Final Quantiy RUANG PERPUSTAKAAN SMA MISBAHUL HALSEL
Final Quantiy RUANG PERPUSTAKAAN SMA MISBAHUL HALSEL
Final Quantiy RUANG PERPUSTAKAAN SMA MISBAHUL HALSEL
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOL SAT SATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 (3x5)
A. PEKERJAAN PERSIAPAN / UMUM
1. Papan Nama Proyek 1.00 Ls 200,000.00 200,000.00
2. Pek. Pembersihan Awal dan Akhir 1.00 Ls 3,611,500.00 3,611,500.00
3. Pek. Pemasangan Bowplank 41.00 M 79,710.00 3,268,110.00
4. Penyediaan Listrik Kerja dan Air Kerja 1.00 Ls 1,600,000.00 1,600,000.00
5. Keselamatan dan Kesehatan Kerja (K3) 1.00 Ls 1,500,000.00 1,500,000.00
6. Administrasi / Dokumentasi / As Built Drawing 1.00 Ls 2,000,000.00 2,000,000.00
Jumlah A 12,179,610.00
B. PEKERJAAN TANAH DAN PONDASI
1. Pek. Pondasi Bangunan
- Galian Tanah 16.32 M3 85,750.00 1,399,440.00
- Urugan Kembali 4.08 M3 61,500.00 250,920.00
- Urugan pasir dibawah pondasi 1.36 M 3
532,300.00 723,928.00
- Anstamping/Batu Kosong 4.08 M3 977,730.00 3,989,138.40
- Pondasi Batu belah camp 1 PC : 5 PS 15.90 M3 1,483,850.00 23,593,215.00
2. Pek. Pondasi Teras
- Galian Tanah 3.25 M3 85,750.00 278,687.50
- Urugan Kembali 0.81 M 3
61,500.00 49,815.00
- Urugan pasir dibawah pondasi 0.33 M3 532,300.00 175,659.00
- Anstamping/Batu Kosong 0.98 M3 977,730.00 958,175.40
- Pondasi Batu belah camp 1 PC : 5 PS 5.56 M3 1,483,850.00 8,250,206.00
Jumlah B 39,669,184.30
C. PEKERJAAN STRUKTUR
1. Pek. Sloof (15/20)
- Beton 1.41 M3 1,532,489.60 2,160,810.34
- Pembesian : 172.81 Kg 30,421.70 5,257,173.98
- Bikisting Dua Kali Pakai 18.80 M2 234,200.00 4,402,960.00
2. Pek. Kolom (15x15)
- Beton 1.12 M3 1,532,489.60 1,716,388.35
- Pembesian : 184.17 Kg 30,421.70 5,602,764.49
- Bikisting Dua Kali Pakai 31.81 M2 431,430.00 13,723,788.30
3. Pek. Balok (12/15)
- Beton 1.13 M3 1,532,489.60 1,731,713.25
- Pembesian : 227.73 Kg 30,421.70 6,927,933.74
- Bikisting Dua Kali Pakai 18.80 M2 444,180.00 8,350,584.00
Jumlah C 49,874,116.45
D. PEKERJAAN ARSITEKTURAL
I. PEKERJAAN PASANGAN DAN PLESTERAN
1. Pek. Pasangan Dinding Batu Batu Camp 1 : 5 128.74 M2 180,350.00 23,218,259.00
2. Pek. Plesteran Dinding dan Kolom Camp 1 : 5 tbl. 1.5 cm 224.84 M2 76,610.00 17,224,992.40
3. Pek. Plesteran Penebalan Camp 1 : 4 tbl. 1.5 cm 19.80 M 2
76,610.00 1,516,878.00
4. Pek. Acian Dinding dan Kolom 211.99 M2 43,625.00 9,248,063.75
5. Pek. Pemasangan Batu Angin 2.00 Bh 78,300.00 156,600.00
Sub total I 51,208,193.15
II. PEKERJAAN PENUTUP ATAP
1. Pek. Rangka Atap Baja Ringan 132.60 M2 433,066.95 57,424,677.57
2. Pek. Atap Gelomabang Spandek 0.3 mm (Warna) 132.60 M 2
215,904.40 28,628,923.44
3. Pek. Nok. Bumbungan Spandek 0.03 mm (warna) 10.60 M1 109,267.60 1,158,236.56
4. Pek. Lisplank GRC 30 cm 46.40 M 1
108,672.00 5,042,380.80
Sub total II 92,254,218.37
III. PEKERJAAN PLAFOND
1. Pek. Rangka Langit-langit (60 x 60) cm, kayu kelas II 118.12 M2 117,105.00 13,832,442.60
2. Pek. Rangka Langit-langit tripleks (120 x 120) cm, tebal 3 mm 118.12 M2 54,915.00 6,486,559.80
3. Pek. List Profil Kayu 72.00 M 1
34,470.00 2,481,840.00
Sub total III 22,800,842.40
IV. PEKERJAAN LANTAI
1. Pek. Timbunan tanah peninggian elevasi lantai 44.10 M3 298,300.00 13,155,030.00
2. Pek. Timbunan pasir di bawah lantai tbl 5 cm 3.60 M3 532,300.00 1,916,280.00
