Volumes Follow up Sheet While Cimenting Liner 7''

Rig : TP-223
Well Name : OMP-241
Date: 3/18/2015
Depth : 3336 m

1 VOLUME LOST WHILE CIRCULATION: 0 m3

2 VOLUME RETURNED WHILE PUMPING DIESEL, SPACERS AND CEMENT:

Volume pumped Volume returned Volume lost Return Rate


Stage Description (m3) (m3) (m3) (%)

1
1 Spacer 8 8 100
2 Slurry 12.9 12.9 100

TOTAL AT THE END OF PUMPING 20.9 20.9 0 100

3 VOLUME RETURNED WHILE DISPLACE CEMENT AND SPACERS

Volume pumped Volume returned Volume lost Return Rate


Stage Description (m3) (m3) (m3) (%)

1 laitier 12.9 12.9 0 100


2 mud 30 30 0 100
3 Total 42.9 42.9 0 100

4 After displacement:

Volume pumped Volume Ejected


Stage Description (m3) (m3)

1 laitier 12.9 1
2 Dislacement with OBM 42.9 0

Comment:

* No mud losses observed while circulate cement job


* No mud losses observed while cement job
* Dumped 05 m3 of Spacer + 03 m3 Contaminated Mud ( ES < 200 volt ) after cement job.

Mud Engineer :A. HAMMADI / D.HADDAD