fraction

One test per each dumper load at both batching plant site and
(D) Workability of fresh concrete-slump Test paving site initially when work starts Subsequently sampling
may be done from alternate dumper.

(E) Compressivestrength in 7 Days 2 cubes and 2 beams per 150 cum Or part thereof (one for
(F) Compressive strength in 28 Days day and other for 28 day strength) or minimum 6 cubes and 6 |
(G) Flexural Strength In 7 Days beams per day's work whichever is more.
(H) Flexural Strength In 28 Days
13 Prime Coat Test Three lesis per Day
Tack coat Test
Three Tests per Day
Bitumen Test
Penetration Per Lots Test
2Softening Point Per Lots est
3 Ductility Per Lots Test
4 Viscositv Par Aic T e c t
16 D.B.M. Test

Three tests for stability flow value density and void contents
(A) Marshall Stability (Set) for each 400 tonnes of mix subject to minimum of two tests
per day per plant
(B) Binder Content
(C) one test for each 400mt of dry mix subject to minimum of
Dry Mix Gradation two tests per day per plant
a
(D) Gradation After Extraction
(E) Flakiness & Elongation Indeex one tests per 350M
(E) A.I.V. onetests per 350M
G) L A. V. one tests per 350M
One test for each source and whenever there is change in
(H) Specific Gravity the
quality of aggregate
One test for each source and whenever there is
(1) Water absorption change in the
quality of aggregate
(J) |Core Compaction one test per 700 m
(K) |Individual Gradation
4 0 mm Agg
20MM Agg one set for individual constituent and mixed aggregate from
10 MM Agg dryer for each 400 tones of mix subject to minimum of twvo
4 Stone Dust tests per day per plant
5 Filler/Cement
17 B.C. Test

Three tests for stability flow value density and void contents
(A) Marshall Stability for each 400 tonnes of mix subject to minimum of two tests
per day per plant
(B) Binder Content
(C) Dry Mix Gradation one test for each 400mt of dry mix subject to a minimum of
(D) two tests per day per plant
Gradation After Extraction
(E) Flakiness & Elongation Index
one tests per 350M
(F) A.I.V. one tests pey350M
L (G) L A. V. one tests per 350M

One test for each source and whenever there is change in the|
(H) Specific Gravity quality of aggregate
One test for each source and whenever there is
change in the
Water absorption quality of aggregatee
(J) |Core Compaction
(K) |IndividualGradation one test Der 700 mn
|10 MM Agg
6 mm one set for individual constituent and mixed
aggregate from
Stone Dust dryer for each 400 tones of mix subject to min1mum of two
|FTler/Cement tests per day per plant