3. Pek. Rabat lantai beton tbl 5 cm 3.60 M 3
1,267,089.03 4,561,520.51
4. Pek. Pasangan Lantai keramik 40 x 40cm 90.00 M2 338,433.00 30,458,970.00
Sub total IV 50,091,800.51
V. PEKERJAAN PINTU DAN JENDELA KAYU KLS I
1. Pintu Dua (daun panel) 1 Unit
- Kusen 0.08 M3 10,960,250.00 876,820.00
- Daun Pintu 2.60 M 2
779,000.00 2,025,400.00
- Kaca 3 mm 1.00 M2 243,851.50 243,851.50
- Kunci Pintu 2 Slaag 0.48 Set 247,750.00 118,920.00
- Engsel 6.00 BH 95,054.00 570,324.00
- Grendel Pintu tanam (atas dan bawah) 2.00 Bh 43,365.00 86,730.00
2. Jendelah J1 (Daun Jendelah) 5 Unit
- Kusen 0.55 M3 10,960,250.00 6,028,137.50
- Daun Jendela 2.70 M2 563,900.00 1,522,530.00
- Kaca Jendela 3 mm 6.55 M 2
243,851.50 1,597,227.33
- Ventelasi Kaca 3 mm (Bouven) 3.93 M2 243,851.50 958,336.40
- Engsel 30.00 Bh 58,365.00 1,750,950.00
- Grendel 15.00 Bh 43,365.00 650,475.00
- Kait Angin 30.00 Bh 50,990.00 1,529,700.00
- Pas. Trali Jendela 15.00 Bh 600,000.00 9,000,000.00
- Pas. Trali Vantasi Jendela 15.00 Bh 300,000.00 4,500,000.00
Sub total V 31,459,401.72
VI. PEKERJAAN PENGECATAN
1. Pengecatan Dinding dan kolom 224.84 M2 44,916.00 10,098,913.44
2. Pengecatan Plafond 118.12 M2 40,136.00 4,740,864.32
3. Pengecatan Bidang Kayu dan Listplank 56.03 M 2
44,570.00 2,497,257.10
Sub total VI 17,337,034.86
Jumlah D 265,151,491.02
E. PEKERJAAN ELEKTRIKAL
1. Pek. Instalasi Titik Lampu 8.00 Titik 210,412.50 1,683,300.00
2. Pek. Instalasi Stop Kontak 1.00 Titik 301,312.50 301,312.50
3. Pek. Lampu Downlight LED 14 Watt 8.00 Bh 205,062.00 1,640,496.00
4. Pek. Pemasangan Saklar Ganda 2.00 Bh 58,992.00 117,984.00
5. Pek. Pemasangan Saklar Tunggal 1.00 Bh 47,112.00 47,112.00
6. Pek. Pemasangan Stop Kontak Tanam (dinding) 1.00 Bh 49,812.00 49,812.00
7. Pas. Box Panel lengkap dengan MCB 1.00 Unit 821,812.00 821,812.00
8. Instalasi Penyambungan Listrik Baru Daya 1.300 VA 1.00 Ls 2,700,000.00 2,700,000.00
Jumlah F 7,361,828.50
F. MEUBELER
1. Meja Perpustakaan 3.00 Bh 5,460,000.00 16,380,000.00
2. Kursi Kerja (Citos) Siswa 23.00 Bh 728,000.00 16,744,000.00
3. Kursi Kerja (Citos) Guru 1.00 Bh 728,000.00 728,000.00
4. Meja Kerja 1.00 Bh 1,202,000.00 1,202,000.00
5. Rak Buku Perpustakaan 4.00 Bh 2,015,000.00 8,060,000.00
6. Tempat Sampah 1.00 Bh 130,000.00 130,000.00
Jumlah F 43,244,000.00
SUB TOTAL 374,236,230.27
PEMERINTAH PROVINSI MALUKU UTARA
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jl. Ki Hajar Dewantara No. 1 - Sofifi
BACK UP DATA
KEGIATAN:
TIM PELAKSANA
SMA ISLAM MISBAHUL AULAD HALSEL
SMA ISLAM MISBAHUL AULAD HALSEL
D A F T A R P E R U B A H A N K U A N T I T A S
CC0-001
### #NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
Jumlah C. #NAME? #NAME? umlah C. Err:504 Err:504 Jumlah C. Err:504 Err:504 Jumlah C. Err:504 Err:504
D. PEKERJAAN ARSITEKTURAL
I. PEKERJAAN PASANGAN DAN PLESTERAN
1. Pek. Pasangan Dinding Batu Batu Camp 1 : 5 M2 128.74 180,350.00 23,218,259.00 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 180,350 Err:504 Err:504 Err:504
2. Pek. Plesteran Dinding dan Kolom Camp 1 : 5 tbl. 1.5 cm M2 224.84 76,610.00 17,224,992.40 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 76,610 Err:504 Err:504 Err:504
