Professional Documents
Culture Documents
Field Arrival Trials
Field Arrival Trials
Dsv ………….
Client: Location Date Time Started
Desk Checks
Lamp Test OS1 OS2 Button Test OS1 OS2
Manual Control (Take control and select functions sequentially to prove operation)
Prove Forward Thrusters Prove Azimuths Prove joystick heading change
Prove Yaw Prove Sway Prove Surge
Reference Systems
Fan Beam Select as sole reference and prove in rotation Prove in movement Without signal loss
Remarks:
Alarms
Heading (Reduce to 1) Position (Reduce to 1m)
Fail one bowthruster 5 4 3 Fail one Azimuth 2 1
(Stop one of above using bridge emergency stop and one from engine room)
With Controller “A” in control – RESET CONTROLLER A – Seamless changeover to Controller “B”
With Controller “B” in control – RESET CONTROLLER B – Seamless changeover to Controller “A”
Remote Joystick (Transfer control to one remote operator terminal)
Switch “DP/Manual” to Manual – Hold position using survey screen – At least 5 minutes
Remarks:
Senior DPO
Master
Clients Rep
Dive Superintendent