Professional Documents
Culture Documents
GiangLe - SPC Project
GiangLe - SPC Project
x1 x2 x3 x4 ̅X x̿ R
Sample 1 1.98 2.11 2.15 2.06 2.08 2.09 0.17
Sample 2 1.99 2.00 2.08 1.99 2.02 2.09 0.09
Sample 3 2.20 2.10 2.20 2.05 2.14 2.09 0.15
Sample 4 2.18 2.01 2.23 1.98 2.10 2.09 0.25
Sample 5 2.01 2.08 2.14 2.16 2.10 2.09 0.15
X-bar Chart
̅X x̿ UCLX LCLX Colu
2.25 0.40
2.20 0.35
2.15
0.30
2.10
0.25
2.05
0.20
2.00
0.15
1.95
0.10
1.90
1.85 0.05
1.80 0.00
1 2 3 4 5 1
R̅ UCLX LCLX UCLR LCLR
0.16 2.203098 1.966902 0.369684 0
0.16 2.203098 1.966902 0.369684 0
0.16 2.203098 1.966902 0.369684 0
0.16 2.203098 1.966902 0.369684 0
0.16 2.203098 1.966902 0.369684 0
R Chart
Column I Column J Column M Column N
0.40
0.35
0.30
0.25
0.20
0.15
0.10
0.05
0.00
1 2 3 4 5
Stensil Fertilizer and Chemical Company SPC Case
Stensil Fertilizer and Chemical Company produces both organic and inorganic fertilizers. Organic fertilizers are gene
none. The EPA allowable specification is 90 parts per million (PPM). The quality control department at Stensil feels
amount of this contaminant. These two departments, after consulting with the marketing department and the EPA, sug
are in place for this process, use Table 2 to determine whether or not the process remains in control for the week of Se
Table 1
Samples
Date 1 2 3 4 5 ̅X
2 57 54 62 45 36 50.8
3 56 54 47 42 62 52.2
4 40 70 58 45 44 51.4
5 52 58 40 52 46 49.6
6 57 42 52 58 59 53.6
9 62 49 42 33 55 48.2
10 40 39 49 59 48 47
11 64 50 42 57 50 52.6
12 58 53 52 48 50 52.2
13 60 50 41 41 50 48.4
August 16 52 47 48 58 40 49
17 55 40 56 49 45 49
18 47 48 50 50 48 48.6
19 50 50 49 51 51 50.2
20 51 50 51 51 62 53
23 51 50 49 50 50 50
24 45 47 70 46 36 48.8
25 50 35 48 39 47 43.8
26 55 70 50 30 51 51.2
27 49 38 64 36 47 46.8
30 59 62 40 54 64 55.8
31 36 33 49 48 56 44.4
1 50 67 53 43 40 50.6
September 2 44 52 46 47 44 46.6
3 70 45 50 47 41 50.6
40
60
35
50
30
40 25
30 20
15
20
10
10 5
0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 1 2 3 4 5 6 7
Organic fertilizers are generally safe, but inorganic fertilizers are carefully monitored by the EPA due to the presence of hazardou
department at Stensil feels that there is no problem with hazardous material content, which has been averaging just over 50 PPM.
partment and the EPA, suggest that a control chart be set up to monitor hazmat content. Five samples will be tested per day and p
control for the week of September 6—10.
Limit
41.6232
0
R-Chart of Table 1
R R̅ UCLR LCLR
45
40
35
30
25
20
15
10
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
A due to the presence of hazardous waste materials (hazmat). Most bags contain some hazardous content, but theoretically there
been averaging just over 50 PPM. The production department estimates that a substantial investment would be required to lower
mples will be tested per day and plotted as one point on the chart. Use the data in Table 1 to set up the control limits. Then, after
Table 2
Samples
Date 1 2 3 4 5 ̅X
6 63 49 50 45 53 52
7 57 70 45 52 61 57
September 8 45 38 46 54 52 47
9 48 52 39 57 61 51.4
10 45 53 48 46 66 51.6
Sub-sample size(n) 5
A2 0.577 New Process Limit
D4 2.115
D3 0 UCLX 63.5708
x̿ 51.8 LCLX 40.0292
R̅ 20.4
60
50
50
40
40
30
30
20
20
10 10
0 0
1 2 3 4 5 1 2
content, but theoretically there should be
ent would be required to lower the
p the control limits. Then, after the limits
Process Limit
UCLR 43.146
LCLR 0
R-Chart of Table 2
R UCLR LCLR
60
50
40
30
20
10
0
1 2 3 4 5