3. Pek. Plesteran Penebalan Camp 1 : 4 tbl. 1.5 cm M2 19.8 76,610.00 1,516,878.00 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 76,610 Err:504 Err:504 Err:504
4. Pek. Acian Dinding dan Kolom M2 211.99 43,625.00 9,248,063.75 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 43,625 Err:504 Err:504 Err:504
### #NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
Jumlah I. #NAME? #NAME? mlah I. Err:504 Err:504 Jumlah I. Err:504 Err:504 Jumlah I. Err:504 Err:504
SATUA KONTRAK AWAL P E K E R J A A N ( + ) T A M B A H P E K E R J A A N ( - ) K U R A N G A M A N D E M E N - 01
No. U R A I A N P E K E R J A A N N KUANTIT HARGA SATUAN JUMLAH HARGA BOBOT KUANTI JUMLAH HARGA BOBOT KUANTIT JUMLAH HARGA BOBOT KUANTITA
HARGA AMANDEMEN TOTAL BIAYA BOBOT KET.
UKURA AS ( Rp ) ( Rp ) ( % ) TAS ( Rp ) ( % ) AS ( Rp ) ( % ) S ( Rp ) ( Rp ) ( % )
II. PEKERJAAN PENUTUP ATAP N
1. Pek. Rangka Atap Baja Ringan M2 132.6 433,066.95 57,424,677.57 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 433,067 Err:504 Err:504 Err:504
2. Pek. Atap Gelomabang Spandek 0.3 mm (Warna) M2 132.6 215,904.40 28,628,923.44 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 215,904 Err:504 Err:504 Err:504
3. Pek. Nok. Bumbungan Spandek 0.03 mm (warna) M1 10.6 109,267.60 1,158,236.56 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 109,268 Err:504 Err:504 Err:504
4. Pek. Lisplank GRC 30 cm M1 46.4 108,672.00 5,042,380.80 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 108,672 Err:504 Err:504 Err:504
Jumlah II. 92,254,218.37 #NAME? lah II. Err:504 Err:504 Jumlah II. Err:504 Err:504 Jumlah II. Err:504 Err:504
III. PEKERJAAN PLAFOND
1. Pek. Rangka Langit-langit (60 x 60) cm, kayu kelas II M2 118.12 117,105.00 13,832,442.60 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 117,105 Err:504 Err:504 Err:504
2. Pek. Rangka Langit-langit tripleks (120 x 120) cm, tebal 3 mm M2 118.12 54,915.00 6,486,559.80 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 54,915 Err:504 Err:504 Err:504
### #NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
Jumlah III. #NAME? #NAME? ah III. Err:504 Err:504 Jumlah III Err:504 Err:504 Jumlah III. Err:504 Err:504
IV. PEKERJAAN LANTAI
1. Pek. Timbunan tanah peninggian elevasi lantai M3 44.1 298,300.00 13,155,030.00 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 298,300 Err:504 Err:504 Err:504
2. Pek. Timbunan pasir di bawah lantai tbl 5 cm M3 3.6 532,300.00 1,916,280.00 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 532,300 Err:504 Err:504 Err:504
3. Pek. Rabat lantai beton tbl 5 cm M3 3.6 1,267,089.03 4,561,520.51 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 1,267,089 Err:504 Err:504 Err:504
### #NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
Jumlah IV. #NAME? #NAME? lah IV. Err:504 Err:504 Jumlah IV. Err:504 Err:504 Jumlah IV. Err:504 Err:504
V. PEKERJAAN PINTU DAN JENDELA KAYU KLS I
1. Pintu Dua (daun panel) 1 Unit
- Kusen M3 0.08 10,960,250.00 876,820.00 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 10,960,250 Err:504 Err:504 Err:504
- Daun Pintu M2 2.6 779,000.00 2,025,400.00 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 779,000 Err:504 Err:504 Err:504
- Kunci Pintu 2 Slaag Set 0.48 247,750.00 118,920.00 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 247,750 Err:504 Err:504 Err:504
#NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
- Engsel BH 6 95,054.00 570,324.00 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 95,054 Err:504 Err:504 Err:504
#NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
- Grendel Pintu tanam (atas dan bawah) Bh 2 43,365.00 86,730.00 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 43,365 Err:504 Err:504 Err:504
2. Jendelah J1 (Daun Jendelah) 5 Unit
#NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
- Kusen M3 0.55 10,960,250.00 6,028,137.50 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 10,960,250 Err:504 Err:504 Err:504
#NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
#NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
#NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
- Engsel Bh 30 58,365.00 1,750,950.00 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 58,365 Err:504 Err:504 Err:504
- Grendel Bh 15 43,365.00 650,475.00 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 43,365 Err:504 Err:504 Err:504
Jumlah V. #NAME? #NAME? mlah V. Err:504 Err:504 Jumlah V. Err:504 Err:504 Jumlah V. Err:504 Err:504
VI. PEKERJAAN PENGECATAN
1. Pengecatan Dinding dan kolom M2 224.84 44,916.00 10,098,913.44 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 44,916 Err:504 Err:504 Err:504
2. Pengecatan Plafond M2 118.12 40,136.00 4,740,864.32 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 40,136 Err:504 Err:504 Err:504
3. Pengecatan Bidang Kayu dan Listplank M2 56.03 44,570.00 2,497,257.10 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 44,570 Err:504 Err:504 Err:504
Jumlah VI. 17,337,034.86 #NAME? lah VI. Err:504 Err:504 Jumlah VI. Err:504 Err:504 Jumlah VI. Err:504 Err:504
Jumlah D. #NAME? #NAME? umlah D. Err:504 Err:504 Jumlah D. Err:504 Err:504 Jumlah D. Err:504 Err:504
E. PEKERJAAN ELEKTRIKAL
1. Pek. Instalasi Titik Lampu Titik 8.00 210,412.50 1,683,300.00 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 210,413 Err:504 Err:504 Err:504
2. Pek. Instalasi Stop Kontak Titik 1.00 301,312.50 301,312.50 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 301,313 Err:504 Err:504 Err:504
3. Pek. Lampu Downlight LED 14 Watt Bh 8.00 205,062.00 1,640,496.00 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 205,062 Err:504 Err:504 Err:504
4. Pek. Pemasangan Saklar Ganda Bh 2.00 58,992.00 117,984.00 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 58,992 Err:504 Err:504 Err:504
5. Pek. Pemasangan Saklar Tunggal Bh 1.00 47,112.00 47,112.00 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 47,112 Err:504 Err:504 Err:504
6. Pek. Pemasangan Stop Kontak Tanam (dinding) Bh 1.00 49,812.00 49,812.00 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 49,812 Err:504 Err:504 Err:504
### #NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
### #NAME?
#NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
#NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
7. Pas. Box Panel lengkap dengan MCB Unit 1.00 821,812.00 821,812.00 #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 821,812 Err:504 Err:504 Err:504
### #NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
Jumlah E. #NAME? #NAME? - Err:504 Err:504 - Err:504 Err:504 Jumlah E. Err:504 Err:504
### #NAME?
### #NAME?
#NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
#NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
#NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
#NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
#NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
#NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
#NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
### #NAME?
#NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
#NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
#NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
### #NAME? ### #NAME? #NAME? #NAME? #NAME? Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 #NAME? Err:504 Err:504 Err:504
BACK UP DATA
JENIS PEKERJAAN : A.PEKERJAAN PERSIAPAN / UMUM
ITEM PEKERJAAN :
SKETSA / GAMBAR
Catatan :
PEMERINTAH PROVINSI MALUKU UTARA
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jl. Ki Hajar Dewantara No. 1 - Sofifi
BACK UP DATA
JENIS PEKERJAAN : B.PEKERJAAN TANAH DAN PONDASI
ITEM PEKERJAAN : 1. Pek. Pondasi Bangunan
SKETSA / GAMBAR
Catatan :
PEMERINTAH PROVINSI MALUKU UTARA
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jl. Ki Hajar Dewantara No. 1 - Sofifi
BACK UP DATA
JENIS PEKERJAAN : B.PEKERJAAN TANAH DAN PONDASI
ITEM PEKERJAAN : 2. Pek. Pondasi Teras
SKETSA / GAMBAR
Catatan :
PEMERINTAH PROVINSI MALUKU UTARA
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jl. Ki Hajar Dewantara No. 1 - Sofifi
BACK UP DATA
JENIS PEKERJAAN : C.PEKERJAAN STRUKTUR
ITEM PEKERJAAN : 1. Pek. Sloof (15/20)
- Bikisting Dua Kali Pakai 2 x (T x P) 47.00 0.20 2.00 1.00 M2 18.80 18.80 -
SKETSA / GAMBAR
Catatan :
PEMERINTAH PROVINSI MALUKU UTARA
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jl. Ki Hajar Dewantara No. 1 - Sofifi
BACK UP DATA
JENIS PEKERJAAN : C.PEKERJAAN STRUKTUR
ITEM PEKERJAAN : 2. Pek. Kolom (15x15)
- Bikisting Dua Kali Pakai ((2 x P) + (2 x L)) x T 0.15 0.15 3.79 4.00 14.00 M2 31.81 31.81 -
SKETSA / GAMBAR
Catatan :
PEMERINTAH PROVINSI MALUKU UTARA
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jl. Ki Hajar Dewantara No. 1 - Sofifi
BACK UP DATA
JENIS PEKERJAAN : C.PEKERJAAN STRUKTUR
ITEM PEKERJAAN : 3. Pek. Balok (12/15)
- Bikisting Dua Kali Pakai 2 x (T x P) 47.00 0.20 2.00 1.00 M2 18.80 18.80 -
SKETSA / GAMBAR
Catatan :
PEMERINTAH PROVINSI MALUKU UTARA
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jl. Ki Hajar Dewantara No. 1 - Sofifi
BACK UP DATA
JENIS PEKERJAAN : D.PEKERJAAN ARSITEKTURAL
ITEM PEKERJAAN : I. PEKERJAAN PASANGAN DAN PLESTERAN
1. Pek. Pasangan Dinding Batu Batu Camp 1 : 5 Pas.Dinding - Bukaan 1.00 M2 128.74 128.74 -
2. Pek. Plesteran Dinding dan Kolom Camp 1 : 5 tbl. 1.5 cm Pas.Dinding x 2 112.42 2.00 1.00 M2 224.84 224.84 -
3. Pek. Plesteran Penebalan Camp 1 : 4 tbl. 1.5 cm lxt 24.75 0.80 1.00 M2 19.80 19.80 -
4. Pek. Acian Dinding dan Kolom Pas.Dinding x 2 106.00 2.00 1.00 M2 211.99 211.99 -
5. Pek. Pemasangan Batu Angin buah 2 Bh 2.00 2.00 -
SKETSA / GAMBAR
Catatan :
PEMERINTAH PROVINSI MALUKU UTARA
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jl. Ki Hajar Dewantara No. 1 - Sofifi
BACK UP DATA
JENIS PEKERJAAN : D.PEKERJAAN ARSITEKTURAL
ITEM PEKERJAAN : II. PEKERJAAN PENUTUP ATAP
1. Pek. Rangka Atap Baja Ringan PxL 10.61 6.25 2.00 1.00 M2 132.60 132.60 -
2. Pek. Atap Gelomabang Spandek 0.3 mm (Warna) PxL 10.61 6.25 2.00 1.00 M2 132.60 132.60 -
3. Pek. Nok. Bumbungan Spandek 0.03 mm (warna) panjang 10.60 1.00 M1 10.60 10.60 -
4. Pek. Lisplank GRC 30 cm P x Unit 23.20 2.00 1.00 M1 46.40 46.40 -
SKETSA / GAMBAR
Catatan :
PEMERINTAH PROVINSI MALUKU UTARA
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jl. Ki Hajar Dewantara No. 1 - Sofifi
BACK UP DATA
JENIS PEKERJAAN : D.PEKERJAAN ARSITEKTURAL
ITEM PEKERJAAN : III. PEKERJAAN PLAFOND
1. Pek. Rangka Langit-langit (60 x 60) cm, kayu kelas II Jumlah Total M2 118.12 118.12 -
Dalam PxL 8.00 9.00 M2 72.00
Teras PxL 2.00 9.00 M2 18.00
Tiris PxL 35.15 0.80 M2 28.12
2. Pek. Rangka Langit-langit tripleks (120 x 120) cm, tebal 3 mm Jumlah Total M2 118.12 118.12 -
Dalam PxL 8.00 9.00 M2 72.00
Teras PxL 2.00 9.00 M2 18.00
Tiris PxL 35.15 0.80 M2 28.12
3. Pek. List Profil Kayu Jumlah Total M1 72.00 72.00 -
Dalam p+lx2 8.00 9.00 2.00 M1 34.00
Teras p+lx2 2.00 9.00 2.00 M1 22.00
Tiris p+lx2 3.50 4.50 2.00 M1 16.00
SKETSA / GAMBAR
Catatan :
PEMERINTAH PROVINSI MALUKU UTARA
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jl. Ki Hajar Dewantara No. 1 - Sofifi
BACK UP DATA
JENIS PEKERJAAN : D.PEKERJAAN ARSITEKTURAL
ITEM PEKERJAAN : IV. PEKERJAAN LANTAI
1. Pek. Timbunan tanah peninggian elevasi lantai Jumlah Total M3 44.10 44.10 -
Dalam PxLxT 8.00 9.00 0.50 M3 36.00
Teras PxLxT 2.00 9.00 0.45 M3 8.10
2. Pek. Timbunan pasir di bawah lantai tbl 5 cm Jumlah Total M3 3.60 3.60 -
Dalam PxLxT 7.32 8.32 0.05 M3 3.05
Teras PxLxT 1.32 8.32 0.05 M3 0.55
3. Pek. Rabat lantai beton tbl 5 cm Jumlah Total M3 3.60 3.60 -
Dalam PxLxT 7.32 8.32 0.05 M3 3.05
Teras PxLxT 1.32 8.32 0.05 M3 0.55
4. Pek. Pasangan Lantai keramik 40 x 40cm Jumlah Total M2 90.00 90.00 -
Dalam PxL 8.05 9.05 M2 72.91
Teras PxL 2.05 8.32 M2 17.09
SKETSA / GAMBAR
Catatan :
PEMERINTAH PROVINSI MALUKU UTARA
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jl. Ki Hajar Dewantara No. 1 - Sofifi
BACK UP DATA
JENIS PEKERJAAN : D.PEKERJAAN ARSITEKTURAL
ITEM PEKERJAAN : V. PEKERJAAN PINTU DAN JENDELA KAYU KLS I
SKETSA / GAMBAR
Catatan :
PEMERINTAH PROVINSI MALUKU UTARA
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jl. Ki Hajar Dewantara No. 1 - Sofifi
BACK UP DATA
JENIS PEKERJAAN : D.PEKERJAAN ARSITEKTURAL
ITEM PEKERJAAN : VI. PEKERJAAN PENGECATAN
SKETSA / GAMBAR
Catatan :
PEMERINTAH PROVINSI MALUKU UTARA
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jl. Ki Hajar Dewantara No. 1 - Sofifi
BACK UP DATA
JENIS PEKERJAAN : E.PEKERJAAN ELEKTRIKAL
ITEM PEKERJAAN : -
SKETSA / GAMBAR
Catatan :
PEMERINTAH PROVINSI MALUKU UTARA
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jl. Ki Hajar Dewantara No. 1 - Sofifi
BACK UP DATA
JENIS PEKERJAAN : F.MEUBELER
ITEM PEKERJAAN : -
SKETSA / GAMBAR
Catatan :
AMIRUDIN, ST., M.Hum ABDUL AFANDI H. ABU. ST. MAMUN ISK ALAM ST.
Nip. 19710116200501 1 012 Tim Fasilitator Zona II Ketua Tim
PEMERINTAH PROVINSI MALUKU UTARA
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jl. Ki Hajar Dewantara No. 1 - Sofifi
FINAL QUANTITY
KEGIATAN:
TIM PELAKSANA
SMA ISLAM MISBAHUL AULAD
HALSEL
SMA ISLAM MISBAHUL AULAD
HALSEL
REKAPITULASI VOLUME PEKERJAAN
FINAL QUANTITY
Kegiatan : Pembangunan Prasarana Belajar Sma 0